0+200

MH39 THIS SITE


E 530575.28

PERIPHERY ROAD
N 2885401.52

12+500
0+150
LINE-B
L=90.00
Ø600
0+100
E 530575.28
N 2885311.52

MH40 KEY PLAN


FOR CONTINUATION SEE DWG # NAS-2-XX16-WW030-0001-SD-08-15

NOTES:
1. MINIMUM COVER OVER PIPE SHOULD BE NOT LESS THAN 1.00 M. PIPES HAVING COVER

12+400
LESS THAN 1.0 SHALL BE ENCASED IN PLAN CONCRETE.

L-09
PROVIDE AN END PLUG

L=73.87
2. A HORIZONTAL SEPARATION OF 2.00 METERS AND A VERTICAL SEPARATION OF 0.50 METER

0+050
AND SHORT PIECE FOR
SHALL BE MAINTAINED BETWEEN POTABLE WATER AND SEWER LINES WITH THE SEWER
POSSIBLE FUTURE CONNECTION 7+950
7+925 LINE BELOW THE WATER LINE. A HORIZONTAL SEPARATION OF 3.00 METERS SHALL BE
00 MAINTAINED WHERE A MINIMUM OF 0.50 METER VERTICAL SEPARATION CANNOT BE
7+9 ACHIEVED. AT CROSS OVERS, WHERE THE VERTICAL SEPARATION CANNOT BE
E 530575.28 A-05A MAINTAINED, THE SEWER LINE SHALL BE ENCASED IN CONCRETE FOR A MINIMUM LENGTH
E 530395.28 E 530485.28 5
87 OF 3.00 METERS ON EACH SIDE OF THE WATER LINE.
LINE-B N 2885237.64 LINE-B N 2885237.64 N 2885237.64 7+
3. FOR GRAVITY PIPE LESS THAN OR EQUAL TO 600MM DIAMETER, VITRIFIED CLAY PIPE (VC)
L=90.00 L=90.00 L=90.00 0 SHALL BE USED CONFORMING TO SASO 236/235-1995. FOR PIPES GREATER THAN 600MM
Ø600 Ø600 7 +85 DIAMETER GLASS REINFORCED PLASTIC (GRP) PIPES SHALL BE USED CONFORMING TO
MH43 MH42 MH41
5 SN-10,0. FOR FORCEMAIN DUCTILE IRON (DI) PIPES SHALL BE USED CONFORMING TO ISO
7+82 2531.
7+000 7+025 7+050 7+075 7+100 7+125 7+150 7+175 7+200 7+225 7+250 7+275 7+300 7+325 7+350 7+375 7+400 7+425 7+450 7+475 7+500 7+525 7+550 7+575 7+600 7+625 7+650 7+675 7+700 7+725 7+750 7+775 7+800 7+850 7+875 7+900 7+925

0+000
7+825 4. THE LOCATION OF THE SEWER LINES AND MANHOLE CHAMBERS SHALL GENERALLY BE AS
INDICATED ON THE DRAWINGS, HOWEVER, THE EXACT LOCATION ON SITE SHALL BE
7+800 MODIFIED AS NECESSARY TO SUIT THE EXISTING CONDITION AS APPROVED BY THE
ENGINEER.

A-05
A-05 PT: 12+319.00 LEGEND:
INTERFACE POINT WITH OTHER CONTRACTS

PROPOSED SEWER LINE

12
+3
MH PROPOSED SANITARY SEWER MANHOLE

00
12+200 12+100 DIRECTION OF FLOW IN PIPE

PC: 12+279.73
PERIPHERY ROAD STUBOUT FOR FUTURE CONNECTION

PROPOSED FORCEMAIN LINE

AIR RELEASE VALVE

BOX / PIPE CULVERT

WASHOUT

ABBREVIATIONS:
MH MANHOLE
Ø PIPE DIAMETER IN mm
LS LIFT STATION
IL INVERT LEVEL
IC INSPECTION CHAMBER
WO WASHOUT
ARV AIR RELEASE VALVE

REFERENCE DRAWINGS:
Refer to the attached DRAWING NO. DRAWING TITLE
1422-04-WW-000 SEWAGE COLLECTION SYSTEM OVERALL LAYOUT PLAN
Comment's Sheet 1422-04-WW-001 TO 047 SEWAGE COLLECTION SYSTEM LAYOUT PLAN (SHEET 1 TO 25)
X

X X X X X X
X
X
X

Supervision and Management Services for King Faisal Air Academy


Facilities Relocation and Construction Project, Majmaah
X
X
X

X X X X X X X X X DOCUMENT / DESIGN REVIEW


X

☐ A - Approved - Construction / Fabrication / installation may be undertaken.


- Approval does not authorize changes in contract sum or contract time.
X

☐ B - Approved as noted
X

☐ C - Revise and Resubmit - Construction / Fabrication / installation may not be undertaken.


- In resubmitting, limit corrections to the items marked.
X

☐ D - Rejected 0 05.11.2020 SUBMITTAL FOR APPROVAL


- Dar Al Riyadh approval of submitted item is not required or the submittal is
X

☐ E - Not reviewed not complying with contact requirements

Squad Checking:
☐ Architecture ☐ Interior Design ☐ Civil ☐ Electrical ☐ Survey REV DATE DESCRIPTION
X

X
☐ Mechanical ☐ Structural ☐ Telecom ☐ Landscape
CLIENT:
X

Reviewed By : NM/OK Date: 22 November 2020


X

Disclaimer:
1. Review and approval are for conformance with the information given and the design concept of the Project as MINISTRY OF DEFENCE
X

expressed in the Contract Documents.


ROYAL SAUDI AIR FORCES
X

2. Dar Al Riyadh review and approval of the Contractor’s submittals shall not relieve the Contractor from any
obligation contained in the Contract Documents.
3. No responsibility is assumed for accuracy or completeness of submittal dimensions, quantities or details.
X

4. The Contractor is responsible to field verify all dimensions prior to fabrication, Construction or installation. SUPERVISION:
X

5. Coordinate with all adjacent and/or related contractors, disciplines, other equipment and materials.
X

6. Respond to and address all previous comments from Dar Al Riyadh.


7. Comply with the requirements of all required approving authorities and obtain timely approval/consent as
ENGINEERING AND WORKS
DEPARTMENT
X

necessary.
X

ENGINEERING AFFAIRS
X

PROJECT:
X

KING FAISAL AIR ACADEMY


INTERFACE POINT INTERFACE POINT
X

IN MAJMA'A
X

N 2885302.112 N 2885302.112
X

AP14
AP14
E 531382.655 E 531514.177
PMC:
X

X X X X X X
AP14 X X X X X X X X X X X X X X X X X X X X X X X X X
Dar Al-Riyadh Consultants
P.O. Box 250170, Riyadh 11391-Saudi Arabia
Tel.: (+966-11) 206 00 88
X
www.daralriyadh.com
X
CONTRACTOR(S):
X JV NAS
X P.O. Box 4339, Riyadh 11491-Saudi Arabia

7+975 8+050 8+075 8+150 8+175 8+200 8+225 8+250 8+200 8+300 8+325 8+350 8+375 8+400 8+425 8+450 8+475 8+500 8+525 8+550 8+575 Tel.: (+966-11) 408 51 00
0+000

0+000

8+000 8+025 8+100 8+125 8+600 X


Fax: (+966-11) 405 78 28
X

8+6 X
A-05A A-05A 25 CONTRACTOR'S CONSULTANT:
X
8+
65
X

0 X X X X X X X X X X X

8+6
75
8+700 Facility Name:
X

7+950 7+975 8+000 8+025 8+075 8+100 8+125 8+150 8+200 8+225 8+250 8+275 8+300 8+325 8+350 8+375 8+400 8+425 8+450 8+475 8+500 8+525 8+550 8+575 8+600 8+625 8+650 8+675 8+725 8+750 8+750 8+800 8+825 8+850

8+050
PHASE - II
8+175 8+700 8+725 8+750 8+775 8+800 8+825 8+850 8+875 8+900
PRIMARY INFRASTRUCTURE
A-05 A-05 A-05
X

Drawing Title:
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SEWAGE COLLECTION SYSTEM
X LAYOUT PLAN
12+000 11+900 11+800 11+700 11+600 11+500 11+400 11+300 11+200
(SHEET 9 OF 15)

PT: 11+210.85
PERIPHERY ROAD
Scale: Date:
1 : 1000 05.11.2020

.96
28
+1
11+ Prepared: Checked: Checked: Approved:

11
100

C:
PR
S.V A.T S.N.S M.H

Sheet No. Rev.

NAS-2-XX16-WW030-0001-SD-09-15 00