Professional Documents
Culture Documents
-02
LINE
WATER
PIT 3.00m
DEWA
EXIST.300mmØ
IAL th= .00 m
TR ng =1 .20 1
LINE
Le IAL 7725
3.0 -01
De 483
ER
0m
WAT
D)
TR 27
E=
PAVE
N=
DEW
LOCK
.00 m
=1 .20 2
mmØ
NTER
D)
ng
dth =1 .68 57
PAVE
EXIS .W
T.300
0
.R.D(I
Wi pth 3921 248.7
R.O
LOCK
EXIST
1.2
NTER
De 48 77
.R.D(I
E= 27
North
EXIST
EXIST
N=
MEDIAN
.W
PARKING
E
ENTRANC
m
R.O
1.00
.00
3.00
3.00
15
1.00
N
CTIO
STRU CLES
ONLY
CON VEHI SS
AL SAFOUH 2ND
ACCE
N CONE
MA TY
AG SAFE
FL
25
.00
.W
m
R.O
25
SPE UCE
.00
m
ED
RED
.70
m
19
30m
52.
25
.00
m AT
K
MEN
WOR
.W
R.O
.90
19
DELAYFOR D
25
AHEA
.00
SORR S
Y
WORK
m
ANY
.W
R.O
.W
R.O
AL THANYAH 1ST
.09
20
Key Plan THIS LOCATION
LEGEND:
WORK AREA
EXIST.INTERLOCK PAVING
FLASHING LIGHT
EXIST.R.D(INTERLOCK PAVED)
TRIAL PIT-02 DUBAI ELECTRICITY & WATER AUTHORITY
TRANSMISSION & DISTRIBUTION
Length=3.00m
R.O.W
R.O.W
WATER DEPARTMENT
Width=1.00 P.O.BOX:564 DUBAI-U.A.E TEL:04-3244444 FAX:04-3244922
Depth=1.20m
MEDIAN
1.20 E=483919.591 ONTRA TOR
15.00m N=2777251.006
S Y D ONTRA TIN L L
EXIST
3.00
PARKING
ENTRANCE
3.00
R.O.W 1.00
Depth=1.20m
E=483921.682 Tel: 04 267 7657, Fax: 04 267 7728.
N=2777248.757 W(P&E)/WM DEWA MANAGER:
20.09
19.90
CLIENT:
FLAGMAN
SURVEYOR: DESIGNING ENG: PROJECT ENG:
CONSTRUCTION
SAFETY CONE VEHICLES
R.O.W ACCESS ONLY
25.00m
CONTRACTOR:
SURVEYOR: PROJECT MANAGER:
19.70m
R.O.W
R.O.W
52.30m
25.00m
REDUCE
SPEED PROJECT NAME
PREVENTATIVE MAINTENANCE FOR THE WATER
NETWORK FROM 100MM TO 1200MM DIA. INCLUDING
TRIAL PIT LOCATION
25.00m
REPAIR,REINSTATE,SUPPLY, INSTALLATION, TESTING
AND COMMISSIONING OF PIPELINES AND ASSOCIATED
AL
FACILITIES IN THE EMIRATES OF DUBAI
PROJECT NO: RFX-2421900057
MEN AT
WORK
DRAWING TITLE:
TH
25.00m
PROP.TRAFFIC SAFETY ARRANGEMENT DETAILS FOR TRIAL PIT
FOR EXIST.DEWA GATE VALVE RECTIFICATION @ 383-AL THANYAH 1ST
Dr h A ro
PP oor h oor h
D
AHEA Sh t or S Sh t r
WORKS Y FOR
SORR LAY A3 NTS 01
ANY DE
DRA IN NU R DAT R
RFX-57/TSPS/TRIAL PIT/383-AL THANYAH FIRST-001 17-01-2022 00