EXT-(4cx300mm²XLPE)

Sno-148808

EXT-38100-10801
445137.925
220923.118
PCE(13756-CE)
E
N

220926.920
ST(10801-13756)
E 220923.214
N 445137.678

E
445133.971
PCE(13756-CE)
N

EXT-38100-13756
E 220927.173
N 445133.453

- EN4
)+PIL ST(10801-13756)

EXT-HDD
Sno-148935
EXT-2X(3cx240mm²XLPE

E 220865.727
445085.159
N

220817.258
E
N 445052.172
PST

ASBUILT

HROMIKA

E)+PIL-KA

0mm²XLP
2X(3cx24

220722.091 E 220725.527
444991.097

ST
E N
N 444989.552

ST
E 220831.950
A ASBUILT
E 220798.422
N 444970.830

AHROMIK
E)+PIL-K
ASBUILT
E 220681.753 0mm²XLP
N 444961.605
E 220747.787 OMIKA
N 444955.774
2X(3cx24
L-KAHR
-DUCT
E 220737.926 EXT LPE)+PI
N 444948.732
E 220680.637
ST
N 444948.902 40mm²X
E 220753.152
N 444948.095
2X(3cx2
A ASBUILT

AHROMIK
E 220831.950
N 444932.092 Sno-148808
EXT-(4cx300mm²XLPE)

E)+PIL-K
CUTOUTMCCB(F4-38100)
CUSTOMER-116641
SIZE 300A

SERVICEINNOTE
NUMBER-103188
NO-224677

E 220831.464
N 444928.968 EARTH BORE
ASBUILT
1C70-PVC-KAHROMIKA

4xSUBS
NEW-PKG-38100 E 220834.532
N 444929.302

0mm²XLP ABAL GARAREES-15

NOTE:-NEW-PKG-38100ABAL GARAREES-15
E 220833.316
N 444927.020
F3-38100
F2-38100
F1-38100

F4-38100

SLD SUBMITTED IN Sno-151485

E 220699.961
N 444927.702 2X(3cx24

N 444932.092
MCCB(F4-38100) KEY PLAN

CUTOUT SIZE 300A NOTES:

LEGEND:
CUSTOMER-116641 PE
PST

ST
PCE PROPOSED 3C x 240 SQ. MM XLPE

CE
11kV CABLE + PILOT OR AS NOTED
(PWA SCOPE OF WORK)
PROPOSED POT END/STRAIGHT JOINT

IN NUMBER-103188 // // //
(PWA SCOPE OF WORK)
EXISTING LV CABLE
CANCELLATION OF EXISTING CABLE
(PWA SCOPE OF WORK)
REALIGNMENT OF EXISTING CABLE

SERVICE NOTE NO-224677


/ / / / /
EXISTING JOINT
EXISTING DUCT
EXISTING SUBSTATION
PROPOSED DUCT
EXT-EN6 BY OTHERS AS PER SCHEME

EXISTING LV CABLE
EXISTING MV CABLE WITH PILOT
SECTION POLE
TERMINAL POLE
PB POLE BOX (MV)
L/A LIGHTNING ARRESTER
STAY
EARTHING
PROPOSED PMT

PROPOSED POLE WITH TERMINAL


BOX FOR 11KV OHL

E 220831.464
LE P L
(3cx240mm²XLPE) 000
L LE
(4cx300mm²XLPE) 000

EARTH BORE
000
000

N 444928.968 P
EE

E
000
000
000

1C70-PVC-KAHROMIKA
PE
E E 000

E
P

ASBUILT R00 APR 2021


REV.
APPROVED DESIGN AA

E 220834.532
DATE DESCRIPTION APPR.
NO.

N 444929.302 Electricity Networks Planning Department


ELECTRICITY NETWORK AFFAIRS
NEW-PKG-38100 4xSUBS
NETWORK PLANNING DEPARTMENT

ABAL GARAREES-15 F1-38100 AL KHALEJIA COMPANY


FOR MECHANICAL
KAHROMIKA W.L.L.

& ELECTRICAL PROJECTS

F2-38100 PROJECT

SUPPLY TO LABER
F3-38100 ACCOMMODATION
FOR BP-M-2020-466.

F4-38100 PROJECT CODE


ABAL GARAREES

L1-TER-GIS 908
E 220833.316 TITLE
UTILITIES
EXISTING AND PROPOSED

N 444927.020 MV NETWORK
SHEET 01
SCHEME NO.27-64-2021
NOTE:-NEW-PKG-38100ABAL GARAREES-15 DESIGNED
SNEEL SA
STATUS
APPROVED DESIGN

SLD SUBMITTED IN Sno-151485 CHECKED

DATE
RM

15 OCT 2023
APPROVAL

SCALE
AM

1:500 on A1
DWG. NO.

27-64-2021 EL / 01 R00