(****) BEFORE STARTING FOUNDATION CONSTRUCTION ACTIVITIES, MK4-9#12@200(T) 3) PLANT DATUM H.P.P. EL.+100.000 CORRESPONDS TO EL.+15.550 METERS ABOVE THE LOW LOW WATER SPRING (LLWS).
SUBCONTRACTOR TO VERIFY ON SITE THAT, GIVEN COORDINATES
& TOG LEVELS ARE IN ACCORDANCE TO EXISTING DISCHARGE LINE 3"-PP-52016-C11A.
MK2-9#12@200(B)
GROUT QUANTITY - FOUNDATION 4) ISOLATION JOINTS IN CONCRETE SLAB ON GRADE SHALL BE FORMED WITH AN APPROVED BITUMEN IMPREGNATED
01 FIBERBOARD. THE UPPER 20MM SHALL BE SEALED WITH AN APPROVED BITUMINOUS SEALANT RESISTANT TO
2 2 MATERIAL TOTAL QUANTITY [Cu. M] HYDROCARBONS, APPLIED STRICTLY IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
THE JOINTS FILLER SHALL BE FIXED FIRMLY TO THE FIRST PLACED CONCRETE BEFORE THE ADJOINING CONCRETE IS
- - NON-SHRINK GROUT 0.11
PLACED. THE CONCRETE MUST BE THOROUGHLY COMPACTED ON BOTH SIDES OF THE EXPANSION JOINT.
LOCATION OF EXPANSION JOINTS SHALL BE AS SHOWN THE DRAWINGS WHERE REQUIRED BY DESIGN.
LEAN CONCRETE QUANTITY 5) ANCHOR BOLTS SUPPLY IS BY VENDOR. ANCHOR BOLT DETAILS ARE AS PER VENDOR
GENERAL ARRANGEMENT DRAWING 4239-GG-VD-LG0077552P03001.
MATERIAL TOTAL QUANTITY [Cu. M] 6) BAR BENDING SCHEDULE IS INDICATIVE. CIVIL SUB-CONTRACTOR IS RESPONSIBLE FOR CHECKING
LEAN CONCRETE 0.18 REBAR QUANTITIES & DIMENSION ACCORDING TO DRAWINGS.
OF FOUNDATION
/ PUMP 7) THIS DRAWING IS EXTRACTED FROM 3D MODEL. FNJ001, RFJ001, FN001A, ETC. ARE CONTRACTORS 3D MODEL
E = 6223.354
CODES USED TO TRACK NEW FOUNDATION QUANTITIES, LOCATIONS, ETC. THROUGH THE MODEL.
FOUNDATION F/W-R/F TYPES (ref. to note 7)
8) EXCAVATION EXTENT SHOWN IN THE DRAWING IS TENTATIVE. SUBCONTRACTOR TO SUITABLY DECIDE THE REQUIRED
EXTENT AS PER SITE CONDITIONS & CONSTRUCTION REQUIREMENTS. WHEREVER POSSIBLE, EXCAVATION WITH
F/W TYPE R/F TYPE QUANTITY STRAIGHT VERTICAL FACE (WITH OR WITHOUT SHORING) SHALL BE PREFERRED OVER INCLINED FACE TO MINIMIZE THE
SECTION 2 FNJ001 RFJ001 1 EXCAVATION IMPACT ON DEMOLITION OF EXISTING FACILITIES SURROUNDING PROPOSED FOUNDATION WORK.
MK7-4#10@75
MK6-4#10@75
MK7-4#10@75
1700
==
(SCALE 1:25) - 9) IN CASE OF HINDRANCE SAY DUE TO SMALL PAVING SUPPORTED PIPE SUPPORTS, SWITCH & INSTRUMENT
SUPPORTS etc. CONSTRUCTION SUBCONTRACTOR CAN SUITABLY CHECK & DEMOLISH THESE
1050 PEDESTALS/SUPPORTS AFTER CONSULTING CONTRACTOR’S RESPECTIVE DISCIPLINE ENGINEER AT SITE.
== CONSTRUCTION STAGES OF NEW FOUNDATION
FOUNDATION TYPE SCHEDULE (ref. to note 7)
FIRST PHASE
75
325 200 650 200 325 3 3
== - - ITEM TAG
41U52-EQ52P03A-FN001A
F/W TYPE
FNJ001
R/F TYPE
RFJ001
1) ALL THE ADJOINING STRUCTURES/FACILITIES SHALL BE PROPERLY PROTECTED BEFORE STARTING THE DEMOLITION
WORK. EXISTING EQUIPMENT ( IF ANY) SHALL BE REMOVED / DISMANTLED FROM POSITION. EXISTING PLATFORM / PIPE
150 750 (SKID) 150
150
SUPPORT ( IF ANY) ABOVE PEDESTAL SHALL BE REMOVED / DISMANTLED.
2) EXISTING PAVING SHALL BE DEMOLISHED. EXISTING REINFORCEMENT BARS FOR PAVING SHALL BE TEMPORARILY BENT
325
UPWARDS DURING SOIL EXCAVATION AND TREATED WITH CORROSION INBHITOR.
FOR PIPE SUPPORT FOUNDATION DETAILS
REFER 4239-AP-DA-4100N020 3) EXISTING SUB-GRADE/SUB-BASE & SOIL SHALL BE EXCAVATED.
150
200
MK5
MK6-11#10@150
MK7-11#10@150
MK7-11#10@150
DEMOLITION OF PAVING CONCRETE QUANTITY 4) ANY UNDER GROUND UTILITIES IF FOUND DURING EXCAVATION SHALL BE TEMPORARILY SUPPORTED
OR RE-ROUTED AS PER INSTRUCTIONS FROM ENGINEER INCHARGE.
750 (SKID)
1 90 N = 90225.042 1
ø4 MATERIAL TOTAL QUANTITY [Cu. M]
1050
1700
==
650
==
==
5) THE EXCAVATED PORTION SHALL THOROUGHLY BE CLEANED OF ANY DEBRIS.
- OF FOUNDATION
/ PUMP
- PAVING CONCRETE 7.80
SECOND PHASE
MK4
PUMP VENT AND DRAIN SUPPORT 01
50
200
6) LEAN CONCRETE SHALL BE POURED.
150
MK3
PRICE CODES 7) NEW FOUNDATION SHALL BE CAST WITH POCKETS FOR BOLTS.
THIS DOCUMENT IS TECNIMONT'S PROPERTY AND CANNOT BE USED BY OTHERS FOR ANY PURPOSE, WITHOUT PRIOR WRITTEN CONSENT
01
325
300
(TYP.)
PRICE CODES DESCRIPTION OF WORK 8) AFTER CASTING OF NEW FOUNDATION, THE DAMAGED UG FACILITIES SHALL BE RECONSTRUCTED.
300
FN-001A 4 NOS. 150X150X520 DEEP POCKETS AAA03AB21 DEMOLITION OF REINFORCED PAVING CONCRETE BY HAND
9) 3 COATS OF OXIDIZED BITUMINOUS PAINT SHALL BE APPLIED ON ALL THE SURFACES IN
why this pattern? FNJ001 FOR 30 DIA ANCHOR BOLTS (TYP.) CONTACT WITH SOIL.
950 ABA02AD01 LIMITED EXCAVATION BY HAND
RFJ001 300
MK1 (TYP.) ACA05AM01 BACKFILLING 10) EXCAVATED SIDES SHALL BE BACKFILLED AND COMPACTED.
MK2 ADA08AA01 LEAN CONCRETE
440
revision 11) NEW POLYTHENE SHEET SHALL BE PLACED.
01 ADA08AB02 CONCRETE FOR FOUNDATION
12) EXISTING REINFORCEMENT BARS FOR PAVING SHALL BE REPLACED IN THE ORIGINAL POSITION
SECTION
E = 6223.794 (****)
3 ADA09AA01 FORMWORK FOR FOUNDATION CONCRETE BEFORE POURING OF NEW CONCRETE FOR RESTORING THE PAVING. PAVING SHALL BE RESTORED.
(SCALE 1 : 25) - ADA09BA01
FORMWORK FOR EXECUTION OF ANCHOR BOLT BOXES - WET 13) ANCHOR BOLTS ARE INSTALLED IN THE POCKETS.
CONTOUR AREA UP TO 0.50 m2
01
MK5-4#20 14) NEW GROUT SHALL BE POURED FOR SKID LEVELING.
ADA10AA02 SUPPLY AND INSTALLATION OF REBARS
MK5-6#20
MK5-6#20
01 01 ADA16AA01 THREE COATS OF OXIDIZED BITUMINOUS PAINT
MK7
ADA16AB01 POLYETHYLENE SHEET REFERENCE DOCUMENTS
MK7 AEA08AG01 CONCRETE FOR PAVING DRAWING NO. DESCRIPTION
MK6
SUPPLY, CUTTING, MACHINING AND INSTALLATION OF WIRE 4239-AA-DX-00000005 CONCRETE GENERAL NOTES
AEA10AB01
WELDED MESH 4239-AA-DC-41U52RD001 DEMOLITION SCHEDULE FOR PUMP FOUNDATION AREA OFFSITE-TOTAL DEMOLITION (SHEET 1)
MK5-4#20
8mm THK. CIRCULAR 4239-GG-VD-LG0077552P03001 GENERAL ARRANGEMENT DRAWING FOR BUTANE TRANSFER PUMPS- 52P03A/B
STEEL PIPE CASING
01 4239-AA-DA-4100N001 FOUNDATION LAYOUT FOR AREA OFFSITE
PERMANENTLY EMBEDDED AND
SECTION 1 TO BE PLACED DURING CASTING
OF PEDESTAL KEYPLAN (AREA-OFFSITE)
DETAIL
83 THK. NON-SHRINK
(SCALE 1:25)
01 (SCALE 1:10) - CN
EXSISTING
49°
X = 6345.000
( BY VENDOR) S/S C S/S E
PAVING THICKNESS.
140 50 52 TK 51 F
(****) BEFORE STARTING FOUNDATION CONSTRUCTION ACTIVITIES,
ROAD 11
Y = 90380.000
OFFSITE - AREA 5
53P543
HORTON
OFFSITE - AREA 5
53P515
99.857
OFFSITE - AREA 5
91
53P514
OFFSITE - AREA 5
AVENUE A
52P504A
P= 178
SUBCONTRACTOR TO VERIFY ON SITE THAT, GIVEN COORDINATES
OFFSITE - AREA 5
37 SPHERE
53P519
OFFSITE - AREA 5
52P504B
38 OFFSITE - AREA 5
53P518
OFFSITE - AREA 5
53P517
52 TK 51 G
52P03A 39
OFFSITE - AREA 5
OFFSITE - AREA 5
53P541
2 1 A B 93
SEE NOTE 1
ROAD 7
52 TK 51
01 EL.+99.824 (TOC) (***) AVENUE B
C D
RAILWAYS
95
Y = 90332.000
01
50
OFFSITE - AREA 5
OFFSITE - AREA 5
OFFSITE - AREA 5
52 TK 102
OF FOUNDATION
50P534A
50P539B
50P534C
CEMENT BASED GROUT
OFFSITE - AREA 5
A A B
50
50P539C
L.P.G.
52 TK 54 52 TK 53
STREET 8
STREET 9
VENT STACK
REFER NOTE-5 C D
B C
A
OFFSITE - AREA 5
B14 B15
62P547
4 3
01 01
- EL.+99.907 (TOG) (****) OFFSITE
OFFSITE
R 52
OFFSITE
OFFSITE
OFFSITE - AREA 5OFFSITE
62P553B - AREA 5
62P553A
P8 P9
OFFSITE OFFSITE
520
52P03A 56P11A 56P11B
52P03B
53P09B
Y = 90208.000
53P09C
OFFSITE - JETTY
OFFSITE - JETTY
OFFSITE OFFSITE
OFFSITE
OFFSITE OFFSITE OFFSITE
OFFSITE OFFSITE OFFSITE
69P01A
(see note - 4)
SHEET (TYP.) EL.+99.824 (TOC) (****)
99.857
AVENUE D
EXISTING DITCH
PAVING TO BE RESTORED
50
REINFORCEMENT QUANTITY EXISTING PIPE WAY BOTTLING
150
OFFSITE - AREA 5
50P534B
170
137
EL.+99.687 (HPP) BAR DIAMETER [mm] UNIT WEIGHT [kg/m] BAR LENGTH [mm] WEIGHT [kg]
10 0.62 96905 60.08
12 0.89 82980 73.85
150 (TYP.)
SQ. == 20 2.47 52200 128.93
OF BOLT TOTAL 232085 262.87 01 07.Sep.2022 IFA - ISSUE FOR APPROVAL K.Tandel V.Rama Rao A.Frigerio
00 08.Aug.2022 IFA - ISSUE FOR APPROVAL K.Tandel V.Rama Rao A.Frigerio
01
1990
Issue Date Reason for Issue - Revision Description Prepared Checked Approved
1770
2600
BAR BENDING SCHEDULE - REINFORCEMENT TYPE RFJ001 Digital signature
2590
1830
BAR MARK BAR DIAMETER [mm] BAR LENGTH [mm] QUANTITY (Nos) TOTAL BAR LENGTH [mm] a b c d e g SHAPE WEIGHT [kg]
MODEL NAME:4239-AA3D-41U52-EQ52P03A
MK3 12 2340 9 21060 0 400 1550 400 0 0 18.74 REFINERY PROJECT NUMBER OF SHEET DOC. CLASS. ISSUE
(Port Harcourt - Nigeria) 1 01
600
97.257
MK4 12 2320 9 20880 0 390 1550 390 0 0 18.58 CLIENT IDENTIFICATION CODE
SOIL BELOW EXISTING PAVING
EL.+97.317 (BOF) PORT HARCOURT
TO BE EXCAVATED AND BACKFILLED AFTER REFINING COMPANY
CONSTRUCTION OF NEW FOUNDATION (TYP.) MK5 20 2610 20 52200 0 2360 300 0 0 0 128.93
01 01 01 LIMITED (PHRC)
500 605 490 605 500
3 COATS OF OXIDIZED MK6 10 3715 15 55725 90 900 900 900 900 90 34.55
MOD-CADA1 E rev.1
8mm THK. CIRCULAR STEEL PIPE CASING BITUMINOUS PAINT. (TYP.) TITLE
PERMANENTLY EMBEDDED AND TO BE PLACED CONCRETE DRAWING
50 THK. LEAN CONCRETE
DURING CASTING OF PEDESTAL (TYP.) 10 THK. PLATE (TYP.)
(TYP.) MK7 10 710 58 41180 90 530 0 0 0 90 25.53 PUMP 52P03A (OFFSITE AREA)
01 01
F/W & R/F DETAILS OF FOUNDATION SCALE
1:25,1:10
ORIG. SIZE
A0