JOB NO : GT/3.

0/167/2021

SOIL INVESTIGATION REPORT FOR


CADANGAN PEMBANGUNAN PERINDUSTRIAN YANG MENGANDUNGI:
A. 2 UNIT GUDANG 1 TINGKAT BERSERTA LALUAN BERBUMBUNG
B. 1 BLOK PEJABAT 5 TINGKAT BERSERTA PODIUM TEMPAT LETAK
KERETA 4 TINGKAT
C. 1 BLOK BANGUNAN ASRAMA PEKERJA 3 TINGKAT BERSERTA
KEMUDAHAN UTILITI
D. 1 UNIT STESEN SUIS UTAMA
E. 1 UNIT PONDOK PENGAWAL
F. 2 UNIT KEBUK SAMPAH
G. 1 UNIT SISTEM RAWATAN PUSAT
DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK
TETUAN: INFINITY LOGISTICS & TRANSPORT SDN BHD.

FINAL REPORT – JUNE 2021

CLIENT :- CONSULTING ENGINEER :-

INFINITY LOGISTIC & TRANSPORT SDN. ISP CONSULTING (SA0189471-K)


BHD. (531298-W) S-3-10, THE GAMUDA BIZ SUITES,
NO. 2, JALAN KASUARINA 8, NO. 12, JALAN ANGGERIK VANILLA 31/99,
BANDAR BOTANIC, KOTA KEMUNING SEKSYEN 31,
41200 KLANG, 40460 SHAH ALAM,
SELANGOR DARUL EHSAN. SELANGOR DARUL EHSAN.
TEL : 03 – 3101 2926 (EXT: 333) TEL : 03 – 6734 6072
FAX : 03 – 3101 3926 FAX : 03 – 5525 2781
TABLE OF CONTENT Introduction ................................................................................. 1
Scope of Work ................................................................ 1
Sub-Surface Exploration .............................. 1
Standard Penetration Test ..................................................... 2
Soil Sampling .................................................................. 2
Groundwater Table Monitoring ................ 2
Soil Description ........................................................................... 3
Laboratory Testing …………………………………………………4

APPENDICES Engineering Borehole Logs


Laboratory Test Results
Photographs
Plan
INTRODUCTION

This report presents the results of The Soil Investigation Work For Cadangan Pembangunan
Perindustrian Yang Mengandungi: A. 2 Unit Gudang 1 Tingkat Berserta Laluan Berbumbung; B.
1 Blok Pejabat 5 Tingkat Berserta Podium Tempat Letak Kereta 4 Tingkat; C. 1 Blok Bangunan
Asrama Pekerja 3 Tingkat Berserta Kemudahan Utiliti; D. 1 Unit Stesen Suis Utama; E. 1 Unit
Pondok Pengawal; F. 2 Unit Kebuk Sampah; G. 1 Unit Sistem Rawatan Pusat Di Atas Lot 183089
(Dahulunya PT 152263), Pulau Indah Mukim Klang, Daerah Klang, Selangor Darul Ehsan Untuk
Tetuan: Infinity logistics & Transport Sdn Bhd. The main objective of the works is to investigate
the subsoil conditions of the site and to collect relevant geotechnical parameters for foundation
design.

The Client is Infinity Logistics & Transport Sdn. Bhd. (531298-W)

Gagasan Teguh Sdn. Bhd. was appointed as the Site Investigation Specialist.

The Consulting Engineer is ISP Consulting (SA0189471-K).

SCOPE OF WORK The scope of work comprises three (3) nos. of deep borehole,
insitu tests, soil sampling, groundwater level monitoring and
selected laboratory testing.

The field works (18/05/2021 – 28/05/2021) were carried


out with the respective equipment as described as follows.

SUB-SURFACE Sub-surface exploration was carried out using a multi-speed


EXPLORATION YWE D90-R wash boring rig operated by our experienced
locally-trained driller .
Casing NW size (89mm dia.) or HW size (100mm) was
lowered into the borehole to prevent collapse of the borehole
wall. Water was circulated with YWE-D90-R Piston Pump
into the Boreholes to wash up samples for visual
examination by our supervisor. If rock encountered, rock
coring using an NMLC size with core barrel with diamond bit
will be carried out. The normal drill run shall be 1.50m with
core size of 54mm diameter.

Page | 1
STANDARD The Standard Penetration Test (S.P.T.) was carried at 1.5 m
PENETRATION intervals until the termination of the borehole or hitting
TEST rock. The S.P.T. is carried out accordance with test No.19,
B.S.1377 : 1990.

Basically, the test was conducted by dropping a self


tripping hammer of 63.5kg from a fixed height of 76cm
(+2cm) and 75mm markings are made on the extended rod.

According to BS 5930 the number of blows for initial 15 cm


was recorded as the seating drive. The N – value is the
number of blows to penetrate the subsequent 30cm.
Nevertheless, if the number of blows ever reached 50 in
test drive, the test was terminated and the
corresponding penetration recorded.

Cohesive Soil N-Blows Description


0- 2 Very Soft
2- 4 Soft
4- 8 Firm
8 - 15 Stiff
15 - 30 Very Stiff
> 30 Hard

Non Cohesive Soil N-Blows Description


0- 4 Very Loose
4 - 10 Loose
10 – 30 Medium Dense
30 – 50 Dense
> 50 Very Dense

Disturbed soil samples were extruded from the split-spoon


SOIL sampler and sealed in air-tight double layered thick-gauge
SAMPLING plastic bags. Undisturbed samples were obtained by
jacking thin-walled tubes into soft cohesive layers and
mazier sampler is used for stiffer soil layer. All samples
were duly labelled and sampling tube are promptly sealed
with paraffin wax to prevent any loss of moisture and stored
before despatch to an approved laboratory for tests.

GROUND The measurement of groundwater table in the borehole


WATER TABLE was taken once before work commenced in the morning
MONITORING and once after work stopped in the afternoon. These
levels were recorded.

Page | 2
SOIL DESCRIPTION Table 17 : Terms For Mixtures Of Coarse And Fine Soils
(BS 5930 : 2015 –
Item 33.4.4.5)

Page | 3
LABORATORY The Standard Penetration Representative samples were sent to
TESTING an approved laboratory for the following tests :-

(i) Moisture Content (Part 2 : Method 3.2)

(ii) Atterberg Limits (Part 2 : Method 4.5)

(iii) Particle Size Distribution (Part 2 : Method 9.3 & 9.5)

(iv) Consolidated Undrained Triaxial (Part 8 : Method 7)

(v) Unconsolidated Undrained Triaxial (Part 8 : Method 7)

Page | 4
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions
Sheet 1 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-1
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 9.00 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 19/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 22/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 0 0
_ 0.000 Top soil
_
_
__ 1 1
_ 1.50
_ Loose ::::: P1/D1 1.500 44% 1 1 2 1 2 2 7
_ brownish grey ::::: 1.950
__ 2 SAND. ::::: 2
_ :::::
_ :::::
_ :::::
__ 3 Loose ::::: P2/D2 3.000 37% 1 1 2 2 2 3 9 3
_ brownish grey ::::: 3.450
_ SAND. :::::
_ :::::
__ 4 ::::: 4
_ 4.50 :::::
_ No recovery. P3 4.500 0% 1 3 1 1 1 2 5
_ (Suspected sandy / gravelly materials). 4.950
__ 5 5
_
_
_
__ 6 No recovery. P4 6.000 0% 1 1 1 2 1 2 6 6
_ (Suspected sandy materials). 6.450
_
_
__ 7 7
_ 7.50
_ Loose ::::: P5/D3 7.500 24% 1 1 2 1 2 2 7
_ brownish grey ::::: 7.950
__ 8 SAND. ::::: 8
_ :::::
_ :::::
_ :::::
__ 9 Loose ::::: P6/D4 9.000 49% 1 2 2 2 2 3 9 9
_ brownish grey ::::: 9.450
_ SAND. :::::
_ :::::
10
__ 10 :::::
_ 10.50 :::::
_ No recovery. P7 10.500 0% 1 0 1 1 1 1 4
_ (Suspected sandy materials). 10.950
11
__ 11
_
_
_ 12.00 Very soft
__ 12 –– :: P8/D5 12.000 100% 0 0 0 0 0 0 0 12
dark grey
_ 12.50 sandy CLAY. – :: 12.450
_ No recovery. UD1 12.500 0%
_ (Suspected sandy materials).
13
__ 13 13.000
_ 13.50
_ Very soft –– :: P9/D6 13.500 56% 0 1 0 0 0 0 0
_ dark grey – :: 13.950
14
__ 14 sandy CLAY. –– ::
_ – ::
_ –– ::
_ – ::
15
__ 15 Very soft –– :: P10/D7 15.000 42% 0 0 0 1 0 0 1
_ dark grey – :: 15.450
_ sandy CLAY. –– ::
_ – ::
16
__ 16 –– ::
_ 16.50 – ::
_ No recovery. P11 16.500 0% 0 1 0 0 0 0 0
_ (Suspected sandy materials). 16.950
17
__ 17
_
_
_ 18.00 Very soft
18
__ 18 dark grey ––– – P12/D8 18.000 44% 0 0 0 0 0 0 0
_ CLAY with some decayed wood. –– – 18.450
_ Dark grey ––– – UD2 18.500 70%
_ CLAY of extremely high plasticity. –– – 19
__ 19 ––– – 19.000
_ –– –
_ Very soft ––– – P13/D9 19.500 39% 0 0 0 0 0 0 0
_ dark grey –– – 19.950 20
__ 20 CLAY with decayed wood. ––– –
SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time Borehole
Cohesive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample 19/05/2021 3.45 pm 13.00 8.63 Driller : Supervisor :
P Standard Penetration Test 21/05/2021 8.45 am 13.00 9.22
AMIRUL HANAFI
UD Undisturbed Sample 21/05/2021 5.48 pm 45.45 7.15
MZ Mazier Sample 22/05/2021 8.50 am 45.45 8.00 Geologist :
VS Vane Shear Test 22/05/2021 11.00 am 49.45 9.00
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions Sheet 2 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-1
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 9.00 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 19/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 22/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 20 20
_ ––– –
_ –– –
_ Very soft ––– –
__ 21 dark grey – – – P14/D10 21.000 43% 0 0 1 0 0 0 1 21
_ CLAY. ––– – 21.450
_ Dark grey –– – UD3 21.500 40%
_ CLAY of very high plasticity. ––– –
__ 22 –– – 22.000 22
_ ––– –
_ Very soft to soft – – – P15/D11 22.500 47% 0 0 1 0 0 1 2
_ dark grey ––– – 22.950
__ 23 CLAY. –– – 23
_ ––– –
_ –– –
_ ––– –
__ 24 Very soft – – – P16/D12 24.000 40% 0 0 0 1 0 0 1 24
_ dark grey ––– – 24.450
_ CLAY. –– –
_ ––– –
__ 25 –– – 25
_ 25.50 ––– –
_ No recovery. P17 25.500 0% 0 0 0 0 0 0 0
_ (Suspected sandy materials). 25.950
__ 26 26
_
_
_ 27.00
__ 27 Very soft – – – – P18/D13 27.000 43% 0 0 1 0 0 0 1 27
_ dark grey –– – 27.450
_ CLAY. ––– –
_ –– –
__ 28 ––– – 28
_ –– –
_ Very soft – – – – P19/D14 28.500 44% 0 0 0 0 1 0 1
_ dark grey –– – 28.950
__ 29 CLAY. ––– – 29
_ –– –
_ ––– –
_ –– –
30
__ 30 Very soft – – – – P20/D15 30.000 51% 1 0 0 0 1 0 1
_ dark grey –– – 30.450
_ CLAY. ––– –
_ –– –
31
__ 31 ––– –
_ 31.50 –– –
_ No recovery. P21 31.500 0% 0 0 0 1 0 1 2
_ (Suspected sandy materials). 31.950
32
__ 32
_
_
_
33
__ 33 No recovery. P22 33.000 0% 0 0 0 1 0 1 2
_ (Suspected sandy materials). 33.450
_
_
34
__ 34
_ 34.50
_ Loose to medium dense ::::: P23/D16 34.500 33% 2 2 2 2 3 3 10
_ dark grey ::::: 34.950
35
__ 35 SAND. :::::
_ :::::
_ :::::
_ ::::: 36
__ 36 Medium dense ::::: P24/D17 36.000 38% 2 2 3 4 4 4 15
_ dark grey ::::: 36.450
_ SAND. :::::
_ ::::: 37
__ 37 :::::
_ :::::
_ Medium dense ::::: P25/D18 37.500 44% 3 2 3 3 3 4 13
_ dark grey ::::: 37.950 38
__ 38 SAND. :::::
_ :::::
_ :::::
_ ::::: 39
__ 39 Medium dense ::::: P26/D19 39.000 31% 3 3 4 5 5 5 19
_ dark grey ::::: 39.450
_ SAND. :::::
_ ::::: 40
__ 40 ::::: SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time Borehole
Cohedive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample Driller : Supervisor :
P Standard Penetration Test
AMIRUL HANAFI
UD Undisturbed Sample
MZ Mazier Sample Geologist :
VS Vane Shear Test
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions Sheet 3 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-1
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 9.00 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 19/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 22/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 40 40
_ :::::
_ Medium dense : : : : : P27/D20 40.500 42% 3 4 3 3 4 5 15
_ dark grey ::::: 40.950
__ 41 SAND. ::::: 41
_ :::::
_ :::::
_ 42.00 :::::
__ 42 No recovery. P28 42.000 0% 3 2 3 3 3 4 13 42
_ (Suspected sandy materials). 42.450
_
_
__ 43 43
_ 43.50
_ Medium dense : : : : : P29/D21 43.500 49% 3 4 4 5 5 5 19
_ dark grey ::::: 43.950
__ 44 SAND. ::::: 44
_ :::::
_ :::::
_ :::::
__ 45 Medium dense : : : : : P30/D22 45.000 44% 3 3 4 4 5 5 18 45
_ dark grey ::::: 45.450
_ SAND. :::::
_ :::::
__ 46 ::::: 46
_ :::::
_ Medium dense : : : : : P31/D23 46.500 40% 4 3 4 4 5 6 19
_ dark grey ::::: 46.950
__ 47 SAND. ::::: 47
_ :::::
_ :::::
_ 48.00 :::::
__ 48 No recovery. P32 48.000 0% 5 4 3 4 5 5 17 48
_ (Suspected sandy materials). 48.450
_
_
__ 49 49
_ 49.50
_ Medium dense : : : : : P33/D24 49.500 47% 5 5 4 4 5 7 20
_ 49.45 dark grey ::::: 49.450
50
__ 50 SAND.
_
_ End of BH-1 at depth 49.45m.
_
51
__ 51
_
_
_
52
__ 52
_
_
_
53
__ 53
_
_
_
54
__ 54
_
_
_
55
__ 55
_
_
_
56
__ 56
_
_
_
57
__ 57
_
_
_ 58
__ 58
_
_
_ 59
__ 59
_
_
_ 60
__ 60
SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time Borehole
Cohedive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample Driller : Supervisor :
P Standard Penetration Test
AMIRUL HANAFI
UD Undisturbed Sample
MZ Mazier Sample Geologist :
VS Vane Shear Test
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions
Sheet 1 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-2
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 6.45 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 24/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 25/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 0 0
_ 0.000 Top soil
_
_
__ 1 1
_ 1.50
_ Loose ::::: P1/D1 1.500 40% 1 1 2 1 2 1 6
_ dark grey ::::: 1.950
__ 2 SAND. ::::: 2
_ :::::
_ :::::
_ :::::
__ 3 Loose ::::: P2/D2 3.000 47% 1 0 1 1 1 2 5 3
_ dark grey ::::: 3.450
_ SAND. :::::
_ :::::
__ 4 ::::: 4
_ :::::
_ Loose ::::: P3/D3 4.500 33% 1 1 1 0 1 1 3
_ dark grey ::::: 4.950
__ 5 SAND. ::::: 5
_ :::::
_ :::::
_ 6.00 :::::
__ 6 No recovery. P4 6.000 0% 0 1 0 0 0 1 1 6
_ (Suspected sandy materials). 6.450
_
_
__ 7 7
_ 7.50
_ Very soft ––– – P5/D4 7.500 41% 0 0 0 0 0 0 0
_ dark grey –– – 7.950
__ 8 CLAY with decayed wood. ––– – 8
_ –– –
_ ––– –
_ –– –
__ 9 Very soft to soft ––– – P6/D5 9.000 38% 1 0 1 1 0 0 2 9
_ dark grey –– – 9.450
_ CLAY with decayed wood. ––– –
_ –– –
10
__ 10 ––– –
_ 10.50 –– –
_ No recovery. P7 10.500 0% 1 0 0 1 0 0 1
_ (Suspected sandy materials). 10.950
11
__ 11
_
_
_ 12.00 Very soft
12
__ 12 dark grey ––– – P8/D6 12.000 44% 1 0 0 0 0 0 0
_ 12.50 CLAY with decayed wood. –– – 12.450
_ Dark grey –– :: UD1 12.500 50%
_ slightly sandy CLAY of high plasticity. – ::
13
__ 13 –– :: 13.000
_ 13.50 – ::
_ Very soft ––– – P9/D7 13.500 33% 0 0 1 0 0 0 1
_ dark grey –– – 13.950
14
__ 14 CLAY. ––– –
_ –– –
_ ––– –
_ 15.00 –– –
15
__ 15 No recovery. P10 15.000 0% 1 0 0 0 0 0 0
_ (Suspected sandy materials). 15.450
_
_
16
__ 16
_ 16.50
_ Very soft ––– – P11/D8 16.500 40% 0 0 0 0 0 0 0
_ dark grey –– – 16.950
17
__ 17 CLAY. ––– –
_ –– –
_ ––– –
_ Very soft –– – 18
__ 18 dark grey ––– – P12/D9 18.000 47% 1 1 0 0 0 1 1
_ 18.50 CLAY. –– – 18.450
_ No recovery. UD2 18.500 0%
_ (Suspected sandy materials). 19
__ 19 19.000
_ 19.50
_ Very soft ––– – P13/D10 19.500 47% 0 0 0 0 0 0 0
_ dark grey –– – 19.950 20
__ 20 CLAY. ––– –
SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time Borehole
Cohesive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample 24/05/2021 4.50 pm 25.95 4.50 Driller : Supervisor :
P Standard Penetration Test 25/05/2021 9.00 am 25.95 6.00
AMIRUL HANAFI
UD Undisturbed Sample 25/05/2021 4.30 pm 49.95 6.45
MZ Mazier Sample Geologist :
VS Vane Shear Test
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions Sheet 2 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-2
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 6.45 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 24/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 25/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 20 20
_ ––– –
_ –– –
_ Very soft to soft ––– –
__ 21 dark grey – – – P14/D11 21.000 38% 0 1 0 0 1 1 2 21
_ 21.50 CLAY. ––– – 21.450
_ Dark grey –– :: UD3 21.500 70%
_ slightly sandy CLAY of high plasticity. – ::
__ 22 –– :: 22.000 22
_ 22.50 – ::
_ Very soft to soft – – – P15/D12 22.500 40% 0 0 1 1 0 0 2
_ dark grey ––– – 22.950
__ 23 CLAY. –– – 23
_ ––– –
_ –– –
_ 24.00 ––– –
__ 24 No recovery. P16 24.000 0% 0 0 0 0 1 0 1 24
_ (Suspected sandy materials). 24.450
_
_
__ 25 25
_ 25.50
_ Very soft ––– – P17/D13 25.500 49% 0 0 0 0 0 0 0
_ dark grey –– – 25.950
__ 26 CLAY. ––– – 26
_ –– –
_ ––– –
_ –– –
__ 27 Very soft to soft ––– – P18/D14 27.000 44% 1 1 1 0 1 0 2 27
_ dark grey –– – 27.450
_ CLAY. ––– –
_ –– –
__ 28 ––– – 28
_ –– –
_ Very soft ––– – P19/D15 28.500 51% 0 1 1 0 0 0 1
_ dark grey –– – 28.950
__ 29 CLAY. ––– – 29
_ –– –
_ ––– –
_ –– –
30
__ 30 Very soft ––– – P20/D16 30.000 51% 0 0 0 1 0 0 1
_ dark grey –– – 30.450
_ CLAY. ––– –
_ –– –
31
__ 31 ––– –
_ –– –
_ Very soft ––– – P21/D17 31.500 38% 0 1 0 0 0 1 1
_ dark grey –– – 31.950
32
__ 32 CLAY. ––– –
_ –– –
_ ––– –
_ 33.00 –– –
33
__ 33 No recovery. P22 33.000 0% 0 1 1 0 1 1 3
_ (Suspected sandy materials). 33.450
_
_
34
__ 34
_ 34.50
_ Loose : : : : : P23/D18 34.500 40% 1 0 1 2 1 1 5
_ dark grey ::::: 34.950
35
__ 35 SAND. :::::
_ :::::
_ :::::
_ ::::: 36
__ 36 Loose : : : : : P24/D19 36.000 43% 2 1 1 3 2 2 8
_ dark grey ::::: 36.450
_ SAND. :::::
_ ::::: 37
__ 37 :::::
_ :::::
_ Medium dense : : : : : P25/D20 37.500 51% 2 2 3 4 4 4 15
_ dark grey ::::: 37.950 38
__ 38 SAND. :::::
_ :::::
_ :::::
_ 39.00 ::::: 39
__ 39 No recovery. P26 39.000 0% 3 2 4 4 5 4 17
_ (Suspected sandy materials). 39.450
_
_ 40
__ 40
SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time Borehole
Cohedive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample Driller : Supervisor :
P Standard Penetration Test
AMIRUL HANAFI
UD Undisturbed Sample
MZ Mazier Sample Geologist :
VS Vane Shear Test
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions Sheet 3 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-2
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 6.45 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 24/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 25/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 40 40
_ 40.50
_ Medium dense : : : : : P27/D21 40.500 41% 4 3 4 5 5 6 20
_ dark grey ::::: 40.950
__ 41 SAND. ::::: 41
_ :::::
_ :::::
_ :::::
__ 42 Medium dense : : : : : P28/D22 42.000 42% 4 4 5 6 6 4 21 42
_ dark grey ::::: 42.450
_ SAND. :::::
_ :::::
__ 43 ::::: 43
_ :::::
_ Medium dense : : : : : P29/D23 43.500 47% 5 4 5 5 4 6 20
_ dark grey ::::: 43.950
__ 44 SAND. ::::: 44
_ :::::
_ :::::
_ 45.00 :::::
__ 45 No recovery. P30 45.000 0% 4 6 6 4 4 7 21 45
_ (Suspected sandy materials). 45.450
_
_
__ 46 46
_ 46.50
_ Medium dense : : : : : P31/D24 46.500 41% 5 5 7 3 4 3 17
_ dark grey ::::: 46.950
__ 47 SAND. ::::: 47
_ :::::
_ :::::
_ :::::
__ 48 Medium dense : : : : : P32/D25 48.000 44% 3 4 3 4 4 5 16 48
_ dark grey ::::: 48.450
_ SAND. :::::
_ :::::
__ 49 ::::: 49
_ :::::
_ Medium dense : : : : : P33/D26 49.500 43% 4 5 5 7 7 6 25
_ 49.95 dark grey ::::: 49.950
50
__ 50 SAND.
_
_ End of BH-2 at depth 49.95m.
_
51
__ 51
_
_
_
52
__ 52
_
_
_
53
__ 53
_
_
_
54
__ 54
_
_
_
55
__ 55
_
_
_
56
__ 56
_
_
_
57
__ 57
_
_
_ 58
__ 58
_
_
_ 59
__ 59
_
_
_ 60
__ 60
SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time Borehole
Cohedive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample Driller : Supervisor :
P Standard Penetration Test
AMIRUL HANAFI
UD Undisturbed Sample
MZ Mazier Sample Geologist :
VS Vane Shear Test
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions
Sheet 1 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-3
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 5.00 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 27/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 28/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 0 0
_ 0.000 Top soil
_
_
__ 1 1
_ 1.50
_ Loose ::::: P1/D1 1.500 40% 2 1 1 2 1 1 5
_ dark grey ::::: 1.950
__ 2 SAND. ::::: 2
_ :::::
_ :::::
_ :::::
__ 3 Loose ::::: P2/D2 3.000 39% 1 2 1 2 1 2 6 3
_ dark grey ::::: 3.450
_ SAND. :::::
_ :::::
__ 4 ::::: 4
_ 4.50 :::::
_ No recovery. P3 4.500 0% 1 1 1 0 1 0 2
_ (Suspected sandy materials). 4.950
__ 5 5
_
_
_ 6.00
__ 6 Loose ::::: P4/D3 6.000 44% 2 1 1 0 1 2 4 6
_ dark grey ::::: 6.450
_ SAND. :::::
_ :::::
__ 7 ::::: 7
_ :::::
_ Loose ::::: P5/D4 7.500 43% 1 1 2 1 3 1 7
_ dark grey ::::: 7.950
__ 8 SAND. ::::: 8
_ :::::
_ :::::
_ 9.00 :::::
__ 9 No recovery. P6 9.000 0% 1 2 1 1 0 1 3 9
_ (Suspected sandy materials). 9.450
_
_
10
__ 10
_ 10.50 Very soft
_ dark grey –– :: P7/D5 10.500 38% 0 0 1 0 0 0 1
_ 11.00 sandy CLAY. – :: 10.950
11
__ 11 Dark grey ––– – UD1 11.000 80%
_ CLAY of extremely high plasticity. –– –
_ ––– – 11.500
_ 12.00 –– –
__ 12 –– :: P8/D6 12.000 43% 0 0 0 1 1 0 2 12
Very soft to soft
_ dark grey – :: 12.450
_ sandy CLAY. –– ::
_ – ::
13
__ 13 –– ::
_ – ::
_ Very soft –– :: P9/D7 13.500 44% 1 0 0 0 0 0 0
_ dark grey – :: 13.950
14
__ 14 sandy CLAY. –– ::
_ – ::
_ –– ::
_ 15.00 – ::
15
__ 15 Very soft to soft ––– – P10/D8 15.000 47% 1 1 0 1 1 0 2
_ dark grey –– – 15.450
_ CLAY. ––– –
_ –– –
16
__ 16 ––– –
_ –– –
_ Soft ––– – P11/D9 16.500 44% 1 1 1 0 1 1 3
_ dark grey –– – 16.950
17
__ 17 CLAY. ––– –
_ –– –
_ ––– –
_ –– – 18
__ 18 Very soft ––– – P12/D10 18.000 38% 0 0 0 0 0 0 0
_ dark grey –– – 18.450
_ CLAY. ––– –
_ –– – 19
__ 19 ––– –
_ –– –
_ Very soft ––– – P13/D11 19.500 43% 1 0 0 1 0 0 1
_ dark grey –– – 19.950 20
__ 20 CLAY. ––– –
SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time
Borehole
Cohesive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample 27/05/2021 4.15 pm 21.45 3.43 Driller : Supervisor :
P Standard Penetration Test 28/05/2021 9.00 am 21.45 3.43
AMIRUL HANAFI
UD Undisturbed Sample 28/05/2021 12.45 pm 40.95 5.00
MZ Mazier Sample Geologist :
VS Vane Shear Test
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions Sheet 2 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-3
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 5.00 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 27/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 28/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 20 20
_ ––– –
_ –– –
_ ––– –
__ 21 Very soft to soft –– – P14/D12 21.000 51% 1 1 1 0 1 0 2 21
_ dark grey ––– – 21.450
_ CLAY of very high plasticity. –– –
_ ––– –
__ 22 –– – 22
_ Soft ––– –
_ dark grey –– – P15/D13 22.500 40% 1 0 1 0 0 0 1
_ CLAY. ––– – 22.950
__ 23 –– – 23
_ ––– –
_ –– –
_ ––– –
__ 24 Soft –– – P16/D14 24.000 47% 0 1 0 1 1 1 3 24
_ dark grey ––– – 24.450
_ CLAY. –– –
_ ––– –
__ 25 –– – 25
_ ––– –
_ Very soft to soft –– – P17/D15 25.500 51% 1 1 1 0 0 1 2
_ dark grey ––– – 25.950
__ 26 CLAY. –– – 26
_ ––– –
_ –– –
_ 27.00 ––– –
__ 27 No recovery. P18 27.000 0% 1 0 0 1 1 0 2 27
_ (Suspected sandy materials). 27.450
_
_
__ 28 28
_
_ No recovery. P19 28.500 0% 1 0 2 1 1 0 4
_ (Suspected sandy materials). 28.950
__ 29 29
_
_
_ 30.00
30
__ 30 Loose ::::: P20/D16 30.000 39% 1 1 2 1 3 1 7
_ dark grey ::::: 30.450
_ SAND. :::::
_ :::::
31
__ 31 :::::
_ :::::
_ Medium dense ::::: P21/D17 31.500 47% 2 3 3 4 4 5 16
_ dark grey ::::: 31.950
32
__ 32 SAND. :::::
_ :::::
_ :::::
_ :::::
33
__ 33 Medium dense ::::: P22/D18 33.000 49% 3 3 4 5 4 6 19
_ dark grey ::::: 33.450
_ SAND. :::::
_ :::::
34
__ 34 :::::
_ :::::
_ Medium dense ::::: P23/D19 34.500 44% 4 5 4 4 5 6 19
_ dark grey ::::: 34.950
35
__ 35 SAND. :::::
_ :::::
_ :::::
_ 36.00 ::::: 36
__ 36 No recovery. P24 36.000 0% 5 5 4 5 5 7 21
_ (Suspected sandy materials). 36.450
_
_
37
__ 37
_ 37.50
_ Medium dense : : : : : P25/D20 37.500 39% 6 5 4 4 6 6 20
_ dark grey ::::: 37.950 38
__ 38 SAND. :::::
_ :::::
_ :::::
_ ::::: 39
__ 39 Medium dense : : : : : P26/D21 39.000 44% 6 5 5 5 4 7 21
_ dark grey ::::: 39.450
_ SAND. :::::
_ ::::: 40
__ 40 ::::: SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time Borehole
Cohedive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample Driller : Supervisor :
P Standard Penetration Test
AMIRUL HANAFI
UD Undisturbed Sample
MZ Mazier Sample Geologist :
VS Vane Shear Test
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
GAGASAN TEGUH SDN BHD ENGINEERING BOREHOLE LOG
We Drill Deep For Solutions Sheet 3 of 3
CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH,
Project : MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS &
TRANSPORT SDN BHD.
Borehole No :
BH-3
Location : AT PULAU INDAH, MUKIM KLANG, DAERAH KLANG, SELANGOR DARUL EHSAN
Client : INFINITY LOGISTICS & TRANSPORT SDN. BHD. Rig Type : YWE D-90R Coordinate N: - Water Level : 5.00 m
Consultant : ISP CONSULTING Drill Method : Rotary Wash E: - Date Start : 27/05/2021
Job No. : GT/3.0/167/2021 Casing Type : NW Reduce Level : ** Date Finish : 28/05/2021
Strata SAMPLING DETAIL Penetration, P (mm) N SPT PLOT
Depth Thick- Description of Strata Log Sample Depth Rec 75 75 75 75 75 75 For For
m ness No m Ratio SPT BLOW COUNT <75 Value <300 0 10 20 30 40 50
__ 40 40
_ :::::
_ Medium dense : : : : : P27/D22 40.500 40% 7 6 4 4 5 4 17
_ 40.95 dark grey ::::: 40.950
__ 41 SAND. 41
_
_ End of BH-3 at depth 40.95m.
_
__ 42 42
_
_
_
__ 43 43
_
_
_
__ 44 44
_
_
_
__ 45 45
_
_
_
__ 46 46
_
_
_
__ 47 47
_
_
_
__ 48 48
_
_
_
__ 49 49
_
_
_
50
__ 50
_
_
_
51
__ 51
_
_
_
52
__ 52
_
_
_
53
__ 53
_
_
_
54
__ 54
_
_
_
55
__ 55
_
_
_
56
__ 56
_
_
_
57
__ 57
_
_
_ 58
__ 58
_
_
_ 59
__ 59
_
_
_ 60
__ 60
SPT PLOT
_ Rec = Recovery
Depth of
Legend: Table of Strength Water Example :
Date Time Borehole
Cohedive Soil Non-Cohesive Level (m)
CC Concrete Coring (m) 50 | 120 = 50 Blows/120 mm
D Disturbed Sample Driller : Supervisor :
P Standard Penetration Test
AMIRUL HANAFI
UD Undisturbed Sample
MZ Mazier Sample Geologist :
VS Vane Shear Test
RC Rock Coring
W W Water Sample NOTE :
N - No. of Blows/300mm ** Existing ground level
SOIL INVESTIGATION WORKS FOR CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS
LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH, MUKIM KLANG, DAERAH KLANG,
SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS & TRANSPORT SDN BHD.

Setting
Up
Borehole
BH-1

Disturbed Sample BH-1 (15.00m – 15.45m) Disturbed Sample BH-1 (24.00m – 24.45m)

Disturbed Sample BH-2 (34.50m – 34.95m) Disturbed Sample BH-1 (45.00m – 45.45m)

1
SOIL INVESTIGATION WORKS FOR CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS
LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH, MUKIM KLANG, DAERAH KLANG,
SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS & TRANSPORT SDN BHD.

Setting
Up
Borehole
BH-2

Disturbed Sample BH-2 (4.50m – 4.95m)

Disturbed Sample BH-2 (16.50m – 16.95m) Disturbed Sample BH-2 (25.50m – 25.95m)

Disturbed Sample BH-2 (36.00m – 36.45m) Disturbed Sample BH-2 (48.00m – 48.45m)

2
SOIL INVESTIGATION WORKS FOR CADANGAN PEMBANGUNAN PERINDUSTRIAN DI ATAS
LOT 183089 (DAHULUNYA PT 152263), PULAU INDAH, MUKIM KLANG, DAERAH KLANG,
SELANGOR DARUL EHSAN UNTUK TETUAN: INFINITY LOGISTICS & TRANSPORT SDN BHD.

Setting
Up
Borehole
BH-3

Disturbed Sample BH-3 (6.00m – 6.45m)

Disturbed Sample BH-3 (15.00m – 15.45m) Disturbed Sample BH-3 (24.00m – 24.45m)

Disturbed Sample BH-3 (37.50m – 37.95m) Disturbed Sample BH-3 (40.50m – 40.95m)

3
0
20
90

NB
BT NB
BT
1
20 P
90 SU
M

JALAN SUNG
AI CHANDONG
26/KS 11

2 1
20 staff
90 OUT OUT staff
IN IN
GUARD
HOUSE
23.89 sqm

13.78 sqm
11

15.577
5023
TNB

31
Reserve

18 PE

6100
TNB

3
641
03
Reserve

2 LOBBY

90
TNB
14488 14525 Reserve

Dotted line indicated Office Floor


MNE MNE 19.105
SERVICES ROOM

3750 3750

5872

WORKING PLATFORM
6100 (20')

LOBBY
20
WORKING PLATFORM

90
Gradient 1:12
40ft Lorry Loading Area = 11 Bays

5
PENAMPAN

20
90

40ft Lorry Loading Area = 15 Bays


NB
BT
Access Road - 6.1m

Access Road - 6.1 m


6
20
90
ZON

2 07
90
8
30
18
WORKING PLATFORM
WORKING PLATFORM
JALAN SUNGAI PINANG 4/1

8 Warehouse 1 Area Warehouse 2 Area


20
90
40ft Lorry Loading Area = 12 Bays

9
20 'A'
90 G
20ft Lorry Loading Area

AT KAN 183089
183125

LIH NG
LO 84323.939mp
8.432Ha
20.84Ek
0
21
90

1
WORKING PLATFORM

21
WORKING PLATFORM

90

NB
BT
Gradient 1:12

C
MH

97
3.3 4
Dotted line indicated Workers Quarters Floor

C
82 2.23 MH
13500 Litres
Skid Tank

77
Bicycle Parking

S 1705
13500 Litres
Skid Tank

LEISURE AREA

6.1m
SURAU CONVENIENCE
CAFETERIA
KITCHEN
LEISURE AREA B
oad -
STORE

214 TB
M
sR
90 Acces
85
6.8 3
40 8.23
77
S 1703
B
NB
BT
AT
2 N BAR
BUHA
PELA
IARAN
PERS

9
50
90

90
30
18
MP
SU

4 93 AN
90 AS G
W N
KA ILA
K

You might also like