You are on page 1of 20

The reinforcement sol-utions

Peneguhan penyelesaian
D

8-9-10.
Retaining work along the Fl race
track at lmola carried out by using
soil type reinforced Green
Terramesh•, lmola-ltaly.

8-9-10.
Kerja membina tembok penahan di
sepanjang trek lumba F1 di Imo/a
dijalankan menggunakan Green
Terramesh• diperteguh jenis tanah,
Imo/a - /tali.

6 Maccaf�rri Terramesh"' System


11-12. Slope stabilization with Green Terramesh• System,
Jalan Pintas along Sangi - Semenyih, Selangor.

7 7 - 7 2. Penstabilan cerun dengan menggunakan Sistem Green Terramesh•,


Jalan Pintas di sepanjang Bangi - Semenyih, Selangor.

Concrete abutment
1---==----:---------===----r-,-..,...,..J.-,----
L Steel deck for bridge crossing

0.15m-Q=(..,l=Q,i.t:,'-�-�--_:__.::.._______
'--
'--
'--
Compacted 7.0m
'-- Granular Fill TM475 6 (14 nos)

'--
,__
'--
'--
Railway I__
track
'-- IE
-------6.0m -------

13-14. 7m high Terramesh• bridge abutment, KM2.5,


Jalan Sungai Buaya, Hulu Selangor - Malaysia.

7 3- 7 4. Tembok landas jambatan Terramesh•


setinggi 7m, Km2.5, Jalan Sungai Buaya,
Hulu Selangor - Malaysia.

Maccaferri Terramesh System 7


Diaphragm TERRAMESH• GREEN TERRAMESH"
Double twisted wire mesh Double twisted wire mesh

Metallic
reinforced Reinforcing
rods metallic rods

Reinforcing welded Erosion control


wire mesh element

Single factory-made unit, folded Single factory-made unit, folded and ready to place
and ready to place in position. in position, including the revegetation matrix, an
additional welded mesh panel, triangular
reinforcing steel brackets.

Unit in position, opened out along the Unit in position, opened out along the
folded corner. folded corner to the required slope.

Partition panels (diaphragms) Opening and pivoting of the triangular


attached by wiring on the edges. supporting brackets.

Gabion portion filled with stone, and lid


wired down. Geotextile positioned and
Backfilling up to desired level.
backfilling commenced.

Folding of the face upper side. Placement of the next


Placing next unit on top.
unit and attaching by stainless steel rings to the
unit below.

Maccaferri Terramesh• Systen1 9


Possible checks Pemeriksaan yang boleh dilaksanakan
(using Janbu or Bishop methods) are: (menggunakan kaedah Janbu atau
Bishop) ialah:
• Surface stability
• Internal stability • Kestabilan permukaan
• Global stability • Kestabilan dalaman

• Sliding • Kestabilan sejagat

.
• • Ge/ongsoran
Retaining walls
• Tembok penahan
Sinking
• Benaman
Report
It is possible to issue a report which Laporan
summarizes all projects and results data. Laporan yang memberikan ringkasan
The Report is saved in a Word file. tentang semua projek dan data hasil
boleh dikeluarkan. Laporan ini disimpan di
dalam fail yang menggunakan atur cara
Word.

.. .
lJO.O(J
Js.oo

.. .
ll,oo
11.00

r
O.Jo

o,oo
J•.oo

..
o.oo
1,.00
i,.oo

•.o0
o.Jo

.
·I'
o.oo
>•.oo
ou•'''

........
O,Of

-: .-:.- .-/-/·/•:-::-:-: ;�.:r· ·;


JJ.o o
U,oo a11•'' � :::: :�✓-•,:
u...
o.oo
O,Jo '�:-;:.,,..,,' u ...
\ u...
....
.. .
.'·. \�'•'' . /Q/-•
t'
o.oo

.:�.'.*\',,,.,.,,',
...............
>•.oo •.u

"·"'
. n:,,✓
•• .,
,,
. ::::········· \Oll•'l
',

...•
· t,a,,,.,,' u.o0 ,,,,

.
......,.
o.o0
•,,o

....
...···•.........
....
....
t,JI

.. .. ................ .
'*• •t-.,
•u ',, ..,
..... ········· , , ,'
"1l.\J'A Pa
o•lt.at
.....,.
,.,
0-..d,,c.1 ..
, r-.r11

lt,Jt ,.,
26-27.
Slope repair works
using 45• angle Green
Terramesh• reinforced soil
system for TNB Sub
Station at Cembong,
Negeri Sembilan -
Malaysia.

26-27.
Kerja-kerja pembaikan
cerun dengan 45• Sistem
Green Terramesh• untuk
TNB Sub Station di
Cembong, Negeri
Sembilan - Malaysia.

28-29. Slope repair with extension works for a house owner in


Taman Melawati, 8.4m high Green Terramesh• Wall -
Malaysia.

28-29. Membaiki cerun dengan kerja-kerja pembesaran untuk


pemilik sebuah rumah di Taman Melawati, Tembok
Green Terramesh• setinggi 8.4m - Malaysia.

lv1accaferri Terramesh19 System· 15


34-35. Terramesh System in Batu Hijau gold mines, Sumbawa - Indonesia.

34-35. Sistem Terramesh di Jombong emas Batu Hijau, Pu/au Sumbawa - Indonesia.

36-37. Reinforced hill slope by using Terramesh•.to build a 7m high wall at


Federal Route 8. Kuala Krai, Gua Musang Road, Kelantan.

36-37. Memperteguhkan cerun bukit dengan menggunakan Terramesh• untuk membina


tembok setinggi 7m di Laluan Persekutuan 8, Kuala Krai, la/an Gua Musang, Kelantan.

38. East-West Highway at KM23, a 9m high


Terramesh• wall - Malaysia.

38. Lebuh Raya Timur-Barat di Km23, tembok


Terramesh• setinggi 9m - Malaysia.

Maccaferri Terramesh" System 17


Maccaferri Asia (Exports) Maccaferri (Malaysia) Sdn. Bhd. Maccaferri Indonesia, PT Maccaferri (Philippines), Inc. Maccaferri India Siam Gabions Co., Ltd.
Tel : + (60-3) 7957 8330 Tel : + (60-3) 7955 7800 Tel : + (62-21) 750 6555 Tel : + (63-2) 889 0623 e-mail : info.in@maccaferri.com Tel : +(66-2) 642 3307
Fax : + (60-3) 7957 9080 Fax : + (60-3) 7955 7801 Fax : + (62-21) 750 6553 Fax : + (63-2) 889 0346 www.maccaferri.com/in Fax : +(66-2) 642 3309
e-mail : info.asia@maccaferri.com e-mail : info.my@maccaferri.com e-mail : info.id@maccaferri.com e-mail : info.ph@maccaferri.com e-mail : info@siamgabions.com
www.maccaferri.com/asia www.maccaferri.com/my www.maccaferri.com/id www.maccaferri.com/ph www.siamgabions.com
www.maccaferri.com/my

You might also like