2+275

FOR CONTINUATION SEE DWG # NAS-2-XX16-WW030-0001-SD-06-15

N 2884443.64
MH113

E 525809.45
2+300
THIS SITE

2+325

LINE-B
L=90.06
Ø200
2+350

N 2884488.67
E 525887.44
2+375

N 2884501.91
E 525898.84
KEY PLAN

MH112

2884546.06 N
E 525906.85
L=17

MH111
2+400
4+480

4+498

.4
FOR CONTINUATION SEE DWG # NAS-2-XX16-WW030-0001-SD-03-15

7
4+460
NOTES:

4+440
1. MINIMUM COVER OVER PIPE SHOULD BE NOT LESS THAN 1.00 M. PIPES HAVING COVER

SLOW-DOWN
m L=

CHAMBER
m 44
50 LESS THAN 1.0 SHALL BE ENCASED IN PLAN CONCRETE.

N 2884435.56
E 525995.99
.87
Ø1

Ø2
N 2. A HORIZONTAL SEPARATION OF 2.00 METERS AND A VERTICAL SEPARATION OF 0.50 METER
AI

00
2+425
EM SHALL BE MAINTAINED BETWEEN POTABLE WATER AND SEWER LINES WITH THE SEWER

4+420

2884497.26 N
RC

525906.42 E
FO LINE BELOW THE WATER LINE. A HORIZONTAL SEPARATION OF 3.00 METERS SHALL BE

MH110
MAINTAINED WHERE A MINIMUM OF 0.50 METER VERTICAL SEPARATION CANNOT BE

N 2884571.22
E 525925.94
ACHIEVED. AT CROSS OVERS, WHERE THE VERTICAL SEPARATION CANNOT BE

4+400
MAINTAINED, THE SEWER LINE SHALL BE ENCASED IN CONCRETE FOR A MINIMUM LENGTH

4+260

4+280

4+300

4+320

4+340

4+360

4+380

L=3
2+450
A-01 OF 3.00 METERS ON EACH SIDE OF THE WATER LINE.

1.58
Ø20
3+800 3+820 3+840 3+860 3+880 3+900 3+920 3+940 3+960 3+980 4+000 4+020 4+040 4+060 4+080 4+100 4+120 4+140 4+160 4+180 4+200 4+220 4+240
3. FOR GRAVITY PIPE LESS THAN OR EQUAL TO 600MM DIAMETER, VITRIFIED CLAY PIPE (VC)

0
SHALL BE USED CONFORMING TO SASO 236/235-1995. FOR PIPES GREATER THAN 600MM

MH109
FORCEMAIN Ø150mm FORCEMAIN Ø150mm DIAMETER GLASS REINFORCED PLASTIC (GRP) PIPES SHALL BE USED CONFORMING TO
3+700 3+725 3+750 3+775 3+800 3+825 3+850 3+875 3+900 3+925 3+950 3+975 4+000 4+025 4+050 4+075 4+100 4+125 4+150 4+175 4+200 4+225 4+250 4+275 4+450 4+475 4+500 4+525 4+550 4+575 SN-10,0. FOR FORCEMAIN DUCTILE IRON (DI) PIPES SHALL BE USED CONFORMING TO ISO
4+300 4+325 4+350 4+375 4+400 4+425 4+625 2531.

L=26.13
4+600 4. THE LOCATION OF THE SEWER LINES AND MANHOLE CHAMBERS SHALL GENERALLY BE AS

2+475
INDICATED ON THE DRAWINGS, HOWEVER, THE EXACT LOCATION ON SITE SHALL BE

MH108
MODIFIED AS NECESSARY TO SUIT THE EXISTING CONDITION AS APPROVED BY THE

RA # 03
ENGINEER.

N 2884583.61
E 525948.94
2+500

L=2
A-01 LEGEND:

8.47
INTERFACE POINT WITH OTHER CONTRACTS

MH107
PROPOSED SEWER LINE

L-OM-02
12+525
N 2884576.35
E 526031.99
Ø2
0 0 MH PROPOSED SANITARY SEWER MANHOLE
LI L=40

MH106
NE .03
DIRECTION OF FLOW IN PIPE

N 2884586.17
-B

E 525977.29
STUBOUT FOR FUTURE CONNECTION

L=17
2+550
PROPOSED FORCEMAIN LINE

.20

N 2884573.03
INTERFACE POINT AIR RELEASE VALVE

MH105

E 526015.11
N 2884671.676
E 525926.933 BOX / PIPE CULVERT

2+575

L=43.87
WASHOUT

MH104
2+600
ABBREVIATIONS:

DISTRIBUTION SUBSTATION ROOM-3

N 2884598.28
E 526069.99
LOCAL MEDIUM VOLTAGE
MH MANHOLE

2+625
Ø PIPE DIAMETER IN mm
LS LIFT STATION

UT17
IL INVERT LEVEL
IC INSPECTION CHAMBER

LINE-B
WO WASHOUT

L=90.00
Ø200
ARV AIR RELEASE VALVE

2+650
REFERENCE DRAWINGS:
DRAWING NO. DRAWING TITLE

SS-SF-01
FOR CONTINUATION SEE DWG # NAS-2-XX16-WW030-0001-SD-06-15 1422-04-WW-000 SEWAGE COLLECTION SYSTEM OVERALL LAYOUT PLAN
1422-04-WW-001 TO 047 SEWAGE COLLECTION SYSTEM LAYOUT PLAN (SHEET 1 TO 25)

0 05.11.2020 SUBMITTAL FOR APPROVAL

REV DATE DESCRIPTION


CLIENT:

MINISTRY OF DEFENCE
ROYAL SAUDI AIR FORCES

SUPERVISION:

ENGINEERING AND WORKS


DEPARTMENT
ENGINEERING AFFAIRS
PROJECT:

KING FAISAL AIR ACADEMY


IN MAJMA'A
A-01 A-01
PMC:
Dar Al-Riyadh Consultants
P.O. Box 250170, Riyadh 11391-Saudi Arabia
70.00 4+750 4+775 4+800 4+825 4+850 4+875 4+900 4+925 4+950 4+975 5+000 5+025 5+050 5+075 5+100 5+125 5+150 5+175 5+200 5+225 5+250 5+275 5+300 5+325 5+350 5+375 5+400 5+425 5+450 5+475 5+500 5+525 5+550 5+575 Tel.: (+966-11) 206 00 88
4+650 4+675 4+700 4+725 www.daralriyadh.com

CONTRACTOR(S):
14.25
JV NAS
P.O. Box 4339, Riyadh 11491-Saudi Arabia
Tel.: (+966-11) 408 51 00
Fax: (+966-11) 405 78 28

CONTRACTOR'S CONSULTANT:
L-OM-01

Facility Name:
INTERFACE POINT
N 2884896.356
E 525797.218
PHASE - II
PRIMARY INFRASTRUCTURE
Drawing Title:
UP
RAMP

SEWAGE COLLECTION SYSTEM


RAMP
UP
LAYOUT PLAN
(SHEET 4 OF 15)
UP

Scale: Date:
1 : 1000 05.11.2020
RAMP

RAMP

Prepared: Checked: Checked: Approved:


UP

S.V A.T S.N.S M.H


RAMP RAMP

Sheet No. Rev.


UP

RAMP

NAS-2-XX16-WW030-0001-SD-04-15 00
SS-SF-01