ALTERNATIVE ROUTE PLAN

-02

LINE

WATER
PIT 3.00m

DEWA

EXIST.300mmØ
IAL th= .00 m
TR ng =1 .20 1

th= PIT 1.006


Le dth =1 .59
Wi pth 919

LINE

Le IAL 7725

3.0 -01
De 483

ER

0m
WAT
D)

TR 27
E=

PAVE

N=
DEW
LOCK
.00 m
=1 .20 2

mmØ
NTER
D)

ng
dth =1 .68 57

PAVE

EXIS .W
T.300
0

.R.D(I
Wi pth 3921 248.7

R.O
LOCK

EXIST
1.2

NTER
De 48 77

.R.D(I
E= 27

North

EXIST

EXIST
N=

MEDIAN
.W

PARKING

E
ENTRANC
m
R.O

1.00
.00

3.00

3.00
15

1.00
N
CTIO
STRU CLES
ONLY
CON VEHI SS

AL SAFOUH 2ND
ACCE

N CONE
MA TY
AG SAFE
FL

25
.00

.W
m

R.O
25

SPE UCE
.00
m

ED
RED
.70

m
19
30m
52.

25
.00
m AT

K
MEN

WOR
.W
R.O
.90
19

DELAYFOR D
25

AHEA
.00

SORR S
Y
WORK
m

ANY
.W
R.O

.W
R.O
AL THANYAH 1ST

.09
20
Key Plan THIS LOCATION

LEGEND:

EXIST.300mmØ DEWA WATER LINE

WORK AREA

EXIST.INTERLOCK PAVING

TEMPORARY SAFETY BARRIER


(PLASTIC JERSEY BARRIER)
TEMPORARY END OF LANE ARROW
PROP.TRIAL PIT LOCATION
SAFETY CONES

FLASHING LIGHT

Work Time(Night 11Pm To Morning 6 Am

EXIST.300mmØ DEWA WATER LINE


TSPS FOR PROP.TRIAL PIT

EXIST.300mmØ DEWA WATER LINE


EXIST.R.D(INTERLOCK PAVED)
LI NT

EXIST.R.D(INTERLOCK PAVED)
TRIAL PIT-02 DUBAI ELECTRICITY & WATER AUTHORITY
TRANSMISSION & DISTRIBUTION
Length=3.00m

R.O.W

R.O.W
WATER DEPARTMENT
Width=1.00 P.O.BOX:564 DUBAI-U.A.E TEL:04-3244444 FAX:04-3244922
Depth=1.20m

MEDIAN
1.20 E=483919.591 ONTRA TOR
15.00m N=2777251.006
S Y D ONTRA TIN L L
EXIST

1.00 TRIAL PIT-01


Length=3.00m Westburry Commercial Towers,Room No:305-306

3.00
PARKING
ENTRANCE

Width=1.00 Business Bay P.O.Box 282194, Dubai,UAE

3.00
R.O.W 1.00
Depth=1.20m
E=483921.682 Tel: 04 267 7657, Fax: 04 267 7728.
N=2777248.757 W(P&E)/WM DEWA MANAGER:
20.09

19.90
CLIENT:
FLAGMAN
SURVEYOR: DESIGNING ENG: PROJECT ENG:
CONSTRUCTION
SAFETY CONE VEHICLES
R.O.W ACCESS ONLY

25.00m
CONTRACTOR:
SURVEYOR: PROJECT MANAGER:

19.70m

R.O.W

R.O.W
52.30m

25.00m
REDUCE
SPEED PROJECT NAME
PREVENTATIVE MAINTENANCE FOR THE WATER
NETWORK FROM 100MM TO 1200MM DIA. INCLUDING
TRIAL PIT LOCATION

25.00m
REPAIR,REINSTATE,SUPPLY, INSTALLATION, TESTING
AND COMMISSIONING OF PIPELINES AND ASSOCIATED

AL
FACILITIES IN THE EMIRATES OF DUBAI
PROJECT NO: RFX-2421900057
MEN AT
WORK
DRAWING TITLE:

TH

25.00m
PROP.TRAFFIC SAFETY ARRANGEMENT DETAILS FOR TRIAL PIT
FOR EXIST.DEWA GATE VALVE RECTIFICATION @ 383-AL THANYAH 1ST
Dr h A ro
PP oor h oor h
D
AHEA Sh t or S Sh t r
WORKS Y FOR
SORR LAY A3 NTS 01
ANY DE
DRA IN NU R DAT R
RFX-57/TSPS/TRIAL PIT/383-AL THANYAH FIRST-001 17-01-2022 00