Professional Documents
Culture Documents
Peneguhan penyelesaian
D
8-9-10.
Retaining work along the Fl race
track at lmola carried out by using
soil type reinforced Green
Terramesh•, lmola-ltaly.
8-9-10.
Kerja membina tembok penahan di
sepanjang trek lumba F1 di Imo/a
dijalankan menggunakan Green
Terramesh• diperteguh jenis tanah,
Imo/a - /tali.
Concrete abutment
1---==----:---------===----r-,-..,...,..J.-,----
L Steel deck for bridge crossing
0.15m-Q=(..,l=Q,i.t:,'-�-�--_:__.::.._______
'--
'--
'--
Compacted 7.0m
'-- Granular Fill TM475 6 (14 nos)
'--
,__
'--
'--
Railway I__
track
'-- IE
-------6.0m -------
Metallic
reinforced Reinforcing
rods metallic rods
Single factory-made unit, folded Single factory-made unit, folded and ready to place
and ready to place in position. in position, including the revegetation matrix, an
additional welded mesh panel, triangular
reinforcing steel brackets.
Unit in position, opened out along the Unit in position, opened out along the
folded corner. folded corner to the required slope.
.
• • Ge/ongsoran
Retaining walls
• Tembok penahan
Sinking
• Benaman
Report
It is possible to issue a report which Laporan
summarizes all projects and results data. Laporan yang memberikan ringkasan
The Report is saved in a Word file. tentang semua projek dan data hasil
boleh dikeluarkan. Laporan ini disimpan di
dalam fail yang menggunakan atur cara
Word.
.. .
lJO.O(J
Js.oo
.. .
ll,oo
11.00
r
O.Jo
o,oo
J•.oo
..
o.oo
1,.00
i,.oo
•.o0
o.Jo
.
·I'
o.oo
>•.oo
ou•'''
........
O,Of
.:�.'.*\',,,.,.,,',
...............
>•.oo •.u
"·"'
. n:,,✓
•• .,
,,
. ::::········· \Oll•'l
',
...•
· t,a,,,.,,' u.o0 ,,,,
.
......,.
o.o0
•,,o
....
...···•.........
....
....
t,JI
.. .. ................ .
'*• •t-.,
•u ',, ..,
..... ········· , , ,'
"1l.\J'A Pa
o•lt.at
.....,.
,.,
0-..d,,c.1 ..
, r-.r11
lt,Jt ,.,
26-27.
Slope repair works
using 45• angle Green
Terramesh• reinforced soil
system for TNB Sub
Station at Cembong,
Negeri Sembilan -
Malaysia.
26-27.
Kerja-kerja pembaikan
cerun dengan 45• Sistem
Green Terramesh• untuk
TNB Sub Station di
Cembong, Negeri
Sembilan - Malaysia.
34-35. Sistem Terramesh di Jombong emas Batu Hijau, Pu/au Sumbawa - Indonesia.