Chemilink™ SS-108 has been successfully utilized in hundreds of projects: airport runways, taxiways & parking aprons, highways,
shipyard & container-yard platforms, public/private/industrial roads and other shallow base foundations in Asia, mostly in the South-
East Asia region since 1994. It has been verified by many relevant authorities in Asia countries and endorsed in the public works
specifications and tender documents.
Typical Technical Data Range (Stabilized Soils and Rehabilitated Crushed Stones)
Dosage CBR* UCS* Permeability (m/s) /
Soil Types
(%) (%) (MPa) Resilient Modulus (MPa)
Sandy/ Silty/ Clayey Soils/ 2.0 to 4.0 30 to 300 0.7 to 5.0 10-7 to 10-11 /
Crushed Stones 1.5 to 3.0 120** to 300 1.5** to 5.0 Averagely, 5,000
* Generally at 7-day curing or 4-day soaking; ** Within 24-hour for crushed stones with recommended gradation.
6.0
UCS = 0.8e0.0063CBR
R-I
R-II
UCS = 0.015 CBR
4.5
UCS (MPa)
3.0
-UCS in Mpa
-CBR in %
1.5
CBR (%)
110
250
Aveage UCS: 2.071MPa
Average CD: 98.2%
California Bearing Ratio CBR (%)
100
150
95
100
90
50
1 1.5 2 2.5 3
1 1.5 2 2.5 3
Unconfined Compressive Strength UCS (MPa)
Unconfined Compressive Strength UCS (MPa)
Test Data Library Stabilized Soil/Crushed Stone Samples In-Situ Testing (CBR & MR)
Functions
• To improve and maintain the soaked strengths of various soils including crushed stones and, thereby to improve the bearing
capacity of sub-grade or stabilized soils through binding of particles and immediate chemical reaction with soils;
• To form a semi-rigid platform with a certain tensile strength and thereby reduce total and differential settlements;
• To decrease the compressibility and permeability of soils and to achieve anti-cracking effect, thereby reducing or eliminating
potential damages due to swelling, shrinkage and seepage;
• To rapidly rehabilitate the existing base course mostly with crushed stones and to achieve higher technical indexes; and
• To improve the long-term performances of stabilized soils and crushed stones.
Benefits
• Directly improve the in-situ soils or quarry materials by Stabilization & Rehabilitation and minimize the usage and transportation
of imported fill materials, so as to protect the natural environment and reduce costs;
• To maintain the strengths of stabilized/rehabilitated soils in soaking conditions and achieve long-term pavement performances
especially in low-lying, flood prone and swampy areas;
• Easy and fast soil/crushed stone stabilization/rehabilitation procedures enable contractors to complete the project in a shorter
period of time than conventional construction method. Furthermore, the construction procedure takes into consideration of wet
weather factors to eliminate possible complications caused by rain;
• The application of Chemilink™ SS-108 soil stabilization agent has been proven being highly effective and reliable with a proper
quality control, which is cost-saving appr to treat most known soils and in-situ quarry materials;
• Its resulted “Semi-Rigid Platform Effect” can significantly reduce total settlements and minimize differential settlements;
• The anti-cracking effect, lower permeability and compressibility are the major factors to maintain long-term performance of
pavement; and
• The product is green, environmentally and ozone friendly.
1
CHEMILINK™ SS-108
Construction Procedure
• Spreading SS-108 product in powder form on the ground to be stabilized or rehabilitated.
• Mixing SS-108 In-Situ with soils or quarries, where better results may be achieved if using a Central Mixing Plant.
• Compaction as per normal.
Precautions
Wear gloves and goggles while handling the product. Any contact with the skin or eyes should be washed off with clean water. In the
event of prolonged irritation, seek medical advice. Powder products should be handled with care to minimize dust formation. Use a
light mask if excessive dusting is unavoidable.
2
CHEMILINK™ SS-108
City Road in China Industrial Access in India Major Road in Myanmar Public Road in PNG
112020
Our technical advice on the uses of our materials is given without obligation. The buyer is responsible for the application and processing
of our products, and he is also liable for observing any third party rights. Technical data concerning our products are typical values.
Road maintenance at Jalan Terusan Section 4.00 - JKR Perak (Perak Public Works
220 Perak, Malaysia GB Kuari Sdn Bhd 2020 Completed HD4
5.43 Department)
Page 1 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road maintenance at Jalan Sec.6.7 Hingga 7.1 Kuala
214 Pahang, Malaysia JKR Pahang Yong Niaga Enterprise 2019 Completed HD4
Wau Kertau (C130), Maran, Pahang
Road maintenance at Jalan Tronoh Mines Section JKR Perak (Perak Public Works
211 Perak, Malaysia GB Kuari Sdn Bhd 2019 Completed HD4
8.20-8.50 Department)
209 Road maintenance at Daerah Hilir Perak, Perak Perak, Malaysia JKR Federal Belati Wangsa Sdn Bhd 2019 Completed HD4
208 Road maintenance at Daerah Manjung, Perak Perak, Malaysia JKR Federal Belati Wangsa Sdn Bhd 2019 Completed HD4
Road maintenance at A110 Jalan Kota Bharu, JKR Perak (Perak Public Works
207 Perak, Malaysia GB Kuari Sdn Bhd 2019 Completed HD4
Gopeng Section 7.0 - 7.5 Department)
Road maintenance at A110 Jalan Kota Bharu, JKR Perak (Perak Public Works
206 Perak, Malaysia GB Kuari Sdn Bhd 2019 Completed HD4
Gopeng Section 8.0 - 8.5 Department)
Road maintenance at A110 Jalan Kota Bharu, JKR Perak (Perak Public Works
205 Perak, Malaysia GB Kuari Sdn Bhd 2019 Completed HD4
Gopeng Section 14.30 - 14.80 Department)
Road maintenance at A110 Jalan Kota Bharu, JKR Perak (Perak Public Works
204 Perak, Malaysia GB Kuari Sdn Bhd 2019 Completed HD4
Gopeng Section 17.50 - 18.00 Department)
Page 2 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
CAG (Changi Airport Group Multiform Developments & Construction
201 Upgrading Job at Changi Airport Singapore 2019 Completed AF1
Singapore) Pte Ltd
197 Road Turning Area at Kent Ridge Crescent in NUS Sinagapre NUS, Singapore C. K. Toh Construction Pte Ltd (Installer) 2019 Completed HD4
Road Maintenance & Rehablitation at Jalan Bangas, JKR Maran (Pahang Public Works
196 Pahang, Malaysia Pembinaan Nam 2018 Completed HD4
Daerah Maran, Pahang Department)
Road Maintenance & Rehablitation at Jalan Batu JKR Perak (Perak Public Works
195 Perak, Malaysia GB Kuari Sdn Bhd 2018 Completed HD4
Gajah-Changkat Larang, Kinta, Perak Department)
Road Maintenance & Rehablitation at Jalan Taman JKR Perak (Perak Public Works
194 Perak, Malaysia GB Kuari Sdn Bhd 2018 Completed HD4
Jati, Kinta, Perak Department)
Road Maintenance & Rehablitation at Jalan JKR Perak (Perak Public Works
190 Perak, Malaysia GB Kuari Sdn Bhd 2018 Completed HD4
Kampung Luat Lenggong, Perak Department)
Page 3 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Maintenance & Rehablitation at Jalan Memban JKR Perak (Perak Public Works
189 Perak, Malaysia GB Kuari Sdn Bhd 2018 Completed HD4
Batu Gajah, Perak Department)
Road Maintenance & Rehablitation at Jalan JKR Klang (Perak Public Works
187 Selangor, Malaysia Sauh Emas Enterprise 2018 Completed HD4
Kampung Batu Tiga, Kapar Daerah Klang, Selangor Department)
186 Bus Bay Matenance at Serangoon Bus interchange Singapore LTA, Singapore Yun Onn Co Pte Ltd 2018 Completed HD4
Road Maintenance & Rehablitation at Jalan JKR Perak (Perak Public Works
185 Perak, Malaysia GB Kuari Sdn Bhd 2018 Completed HD4
Transperak, Perak Tengah, Perak Department)
Road Maintenance & Rehablitation at Jalan Klang JKR Klang, Selangor (Selangor
182 Selangor, Malaysia Wawasan Aynoor Enterprise 2017 Completed HD4
Perdana, Kapar, Daerah Klang, Selangor Public Works Department)
Page 4 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Maintenance & Rehablitation at Jalan JKR Perak (Perak Public Works
178 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Kampung Luat, Lenggong, Perak Department)
177 Road maintenance at Kepple Road Singapore LTA, Singapore Singapore Pilling / Yun Onn Co. Pte Ltd 2017 Completed HD4
Road Maintenance & Rehablitation at Jalan Taiping, JKR Perak (Perak Public Works
174 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Selama, Taipin, Perak Department)
Road Maintenance & Rehablitation at Jalan Banggol JKR Perak (Perak Public Works
173 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Jas - Nukit Bertam, Taipin, Perak Department)
Road Maintenance & Rehablitation at Jalan Air JKR Perak (Perak Public Works
172 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Kuning, Perak Tengah, Perak Department)
Road Maintenance & Rehablitation at Jalan JKR Perak (Perak Public Works
170 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Transperak, Perak Tengah, Perak Department)
Road Maintenance & Rehablitation at Jalan Teluk JKR Perak (Perak Public Works
169 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Sena,Perak Tengah, Perak Department)
Road Maintenance & Rehablitation at Jalan Tanjung JKR Perak (Perak Public Works
168 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Piandang, Kerian, Perak Department)
Page 5 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Maintenance & Rehablitation at Jalan Pantai, JKR Perak (Perak Public Works
167 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan Terusan, JKR Perak (Perak Public Works
166 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan Parit - JKR Perak (Perak Public Works
165 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Seri Iskandar, Perak Tengah, Perak Department)
Road Maintenance & Rehablitation at Jalan Jelapang, JKR Perak (Perak Public Works
164 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Kinta, Perak Department)
Road Maintenance & Rehablitation at Air Kuning JKR Perak (Perak Public Works
163 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
(Tambahan), Perak Tengah, Perak Department)
Road Maintenance & Rehablitation at Jalan Teluk JKR Perak (Perak Public Works
162 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Sena Selat Pulau, Perak Tengah, Perak Department)
Road Maintenance & Rehablitation at Jalan Ulu JKR Perak (Perak Public Works
160 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Kuang, Kinta, Perak Department)
Road Maintenance & Rehablitation at Jalan Taman JKR Perak (Perak Public Works
159 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Perpaduan, Kinta, Perak Department)
Road Maintenance & Rehablitation at Tronoh Mines, JKR Perak (Perak Public Works
158 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Kinta, Perak Department)
Road Maintenance & Rehablitation at Air JKR Perak (Perak Public Works
157 Perak, Malaysia GB Kuari Sdn Bhd 2017 Completed HD4
Kuning,Perak Tengah, Perak Department)
Page 6 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Junction between Changi Cost Road and Tanah
156 Singapore Ministry of Conmunication Penta-Ocean / Koon Joint Venture 2017 Completed HD4
Merah Road
Regular Pavement Maintenance Job at Singapore CAG (Changi Airport Group Lay Choon Group (Multiform Development
154 Singapore 2016 Completed AF1
Changi Airport Singapore) and Construction Pte Ltd )
Road Maintenance & Rehablitation at Jalan Ulu JKR Perak (Perak Public Works
153 Perak, Malaysia GB Kuari Sdn Bhd 2016 Completed HD4
Dedap, Teluk Sena, Perak Tengah Department)
Road Maintenance & Rehablitation at Jalan Teluk JKR Selangor (Selangor Public Asda Engineering Sdn Bhd/Apple Bright
151 Selangor, Malaysia 2016 Completed HD4
Piah Kanan Kuala Selangor Works Department) Sdn Bhd
Road Maintenance & Rehablitation at Jalan Taiping, JKR Perak (Perak Public Works
150 Perak, Malaysia Kamunting Premix Plant Sdn Bhd 2016 Completed HD4
Kerian, Perak Department)
147 Army Training at Seletar Camp Singapore Ministry of Defence Combat Engineer 2016 Completed HD4
Page 7 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Maintenance & Rehablitation at Jalan Gunung JKR Perak (Perak Public Works
145 Perak, Malaysia GB Kuari Sdn Bhd 2016 Completed HD4
Semanggol, Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan Tanjung JKR Perak (Perak Public Works
144 Perak, Malaysia GB Kuari Sdn Bhd 2016 Completed HD4
Piandang & Jalan Alor Pongsu, Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan Tanjung JKR Perak (Perak Public Works
143 Perak, Malaysia GB Kuari Sdn Bhd 2016 Completed HD4
Piandang, Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan Air JKR Perak (Perak Public Works
142 Perak, Malaysia GB Kuari Sdn Bhd 2016 Completed HD4
Kuning, KG Gajah, Perak Department)
Tuas West Extention (MRT Depot) C1685 (Project Jurong Primewide Pte Ltd / United E & P
141 Singapore LTA, Singapore 2015 - 2016 Completed HD4
Code: ER 346) Pte Ltd
Runway Resurfacing and Other Associated Works at Malaysia Airport Sdn Bhd Completed (Rehabilitated
140 Penang, Malaysia KBE Construction Sdn Bhd (ASTR) 2015 - 2016 AF1
Penang International Airport (MASB) Base, 300 - 600mm thick)
Road Maintenance & Rehablitation at Jalan Lasah JKR Perak (Perak Public Works
139 Perak, Malaysia GB Kuari Sdn Bhd 2015 Completed HD4
Sungai Siput, Perak Department)
Road Maintenance & Rehablitation at Jalan Pimtasan JKR Perak (Perak Public Works
138 Perak, Malaysia GB Kuari Sdn Bhd 2015 Completed HD4
Alor Pongsu Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan Kerian JKR Perak (Perak Public Works
137 Perak, Malaysia GB Kuari Sdn Bhd 2015 Completed HD4
A4 Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan Semat, JKR Perak (Perak Public Works
136 Perak, Malaysia GB Kuari Sdn Bhd 2015 Completed HD4
Kuala Kangsar, Perak Department)
Road Maintenance & Rehablitation at Jalan Kati, JKR Perak (Perak Public Works
135 Perak, Malaysia GB Kuari Sdn Bhd 2015 Completed HD4
Kuala Kangsar, Perak Department)
Page 8 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Maintenance & Rehablitation at Jalan Manong, JKR Perak (Perak Public Works
134 Perak, Malaysia GB Kuari Sdn Bhd 2015 Completed HD4
Kuala Kangsar, Perak Department)
Road Upgrading of Jalan Buau - Biadong - Sukang - Chemilink SS-108 has been specified in the
132 Brunei JKR, Brunei 2014 - 2016 Pending HD4
Melilas (Roadworks) Tender
Road Maintenance & Rehablitation at Jalan Teluk JKR Perak (Perak Public Works
131 Perak, Malaysia GB Kuari Sdn Bhd 2015 Completed HD4
Sena, Perak Department)
Road Maintenance & Rehablitation at Laluan JKR Perak (Perak Public Works
130 Perak, Malaysia Belati Wangsa Sdn Bhd 2014 - 2015 Completed HD4
Tambahan, Perak Department)
Road Maintenance & Rehablitation at Jalan B48, JKR Selangor (Selangor Public
128 Selangor, Malaysia Supreme Pavement 2014 Completed HD4
Sepang, Selangor Works Department)
Road Maintenance & Rehablitation at Jalan B48, JKR Perak (Perak Public Works
127 Perak, Malaysia Belati Wangsa Sdn Bhd 2014 Completed HD4
Perworsg, Perak Department)
Road Maintenance & Rehablitation at Siput, Jalan JKR Perak (Perak Public Works
126 Perak, Malaysia Belati Wangsa Sdn Bhd 2014 Completed HD4
Hutan Melintang, Perak Department)
Road Maintenance & Rehablitation at Jalan Istana, JKR Perak (Perak Public Works
125 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Kuala Kangsar, Perak Department)
Road Maintenance & Rehablitation at Jalan Kota JKR Perak (Perak Public Works
124 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Bahru, Kampar, Perak Department)
Road Maintenance & Rehablitation at Jalan Huntly, JKR Perak (Perak Public Works
123 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Pantai Remis, Manjung, Perak Department)
Page 9 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Maintenance & Rehablitation at Kg Temong JKR Perak (Perak Public Works
122 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Kuala Kangsar, Perak Department)
Road Maintenance & Rehablitation at Jalan Kuala JKR Perak (Perak Public Works
121 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Gula Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan JKR Perak (Perak Public Works
120 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Semanggol Kerian, Perak Department)
Road Maintenance & Rehablitation at Jalan Air JKR Perak (Perak Public Works
119 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Ganda, A168, JKR Hulu Perak , Perak Department)
Road Maintenance at Road Junction of Jurong Town Lay Choon Group (Multiform Development
118 Singapore LTA, Singapore 2014 Completed HD4
Hall Road near LP157 and Construction Pte Ltd )
Road Maintenance & Rehablitation at Jalan A18, Ulu JKR Perak (Perak Public Works
117 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Dedap, JKR Perak Tengah Department)
Road Maintenance & Rehablitation at Jalan Trans JKR Perak (Perak Public Works
116 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Perak, Perak Tengah Department)
Road Maintenance & Rehablitation at Jalan Alor JKR Perak (Perak Public Works
115 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Pongsu, Kerian Department)
Road Maintenance & Rehablitation at Jalan Istana - JKR Perak (Perak Public Works
114 Perak, Malaysia GB Kuari Sdn Bhd 2014 Completed HD4
Manong, Kuala Kangsar Department)
Widening of Lorong 6 Toa Payoh and Braddel Road Toa Payoh / Breddel
113 Land Transport Authority (LTA) Hexagroup Private Limited 2014-2015 Completed HD4
between Lorong 1 Toa Payoh and Breddel Flyover Road, Singapore
Page 10 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Maintenance at Junction of Tuas link 4 - Tuas Lay Choon Group (Multiform Development
111 Singapore LTA, Singapore 2014 Completed HD4
West Road and Construction Pte Ltd )
Road Maintenance & Rehablitation at Jalan Istana - JKR Perak (Perak Public Works
107 Perak, Malaysia GB Kuari Sdn Bhd 2013 Completed HD4
Manong, Kuala Kangsar, Perak Department)
Road Maintenance & Rehablitation at Jalan JKR Perak (Perak Public Works
105 Perak, Malaysia GB Kuari Sdn Bhd 2013 Completed HD4
Transperak, Perak Tengah Department)
Proposed Pavement Structure Strengthening at Vale JKR Perak (Perak Public Works
104 Perak, Malaysia GB Kuari Sdn Bhd 2013 Completed HD4
Ph 2, JKR Manjong, Perak Department)
Page 11 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Maintenance & Rehablitation in Jalan A123, JKR Perak (Perak Public Works
102 Perak, Malaysia GB Kuari Sdn Bhd 2012 Completed HD4
KM 20, Bagan Datoh, Hilir Perak Department)
Road Maintenance & Rehablitation in Jalan A104, JKR Perak (Perak Public Works
100 Perak, Malaysia SK Juara Enterprise Sdn Bhd (744369-A) 2012 Completed HD4
KM 6, Parit Buntar, Kerian, Perak Department)
Road Maintenance at Junction of Lornie Road - Sime Lay Choon Group (Multiform Development
98 Singapore LTA, Singapore 2012 Completed HD4
Road and Construction Pte Ltd )
Page 12 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Proposed Soil Stabilization Works @ Cape Buffalo,
93 Singapore Singapore Zoo SK Engineering Pte Ltd 2012 Completed RR6
Night Safari
Pilot Design with Thicker Semi-Rigid (75mm/layer) Ley Choon Group (Ley Choon Construction Completed
87 Singapore Changi Airport Group (CAG) 2010 AF1
for Taxiway Junctions at Abingdon Road & Engineering Pte Ltd) (150mm thick)
Re-Surface with Semi-Rigid Pavement for Heavy Ley Choon Construction & Ley Choon Group (Ley Choon Construction
85 Singapore 2010 Completed HD4
Traffic Yard at 55 Kranji Cresent Engineering Pte Ltd & Engineering Pte Ltd) / Chemilink
Page 13 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Construction of Highway in Brunei Darussalam BEDB (Brunei Economic Surati Construction Sdn Bhd / China
83 Brunei 2010 - 2013 Pending HW3
(Telisai-Lumut Link Road) Development Board), Brunei Harbour
The Proposed Plantation Development at Kulim, MTS Fibromat (M) Sdn Bhd
81 Kedah, Malaysia Ministry of Agriculture, Malaysia 2010 Completed RR6
Kedah
The Proposed Plantation Development at Ketara, MTS Fibromat (M) Sdn Bhd
80 Terengganu, Malaysia Ministry of Agriculture, Malaysia 2010 Completed RR6
Terengganu
The Proposed Plantation Development at Kuala MTS Fibromat (M) Sdn Bhd
79 Selangor, Malaysia Ministry of Agriculture, Malaysia 2010 Completed RR6
Selangor, Selangor
75 Closure of Sungai Akar Landfill - Phase I Brunei PWD, Brunei Award Pending 2009 - 2011 Chemilink Stabilized Base HD4
Page 14 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Upgrading of Roads at High Density Area (Package Chemilink Stabilized Base &
67 Brunei PWD, Brunei Surati Construction Sdn Bhd 2009-2011 HD4
II), Brunei-Muara District, Brunei Sub-Base
Page 15 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
New Rural Area Development works "Leading to Chengdu City Land &Transport
64 Chengdu, Sichuan, China Chengdu Road & Bridge Builder 2009 Completed RR6
every village" Authority
New Rural Area Development works "Leading to Ba Zhong, Sichuan, Bazhong local Land & Transport
63 Bazhong Road Builder 2009 Completed RR6
every village" China Authority
Construction of Access Road and Traffic Light Public Works Department (PWD),
62 Brunei Osco Sdn Bhd 2008 - 2009 Completed HD4
Junction for City Hall, Brunei Brunei
Penyediaan Tapak Perusahaan Baru Kuala Lurah, Ministry of Industry and Primary
61 Brunei Surati Construction Sdn Bhd 2008 - 2011 Completed HD4
Phase I (Vote No 904-009) - New Industrial Park Resources, Brunei
Upgrading of Seria Bypass Road Surface, Belait Public Works Department (PWD),
60 Brunei Sagamas Sendirian Berhad 2008 - 2009 Completed HD4
District, Brunei Brunei
Page 16 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
County-level Road modification and maintenance Nan Chong, Nanchong City Government Nan Chong Transportation Development &
56 2008 Completed RR6
works Sichuan, China Authority Construction
Nan Chong, Nanchong City Government Nan Chong City Road & Bridge
55 Tong Xiang Road 2008 Completed LD5
Sichuan, China Authority Development
New Rural Area Development works "Leading to Nan Chong, Sichuan, Nanchong City Government
53 Nan Chong Road Builder 2008 Completed RR6
every village" China Authority
47 Qingqi Linking Road Dazhou, Sichuan, China Dazhou City Government Dazhou Road Development & Construction 2007 Completed LD5
Page 17 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Plaza of Chengdu Hao Sheng International Hotel Chengdu City Land &Transport
46 Chengdu, Sichuan, China Chengdu City Building Development 2007 Completed LD5
construction Authority
New Rural Area Development works "Leading to San Tai, Mian Yang,
45 Local Land & Transport Authority Santai Road Builder 2007 Completed RR6
every village" Sichuan China
Improvement of Jalan Gadong/Rimba South Link Public Works Department (PWD), SS-108 Stabilized
43 Brunei Tobishima Corporation Sdn Bhd 2006-2008 HD4
Junction Brunei Sub-base
Pi County, Sichuan,
41 Sichuan Electronic College new campus construction Local Land & Transport Authority Pi County Building Contractor 2006 Completed LD5
China
Re-Surfacing with Semi-Regid Pavement for Asphalt Hanson Building Materials (S) Ptd
40 Singapore Hanson / Chemilink Technologies Group 2006 Completed HD4
Concrete Plant Yard Ltd
Page 18 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Improvement Of Roads Starting from SG. Mau up to Public Works Department (PWD),
36 Brunei Surati Construction Sdn Bhd 2004 - 2006 Completed LD5
Longmayan/Merangking Junction, Ulu Belait Brunei
31 18 Dublin Road - Terrace House / Shop Owner Singapore Private Owner FT Services (S) Pte Ltd 2004 Completed LD5
Page 19 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
New Well Road and Pad Location Petani O-O-33,
27 Sumatra, Indonesia PT Caltex Pacific Indonesia (CPI) PT Tripatra E & C 2003 Completed LD5
CPI, Sumatra, Indonesia
Upgrading of Various High Density Roads in Brunei - Public Works Department (PWD),
26 Brunei Surati Construction Sdn Bhd 2002 - 2005 Completed HD4
Muara District - Package One Brunei
Tanah Jambu Link Road, Pavement Contract, Brunei. Public Works Department (PWD), Dara Construction Sdn Bhd
22 Brunei 2001 Completed HD4
JKR/DOR/SRC 016/2001 Brunei J-V
Rehabilitation of Jalan Malaut - Limau Manis, Phase Public Works Department (PWD),
21 Brunei Surati Construction Sdn Bhd 2000 - 2001 Completed HD4
II, Brunei JKR/DOR/SRC 036/2000 Brunei
Road Maintenance of Jalan Tutong, Phase I [Base Public Works Department (PWD),
20 Brunei Swee Sdn Bhd 2000 Completed HW3
(Crusher Run) stabilization and re-surfacing] Brunei
Airport Runway Repairing of Pulau Tioman Airport, Pulau Tioman, West Aviation Authority of Malaysia
19 Bridgecon Holdings Berhad 2000 Completed AF1
Malaysia Malaysia and JKR, Malaysia
Page 20 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Rehabilitation of Jalan Mulaut - Limau Manis
Public Works Department (PWD), LEC Sdn Bhd / Chemilink Technologies
18 Sengkurong to Brunei 1998 - 2001 Completed HD4
Brunei Group
Kuala Lurah Junction - 17.3 km
Jalan Tutong Widening from Public Works Department (PWD), Dayang Damit Joint Venture -
17 Brunei 1998 - 2000 Completed HW3
Jalan Tutong to Gadong Junction (Phase III) Brunei Surati Construction Sdn Bhd
Proposed Syncrolift Platform and Launching Beam at PT Repindo Sementasi - Joint Operation /
12 Batam, Indonesia PT Batamas Jala Nusantara 1997 Completed SP2
the Shipyard, Batam, Indonesia Chemilink Technologies Group
10 Road Diversion at Raub, Pahang, Malaysia Raub, Pahang, Malaysia PWD, Pahang, Malaysia Pembinaan Din Ibrahim Sdn Bhd 1996 Completed HD4
Page 21 of 22 24/6/2021
SELECTED PROJECT LIST OF CHEMILINK™ TECHNOLOGIES & PRODUCTS
FOR ROADS, SEAPORTS & AIRFIELDS (1994 ~ 06/2021)
ChemilinkTM SS-108 / SS-111 / SS-123 / SS-141
Soil / Stone Stabilizing Agents / High Performance Topping Compound for Semi-Rigid Pavement
The projects independently carried out by our overseas subsidiaries and the most projects handled by our local and overseas distributors / agents may not be included in this list.
Notes:
Category: AF1 - Airfield, SP2 - Sea Port, HW3 - Highway, HD4 - Heavy Duty Road, LD5 - Light Duty Road, RR6 - Rural Road.
LOCATION / STATUS /
No. PROJECT NAME OWNER MAIN-CON YEAR CATEGORY*
COUNTRY REMARKS
Road Construction with Jalan Rambai, Tutong
Public Works Department (PWD), Surati Construction
8 Chemilink Technology in Brunei (lower land and District, Brunei 1995 Completed LD5
Brunei Sdn Bhd
swampy areas)
Road Construction with Alor Gajah, Melaka, PWD & IKRAM JKR, Alor Gajah District,
7 1995 Completed LD5
Chemilink Technology in Malaysia Malaysia Malaysia Meleka, Malaysia
Construction of Industrial Access & Parking Bay at Bukit Minyak, Penang, Concord Link Development
6 Besikon Junutera Sdn Bhd 1995 Completed LD5
Bukit Minkyak Industrial Park, Malaysia Malaysia Sdn Bhd