The document provides a bill of quantities (BOQ) for a construction project including excavation and earth works, concrete works, and masonry works. It lists 17 line items with descriptions of work, units of measurement, quantities, rates, and amounts. The concrete works section accounts for the largest portion of costs, totaling over 526,000 Birr. Overall, the estimated costs for excavation and earth works, concrete works, and masonry works are approximately 98,800 Birr, 526,600 Birr, and 58,100 Birr respectively.
The document provides a bill of quantities (BOQ) for a construction project including excavation and earth works, concrete works, and masonry works. It lists 17 line items with descriptions of work, units of measurement, quantities, rates, and amounts. The concrete works section accounts for the largest portion of costs, totaling over 526,000 Birr. Overall, the estimated costs for excavation and earth works, concrete works, and masonry works are approximately 98,800 Birr, 526,600 Birr, and 58,100 Birr respectively.
The document provides a bill of quantities (BOQ) for a construction project including excavation and earth works, concrete works, and masonry works. It lists 17 line items with descriptions of work, units of measurement, quantities, rates, and amounts. The concrete works section accounts for the largest portion of costs, totaling over 526,000 Birr. Overall, the estimated costs for excavation and earth works, concrete works, and masonry works are approximately 98,800 Birr, 526,600 Birr, and 58,100 Birr respectively.
1.1 Clear off site to remove top soil to a depth of
20cm thick starting from natural ground level M2 200.00 30.72 6,144.00 1.2 Excavation for isolated foundation in ordinary Soil to a depth not exceeeding 2.5m starting M3 129.50 89.15 11,544.67 from Reduced level . 1.3 Trench foundation excavation in ordinary Soil to a depth not exceeeding 1.5m starting M3 45.00 259.56 11,680.20 from reduced level . 1.4 Backfill around foundation with good dry fill material from site and well ram in layers not exceeding 20cm thick M3 47.50 277.31 13,172.13 1.5 Fill under hardcore with selected borrowed material and well ram in layers M3 22.03 277.31 6,109.10 1.6 Cart away surplus excavated material to an appropriate tip M3 96.42 62.70 6,045.73 1.7 25cm thick basaltic or equivalent stone hard core well rolled consolidated and blinded with crushed stones M2 102.33 431.06 44,108.87
TOTAL CARRIED TO SUMMARY… BIRR 98,804.69
2 CONCRETE WORK
2.1 5cm thick lean concrete class C-5, with minimum
3 cement content of 150Kg/m under footing and masonry foundation wall M2 81.80 167.02 13,661.91 2.2 10cm thick reinforced concrete ground floor slab in C-15 with minimum cement content of 3 280 Kg/m well spread and leveled M2 119.37 407.11 48,596.96
Reinforced concrete class C-25, with minimum
3 cement content of 360kg/m filled into form work and vibrated around rod reinforcement. Steel and form work measured separately. 2.3 In footings M3 17.58 4,585.79 80,618.15 TECHNICAL SPECIFICATIONS AND
FLEX BUSINESS Pvt.Ltd.Co. BOQ
NO. JOB DESCRIPTION UNIT QTY. RATE AMOUNT
2.4 In foundation column M3 1.80 4,747.15 8,544.87
2.5 In strap & grade beam M3 6.78 4,585.79 31,091.64
Provide cut and fix in position sawn
zigba wood form work 2.6 To isolated footing M2 47.52 440.66 20,940.35 2.7 To foundation column M2 23.40 440.66 10,311.54 2.8 To strap & grade beam M2 59.92 440.66 26,404.59
Reinforcement steel bars according to structural
drawings. Price includes cutting, bending, placing in position & trying wires
2.9 Diameter 16mm deformed bars Kg 348.15 103.48 36,025.17
2.10 Diameter 14mm deformed bars Kg 1,502.38 103.63 155,694.64 2.11 Diameter 12mm deformed bars Kg 25.59 102.54 2,624.00 2.12 Diameter 8mm deformed bars Kg 863.28 106.64 92,063.63 - TOTAL CARRIED TO SUMMARY… BIRR 526,577.46
3 MASONRY WORK
3.1 50cm thick hard trachytic or equivalent stone
masonry foundation wall bedded in cement mortar mix 1:3 M3 12.50 2,705.15 33,814.35
3.2 50cm thick hard trachytic or equivalent stone
masonry wall bedded in cement 1:3, above NGL exposed face left for pointing. M3 8.25 2,947.42 24,316.18