Professional Documents
Culture Documents
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1360
SH.
1
REV.
A 1
REVISIONS
ROZE M.
A FIRST ISSUE 23 DEC 08 BALCER L.
DELIMOGES S.
NOTES:
1. SE REFERER AU "DEVICE SUMMARY" (MLI 0414) POUR LA DESCRIPTION ET LE REGLAGE DES APPAREILS.
1. REFER TO DEVICE SUMMARY (MLI 0414) FOR DEVICE SETTINGS AND DESCRIPTION.
D D
2. SE REFERER AU PLAN D'IMPLANTATION (MLI 0313) ET AUX NOTES (MLI 0314) POUR LA POSITION ET LES CARACTERISTIQUES DES CONNEXIONS PC TURBINE.
2. REFER TO OUTLINE DRAWING (MLI 0313) AND NOTES (MLI 0314) FOR GAS TURBINE PC CONNECTION POSITIONS AND CHARACTERISTICS.
3. SE REFERER AUX DOCUMENTS 3 ET 4 DE LA LISTE DES DOCUMENTS COMPLEMENTAIRES POUR CE QUI CONCERNE LES RECOMMANDATIONS SUR L'EAU D'INJECTION.
3. REFER TO DOCUMENTS 3 AND 4 OF LIST OF COMPLEMENTARY DOCUMENTS FOR WATER INJECTION RECOMMENDATIONS.
4. LE FILTRE CONIQUE EN AMONT DE LA POMPE DOIT ETRE NETTOYE APRES 500 HEURES DE FONCTIONNEMENT DU SKID, ET TOUS LES 3 ANS ENSUITE.
4. THE CONICAL FILTER UPSTREAM OF THE PUMP MUST BE CLEANED AFTER THE INITIAL 500 HOURS OF OPERATION AND EVERY THREE YEARS AFTER.
NOMENCLATURE IDENT
A A REV
REV STATUS
OF SHEETS
2 1 SH
N
IO
AT
M
R
FO
REFERENCE NUMBER : E0880 100 IK0 FD 002 REVISION : A
al
23/12/2008 23/12/2008 23/12/2008
IN
ECH / SCALE
None DATE 23/12/2008 23/12/2008 23/12/2008
ROZE MAGALI BALCER LAURENT DELIMOGES SYLVAIN
ci
None NOM / NAME ROZE MAGALI BALCER LAURENT DELIMOGES SYLVAIN
ROZE MAGALI BALCER LAURENT DELIMOGES SYLVAIN
R
FORMAT
A1 / SIZE VISA ROZE MAGALI BALCER LAURENT DELIMOGES SYLVAIN
ffi
FO
VALIDE
A1 REDIGE / MADE VERIFIE / CHECKED APPROUVE / APPROVED
TITRE / TITLE
O
GAS TURBINE
SCHEMA WITH ASSOCIATES
TUYAUTERIE INJECTION ITEMS-PIPING
EAU
AND INSTRUMENT DIAGRAM (P&I D)
E
0462, PID, WATER INJECTION SYSTEM
NOMS / NAMES GENERAL ELECTRIC COMPANY
VALIDE
DIAG SCH PP WATER INJECTION
DRAWN ROZE M.
JESSICA
CHECKED BALCER L.
CHENUT BRIGITTE
APPROVED DELIMOGES S.
A Ce document, propriété exclusive de
GE Energy Products France SNC SCHEMA TUY.INJECTION EAU REVISION
GE Energy A
DIAG. SCH. PP-WATER INJECTIONA
MILLOTTE
est strictement confidentiel. Il ne peut
être communiqué, copié ou reproduit
227D1360
A1
DISTR
Ce document, propriete exclusive de This document, exclusive property of Section Doc.
is strictly confidential. It must not be
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be com municated communicated, copied or reproduced 01 FX
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. without
SIM TO:our previous written consent.
219D1277 1/2
1/2
SHEET. SCALE
N° REV. : A SHEET : 1
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)
FORMAT UTILE:(841 X 594)
8 7 6 5 4 3 SIZE
A1
DWG.NO.
227D1360
SH.
2
REV.
A 1
TYP. POUR 8 BUSES D'INJECTION D'EAU TYP. POUR 4 BUSES D'INJECTION D'EAU
VERS RESERVOIR
(POUR UN INJECTEUR FUEL)
TO WATER TANK
(POUR UN INJECTEUR FUEL)
WJ10 (FOR ONE FUEL NOZZLE)
PC
(FOR ONE FUEL NOZZLE)
PC
WJ3
WD
63WN-1 63WN-2
MANIFOLDS POUR
PI PI PSL 14 INJECTEURS FUEL
PDSL
MANIFOLDS SUPPLY
STOP VALVE FOR 14 FUEL NOZZLES
ASSEMBLY
ALIMENTATION EN EAU
FROM WATER SUPPLY
(VPR62-13)
WD
HV110 (FO-1)
HV121
NC HV111
HV120 NC VTA
NO
WD
ON
(20WN-2)
WD
WI2
PC
WD
PC
PW1-1 C
C WI1
VS2-2 PC SOCLE TURBINE
TURBINE BASE
(33WN-7)
(33WN-8)
ZSH
ZSL TURBINE BASE PIPING MLI 0968
HV130
CONTROL
VALVE
WD
VCK110
WD
WD
ASSEMBLY PC
PDI FC
NO WJ2
( VPR62-1 )
63WN-3
HV127 HV129
NC NC ( VPR62-11)
VTA
VTA
HV126
NC
( 90WN-1 )
(20WN-1)
MEGA DEAL PROJECT E B
B NC I
P
( 33WN-1 )
HV123 ( VQE1-1 )
ZSH
FW1-1 ( 33WN-2)
( 96WF-1) ( 96WF-2)
HV128 ZSL
N
HV122 NO NO FT FT
NO NO
IO
HV124 HV125
AT
FC
( 96WF-3) FW1-3 VS2-1
M
FT
(33WN-3)
R
VC4-1
FO
FM1-1 (33WN-4) ZSH REFERENCE NUMBER : E0880 100 IK0 FD 002 REVISION : A
al
HV131
ZSL 23/12/2008 23/12/2008 23/12/2008
IN
ECH / SCALE
None DATE 23/12/2008 23/12/2008 23/12/2008
VCK111 ROZE MAGALI BALCER LAURENT DELIMOGES SYLVAIN
ci
None NOM / NAME ROZE MAGALI BALCER LAURENT DELIMOGES SYLVAIN
PC ROZE MAGALI BALCER LAURENT DELIMOGES SYLVAIN
R
FORMAT
A1 / SIZE VISA ROZE MAGALI BALCER LAURENT DELIMOGES SYLVAIN
FC NO
ffi
WJ4
FO
VALIDE
A1 REDIGE / MADE VERIFIE / CHECKED APPROUVE / APPROVED
DRAIN
TITRE / TITLE
MODULE INJECTION D'EAU A035
O
WATER INJECTION MODULE A035 GAS TURBINE
SCHEMA WITH ASSOCIATES
TUYAUTERIE INJECTION ITEMS-PIPING
EAU
PC AND INSTRUMENT DIAGRAM (P&I D)
WJ5
E
0462, PID, WATER INJECTION SYSTEM
NOMS / NAMES GENERAL ELECTRIC COMPANY
VALIDE
DIAG SCH PP WATER INJECTION
DRAWN ROZE M.
JESSICA
CHECKED BALCER L.
CHENUT BRIGITTE
APPROVED DELIMOGES S.
A Ce document, propriété exclusive de
GE Energy Products France SNC SCHEMA TUY.INJECTION EAU REVISION
GE Energy A
A
MILLOTTE
est strictement confidentiel. Il ne peut
être communiqué, copié ou reproduit DIAG. SCH. PP-WATER INJECTION
0462 sans son autorisation écrite préalable
DISTR
Ce document, propriete exclusive de Section Doc.
is strictly confidential. It must not be
TO
GE Energy Products France SNC est GE Energy Products France SNC
strictement confidentiel. IL ne peut etre communique, is strictly confidential. It must not be com municated communicated, copied or reproduced 01 FX
copie ou reproduit sans son autorisation ecrite prealable. copied or reproduced without our previous written consent. without
SIM TO:our previous written consent.
219D1277 2/2
N°2/2
SHEET. SCALE REV. : A SHEET : 2
8 7 6 5 4 3 2 1
FORMAT A1:841 X 594 (ISO 5457-1980)