SUMMARY OF QUANTITIES

ITEM
DESCRIPTION QUANTITY UNIT REMARKS
CONSTRUCTION OF (Name of Project and Location) NO.
The contractor shall
CONTRACTOR : Provision for Field Office
at all times provide
field office for the
DATE STARTED : A.1.1(8) for Engineer (Rental Basis) 3.83 month engineer during the
duration of the
CONTRACT COMPLETION DATE : contract.
CONTRACTOR COST : As per D.O. 21,
B.3 Permits and Clearances 1.00 l.s Series of 2017
IMPLEMENTING OFFICE / CONTACT No. :
SOURCES OF FUND : As per D.O. 21,
B.5 Project Billboard / Signboard 3.00 each Series of 2017
Occupational Safety and Health As per D.O. 13,
B.7(2) Program 1.00 L.S. Series of 2018
DEPARTMENT OF
PUBLIC WORKS AND HIGHWAYS As per D.O. 13,
TEXT 2920 or call (02)165-02 for any concern on this project B.8(2) Traffic Management 1.00 L.S. Series of 2018
www.dpwh.gov.ph

As per D.O. 197,


B.9 Mobilization/Demobilization 1.00 L.S. Series of 2018
Removal of Actual For
101(3)b2 Structures/Obstruction 60.00 sq.m Road Concreting
(PCCP,Unreinforced,0.20m thk.)
DPWH STANDARD PROJECT BILLBOARD Removal of Structures and For Drainage
101(6) 21.00 cu.m. Protection
Obstruction (Concrete)
For Drainage
103(3) Foundation Fill 33.00 cu.m. Protection
Embankment from Borrow For
104(2)a 4,450.35 cu.m.
(Common Soil) Road Concreting

Subgrade Preparation (Common For


105(1)a 930.00 cu.m. Road Concreting
Material)
For
200(1) Aggregate Subbase Course 122.10 cu.m. Road Concreting
ORIENTATION Portland Cement Concrete
For
311(1)e1 Pavement (Unreinforced,0.28m 600.00 sq.m.
Road Concreting
thk., 14 days)

Reinforcing Steel (Grade 40) 18,978.55 kg. For Drainage


404(1)a
Protection
TYPICAL FRAME ELEVATION FRONT ELEVATION (OPTION 1) FRONT ELEVATION (OPTION 2)
Structural Concrete (20.68 MPa, For Drainage
405(1)a3 216.00 cu.m. Protection
Class A, Class A, 28 days)
NOTE:
QUANTITY OF VARIOUS WORK ITEMS ARE SUBJECT TO DECREASE OR INCREASE DEPENDING ON THE ACTUAL FIELD CONDITION BEFORE THE START
OF ACTUAL CONSTRUCTION.

2400 (8 ft.)

2400 (8 ft.)

COMMISSION ON AUDIT DISPLAY AREA

(PROVINCE AND CITY)


50 x 50 HORIZONTAL
COCO LUMBER

1200
DISPLAY AREA
(TARPAULIN ON 2-1200 x 2400 x 1/4 MARINE PLYWOOD)
Project: Cost:
Location: Fund sources:

2400
Implementing Agency:
HELVETICA 3" Development Partner: WHITE BACKGROUND
Contractor/Supplier: BLACK TEXT

Brief Description of Project:

1200
2400 (8 ft.)
Project Details:

Project Date Project Status


Description Standard Target Date ofPercentage of As of Cost Incurred Date Remarks 50 x 75 VERTICAL
Completion Completion (Date) to Date Completed

1000

1000
COCO LUMBER
HELVETICA 1"
50 x 50
WOODEN STAKE

GROUND LEVEL

500

500
For Particulars or Complaints about this project, Please Contact the Regional office or Cluster Which has
Audit Jurisdiction on this Project.
HELVETICA 1"
COA Regional Office No./ Cluster: 1000
Address: TYPICAL FRAME ELEVATION FRONT ELEVATION
Contact No.: or text COA Citizens Desk at 0915-539-1957

ROAD MARKER
COA STANDARD PROJECT BILLBOARD
SCALE: NTS

REPUBLIC OF THE PHILIPPINES PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE I CRISTIAN D. GONZALES
SUMMARY OF QUANTITIES ENGINEER II (COS)
REHABILITATION OF J. QUINTO ST. AT BRGY. A 02
DPWH STANDARD PROJECT BILLBOARD
PANGASINAN 2ND POBLACION,MANGALDAN, PANGASINAN COA STANDARD PROJECT BILLBOARD PREPARED:
SAN FABIAN, PANGASINAN GLORIFICADOR A. DE GUZMAN FERNANDO F. BUGARIN ERICSON A. PAZ EDITA L. MANUEL 02 02
DISTRICT ENGINEERING OFFICE ROAD MARKERS
MARK HARVEY T. TAYAG ENGINEER II OIC-CHIEF, PLANNING AND DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER
04
ALVEAR ST., LINGAYEN, PANGASINAN ENGINEER II (CTO) DATE: DATE: DATE: DATE: