You are on page 1of 3

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
C
THIS INDICATES THAT REV. NO.__________
A 03/29/18 10-01390 NOT ISSUED FFA AAM NMH
OF THIS DRAWING IS COVERED, FOR ALL SAH
CONTROL NUMBER

TJM
AHJ

KZS

FAR
AAM
APPROVAL/CERTIFICATION REQUIREMENTS, 09/19/18 10-01390 NOT ISSUED FFA AAM NMR
B VGA

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER

01/24/19
DISCIPLINE

01/24/19
01/24/19

CERTIFIED
01/24/19

01/24/19
AAM FAR

OPERATIONS
KZS

CONSTRUCTION
_____________________
(DCC) NO.10-01390-0001-500 C 01/24/19 10-01390 ISSUED FOR 90% SUBMITTAL TJM
DATE:
`

BERRI
Saudi Aramco 2616-ENG (03/99)

SULFUR RECOVERY PLANT


MATERIAL TAKE-OFF LISTS (STRUCTURAL)

BUILDING RISK MITIGATION –BGP HVAC REPLACEMENT DD


MTL

SAUDI ARABIA
Prepared by
BI-10-01390

JANUARY 2019

475

JO / EWO:
(STRUCTURAL)
DETAILED DESIGN

A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

MATERIAL TAKE-OFF LISTS

10-01390-0001
GAS FACILITIES PROJECTS DEPARTMENT
NORTHERN AREA GAS PROJECTS DIVISION

DRAWING NO.

TO-456023
3
1
OF
SHT.NO.
BUILDING RISK MITIGATION –BGP HVAC REPLACEMENT

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
MATERIAL TAKE-OFF LIST
ARAMCO 6228-ENG (11/2010)
REV. SAMS PER DWG.
DESCRIPTION SAP # QTY I/U STATUS REMARKS
CODE STOCK NUMBER REQ. CODE
PACU-01 FOUNDATION QTY. FOR 1 UNIT(S)

C STRUCTURAL CONCRETE Contractor Supply 7.23 m3


READY-MIXED, Fc'=28 MPa (4000 PSI), Type-I cement with micro silica
AS PER SAES-Q-001 AND 09-SAMSS-097

C NON-STRUCTURAL LEAN CONCRETE, 50MM THK. Contractor Supply 0.55 m3


READY-MIXED, Fc'=14 MPa (2000 PSI), Type-I cement
AS PER SAES-Q-001 AND 09-SAMSS-097

C 12 DIA. REINFORCING STEEL DEFORMED BAR, 0.888 KG/M Contractor Supply 22.56 kg
FUSION BONDED EPOXY COATED AS PER 09-SAMSS-106
422 Mpa (60,000 PSI) YIELD STRENGTH AS PER ASTM A615

C 16 DIA. REINFORCING STEEL DEFORMED BAR, 1.578 KG/M Contractor Supply 507.51 kg
FUSION BONDED EPOXY COATED AS PER 09-SAMSS-106
422 Mpa (60,000 PSI) YIELD STRENGTH AS PER ASTM A615

C FORM WORKS Contractor Supply 9.69 m2

C 2- CONCRETE PROTECTIVE COATING Contractor Supply 9.69 m2


APCS-10 AS PER SAES-H-003

C SOIL EXCAVATION Contractor Supply 12.29 m3

C SOIL BACKFILL Contractor Supply 4.51 m3

C 25MM THK NON-SHRINK GROUT AS PER SAES-Q-010 Contractor Supply 9.64 m2

C COMPACTED SELECT FILL / UNDISTURBED SOIL AS PER SAES-A-114 Contractor Supply 3.78 m3

C APCS-1B AS PER SAES-H-003 Contractor Supply 9.64 m2

C AB-2-M16-100-350-(2) ANCHOR BOLTS Contractor Supply 10.00 EA


AS PER ARAMCO STD DWG. AA-036322, REV-08

C ASPHALT CUT Contractor Supply 18.90 m2

LEGEND: CS=CONTRACTOR SUPPLY, m=METER, EA=EACH, m²=SQUARE METER, m³=CUBIC METER, kg=KILOGRAMS FOR OTHER UNITS & LEGENDS REFER TO SAEP-103
NOTES: "CONSTRUCTION CONTRACTOR SHALL VERIFY ALL QUANTITIES OF CONTRACTOR SUPPLIED
MATERIAL REQUIRED TO PERFORM THE WORK, AS DETAILED, ON THE CONSTRUCTION DRAWINGS"

APPROVAL
COMPILED BY REV. REFERENCE DRAWING
CHECKED DATE PROJECT ENG DATE
SLFE AHJ C NFP Jan-19 VGA Jan-19 CA-456025-001
ISSUED FOR 90% SUBMITTAL
B.I. E.W.O. PHASE ENG. ITEM AREA START-UP DATE PRELIM X REVISION C
10-01390-0001 400 STRUCTURAL FINAL REVISION
INDEX Materials for: MISCELLANEOUS EQUIPMENT PAD FOUNDATION (PACU) SHEET 2 of 3
Q SRU OME NIC (BLDG 43)
PLANT SULFUR RECOVERY UNIT T/O-456023
475 BERRI SAUDI ARABIA
Revised By RRED, March 2006
MATERIAL TAKE-OFF LIST
ARAMCO 6228-ENG (11/2010)
REV. SAMS PER DWG.
DESCRIPTION SAP # QTY I/U STATUS REMARKS
CODE STOCK NUMBER REQ. CODE
AIR STACK FOUNDATION QTY. FOR 1 UNIT(S)

C STRUCTURAL CONCRETE Contractor Supply 3.58 m3


READY-MIXED, Fc'=28 MPa (4000 PSI), Type-I cement with micro silica
AS PER SAES-Q-001 AND 09-SAMSS-097

C NON-STRUCTURAL LEAN CONCRETE, 50MM THK. Contractor Supply 0.19 m3


READY-MIXED, Fc'=14 MPa (2000 PSI), Type-I cement
AS PER SAES-Q-001 AND 09-SAMSS-097

C 16 DIA. REINFORCING STEEL DEFORMED BAR, 1.578 KG/M Contractor Supply 293.14 kg
FUSION BONDED EPOXY COATED AS PER 09-SAMSS-106
422 Mpa (60,000 PSI) YIELD STRENGTH AS PER ASTM A615

C 10 DIA. REINFORCING STEEL DEFORMED BAR, 0.616 KG/M Contractor Supply 94.02 kg
FUSION BONDED EPOXY COATED AS PER 09-SAMSS-106
422 Mpa (60,000 PSI) YIELD STRENGTH AS PER ASTM A615

C FORM WORKS Contractor Supply 9.45 m2

C 2- CONCRETE PROTECTIVE COATING Contractor Supply 10.43 m2


APCS-10 AS PER SAES-H-003

C SOIL EXCAVATION Contractor Supply 13.69 m3

C SOIL BACKFILL Contractor Supply 9.92 m3

C 25MM THK NON-SHRINK GROUT AS PER SAES-Q-010 Contractor Supply 2.06 m2

C COMPACTED SELECT FILL / UNDISTURBED SOIL AS PER SAES-A-114 Contractor Supply 1.77 m3

C APCS-1B AS PER SAES-H-003 Contractor Supply 2.06 m2

C ASPHALT CUT Contractor Supply 8.83 m2

C ANCHOR BOLTS AS PER ARAMCO STD DWG. AA-036322, REV-08 By Vendor

LEGEND: CS=CONTRACTOR SUPPLY, m=METER, EA=EACH, m²=SQUARE METER, m³=CUBIC METER, kg=KILOGRAMS FOR OTHER UNITS & LEGENDS REFER TO SAEP-103
NOTES: "CONSTRUCTION CONTRACTOR SHALL VERIFY ALL QUANTITIES OF CONTRACTOR SUPPLIED
MATERIAL REQUIRED TO PERFORM THE WORK, AS DETAILED, ON THE CONSTRUCTION DRAWINGS"

APPROVAL
COMPILED BY REV. REFERENCE DRAWING
CHECKED DATE PROJECT ENG DATE
SLFE AHJ C NFP Jan-19 VGA Jan-19 CA-456026-001
ISSUED FOR 90% SUBMITTAL
B.I. E.W.O. PHASE ENG. ITEM AREA START-UP DATE PRELIM X REVISION C
10-01390-0001 400 STRUCTURAL FINAL REVISION
INDEX Materials for: MISCELLANEOUS EQUIPMENT PAD FOUNDATION (AS) SHEET 3 of 3
Q SRU OME NIC (BLDG 43)
PLANT SULFUR RECOVERY UNIT T/O-456023
475 BERRI SAUDI ARABIA
Revised By RRED, March 2006