Professional Documents
Culture Documents
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
DATE:
DATE:
DATE:
DATE:
DATE:
C
THIS INDICATES THAT REV. NO.__________
A 03/29/18 10-01390 NOT ISSUED FFA AAM NMH
OF THIS DRAWING IS COVERED, FOR ALL SAH
CONTROL NUMBER
TJM
AHJ
KZS
FAR
AAM
APPROVAL/CERTIFICATION REQUIREMENTS, 09/19/18 10-01390 NOT ISSUED FFA AAM NMR
B VGA
AGENCY
BY:
PROJECT
BY DRAWING COMPLETION CERTIFICATE
ENGINEER
ENGINEER
01/24/19
DISCIPLINE
01/24/19
01/24/19
CERTIFIED
01/24/19
01/24/19
AAM FAR
OPERATIONS
KZS
CONSTRUCTION
_____________________
(DCC) NO.10-01390-0001-500 C 01/24/19 10-01390 ISSUED FOR 90% SUBMITTAL TJM
DATE:
`
BERRI
Saudi Aramco 2616-ENG (03/99)
SAUDI ARABIA
Prepared by
BI-10-01390
JANUARY 2019
475
JO / EWO:
(STRUCTURAL)
DETAILED DESIGN
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-01390-0001
GAS FACILITIES PROJECTS DEPARTMENT
NORTHERN AREA GAS PROJECTS DIVISION
DRAWING NO.
TO-456023
3
1
OF
SHT.NO.
BUILDING RISK MITIGATION –BGP HVAC REPLACEMENT
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MATERIAL TAKE-OFF LIST
ARAMCO 6228-ENG (11/2010)
REV. SAMS PER DWG.
DESCRIPTION SAP # QTY I/U STATUS REMARKS
CODE STOCK NUMBER REQ. CODE
PACU-01 FOUNDATION QTY. FOR 1 UNIT(S)
C 12 DIA. REINFORCING STEEL DEFORMED BAR, 0.888 KG/M Contractor Supply 22.56 kg
FUSION BONDED EPOXY COATED AS PER 09-SAMSS-106
422 Mpa (60,000 PSI) YIELD STRENGTH AS PER ASTM A615
C 16 DIA. REINFORCING STEEL DEFORMED BAR, 1.578 KG/M Contractor Supply 507.51 kg
FUSION BONDED EPOXY COATED AS PER 09-SAMSS-106
422 Mpa (60,000 PSI) YIELD STRENGTH AS PER ASTM A615
C COMPACTED SELECT FILL / UNDISTURBED SOIL AS PER SAES-A-114 Contractor Supply 3.78 m3
LEGEND: CS=CONTRACTOR SUPPLY, m=METER, EA=EACH, m²=SQUARE METER, m³=CUBIC METER, kg=KILOGRAMS FOR OTHER UNITS & LEGENDS REFER TO SAEP-103
NOTES: "CONSTRUCTION CONTRACTOR SHALL VERIFY ALL QUANTITIES OF CONTRACTOR SUPPLIED
MATERIAL REQUIRED TO PERFORM THE WORK, AS DETAILED, ON THE CONSTRUCTION DRAWINGS"
APPROVAL
COMPILED BY REV. REFERENCE DRAWING
CHECKED DATE PROJECT ENG DATE
SLFE AHJ C NFP Jan-19 VGA Jan-19 CA-456025-001
ISSUED FOR 90% SUBMITTAL
B.I. E.W.O. PHASE ENG. ITEM AREA START-UP DATE PRELIM X REVISION C
10-01390-0001 400 STRUCTURAL FINAL REVISION
INDEX Materials for: MISCELLANEOUS EQUIPMENT PAD FOUNDATION (PACU) SHEET 2 of 3
Q SRU OME NIC (BLDG 43)
PLANT SULFUR RECOVERY UNIT T/O-456023
475 BERRI SAUDI ARABIA
Revised By RRED, March 2006
MATERIAL TAKE-OFF LIST
ARAMCO 6228-ENG (11/2010)
REV. SAMS PER DWG.
DESCRIPTION SAP # QTY I/U STATUS REMARKS
CODE STOCK NUMBER REQ. CODE
AIR STACK FOUNDATION QTY. FOR 1 UNIT(S)
C 16 DIA. REINFORCING STEEL DEFORMED BAR, 1.578 KG/M Contractor Supply 293.14 kg
FUSION BONDED EPOXY COATED AS PER 09-SAMSS-106
422 Mpa (60,000 PSI) YIELD STRENGTH AS PER ASTM A615
C 10 DIA. REINFORCING STEEL DEFORMED BAR, 0.616 KG/M Contractor Supply 94.02 kg
FUSION BONDED EPOXY COATED AS PER 09-SAMSS-106
422 Mpa (60,000 PSI) YIELD STRENGTH AS PER ASTM A615
C COMPACTED SELECT FILL / UNDISTURBED SOIL AS PER SAES-A-114 Contractor Supply 1.77 m3
LEGEND: CS=CONTRACTOR SUPPLY, m=METER, EA=EACH, m²=SQUARE METER, m³=CUBIC METER, kg=KILOGRAMS FOR OTHER UNITS & LEGENDS REFER TO SAEP-103
NOTES: "CONSTRUCTION CONTRACTOR SHALL VERIFY ALL QUANTITIES OF CONTRACTOR SUPPLIED
MATERIAL REQUIRED TO PERFORM THE WORK, AS DETAILED, ON THE CONSTRUCTION DRAWINGS"
APPROVAL
COMPILED BY REV. REFERENCE DRAWING
CHECKED DATE PROJECT ENG DATE
SLFE AHJ C NFP Jan-19 VGA Jan-19 CA-456026-001
ISSUED FOR 90% SUBMITTAL
B.I. E.W.O. PHASE ENG. ITEM AREA START-UP DATE PRELIM X REVISION C
10-01390-0001 400 STRUCTURAL FINAL REVISION
INDEX Materials for: MISCELLANEOUS EQUIPMENT PAD FOUNDATION (AS) SHEET 3 of 3
Q SRU OME NIC (BLDG 43)
PLANT SULFUR RECOVERY UNIT T/O-456023
475 BERRI SAUDI ARABIA
Revised By RRED, March 2006