TIME & QUANTITY REPORT (TQR) - CIVIL

CM NAME: DATE: 21-Dec

PLEASE MENTION CM ID SIGN :

JAZAN B
S-07
ENGINEER NAME: 157729 FOREMAN NAME: 108660
SIGN : SIGN :

LOCATION PLANNING TIME PERFORMANCE

No.of Workers
No. of Workers

No. of Hours
(MH/UNIT)

(incl. CH)

DELAY

delayed
BUDGET

ACTUAL
Manhour

PROGRESS
Building
C

Code
Corrective

RATE
Actual

lost
Level
BS

Zone

QTY
REWORK SECTION ACTIVITY

Plan
SN CODE CODE CODE DESCRIPTION SUBCONTRACTOR NAME Act. 8:30 11:00 3:00 5:00
Plan Qty UOM Working Action Taken
C

Time AM AM PM PM
od

Hours
e

S: P
1 0 ABS 1 ABSENT 30 HRS NO RATE F: A
S: P
2 0 ABS 2 ABSENT - VACTION HRS NO RATE F: A
S: P
3 0 ABS 3 Left Site Without Permission HRS NO RATE F: A
S: P
4 01 85 20 01 GEN 6 Medical Leave HRS NO RATE F: A
S: P
5 0 GEN 10 Money Transferring HRS NO RATE F: A
S: P
6 0 IN 1 Indirect Site HRS NO RATE F: A
Surface preparation (chipping, grinding, sanding)- S: P 40 40 40 40
7 03 41 41 14 Con 2c.42 VILLA (RDB Scope) General Infra 200 M2 0.22946269 46 F: A
Manual backfilling inc. compaction by roller operator S: P 13 12 10 10
8 31 23 24 05 EXW 6.3 walking General Infra 45 m3 0.79195 36 F: A
S: P 10 9 8 8
9 31 23 24 05 EXW 6a.2 Manual backfilling inc. compaction (hand-tamp) General Infra 35 m3 1.06845 37 F: A
S: P
10 01 05 10 01 GEN 5 Housekeeping HRS NO RATE F: A
S: P 10 10 8 7
11 31 23 17 05 EXW 6A.1 Manual Excavation (Common Labor, hand shovel) General Infra 35 m3 1.1118 39 F: A
S: P
12 0 Con 4 Chipping 0 0 0 F: A
S: P
13 01 05 10 01 GEN 5 Housekeeping HRS NO RATE F: A
Installation of Cable Tiles (Including Sand & Rope S: P
14 0 EXW 1.8b10 Leveling) Lm 0.15 0 F: A
S: P
15
F: A
S: P
16
F: A
158 0 0