You are on page 1of 1

J

L
F

K
E
B
A

H
D

M
C
CC2/C E=67
K 94

1.

3.
2.
E=67 T1/P26 N=26 82.313
9457. 59826
N=26 54 .364

LEGEND
59783 1
.398

1
1

4c,1
6

1C 150MM CU/PVC
50m sqmm XL
MATCH LINE P

50MM DIA PVC CONDUIT


m UP
VC p E/SWA/

DRIVING SPIKE
WALLIS : ERCS 20
ipe

YELLOW-GREEN(ECC)
PVC
CH: 625.000

EARTH PIT
4c,16
sqmm

LIGHTING PANEL

4Cx16 MM CABLE
XLPE

ENCASED BY PCC
SHOP DRAWING REFERENCE

Pole Height- 14 Mtrs


CC2/C
K

Pole Height- 18 Mtrs


Pole Height- 20 Mtrs
50mm /SWA/PVC

DESCRIPTION
E=67 T2/P40

C0303-S02-ECH-DS-61001
UPVC

ROAD CROSSING DUCT


9490.
pipe N=26 16

Light Fixture Height- 20Mtrs

Light Fixture Height- 14 Mtrs


Light Fixture Height- 18 Mtrs
55.000
55.000
59791 6

2X120W LED LIGHT FIXTURE


2X120W LED LIGHT FIXTURE
4X120W LED LIGHT FIXTURE
.632

EXISTING STREET LIGHT POLE


CC2/C
K
E=67 T1/P25
9471.
N=26 00
59730 0

NO.C0303-S02-ECH-DS-61002 AND 61009


.070

2
2

38
4c,16 50MM

NOTES
sqmm UPVC
XLPE DUCT
50mm /SWA/PVC
UPVC 4c,1
pipe 6

ABBREVIATIONS
CONTROL CIRCUIT DIAGRAM REFER DRAWING NO.

LIGHT PANEL NO.


50m sqmm XL
m UP P

TYP EARTH PIT DETAIL-A


VC p E/SWA/
ipe PVC

FOR SECTIONS A-A, 1-1, 2-2, 3-3 AND F-F REFER DRAWING

FOR INDIVIDUAL DUCT CROSS SECTIONS REFER DRAWING

4WAY STREET LIGHTING CONTROL CABINET SINGLE LINE &

3
8
7
NO.C0303-GMA-EUT-DS-60286, 60174, 60177, 60178 AND 60179
N: 679322.906

CC2/C
K
E: 2660385.605

E=67 T1/P24

CC1 CKT1 P1
9484.
45

55.000
55.000
N=26 CC2/C
K

EXISTING ROUNDABOUT
59676 9
.742 E=67 T2/P39

DATUM: NEW ABU DHABI DATUM (NADD).


POLE QTY POLE FOUNDATION QTY
9503.

COMING ON MSE WALL)


4c,16
sqmm N=26 62
XLPE 59738 5
.304

POLE NO.

3
3

U.N

CIRCUIT NO.
COUPLER

Nos.
(30 STREET LIGHT POLES Nos.
Nos.
50mm /SWA/PVC

CONCRETE PIT

DRIVING STUD
UPVC

WALLIS:DT 510
WALLIS:ERH 02W
pipe

WALLIS:ERCD 20

WALLIS:ERD 01
WALLIS:ERA 1625

WALLIS:ERU 470
4c,1
6

EARTH BAR EBC-07


TIE-IN TO EXISTING ROUNDABOUT

ROD TO TAPE CLAMP

ACHIEVE REQUIRED
50m sqmm XL

INSPECTION HOUSING
P
EXISTING STREET LIGHT POLES

m UP

ROD TO CABLE CLAMP


VC p E/SWA/
P

WRAP WITH DENSO TAPE


ipe

CONNECTING TO NEXT PIT

RESISTANCE FOR SYSTEM


20X1200mm SOLID COPPER
- TY VC

1. ALL DIMENSIONS SHOWN IN METERS UNLESS NOTED OTHERWISE.


DRIVEN TO THE GROUND TO
EARTH ROD WALLIS:ERC212,
E=67

WHICH IS LESS THAN 20 OHM


P DE 93
T

1CX70mm2 CABLE FOR LOOPING


AIL-B N=26 27.354

ROW
60374
LIMT OF WORK .445
E=67
B

ER FENCE

MSE WALL
CC2/C A A 9344.
K CC2/C START CH: 0+000 N=26 61
E=67 T1/P23 E=67 60378 3

CARRIAGEWAY
TO B .
9497. E=67 KT2/P38 N
930 RE E 17.702 TO B 382
=

2. GEODETIC REFERENCE SYSTEM: PROJECTION: UTM 39N,SPHEROID: WGS 84, HEIGHT


91 95 E

55.000

PROPOSED ROAD
N=26 PROP 26603 9.463 LOCATED

55.000
59623 8
.414 N=26 17.084 OSED 65.07
5 SLD-01 RELO
C

PROPOSED LOCATION
59684 LOCA

CROSSING STRUCTURE
.976 2x100 T

EXISTING ROUNDABOUT
E=67 ATED

TO BE RE LOCATED POLE
mm U ION

4
4

4c,16 9344.
sqmm
PVC D N=26 031
UCT W
IT 60
GHWEIFAT XLPE (PRO
POSE H PCC PROP 372.662
B

50mm /SWA/PVC
UPVC RD C D -N CC1/
OSED
LOCA

STANDARD
pipe 4c,1 H : 0+ EW) TION
6 11.90
9
E=67 CKT1/P1

KEY PLAN
STRE 9325.
50m sqmm XL N=26 804
m UP P ET LI
G HT
C

VC p E/SWA PAN 4c,16 60374.120

LAYER AS PER RTA


ipe /PVC
E=67 EL CC1 sq
93 50mm mm XLPE
55.000

COMPACTED NATURAL
SOIL FILLING LAYER BY
/S W

AND SURROUND
UPVC

4C,16SQMM XLPE/SWA/PVC
SLD-02

+1C, 16SQMM ECC INSIDE


50MM UPVC PIPE

STONE-FREE BED
DETA N=26 14.756 pipe T A/PVC
600 IL -A
60332
.577 YP D

STAGE 2
CC2/C ETAIL
CC2/C -B
E=67 KT1/P22
95 K E=67
9 44.351 E=67
C

N=26 11.377 E=67 T2/P37


9530. N=26 312.897 93
59570 54 N=26 55.874

55.000
55.000
.087 N=26 60334 60345
59631 3 .299 .252
4c,16 .648

5
5

sqmm 2x100
RUWAIS XLPE CC1/C M
K (EXI S M U PVC

THIS DRAWING
50mm /SWA/PVC TING

500
DUCT
UPVC
pipe
E=67 T2/P10
9322. RD C 2 W
4c,1 N=26 95 H : 0+ W 100mm ITH PCC
D
6 60316 1 47.15
0 UCT)

PAVED ASPHALT
50m sqmm XL .675 CC1/C
m UP P E=67 KT1/P2
VC p E/SWA/ 93

STAGE 1
ipe PVC 4c,16 N=26 55.576
sqmm 60324
XLPE .909
300 200

00
AB
AA
REV

AC
50mm /SWA/PVC
56.000
56.000

250MM,WIDE
CC2 UPVC
pipe 4c,1
6

WARNING TAPE
E=67/CKT1/P21

TYP. CABLE TRENCH DETAIL-B


95 CC2/C 50m sqmm XL
N=26 22.531 K m UP P
59516 E=67 T2/P36
.357 9544.
VC p E/SWA/
ipe PVC

DATE
00

54.826
55.000

N=26

6
6

59578 2 CC1/C
.320
E=67 KT2/P11
93
CH: 120.000

N=26 36.654

CH: 905.000
4c,1 60262
6 .378
CC1/C
50m sqmm XL K

END MSE WALL


m UP P 4c,16
START MSE WALL

E=67 VC p E/SWA sqmm E=67 T1/P3


9

BACKFILLING
ipe /PVC 9369.
28
D

DESCRIPTION
N=26 523.430 UPVC XLPE/SW N=26
59499 pipe T A/P 60270 0
.115 YP D VC +
ETAIL .612

ENCASEMENT)
PCC (CONCRETE
CC2/C
41.855 K -B
E=67 T2/P35

FINISHED ROAD LEVEL


9557.
46
54.000
54.000

CC2/C
K N=26
59524 1
4c,1
6
E=67 T1/P20 .993
9534.
81 SLD-04 50m sqmm XL
m UP P
N=26 CC1/C VC p E/SWA/
59462 3 E=67
95 K P

26/05/2021 ISSUED FOR CONSTRUCTION


16/05/2021 ISSUED FOR CONSTRUCTION
15/03/2021 ISSUED FOR CONSTRUCTION
20/12/2020 ISSUED FOR CONSTRUCTION
.552 ipe T
D

7
7

150 N=26 63.988 E=67 T2/P12 YP D VC


55.000

59509 9349.
86 ETA
.456 N=26 IL -B
2x100 60210 9
.020
55.174

MM U
PCC P
(FUTU VC DUCT
RD C RE D WITH

150 100
H : 0+ U CC1/C
4c,16 908.5 CT)
sqmm 53 E=67 KT1/P4
93

150
X 4c,16
sq N=26 82.494
50mm LPE/SWA 4c,1
150 UPVC /PV 6 1c, 16 mm XLPE 60218
50m sqmm XL sqmm /SWA .254
pipe T C m UP P ECC /P
1000

SECTION :B-B
DETA YP VC p E/SWA/ inside VC +
IL-B ipe PVC 50

RD:CH 0+0+11.909
UPVC mm
pipe
55.000
55.000

NMD
CC2/C

8
8

CC2/C CC1/
K

AM
Drwn Chkd
E=67 KT1/P19 E=67 CKT2/P13
95 E=67 T2/P34 93
55.000
55.000

N=26 48.272 9570. CC1/C


59409 N=26 91 N=26 63.328
60156
.224 59471 9 E=67 KT1/P5
.692 93

100MM UPVC DUCT

AM
.665

Appr

SPK AWS AWS


SPK AWS AWS
SPK AWS AWS
N=26 95.953
60164
4c,16 .926
4c,16
sqmm s qmm
XLPE 4c,1
6 X
50mm /SWA/PVC 50m sqmm XL 50mm LPE/SWA
UPVC m UP P UPVC /PV
pipe VC p E/SWA/ pipe T C
ipe - P 4c,1
6
PROPOSED CENTER LINE

TYP VC DETA YP
DET IL-B
A IL-B 50m sqmm XL
m UP P
VC p E/SWA/
ipe PVC
55.000

CC2/C

9
9

CC2/C
55.000

E=67 KT2/P33
E=67 KT1/P18
95 95 CC1/C
N=26 61.625 N=26 84.379 E=67 KT2/P14
59355 59418
.337 93
54.966
55.000

.905 N=26 76.787


60103
LAYOUT PLAN

.364

ENCASEMENT)
PCC (CONCRETE
BACKFILLING
E=67

CONTRACTOR'S JOINT VENTURE :


9 CC1/C
STRE N=26 591.148 E=67 KT1/P6
ET LI 59321
.506
4c,1
6 94
DETAIL-A

FINISHED ROAD LEVEL

50m sqmm XL N=26 09.412


PANE GHT P 60111
E 679 L CC2 m UP
VC p E/SWA/ .598
N 265 560.806 ipe PVC 4c,16 A A
9333. sqmm
347 XLPE
2x100 50mm /SWA/PVC
150 PCC ( MM U CC2/C
PV K UPVC
4c,

CONC
RETE C DUCT W E=67 T2/P32 pipe
16

ENCA ITH 9597.


83

10
10

N=26
55.000
55.000

RD C SEMENT) 59365 8
H:1+0 .009 4c,1
97 6
m X
PROPOSED CENTER LINE

E=67 .389 25.543 22.323 CC1/


150 100

50m sqmm XL
9567.
8 4c,1 m UP P
6
sqm 50m

N=26 E=67 CKT2/P15


93 VC p E/SWA/
P
m

59315 58
E
55.000

ip e T
150

.650 50m sqmm XL N=26 90.246


m UP P 60050 YP D VC
W

150 VC p E/SWA/ .036 ETA


IL
LP UPV

CC2/ ipe PVC -B


CK SLD-05 SLD-06
E 679 T3/P31
E/S C p
VC

1000 N 265 565.010


A/P ipe

SECTION :C-C

2x100
9302.
406 M
RD CH : 0+47.150

(PRO M UPVC
E

72 POSE
D
DUCT
41.9 RD C
H:1+0 -NEW)
WITH
PCC 4c,16 CC1/C
9 7 .38 sqmm E=67 KT1/P7
42.202 E=67 XLPE 94
9610. 9 /S
SUB-CONSULTANT :

N=26 89 N=26 22.871


60058
59326 1 50mm WA/MDPE .270
.469 UPVC

11
11

pipe
E=67
100MM UPVC DUCT

95
55.000
55.000

N=26 91.747
59321 4c,1
.656 CC1/C 6
E=67 KT2P16 50m sqmm XL
CC3/C 94 m UP P
55.000

STREET LIGHTING ELECTRICAL CONTRACTOR:

E=67 KT1/P48 N=26 03.705 VC p E/SWA/


95 59996 ip e M DP
CC2/C N=26 94.985 .708 E
K 59307
.565 4c,16
E=67 T3/P29
9489. CC2/ sq mm X
N=26 88 LPE
PMC

E 679CKT3/P30
59265 2
.711 5 4c,1
6 50mm /SWA/PVC
CLIENT

N 265 30.088 50m sqmm XL UPVC CC1/C


P pipe
PROJECT

9279. m UP
835 E=67 KT1/P8
VC p E/SWA/
ipe PVC 94
E=679473.947

N=26 36.330
N=2659254.020

60004
.942
12
12

BACKFILLING

ENCASEMENT)
PCC (CONCRETE

CC3/C
K
FINISHED ROAD LEVEL

E=67 T1/P47
55.000
55.000

9608. 4c,1
N=26 45 CC1/C 6
59254 4 E=67 KT2/P17 50m sqmm XL
.239 94 m UP P
55.000

VC p E/SWA/
N=26 17.164
59943 ipe P
- TY VC
LIMT OF WORK

.381
150 F F P DE
T AIL-B
4c,1
6
1
1

50m sqmm XL
m UP P
ENGINEER

VC p E/SWA/
150 100

ipe PVC CC1/C


K
E=67 T1/P9
150

9449.
7
13
13

N=26
150 59951 89
.615
SECTION :D-D

CC3/C
1000
RD CH : 0+908.553

E=67 KT1/P46
96
55.000
55.000

N=26 21.918 CC2/C


59200
.913
ER EMBANKMENT
ER ROW

ER RAIL ALIGNMENT

OBR AT RAIL CH128+716


PROPOSED STUCTURE
ER FENCE

E=67 KT1/P28
94
N=26 30.623
55.000

59890
.053
4c,1
6
50m sqmm XL
P
0

m UP
100MM UPVC DUCT

VC p E/SWA
ipe /PVC
10
2
2

ETIHAD RAIL NETWORK

14
14

CC2/C
E=67 KT2/P42
94
20

N=26 63.248
CC3/C 59898
.287
E=67 KT1/P45 CC2/
C
96
3

30

N=26 35.372 E=67 KT1/P27


3

9444.
54.999
54.999

59147 08
.584 N=26
59836 2
.726
1 : 1 000 SCALE BAR
40

TO
55.000

NOTES:

GHWEIFA 4c,16
T
BACKFILLING

sqmm
XLPE
ENCASEMENT)
PCC (CONCRETE
E: 679665.544

50mm /SWA/PVC
01 OF 01
SHEET No
50 M
N: 2659028.121

UPVC
pipe
DRAWING No
FINISHED ROAD LEVEL

DRAWING TITLE

E=67
9
PROJECT STAGE

15
15

N=26 447.970
59817
150 .708 35.417
BIN HAFEEZ CH: 3+523.029

CONSTRUCTION

CC3/C CC2/
KT1/P
44 SL FE
EDIN SLD-03 E=67 CKT2/P41
E=67 94
96 G DU
C
2-WA
Y N=26 76.707
N=26 48.846
SCALE

AT RO T(FUTUR 200 Ø 59844


150 100

STRE 59094 E DU .960


E .260 AD C
H : 0+ CT
55.000
55.000

PANE T LIGHT 581.2 )


150

40
AS SHOWN

C0303-S02-ECH-DS-61001

E=67 L CC3
E

150
DUCTS WILL SUBMIT INDIVIDUALLY
55.000

N=26 9664.641 CC2/C E=67 TO RUW


94
59034 4c,16 K AIS
TIE-IN TO BIN HAFEEZ PERMANENT WORKS

.513 sq E=67 T1/P26 N=26 82.313 JUNCTION


1000 50mm mm XLPE
/SWA
9457.
54
59826
.364
SECTION :E-E

UPVC N=26
1. CROSS SECTIONS FOR ROAD CROSSING

pipe /PVC 59783 1


.398
RD CH:1+097.389

16
16

4c,1
6
A1

50m sqmm XL
P
E

MATCH LINE m UP
VC p E/SWA/
ipe PVC
ETIHAD RAIL STAGE 2 & 3 PROJECT C0303 - PACKAGE 2A

CH: 625.000
REVISION
00

CC3/C
FOR INFORMATION
ISSUED FOR ACCEPTANCE

KT1/P
43
100MM UPVC DUCT

4c,16
PROPOSED STREET LIGHTING LAYOUT FOR OBR CH 128+716

LIMT OF WORK E=67


9662. s qmm
ORIGINAL SIZE

N=26 309 XLPE CC2/C


END CH: 1+400.058 59040
.933 50mm /SWA/PVC K
UPVC E=67 T2/P40
J

L
F

K
E
B
A

H
D

M
C

pipe 9490.
166
55.000
55.000

You might also like