JOB NO: GT/3.0/271/2021 SOIL INVESTIGATION REPORT FOR EXISTING DEPOT AT PERAI, PULAU PINANG FOR INFINITY LOGISTIC & TRANSPORT SDN. BHD. FINAL REPORT - OCTOBER 2021 BHD. (531298-W) NO. 2, JALAN KASUARINA 8, BANDAR BOTANIC, 41200 KLANG, SELANGOR DARUL EHSAN. TEL: 03-3101 2926 (EXT: 333) FAX: 03-3101 3926 NITY LOGISTICS & TRANSPORT SDN. CONSULTING ‘S-3-10, THE GAMUDA BIZ SUITES NO. 12, JALAN ANGGERIK VANILLA 31/99 KOTA KEMUNING, SEKSYEN 31. 40460 SHAH ALAM SELANGOR DARUL EHSAN. TEL: 03 - 67346072 FAX: 03-5525 2781 PROJECT : EXISTING DEPOT AT PERAI, PULAU PINANG FOR INFINITY LOGISTIC & TRANSPORT SDN. BHD. JOBNO — :GT/3.0/271/2021 CERTIFICATION : Thereby confirm that the soil investigation for this project was supervised by me or under my direction and supervision and comply with the relevant standards and codes of practice by Jaw and regulations. VERIFIED BY, Name Ir Shazri Shuib NRICNo. 610726 - 08 - 6279 P.Eng.No: 17968 prom GAGASAN TEGUH SDN, BHD We Dri Deep for Solutions Introduction, Scope of Work Sub-Surface Exploration .. Standard Penetration Test Soil Sampliny Groundwater Table Monitoring Soil Descriptio! Laboratory Testing Engineering Borehole Logs Laboratory Test Results Photographs Plan INTRODUCTION ‘This report presents the results of The Soil Investigation Work For Existing Depot At Perai, Pulau Pinang For Infinity Logistic & Transport Sdn. Bhd. The main objective of the works is to investigate the subsoil conditions of the site and to collect relevant geotechnical parameters for foundation design. The Client is Infinity Logistics & Transport Sdn. Bhd. Gagasan Teguh Sdn. Bhd. was appointed as the Site Investigation Specialist. The Consulting Engineer is ISP Consulting. SCOPE OF WORK The scope of work comprises two (2) nos. of deep borehole, insitu tests, soil sampling, groundwater level monitoring and selected laboratory testing. The field works (23/09/2021 - 03/10/2021) were carried out with the respective equipment as described as follows. SUB-SURFACE Sub-surface exploration was carried out using a multi-speed EXPLORATION YWE D90-R wash boring rig operated by our experienced locally-trained driller. Casing NW size (89mm dia.) or HW size (100mm) was lowered into the borehole to prevent collapse of the borehole wall. Water was circulated with YWE-D90-R Piston Pump into the Boreholes to wash up samples for visual examination by our supervisor. If rock encountered, rock coring using an NMLC size with core barrel with diamond bit will be carried out. The normal drill run shall be 1.50m with core size of 54mm diameter. STANDARD PENETRATION TEST SOIL SAMPLING GROUND WATER TABLE MONITORING The Standard Penetration Test (S.P.T.) was carried at 1.5 m intervals until the termination of the borehole or hitting rock. The S.P.T. is carried out accordance with test No.19, BS.1377 : 1990. Basically, the test was conducted by dropping a self tripping hammer of 63.5kg from a fixed height of 76cm (+2cm) and 75mm markings are made on the extended rod, According to BS 5930 the number of blows for initial 15 cm was recorded as the seating drive. The N- value is the number of blows to penetrate the subsequent 30cm, Nevertheless, if the number of blows ever reached 50 in test drive, the test. was terminated and the corresponding penetration recorded. Cohesive Soi N-Blows Description 0-2 Very Soft 2-4 Soft 4-8 Firm 8-15 Stiff 15-30 Very Stiff >30 Hard Non Cohesive Soil N-Blows _ Description o- 4 Very Loose 4-10 Loose 10-30 Medium Dense 30-50 Dense >50 Very Dense Disturbed soil samples were extruded from the split-spoon sampler and sealed in air-tight double layered thick-gauge plastic bags. Undisturbed samples were obtained by jacking thin-walled tubes into soft cohesive layers and mazier sampler is used for stiffer soil layer. All samples were duly labelled and sampling tube are promptly sealed with paraffin wax to prevent any loss of moisture and stored before despatch to an approved laboratory for tests. The measurement of groundwater table in the borehole was taken once before work commenced in the morning and once after work stopped in the afternoon. These levels were recorded. SOIL DESCRIPTION (BS 5930: 2015 - Item 33.4.4.5) ma GAGASAN TEGU P weo il Deep for Solutions naa 1 JH H Table 17 : Terms For Mixtures Of Coarse And Fine Soils Term Principal soil | Approximate proportion of type secondary constituent Coarse soil | Coarse and/or fine soll slightly clayey or slightly silty - 5% andlor slightly sandy or sightly | SAN ‘gravelly andlor clayey or sity andfor sandy or | GRAVEL 5% — 20%” aravelly very clayey or very sity andlor 220% very sandy or very gravelly very sandy or very gravelly UTS 365%" = sandy or gravelly or 35% - 659% slightly sandy and/or sightly gaye 35% gravelly "9" Or desctibed as fine Zoll depending on enginesting behaviour © Or described as coarse soil depending on assessed engineering behaviour Can be sity CLAY or clayey SILT. LABORATORY ‘The Standard Penetration Representative samples were sent to TESTING an approved laboratory for the following tests :~ (i) Moisture Content (Part 2: Method 3.2) (ii) Atterberg Limits (Part 2 : Method 4.5) (iii) Particle Size Distribution (Part 2 : Method 9.3 & 9.5) (iv) Unconsolidated Undrained Triaxial (Part 8 : Method 7) (v) Consolidated Undrained Triaxial (Part 8 : Method 7) — GAGASAN TEGUH SDN BHD LP wwe or Deen for Solutions Page | 4 ENGINEERING BOREHOLE LOGS G GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG Sienintisie: ‘Sheet | of 3 Iron» SOLVESTEATION WORKS FoR ESTO DEATH PER PLAY PNG FOR NFAT LOOT R ‘rantronr son wwste BHA Lecton__: ATPERL PAPA fw: BFWWTY.GUSTES 8 TRANSFERT SON BNO Ripe WOR [eowda w= sit + 100m emu consume Josie =u an . lene = canons bmn craaarimsn cman «ww ered brah = ser a sao aR aliens oo fe pas See oa] | Ta | | ' [Sancta " iyasye yey pe fees] Earner “ a |(Seseecad bese materab) 5450, sere : E, | feeemmeman = gee legs |=] pee wm] wom) 01) 0/0 /e/0 . E | (SSE ma " Mass] feee dy fe a i Iheaene niet Seng aw | me [orn | Mat, [ane SEE cmwecors a Lin |e peep pono 2 Sete EE Se fe | om [ne Pn Ee Wirerelopmy a Be | a Pes [en M2 Mae Sig 8-15 Sew aoas | 100 ae ese fsSo Seow RCH Rock Corina a how see bare ; Ne Netter + exigent ee a css A G GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG SOIL NVESTIGATION WORKS FOR ENISTING DEPOT AT PERAl PULAU PINANG FOR IMFNTY LOGISTIC & Prowet_ ron Son an lowtsene BH-1 locaton + AT PERAL PULAU NANG leet IFBVTYLOOISNES TRANSPORT SON BHO [hg Type > TwEOmR [cowanat NI> jwewrenl : 100m lieve. __: Grorsas coona Tipe: reseetont overasn _oxioaaes SAUURGCETAL | Pein Fi Osean tras ay [Serpe] Des] a= [7575 75757575 Fa baie seve recolffzmlan |i rs os 6 Soda] eco -froeegaseles|e es + E> Pea oe foveal] maw)on) 9 4 2 5 4 6 | ea vaya NOE) Medan ate sn | 3000 Oem Co vost 16-20 oyu | "20° Soy Sense WOR Rosccoms =o, Hor Nove natn Faepeleo asain ai ainsi Fi G GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG We Dt De Fer Soa sheet 012 Su, AVESTICATON WORKS FOR ESTING DEPOT AY PERL PULAD PHANG FOR FT LOGIT Print SpSPORT SON lene were BH-1 Location _: AT PERAL PULAU NANG. (cam: NFINTY LOGISTICS & TRANSPORT SON BHD [esas Wow: 300m [comutint : ISP CONSULTING © lonesat > oarorvat lobo. Grmaraieat Ietucetavt loners = _oaroranat ens, (nT TROT eth Ramee nro] re) | Lene | entre weap din Tate ot Sten tou | time Jenene | eee, [Bama ae St a ae int | 24 fo z= ozo oz Vervsoh | O74 Very oun ‘Superior no Very Si [ener > extn oun oer GAGASAN TEGUH SDN BHD We Dri Dep Fr soho ENGINEERING BOREHOLE LOG SOIL INVESTIGATION WORKS FOR EXISING DEPOT AT PERN, PULAU FINANG FOR INFINITY LOGISTIC & TRANSPORT SON. BHO, INERT LOGISTICS & TRANSPORT SON BHO Ise CONSULTING feat lcaing Type lovwnsnne: BH-2. 16m Decent Sat ton [Fewse wr nor oe ace [used se meas) Icon 1429 Seen sem) fro Sates seree 8 eves Ussattnd soe Eo em Wine Sear est [553° very sur Vater wore ~ exsng gourd eer G GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG etn areas Sheet ot 3 va, SOIL NVESTIOATIN WORKS FOR EXISTING DEPCT AT PERA PULAYPRANG FOR WFNTY LOGISTIC & le SranPonT son BHD” lemiene BH-2 [eet wer LocieT¢s a TRANSPORTSON BNO hwiipe 7 TweomRoowenae Ww sm boone, eracrineat [mins Type bet loners = toa owe mtn 5 to [Sect oon] eminent | Ls a orf zaplox |e ae a a af | | a rsoopplatealans|e «a 23a) | we Le Prowl zal rola 8 3 4 6 a / = woot zenlon|s s «se al | w| E a =f fowon | mam ex ]s 2) 42/2] | of [ Leteeamany : a | ee [Sep oe makes). ™ (assy ]*i°\°]7 er) | | a 1) rr lee xe LN lea baa, oe|p}wealon |e esr 0 r] | a 7 paz | | Ta bette oapfzaa] ms se se a] | a i ia fe oar Heal ee JPasoa1|(7)| s9s00] 100%] 6 4 6 7 9 8) ~ Poe ae eal Le Losey oor ae | time | Boren | at, erase mt) HVA) 50 120 = 5 Biowe/120 men essai > GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG ‘SOIL INVESTIOATION WORKS FOR BUSTING DEPOT AT PERN, PLA PHANG FOR NFWaTY LOGISTIC & Froeet TRANSPORT SON BHO. lawisene BH-2 [cet NFRITY LOGISTICS & TRANSPORT SON BHD [Ripe YWEDEOR ewan Wi Jeemimet 145m [emer ssp consume ont ates: may at e Joesee = anranat ag SAIPLNGDETAL | Periten Fal_[ —W TRF frie Desrpon of Sta eg [Benpe | Oepr] Rar [75 7575 7675 7 Fal oS Shab grae ‘ae ate oe | tm |taae ot cass cena sr ano oa Peper | oa eee Se oe ie Se | | Sis saree 7 i Jis-20 Very sun | “20” Very Dense eee CEH Rock Gonna a we Rete bee N= Noe Bews!0Qmn Extng wourti aero o jad LABORATORY TEST RESULTS PART 1 - CLASSIFICATION TEST a I a z a a & a 4 i z o @ < i a ra © g 5 a i EXISTING DEPOT AT PERAI, PULAU PINANG FOR INFINITY LOGISTIC & TRANSPORT SDN. RED. Ta smngows94n04 anion 15364 ) IL RESEARCH LAB ( company No Trae Ta ANNO oF oer i “uriambe ‘UID “7A Aue BG aa i : a z ovrioawoa | s 8 2 eee 3 i eau inn a8 2 Fé Ec ego: f8 ar ae Oe g waza one] «| aos Ea Sree ele ge ° ag toa A 5 0 $ [oan : a i es | Big] i 8 4 ni re eo: 5 une 3 eT] ee £ = EL —a a 2 a TONY : i : © 2 cr 2 2 8 | wos |_| ® ° Z TayW HLONSULS i aur auibr a|s 33 HTESTING DATE: 1-10-2021 ‘Atterberg Limits Determination RECEIVED DATE: 07-10-2021, ‘Casagrande-Three Point Method BS 1377 : 1990 : Part 2 [TESTED BYR. SUBA & a IW. THANA Project [EXISTING DEFOT AT PERAL PULAU PiNANG FOR IPINITY LOGISTIC & TRANSPORT SON. BHO. eye eee Sample No: BH1/ D4 (300-345 m) 40 Posey niece 62 TT Tao TAT POSTE CMT cir Cs 7 TomberofGiove —[wbiows| ve | ee | 31 [ases ot ep Can i 795 Nass conssonewey [wy [ores [47.5] 804 Tow mass cana sontony |) 3190 | 24a] ear 375 “ase af Sr a] 2800 | 1035 [a08s 77 Moss Wate [ig | 2500 [v975[ 1057 or War Cont | wey [110.88 [rons] a0 Em ‘Sample No: BHI! UD2 (7.50-8.00m) 2 Ter Teac PASTE UMIT 500 Variable ais iB Tanterot Bes [vows] 5 [25 | 35 aan Wise afempy can | to) [| are | a6i | 025 Bae a LY Tass Gans sarod | | 26.45, [54.30] 8020 T108 Nass ConssonOm [io | s50¢ [97.37] 3628 106, le | ‘ass oso (| 2605 [ar76| 2509 26 7 a Toss ofWater [co | zor | v6] 14a O38 Ho. oF Blows, et Water Coniet —[-wocp | 7010 [oose| so 781 < Ronn 1480 HAM Aebog Lint Deterinaton REcEnempatevon oem Casaande‘Thee Poin Mod BS 1377, 190; Pat2 [TESTED BY SUA & A fem Pri crm ero Aro uns rover sewer? oam saree : io BAZ! 8 (489-408) , = Tana FEO ee 1 Cs a A 7 j | 7 a, Reet atest apap a } i ) | eae Se 7 bmeatmes a Loe peste —t ‘a iacareaea | of ae [eepent [ne | | Seer eee eee ee aoe pepe ete fe No. of Blows, 7 ‘Water Cortent wom | eae | 55.12] ot30, Er a "] Sample No: BH2/ UD2 (900-9.60m) 7 ras zr ko a } Taare freee eto | rr : mateo Papert fo Tartare orp ae tempest —t re arenrenea [et wer pote tt ce eee aaa eee teeta te : “go | ie pe pee pomp a ection tomes — po Peer teeter] — SSITINORHIDAYAHASRITI ABD HARAID Poses + entwa otro arr euAlPmanc on ror oomnG A HAPORT COLO SIPLENS BAT TOT SSA) Pa ee el ee | SAUPLENO BHT UO21TSO-600m) = f= |= |= kann TETAS = ‘oe ne ua 2m ony |e Teco} pe pw comme | — re eT compe svomo1e0 BY < PARTICLE SIZ DISTRIBUTION GRADATION CURVE. TRITISH STANDARD BS 1577 Pat 2: 1990 ‘SAMPLE NO: BH2 1 D3(4.50-4.95m) —— Papa ep ie ff fen Den [oop Das [ xD es) SAMPLE NO : BH 2 / UD2(9.00-9.50m) = = |S |S eee is be usr — 75 ee 180 HAND LABORATORY TEST RESULTS PART 2 - SOIL STRENGTH TEST UNCONSOLIDATED UNDRAINED —_ frestep BY TRIAXIAL COMPRESSION TEST —_|sit1 NORHIDAYAH (BS 1377: Part 7: 1990) lsINTLABD HAMID SOIL RESEARCH LAB (M) SDN BHD PROJECT EXISTING DEPOT AT PERAI, PULAU PINANG FOR INFINITY LOGISTIC & TRANSPORT SDN, BHO, lSample No. BH2 / UD2 (9.00-9.50m) Date Tested 08/10/2021 [APPARENT COHESION ‘Sample/Specimen No. 2 3 ‘Specimen Dimensions -Dameter | (mm 36.00 38.00 36.00 ~ Area (en) ||__ 1134.07 113417 13417 “Height om 76.00 76.00 76.00 Mass of Sample om 146.44 145.6% 146.87 Moisture Content 4, 35.00 35.00 35.00 Density Bulk gm] 1.688 1701 1704 Or gm’) 1.259 7.260 7262 THMEDIATE TESTS RATE OF STRAIN 152 mmimine ‘Normal Load at Faiure co 0.193 0.223 261 Normal Stress wom 153 176 224 Call Pressure rom 7 140 280, Total Normal Sess am 223 316 501 Stain at Faire % 7118 784 72.50 11 F f Specimen After Failure Typo of Falure 200 5 2 160 Z 100 2 50 8 S68 re ee ee es a ) NORMAL STRESS (kNim®) ‘Approved by NG (eOLOGIsT BSc NS) RESEARCH US Geotechnical Laboratory Faculty of Civil Engineering Universiti Teknologi MARA MALAYSIA 40450 Shah Alam SUMMARY OF CIU TRIAXIAL TEST RESULTS Job Name EXISTING DEPOT AT PERAI, PULAU PINANG FOR INEINITY LOGISTIC & TRANSPORT ‘CONSOLIDATION STAGE. Gel pressure (ar 500.00 560.00 | _ 680.00 Back pressure wa | 440.00 440.00__| 440.00 Effective pressure Pa) 50.00) 7720.00 24000 inllal Pore Water pressure way | 488.00 543.10 | 660.30 Final Pore Water Pressure way | 440.00 420.00 | 440.00 Volume Change on 3.82 4.49 5.18 100 ir 25.00 21.16 36.00 Cost Of Consolidation, 6, ining | 164.00 195.76 113.89 Coeff Of Volume Comp, m, min | 0.42 022 0.12 ik (Calculated) (oy | 211608 | 133608 | 4236.00 Density = Bulk wom) [| _ 1.685 1691 1.683 = by wae’) | 1.161 1.166 1155 Vela Rao 728 128 129) Moisture Content oH 46.32 4637 75.95 Duration Hs) 4.00 252 4.00 TOADING STAGE Col Pressure (ar 500.00 36000 | 680.00 Initial Pore Pressure (way | 440.00 440.00 440.00 intial Effective Confining Pressure (Pay 60.00 7720.00 240.00 Rate OF Strain irom) | 0.080 0.080 0.080 ‘CONDITIONS AT MAX. DEV. STRESS Pore Pressure Ha) 449.70 491.70 573.30 Deviator Stress a) 124.30 166.60, 228.20 Minor Effective Principal Stress (AP) 50.30 68.30 106.70, ‘Strain , 9.85 To.1T 8.86 ‘Mass of Sample After Shearing an, 324-18 32452 S215 Final Moisture Content 0, 46.31 46.37 45.95 Final Density ~ Bulk wom?) 1.685 1691 1683 = by om?) 1151 1.156 1153, Final Vord Ratio 129 128) 1.29 Duration is) 367 367 367 Failure Mode F F iF ‘STRENGTH PARAMETER Total Stress Paramelers Cohesion (170) 35 Angle Of Shearing Resistance (oe) 14 Effective Stress Parameters Cohesion (13) 6 Angle Of Shearing Resistance (00s) 30 Wate 1. OED One End Drainage. PF Pasta cake 280 ‘Sie Drain 5 Inert anaront 2. oF Bite Fare Job: DEPOT AT PERAT, P. PINANG Triaxial Consolidation BoreHole: BH1 Sample: UD2 _Depth:7.5m Volume Chan Re T A Seg v Root Teme ____ 2 [ 4 o er i & Ss L 4 z 6 wo Q] Q at e ca 2 les Ae ‘. ~2F Be 4.6 L cz26 7 A at 4 LE c 4 eee eee obey Eee ee eee Ee EE % a g 72 16 20 24 28 Root Time ( mins ) 9007p Og Press v Roos Tame © g L J ~ Boor 4 ° 8 L 4 ° 2 & 700 4 ® 2 5 é 600 500} em 4 g 72 76 20 24 28 Root Time ( mins ] Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT ATPERAI, P. PINANG Triaxial Undrained Shear BoreHole:BH1 Sample:U02 Depth: 7.5m Oeviator Stress v Axial Strain 250 (kPa ) 200] 150 100 Oeviator Stress 50) 4 po perce cee ee eee 1 % 4 8 12 TS 20 24 28 Axial Strain (%) aaa Pore Press. v Axial Strain (kPa ) 6009] 4 560| Pore Press 520| 480| 44h 4 EB 12 1S 20 24 28 Axial Strain (%) Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT AT PERTAI, P. PINANG Triaxial Undrained Shear BoreHole: BH1 Sample: UD2 _Depth:7.5m Shear Stress v Normal Stress aera tapes oot Tee 500 450 (kPa ) 35 kPa 4 Deg 350 400 Normal Stress 300 250 Condition at Maxintum Dey Stress Cohesi 200 100 150 50 L o S a Shear Stress ( kPa ) a50- 250- 200- 150 Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT AT PERTAI, P. PINANG Triaxial Undrained Shear BoreHole: BH1 Sample: U2 Depth: 7.5m Shear Stress v Normal Stress a T ls L 48 iS r 1 o oS L 43 eS ie Je 8 co? L gs Be 2 se lo E L s 8 2 38 az meee lo L 2 S ied FE 5 2 IS i ee = S ss 3 | 2885 S228 lo r oe = & L F lo r IS L o 3 L lo 8 Renner eaey oS oS oS P g S 8 & a & Sheer Stress ( kPa ) Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT AT PERAI, P. PINANG Triaxial Undrained Shear BoreHole:BHt Sample:UD2__Depth: 7.5m Shear Stress v Mean Stress 200-77 S788, Sires sv Neen stress > — @ & L 4 & ~ 160 4 ® 8 ° b 4 Q 5 © 420 4 5 3 L 4 2 a 8of 4 A 40r 4 1 reaeee gee eee tase) % 40 a0 Teo 160200 240 280 Mean Stress ( kPa ) Reference A B c Init. Cell Press 500 560 680 kPa Init. Pore Press 440 440 440 kPa Loading Rate 0.0800 0.0800 0.0800 mm/min Max Dev Stress 124.3 166.8 228.2 kPa Strain 9.95 10.41 9.66 % Pore Press 449.7 491.7 573.3. kPa Drain correction 0.0 0.0 0.0 kPa Memb. correction 0.0 0.0 0.0 kPa Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT AT PERAI, P. PINANG Triaxial Saturation BoreHole:BHi Sample:U02/A Depth: 7.5m b Value v Time 1.0 2 3 3° 3 5 0 0. oO. 0. 9.9 2 a 6 @ 10 12 14 Time ( mins ) Reterence at “2 a9 Aa as init. ceil Press 0.0 100.0 200.0 300.1 400.0 kre Init. Pore Press 0.0 45.1. 128.1 286.9 390.0 Pe Final ceil Prese 100.0 200.0 300.0 400.0 500.0. Fe Fine) Pore Press 48.4 122.7 204.4 371.5 488.0 KPa Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT AT PERAI, P. PINANG Triaxial Back Pressure BoreHole:BHt Sample:UD2/A_ Depth: 7.5m ) (m Volume Change (kPa ) Pore Press cee cee eee ee eee eee Dee ae ae eee ea 12 14 50 400} 300 200 400} Volume Change v Root Time aaeat lau bea bea! eben EEL ——1— Root Time ( mins ) Pore Press. v Root Time ————+ T Sat AL 6 8 10 i2 14 Root Time ( mins ) Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT AT PERAT, P. PINANG Triaxial Saturation BoreHole: BH1 Sample:UD2/B Depth: 7.5m b Value v Time 1.0 e 8 3 g on oO. 0. ° 0. % 2 4 6 3 70 12 14 Time ( mins ) feterence a: sss 2s Init, ce11 ress 0.0 100.0 200.0 300.0 400.0 499.8 KPa Init. Pore Press 0.0 68.9 183.5 200.2 386.2 404.2 KPa Final cell Press 100.0 200.0 300.0 400.0 500.0 360.0 kPa Finel Pore Press 71.8 157.4 283.1 358.9 04.2 543.1 KPO Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT AT PERAI, P. PINANG BoreHole: BH1 Sample:U02/B Depth: 7.5m Triaxial BackPressure s Volume Change v Root Time a page Se fe o 4 eo 4 4 5 e 5 L 4 £ 6 © & 3 3 2 v 2 4 6 8 10 72 14 Root Time ( mins ) BOG pS eH Tae © é a a ~ ao0- Ba 4 ene 8 3 E 4 e Pret POO fate EHH Ee Feeee eee ceeee eee 4 2 8 L 4 200 Be el 400 B41 4 |_ % 2 4 6 é 10 12 14 Root Time ( mins ) Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT ATPERAI, P. PINANG Triaxial Saturation BoreHole: BH1 Sample: U02/C Depth: 7.5m b Vi v ie alue_v Time ® 8 @ $ aol es 0. 0. 25 a 3 72 16 20 24 28 Time ( mins } eterence ct co cc cee mit, cel press 0.0 100.0 200.0 300.0 400.0 500.0 KPa Init. Pore Prese 0.0 77.7 164.8 285.7 386.4 483.9 KPa Fine! cei} Press 100.0 200.0 300.0 400.0 500.0 600.0 kPa Fine Pore Press 62.5 150.4 274.8 379.8 483.5 581.8 KPO Reterence o7 Init. Cell Press 600.0 kPa Init. Pore Pres 581.8 kPa Final ce21 Press 680.0 KPa Final Pore Press 650.3 KPa Geotechnical Laboratory UiTM MALAYSIA Job: DEPOT ATPERAT, P. PINANG Triaxial Back Pressure BoreHole:BHi _Sample:UD2/C__ Depth: 7.5m a Volume Change v Root Time ¢ | ce 4 3 2 & 2 5 2 6 eo 1 2 5 £ he 0. 0.9 2 4 6 e 10 72 14 Root Time ( mins ) Pi I BOD Erp vy Rone Tine — 2 é L 4 & ~ 400- ca 4 8 3 L 4 Q = 300 ca 4 = Pe eee eee cece 5 E 4 & 200- ce 4 100F ca |__—_—___________ % 2 4 S é 10 i 14 Root Time ( mins ) Geotechnical Laboratory Ui TM MALAYSIA PHOTOGRAPHS SOIL INVESTIGATION WORKS FOR EXISTING DEPOT AT PERAI, PULAU PINANG FOR INFINITY LOGISTIC & TRANSPORT SDN. BHD. Setting Up Borehole BH-1 Disturbed Sample BH-1 (6.00m ~ 6.45m) Disturbed Sample BH-1 (19.50m ~ 19.95m) Disturbed Sample BH-1 (25.50m ~ 25.95m) Disturbed Sample BH-1 (39.00m - 39.45m) crosses rout on me i SOIL INVESTIGATION WORKS FOR EXISTING DEPOT AT PERAI, PULAU PINANG FOR INFINITY LOGISTIC & TRANSPORT SDN. BHD. neuen. | 1.0 frwe]30. Setting Up Borehole BH-2 i Be bari | ence er peg a | fra rh =e foie | OF Paes rey | 35 loolipas Disturbed Sample BH-2 (36.00m ~ 36.45m) Disturbed Sample BH-2 (40.00m - 40.45m) GA ecu on ULE Allert / Piocoaiizoz 2 Foe ue verre Niidedexs pore] eo) ee

You might also like