You are on page 1of 19

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS & HIGHWAYS


OFFICE OF THE REGIONAL DIRECTOR
REGION I
PLANNING AND DESIGN DIVISION
BRIDGES AND OTHER PUBLIC WORKS DESIGN SECTION
SAN FERNANDO CITY LA UNION

TABLE OF CONTENTS
A1 PERSPECTIVE S8 SCHED. OF R.C. BEAMS
VICINITY MAP TYP. DETAIL OF ROOF BEAMS
SITE DEVELOPMENT PLAN DETAIL OF HT-1
DET. CONNECTION OF HT-1 @ LINE AND GRADE
A2 FLOOR PLAN SUPPORT

A3 FRONT ELEVATION ROOF FRAMING PLAN


S9 (COVERED COURT)
REAR ELEVATION

A4 RIGHT SIDE ELEVATION S10 TRUSS DIAGRAM


LEFT SIDE ELEVATION ST1 & ST2 DIAGRAM
STEEL LOUVER DETAIL STEEL BEAM CONNECTION
STEEL GATE DETAIL
S11 SCHEDULE OF WELDS
A5 LONGITUDINAL SECTION-"A" TYP. ROOF & TRUSS CONNECTIONS LAND USE AND ZONING
CROSS SECTION-"B" STRUT CONNECTION DETAILS
ROOF VENTILATION DETAIL STRUSS-COLUMN CONNECTION DET.

A6 CROSS SECTION-"C" S12 STEEL SECTION DETAILS


RAMP DETAILS TRUSS-RG CONNECTION DETAILS
CEILING INSTALLATION DETAIL 1 SC1-RG CONNECTION DETAILS
CEILING INSTALLATION DETAIL 2 BASE PLATE DETAIL
RAMP DETAIL

1 PERSPECTIVE A7 TRAINING AREA DET. FLOOR PLAN


PWD TOILET DETAIL (TRAINING AREA)
WF-1 DETAIL
FRAME ELEVATION (TRAINING AREA)
ARCHITECTURAL
A 1 HE/SHE TOILET DETAIL (TRAINING AREA)
MAIN FEEDER/ SERVICE ENTRANCE
E1 LAYOUT
A8 HE/SHE T&B DETAIL (TRAINING AREA)
PWD TOILET DETAIL (CLINIC@TRAINING AREA)

E2 LIGHTING LAYOUT
A9 MALE TOILET & BATH DETAIL
E3 POWER LAYOUT
A10 FEMALE TOILET & BATH DETAIL
EMERGENCY LIGHTING/ FIRE ALARM
E4 LAYOUT
A11 KITCHEN DETAIL
LAUNDRY DETAIL STRUCTURAL
E5 AIR-CONDITIONING LAYOUT
A12 DOORS & WINDOWS SCHEDULE
E6 POWER PANEL 1&2 LOAD SCHEDULE
A13 DET. PLAN OF BASKETBALL COURT POWER PANEL 1&2 SINGLE LINE
BASKETBALL STAND DETAIL DIAGRAM

BLEACHER DETAIL
E7 POWER PANEL 3&4 LOAD SCHEDULE
A14 DET. PLAN OF BASKETBALL COURT POWER PANEL 3&4 SINGLE LINE
DET. PLAN OF BASKETBALL COURT DIAGRAM
w/ integrated BADMINTON COURT

BLEACHER DETAIL E8 GENERAL NOTES ELECTRICAL


LEGEND
DET. PLAN OF BASKETBALL COURT MDP LOAD SCHEDULE
A15
w/ integrated BADMINTON COURT MDP SINGLE LINE DIAGRAM
RISER DIAGRAM
DET. PLAN OF BASKETBALL COURT
A16
w/ integrated VOLLEYBALL COURT P1 SEWER LINE LAYOUT

A17 SCHEDULE OF FINISHES P2 STORM DRAIN LAYOUT

A18 REFLECTED CEILING PLAN P3 SEWER LINE ISOMETRIC LAYOUT


SANITARY
S1 GENERAL NOTES P4 WATER LINE LAYOUT
DESIGN CRITERIA
P5 WATER LINE ISOMETRIC LAYOUT
S2 STD. CONSTRUCTION DETAIL
P6 ANAEROBIC BUFFLED REACTOR
S3 FOUNDATION PLAN CONCRETE-WALL CONNECTION DET.
B1 DETAIL
S4 FOOTING DETAILS
SCHED. OF COLUMNS P7 ANAEROBIC BUFFLED REACTOR DET.
SCHED. TIE BEAMS B1 SECTION DETAIL
FIRE DEPARTMENT
WF-2 DETAIL DETAIL A
TYP. SLAB-WALL CONNECTION DET.
ROOF BEAM PLAN TYP. WALL TO WALL DETAIL
S5
(MULTI-PURPOSE & TRAINING AREA) W1 FOOTING DETAIL
W2 FOOTING DETAIL
2 VICINITY MAP S6 ROOF BEAM PLAN (COVERED COURT)
P8 GENERAL NOTES
A 1
ROOF FRAMING PLAN PLUMBING FIXTURES DETAILS
S7 (MULTI-PURP0SE & TRAINING AREA)

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM PERSPECTIVE JULIUS M. GACETA


VICINITY MAP ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A1
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 02 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
1c 2
1b 1a 1 2 3 1 4 5 5' 6 6' 7 7a 7b 7c
A-5 A-6

50.00

7.95 34.10 7.95

3.98 3.98 1.50 5.55 5.55 4.55 4.55 5.45 5.45 1.50 3.98 3.98
A-10 1 A-9
ROOF LINE
A-7

D D
7 7
1 1 1 1 5 1 6 5 6 6
C C'
SHOWER CUBICLE WATER CLOSET PROVIDE D WATER CLOSET SHOWER CUBICLE
1 TRAINING
CUBICLE PVC ACCORDION 3
CUBICLE
D D D 6 DRYWALL BACKSTAGE UP AREA D D D
10 10 10 DOOR PARTITION 10 10 10
D D D D PARTITION STO. D D D D D D D
11 11 11 11 11 11 11 11 11 11 11

TOILET & BATH TOILET TOILET TOILET


D D TOILET & BATH

ROOF LINE
5 FF-1
STO. PRAYER (PWD) 3 3
(SHE)
D (HE) 5
(FEMALE)
5.05

5.05
3
+0.075m
F.F.L. CLINIC FF-1 D (MALE)
ROOM ROOM FF-3
+0.075m
T&B (SHE) T&B (HE) 3

D
10
D
10
D
11 FF-3 FF-3 +0.10m
F.F.L.
F.F.L.
STAGE/ FF-1 D
11 D D
D +0.10m +0.10m +0.075m

D
11 F.F.L. F.F.L. D
8
TRAINING AREA D
10
D
11
D
11
D
10
TOILET TURNING SPACE
F.F.L. 10 10
6

B' D
10
D
10
11
D
D
TURNING SPACE
1.50m x 1.50m
FF-3
+0.60m
SHOWER
CUBICLE
SHOWER
CUBICLE (PWD)
D
8
1.50m x 1.50m D
11
WATER CLOSET D D
B'
11 F.F.L.
6 1 10 10
D CUBICLE
11 D
SHOWER CUBICLE WATER CLOSET 11
D D D
D
1 1
D
5 5 5 SHOWER CUBICLE
CUBICLE 11 1 1 UP UP

1.35
10 10 D D
D 10 10
11

B D
10
D
10
D
11
PWD
CUBICLE D D 6
B 1
6 10 10
PWD A-5
4.60

D
CUBICLE 11
6 D D FF-1
10 10 FF-3 D
+0.075m

3.25
+0.10m 9
15 14 13 12 11 10 09 08 F.F.L. 07 07 06 05 04 03 02 01 F.F.L.
5
D
D 8
9 FF-1
+0.075m
5 D
F.F.L.
8 R.C. SINK

G' G'
0.70

R.C. SINK DELIVERY/


SERVICE AREA D
2

2.35
CONJUGAL FF-3
H' ROOM 1 +0.10m
2.40

F.F.L.
D D
FF-2 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 6
BREASTFEEDING 4 4
4.80

4.80
+0.10m
F.F.L.
CONJUGAL ROOM
KITCHEN
4.10

D
7 4
ROOM 2 FF-6 WET
DRY
FF-2 +0.10m
STO.

2.45
D
RECEPTION 7 +0.10m F.F.L.
STO. FF-3
AREA F.F.L.
1.70

6 FF-3
FF-2 +0.075m
+0.10m
D F.F.L.
+0.10m D F.F.L.
F.F.L.
4 D 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 6
29.00

29.00
4
F' F'
3

A-11

PLAY AREA
4.80

4.80
FF-6
+0.10m FF-3 FF-3 FF-3 4
F.F.L. +0.10m +0.10m +0.10m
F.F.L. 61 60 59 58 57 56 55 F.F.L. 54 53 52 51 50 49 48 F.F.L.

D
1 1

E' E'
77 76 75 74 73 72 71 70 69 68 67 66 65 64 63 62
MESS HALL
2.60m x 2.90m GA. 24 FF-3
+0.10m
OVERHEAD ROLLING STEEL F.F.L.
SERVICE DOOR w/ COLD-ROLL
STORAGE
4.80

4.40m x 2.90m GA. 24

4.80
FORMED CHANNEL and ANGLE;
OVERHEAD ROLLING STEEL 4
ROOF LINE

MANUAL OPERATION FF-3


+0.10m SERVICE DOOR w/ COLD ROLL
F.F.L.
FORMED CHANNEL and ANGLE;
MANUAL OPERATION

D D
3 2
2 93 92 91 90 89 88 87 86 85 84 83 82 81 80 79 78
D' D
D'
4
6
ELEC'L. RECORDS D
1
2.35

RM. ROOM
FF-3 FF-2 PROVIDE
+0.10m +0.10m
2.40
D
3 F.F.L. F.F.L.
D
4 ADMIN. PVC ACCORDION
DOOR PARTITION RECEPTION AREA
OFFICE
4.95

4.95
FF-3 4

1.80
FF-3 +0.10m
D FF-2 105 104 103 102 101 100 99 98 97 96 95 94
+0.10m F.F.L.
5 +0.10m
CONSULATATION F.F.L. F.F.L.

ROOM
2.60

1
FF-2
+0.10m
F.F.L.

A' A

0.40
1 1 1 1

A A'
1.50 2.48 3.98 RAMP UP RAMP UP
3.50m x 2.90m GA. 24 OVERHEAD ROLLING
ROOF LINE STEEL SERVICE DOOR w/ COLD-ROLL FORMED
3.98 3.98 5.55 5.55 9.10 5.45 5.45 3.97 3.98
CHANNEL and ANGLE; MANUAL OPERATION
7.95 1.50 31.10 1.50 7.95

1 FLOOR PLAN
A 2 SCALE: 1:100 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM FLOOR PLAN JULIUS M. GACETA
ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A2
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 03 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
1c 1b 1a 1 2 3 4 5 5' 6 6' 7 7a 7b 7c

SIDE-FOLDING STEEL GATE

STEEL LOUVER PAINTED FINISH

GA 24 x 150mm WIDE SPANDREL


PAINTED FINISH
+9.85m APEX

0.50mm THK PRE-PAINTED LONG SPAN


G.I. ROOFING (RIB TYPE)
3.75

0.50mm THK PRE-PAINTED G.I. FLASHING


SHEET

150mm THK CHB EXTERIOR WALL


w/ PLAIN CEMENT PLASTER:
3 PAINTED FINISH and w/ 25mm
+6.10m TOP OF STEEL BEAM A-4 ACCENT GROOVE
9.85

2.70

+3.40m TOP OF ROOF BEAM


0.40

+3.00m CEILING LINE


2.90

F F F F

+0.10m F.F.L.
0.10

+0.00m F.G.L.

1 FRONT ELEVATION
A 3 SCALE: 1:100 M

7c 7b 7a 7 6' 6 5' 5 4 3 2 1 1a 1b 1c

+9.85m APEX
3.75

0.50mm THK PRE-PAINTED LONG SPAN


G.I. ROOFING (RIB TYPE)

+6.10m TOP OF STEEL BEAM


9.85

2.70

+3.40m TOP OF ROOF BEAM 150mm x 200mm PVC GUTTER ON


0.40

+3.00m CEILING LINE INTERNAL BRACKETS

100mm THK CONCRETE CANOPY

150mm THK EXTERIOR WALL IN PLAIN


2.90

CEMENT PLASTERED PAINTED FINISH


F F F F F

+0.10m F.F.L.
0.10

+0.00m F.G.L.
150mm THK EXTERIOR WALL IN PLAIN
CEMENT PLASTERED PAINTED FINISHED
with 25mm ACCENT GROOVE

2 REAR ELEVATION
A 3 SCALE: 1:100 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM ELEVATIONS JULIUS M. GACETA


FRONT ELEVATION ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REAR ELEVATION
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A3
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 04 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
50mm x 100mm ALUMINUM TUBULAR FRAME
in AUTOMOTIVE LACQUER PAINT FINISH
(VERIFY COLOR)

50mm x 1.5mm THK EXTRUDED BAR FULLY


WELD in AUTOMOTIVE LACQUER PAINT FINISH
A' A D' E' F' G' B B' C' (VERIFY COLOR)

0.10 VERIFY LENGTH 0.10


50mm x 100mm ALUMINUM
TUBULAR FRAME in
AUTOMOTIVE LACQUER
PAINT FINISH (VERIFY COLOR)

0.10

0.15
+9.85m APEX

50mm x 1.5mm THK


EXTRUDED BAR FULLY WELD in
AUTOMOTIVE LACQUER PAINT

0.60

0.40

L/10
FINISH (VERIFY COLOR)
3.75

GA 24 x 150mm WIDE SPANDREL


PAINTED FINISH

GA 24 x 150mm WIDE SPANDREL


+6.10m TOP OF STEEL BEAM PAINTED FINISH

0.10
INTERIOR SIDE
9.85

2.70

0.50mm THK PRE-PAINTED


LONG SPAN G.I. ROOFING EXTERIOR SIDE
(RIB TYPE)

+3.40m TOP OF ROOF BEAM


150mm x 200mm PVC GUTTER ON 3.1 ELEVATION 3.2 SECTION
0.40

+3.00m CEILING LINE INTERNAL BRACKETS


A 4 A 4
150mm THK EXTERIOR WALL IN
PLAIN CEMENT PLASTERED
PAINTED FINISH
2.90

100mm THK R.C. CANOPY

100mm THK R.C. COUNTERTOP

+0.10m F.F.L.
with LAUNDRY SINK (See Detail)
3 STEEL LOUVER DETAIL
0.10

+0.00m F.G.L. A 4 SCALE: 1:10 M

1 RIGHT SIDE ELEVATION SIDE-FOLDING STEEL PANEL w/


25mm x 3mm THK FLAT BAR on 50mm
A 4 SCALE: 1:100 M
x 50mm x 3mm THK TUBULAR PIPE,
EPOXY PAINTED FINISH
3 5
9.10

0.25 8.60 0.25

C' B' B G' F' E' D' A A'

+9.85m APEX

4.1 PLAN
A 4

SIDE-FOLDING STEEL PANEL with


3.75

GA 24 x 150mm WIDE SPANDREL 1.6mm THK SHEET PANEL on


PAINTED FINISH 50mm x 50mm x 3mm THK TUBULAR PIPE,
EPOXY PAINTED FINISH

SIDE-FOLDING STEEL PANEL with


GA 24 x 150mm WIDE SPANDREL 25mm x 3mm THK FLAT BAR on
+6.10m TOP OF STEEL BEAM PAINTED FINISH 50mm x 50mm x 3mm THK TUBULAR PIPE,
EPOXY PAINTED FINISH
8.60
9.85

2.70

0.50mm THK PRE-PAINTED


LONG SPAN G.I. ROOFING 0.90 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.90
(RIB TYPE)

0.10
+3.40m TOP OF ROOF BEAM

0.05
150mm x 200mm PVC GUTTER ON
0.40

+3.00m CEILING LINE INTERNAL BRACKETS

150mm THK EXTERIOR WALL IN


PLAIN CEMENT PLASTERED

2.00

1.90

1.80
PAINTED FINISH
2.90

F F F

0.05
+0.10m F.F.L.
0.10

+0.00m F.G.L.

4.2 ELEVATION
A 4

2 LEFT SIDE ELEVATION 4 STEEL GATE DETAILS


A 4 SCALE: 1:100 M A 4 SCALE: 1:60 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM ELEVATIONS JULIUS M. GACETA


RIGHT SIDE ELEVATION ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
LEFT SIDE ELEVATION
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS STEEL LOUVER DETAIL A4
Planning and Design Division AND CONSTRUCTION OF EVACUATION STEEL GATE DETAIL
GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 05 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
1c 1b 1a 1 2 3 4 5 5' 6 6' 7 7a 7b 7c

+9.85m APEX

6mm THK FIBER CEMENT BOARD


3.75

ON CEILING TRUSS

175mm x 50mm x 20mm x 2.00mm


3 STEEL LIGHT GAUGE PURLINS
SPACED @ 600mm O.C. with
A-6 1L-75x50x6mm THK ANGLE CLIP
3
+6.10m TOP OF STEEL BEAM
A-5 0.50mm THK LONGSPAN G.I.
ROOFING SHEET
9.85

150mm x 200mm PVC GUTTER ON


2.70

4 INTERNAL BRACKETS
A-6

+3.40m TOP OF ROOF BEAM


0.40

+3.00m CEILING LINE PVC EAVES IN CUSTOM COLOR


6mm THK FIBER CEMENT BOARD
ON 19mm x 50mm x 0.40mm THK
METAL FURRING SPACED @
2.90

600mm O.C.

F F
5 LAYER OF 300mm x 300mm
CERAMIC GLAZED TILES(VERIFY
+0.10m F.F.L. COLOR); REST IN PLAIN CEMENT
0.10

PLASTER; PAINTED FINISH


+0.00m F.G.L.
PVC TOILET PARTITION
(VERIFY COLOR)

1 LONGITUDINAL SECTION - "A"


A 5 SCALE: 1:100 M

C' B' B G' F' E' D' A A'

3.2
A-4
6mm THK FICEM
BOARD CEILING
1.20

+9.85m APEX 0.50mm THK LONGSPAN


G.I. ROOFING SHEET
25mm x 50mm SOLID 25mm x 50mm SOLID
6mm THK FIBER CEMENT BOARD WOOD FRAMES WOOD FRAMES
ON 19mm x 50mm x 0.40mm THK
METAL FURRING SPACED @
600mm O.C.
3.75

25mm x 25mm WOOD SLATS 25mm x 25mm

0.60

0.60
SPACED @ 50mm O.C WOOD SLATS
SPACED @ 50mm O.C
+6.10m TOP OF STEEL BEAM
9.85

INSECT SCREEN INSECT SCREEN


2.70

+3.40m TOP OF ROOF BEAM


0.40

+3.00m CEILING LINE


2
A-6

SECTION
2.90

2.4 3.2
3.1 PLAN
A-11 A 5
A 5

+0.10m F.F.L.
0.10

+0.00m F.G.L.

2 CROSS SECTION - "B" 3 ROOF VENTILATION DETAIL


A 5 SCALE: 1:100 M A 5 SCALE: 1:10 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM SECTIONS JULIUS M. GACETA


LONGITUDINAL SECTION - A ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
CROSS SECTION - B
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A5
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 06 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
C' B' B G' F' E' D' A A'

GA. 24 OVERHEAD ROLLING STEEL SERVICE DOOR


W/ COLD ROLL FORMED CHANNEL AND ANGLE;
MANUAL OPERATION

0.50mm THK LONGSPAN G.I. ROOFING SHEET


+9.85m APEX
125mm x 75mm x 8mm STEEL PURLINS
1200MM X 600MM WOODEN VENTILATION
SLATS ON FIBER CEMENT BOARD CEILING
WITH INSECT SCREEN

150mm THK EXTERIOR WALL IN PLAIN


3.75

CEMENT PLASTERED PAINTED FINISH 1200mm x 600mm WOODEN VENTILATION


SLATS ON FIBER CEMENT BOARD CEILING
WITH INSECT SCREEN
PVC EAVES IN
CUSTOM COLOR
19mm x 50mm x 0.40mm METAL FURRING
+6.10m TOP OF STEEL BEAM SPACED @ 600mm

6mm THK FIBER CEMENT BOARD CEILING


9.85

PAINTED FINISH ( VERIFY COLOR)


2.70

62.5mm x 62.5mm x 6mm THK


CONTINUOUS ANGLE BAR SUPPORT
+3.40m TOP OF ROOF BEAM
0.40

+3.00m CEILING LINE 62.5mm x 62.5mm x 6mm THK


ANGLE BAR CLEAT
2.90

+0.10m F.F.L.
0.10

+0.00m F.G.L.

1 CROSS SECTION - "C" 3 CEILING INSTALLATION DETAIL


A 6 SCALE: 1:100 M A 6 SCALE: 1:25 M

1.25 0.30
0.10 1.15

1c 1b 1a

0.20
0.90
0.70
7.95

0.10
3.98 3.98

0.35 3.45 0.35 3.45 0.35 19mm x 50mm x 0.40mm THK


METAL FURRING SPACE @
62mm x 62mm x 4mm
2.3 ELEVATION WALL ANGLE
600mm O.C.

A 6 SCALE: 1:50 M
19mm x 50mm x 0.40mm THK MAIN CHANNEL
METAL FURRING SPACE @ SPACED @ 1200mm O.C
600mm O.C.
62mm x 62mm x 4mm
WALL ANGLE
38mm STAINLESS
1.20
1.30

STEEL HANDRAIL SPACED @ 600mm O.C B.W.

0.20 HANGER SPACED @


600mm O.C B.W.
0.10

0.30

2.1 PLAN
A 6 SCALE: 1:50 M
0.90

38mm STAINLESS 1.2


STEEL VERTICAL 0
BALUSTER
7.45 MAIN CHANNEL SPACED @
0.70

1200mm O.C 1.2


0
0.10 3.45 0.35 3.45 0.10
6mm THK FICEM BOARD 0
0.6
CEILING PAINTED FINISH
FLANGE with
(VERIFY COLOR) 0
EXPANSION BOLT 0.6
0.20

DUST-PROOF
CONCRETE FINISH
0.90
0.70

0.10

4.1 SETION 4.2 ISOMETRIC VIEW


0.10

A 6 A 6

2.2 SECTION 2.4 RAILING DETAIL


A 6 SCALE: 1:50 M A 6 SCALE: 1:10 M

2 RAMP DETAILS 4 TYP. CEILING INSTALLATION DETAIL -2


A 6 A 6 SCALE: NTS

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM SECTION JULIUS M. GACETA


CROSS SECTION - C ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
RAMP DETAILS
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS CEILING DETAILS A6
Planning and Design Division AND CONSTRUCTION OF EVACUATION CEILING INSTALLATION DETAIL 1
GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES TYP. CEILING INSTALLATION DETAIL 2
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 07 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
5' 6' 7
2.92 3.28

0.85 0.89 1.19 1.03 2.25

1.20 1.05

1 2 3 4 5 5' 6 6' 7 5 6 6
C'
5.55 5.55 4.55 4.55 5.45 5.45

1.30
3

1.60
1.90 3.65 3.43 2.13 9.10 2.25 2.45 2.92 3.28 A-7 3.2
A-6

1.83
1.35 6.40 1.35 D
D D

5.80
D
11

1.80
1 1 1 1 1 5 6 6 11 11
C'

3.20
PROVIDE D (HE)
D
TRAINING (SHE)

1.70
0.90
1
PVC ACCORDION 3
FF-1
6 DRYWALL BACKSTAGE UP AREA
DOOR PARTITION FF-1 D 25 +0.075m

2.50
PARTITION

2.83
D
STO. D D
+0.075m F.F.L.

3.20
11

1.60
11 11
F.F.L. 3
TOILET TOILET

2.30
D D
TOILET
(HE) D

2.02
STO. PRAYER (PWD) 3 3
(SHE)
D
5.05

3
CLINIC FF-1 D
3
ROOM ROOM FF-3
+0.075m
T&B (SHE) T&B (HE) 3 25
F.F.L.
STAGE/
6.40

+0.10m

3.35
FF-3 FF-3
+0.10m F.F.L.
+0.10m
F.F.L. F.F.L. D
TRAINING AREA D D D D
TOILET

2.23
8
10 11 11 10
3.3

1.85
TURNING SPACE
B' D
TURNING SPACE
1.50m x 1.50m
FF-3
+0.60m
SHOWER
CUBICLE
SHOWER
CUBICLE (PWD)
D
8
1.50m x 1.50m
A-6 3.1 PLAN
F.F.L.
1
A 7
D D
1 1 5 5 5
1 1 UP
1.35

B 1 2
2
A-8 A-7
A-8
5' 6' 7

+3.00m TOP OF BEAM


6mm THK FIBER CEMENT BOARD

0.40
+2.60m BOTTOM OF BEAM on 19mm x 50mm x 0.40mm THK
METAL FURRING SPACED @
+2.50m CEILING LINE 600mm O.C.

1 TRAINING AREA FLOOR PLAN


A 7 SCALE: 1:100 M

3.00

2.50
PVC TOILET PARTITION

2.40
(VERIFY COLOR)

2.10
1.50
5 LAYER OF 300mm x 300mm
+0.10m COURT F.L. CERAMIC GLAZED TILES (VERIFY
COLOR); REST IN PLAIN CEMENT

0.65
0.60
+0.075m TOILET F.L.

0.45
PLASTER; PAINTED FINISH

0.10
+0.00m F.G.L.
WOODEN CABINET PAINTED
FINISH (VERIFY COLOR)

3.2 SECTION - 01
6 6' A 7

6 6'

2.80 0.13

0.90 C'
0.30

6mm THK FIBER CEMENT BOARD on


19mm x 50mm x 0.40mm THK METAL
+2.50m CEILING LINE
0.90

FURRING SPACED @ 600mm O.C. +3.00m TOP OF BEAM


6mm THK FIBER CEMENT BOARD on

0.40
TOILET +2.60m BOTTOM OF BEAM 19mm x 50mm x 0.40mm THK METAL
FURRING SPACED @ 600mm O.C.
2.30

2.2 (PWD) TURNING SPACE +2.50m CEILING LINE


D GRAB BAR
25

A-7 FF-3 1.50m x 1.50m


+0.60m 8
F.F.L.
2.40

0.60
2.50

3.00

2.50
B'
1.50
PVC TOILET PARTITION (VERIFY

2.40
5 LAYER OF 300mm x 300mm
+0.10m COURT F.L. COLOR)

2.10
0.90 CERAMIC GLAZED TILES(VERIFY
COLOR); REST IN PLAIN CEMENT
5 +0.075m TOILET F.L.
0.48

1.50
0.45

PLASTER; PAINTED FINISH


5 LAYER OF 300mm x 300mm
+0.10m COURT F.L. CERAMIC GLAZED TILES(VERIFY
0.10

COLOR); REST IN PLAIN CEMENT


+0.00m F.G.L. +0.075m TOILET F.L.

0.45
PLASTER; PAINTED FINISH

0.10
2.1 PLAN +0.00m F.G.L.
A 7
2.2 SECTION - 01
A 7 3.3 SECTION - 02
A 7

TRAINING AREA TRAINING AREA


2 PWD DETAIL 3 HE/ SHE TOILET DETAIL
A 7 SCALE: 1:50 M A 7 SCALE: 1:50 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM TRAINING AREA FLOOR PLAN JULIUS M. GACETA
TOILET & BATH TRAINING FACILITY DETAIL ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A6
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 08 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
3
5 5'
4.70
2.20
2.25 2.45

0.75
5' 5
0.45 0.63 0.90

25 25 0.30
6

0.40
0.60

D D
3 3

0.90
T&B (HE)
T&B (SHE) TOILET
1.03

FF-1
FF-1 +0.075m

2.02
(PWD)

2.10
+0.075m F.F.L.
F.F.L.

0.45
3.35

25 25 6mm THK FIBER CEMENT BOARD on 19mm x FF-1


D D D D 50mm x 0.40mm THK METAL FURRING +0.075m
10 11 11 10 1.2 +2.50m CEILING LINE SPACED @ 600mm O.C.
F.F.L.
SHOWER SHOWER A-8 25
1.65

CUBICLE CUBICLE
FF-1
+0.05m
FF-1
+0.05m
D
PVC TOILET PARTITION (VERIFY
F.F.L. F.F.L. 8

0.60
COLOR)
TURNING SPACE

1.50
SHOWER SHOWER
B' WATER CLOSET

2.40
2.50
1.50m x 1.50m
CUBICLE CUBICLE CUBICLE

0.55

1.80
5 5

1.50
5 LAYER OF 300mm x 300mm
+0.10m COURT F.L.

1.20
1.12 1.13 1.13 1.12 CERAMIC GLAZED TILES(VERIFY
COLOR); REST IN PLAIN CEMENT
B'

0.65
+0.075m TOILET F.L.

0.45
PLASTER; PAINTED FINISH

0.10
1.4 1.3
+0.00m F.G.L.
A-8 A-8 2.2
A-8

1.2 SECTION - A
1.1 PLAN A 8
2.1 PLAN
A 8
A 8

B' B' C'

6mm THK FIBER CEMENT BOARD on 6mm THK FIBER CEMENT BOARD on 19mm x 6mm THK FIBER CEMENT BOARD on
19mm x 50mm x 0.40mm THK METAL 50mm x 0.40mm THK METAL FURRING 19mm x 50mm x 0.40mm THK METAL
+2.50m CEILING LINE FURRING SPACED @ 600mm O.C. +2.50m CEILING LINE SPACED @ 600mm O.C. FURRING SPACED @ 600mm O.C.
+2.50m CEILING LINE

GRAB BAR
PVC TOILET PARTITION (VERIFY
COLOR)
TOILET
0.30

PVC TOILET PARTITION (VERIFY WATER CLOSET (PWD)


2.40

2.40

2.40
2.50
2.50

2.50

COLOR)
CUBICLE

0.60
1.80

+0.10m COURT F.L.

1.48
5 LAYER OF 300mm x 300mm 5 LAYER OF 300mm x 300mm 5 LAYER OF 300mm x 300mm
+0.10m COURT F.L. +0.10m COURT F.L.
1.20

+0.075m TOILET F.L. CERAMIC GLAZED TILES(VERIFY CERAMIC GLAZED TILES(VERIFY CERAMIC GLAZED TILES(VERIFY

0.90
0.85

0.85
COLOR); REST IN PLAIN CEMENT COLOR); REST IN PLAIN CEMENT COLOR); REST IN PLAIN CEMENT
0.65

+0.075m TOILET F.L. +0.075m TOILET F.L.


0.65

0.65

+0.05m SHOWER F.L.

0.48
0.45
PLASTER; PAINTED FINISH PLASTER; PAINTED FINISH PLASTER; PAINTED FINISH
0.10

0.10

0.10
+0.00m F.G.L. +0.00m F.G.L. +0.00m F.G.L.

1.3 SECTION - B 1.4 SECTION - C 2.2 SECTION - A


A 8 A 8 A 8

TRAINING AREA CLINIC AT TRAINING AREA


1 HE/ SHE T&B DETAIL 2 PWD TOILET DETAIL
A 8 SCALE: 1:50 M A 8 SCALE: 1:50 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM TOILET BATH TRAINING FACILITY DETAIL JULIUS M. GACETA
ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A8
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 09 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
G' B' C'

6mm THK FIBER CEMENT BOARD on


19mm x 50mm x 0.40mm THK METAL
+3.00m TOP OF BEAM FURRING SPACED @ 600mm O.C.

0.40
7a 7b 7c +2.60m BOTTOM OF BEAM/
CEILING LINE
7.95

3.98 3.98

3.40

2.90
1.28 0.90 0.90 0.90 0.72 1.05 1.05 1.15
PVC TOILET PARTITION
(VERIFY COLOR)
WATER CLOSET
URINAL CUBICLE
C' +0.10m COURT F.L.
5 LAYER OF 300mm x 300mm
CERAMIC GLAZED TILES(VERIFY
COLOR); REST IN PLAIN CEMENT
+0.075m TOILET F.L. PLASTER; PAINTED FINISH
SHOWER CUBICLE

1.35

0.10
1.65

WATER CLOSET CUBICLE


D D D +0.00m F.G.L.
10 10 10
D D D D 25 25 25

11 11 11 11

FF-1 W 1.2 SECTION - A

1.55
TOILET & BATH 5 A 9
+0.075m
1.40

(MALE)
5.05

F.F.L.

D
11

1.15
0.90

D 25 25 D
10 10 W
URINAL FF-1 6
WATER CLOSET
+0.075m D CUBICLE
F.F.L. 11
0.90

1.00
D 25 25 D
10 10
9.65

B' D TOILET & BATH


11
(MALE)

1.20
0.90

D 25 25 D
10 10
URINAL

1.3
W 7a 7b 7c
0.90

PWD A-9
D D 6

1.15
25 25

10 10
4.60

25
6mm THK FIBER CEMENT BOARD on 19mm x
50mm x 0.40mm THK METAL FURRING
D +3.00m TOP OF BEAM SPACED @ 600mm O.C.
FF-1

0.40
9
1.88

W +2.60m BOTTOM OF BEAM/


+0.075m
1.53

FF-1 5 CEILING LINE


25 F.F.L.
+0.075m
F.F.L.
0.65

R.C. SINK

3.40

0.60
2.90
G' 5 LAYER OF 300mm x 300mm
CERAMIC GLAZED TILES(VERIFY

2.10
URINAL PWD CUBICLE SHOWER CUBICLE COLOR); REST IN PLAIN CEMENT

0.55
1.20
+0.10m

1.80
COURT F.L. PLASTER; PAINTED FINISH
1.25 5.40m, EQUAL O.C. = 0.90m EACH 1.30
+0.075m TOILET F.L. PVC TOILET PARTITION

0.90
1.2

0.65
(VERIFY COLOR)

1.30
7.95 +0.05m SHOWER F.L.

0.45
A-9

0.30
0.10
+0.00m F.G.L.

1.1 PLAN 1.3 SECTION - B


A 9
A 9

MALE
1 TOILET &BATH DETAIL
A 9 SCALE: 1:50 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM MALE TOILET & BATH DETAIL JULIUS M. GACETA
ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A9
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 10 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
H' B' C

6mm THK FIBER CEMENT BOARD on 19mm x


50mm x 0.40mm THK METAL FURRING
+3.00m TOP OF BEAM
1a 1b 1c SPACED @ 600mm O.C.

0.40
+2.60m BOTTOM OF BEAM/
CEILING LINE
7.95

3.98 3.98 FACIAL MIRROR


REINF.CONCRETE
LAVATORY PVC TOILET PARTITION (VERIFY
1.15 1.05 1.05 0.73 0.90 0.90 0.90 1.28

3.40
COLOR)

2.90

0.60
WATER CLOSET CUBICLE WATER CLOSET
PWD CUBICLE

2.10
CUBICLE
C

0.25
+0.10m COURT F.L.

1.50
5 LAYER OF 300mm x 300mm
+0.075m TOILET F.L. CERAMIC GLAZED TILES(VERIFY

0.85

0.90
SHOWER CUBICLE COLOR); REST IN PLAIN CEMENT
1.35

+0.05m SHOWER F.L. PLASTER; PAINTED FINISH

0.45
0.45
1.65
WATER CLOSET CUBICLE

0.10
D D D

0.80
10 10 10 +0.00m F.G.L.
25 25 25 D D D D
11 11 11 11 WOODEN CABINET PAINTED FINISH
(VERIFY COLOR)

W FF-1 TOILET & BATH


1.38

5 +0.075m (FEMALE) 3.00 2.40 3.00 1.2 SECTION - A

1.43
F.F.L.
5.05

A 10

D
FF-1
1.10

D 25 25 D 11
10 10
+0.075m

0.90
D
F.F.L. 11

D
11
2.10

D D

0.90
25 25 D
W 10 10 11
6
D
B' SHOWER CUBICLE
11
WATER CLOSET CUBICLE

1.15
1.15

D 25 25 D
D
10 10
11
D
11

0.90
D
1.10

D 25 25 D
11
1.3
W 10 10

A-10 6 1a 1b 1c
PWD

0.90
W D
11
6
1.10

D D
5.30

25 25
10 10 6mm THK FIBER CEMENT BOARD on 19mm x
50mm x 0.40mm THK METAL FURRING
+3.00m TOP OF BEAM SPACED @ 600mm O.C.
25

0.40
1.20 0.90 1.28 0.90 1.50
+2.60m BOTTOM OF BEAM/
D
CEILING LINE
9
W FF-1
1.40

2.53

25
5 1.88 +0.075m D
6.65 F.F.L. 8

3.40

2.90

0.60
0.65

R.C. SINK PVC TOILET PARTITION (VERIFY


COLOR)
SHOWER CUBICLE PWD WATER CLOSET
H'

0.55
CUBICLE

1.80
+0.10m COURT F.L.
5 LAYER OF 300mm x 300mm
+0.075m TOILET F.L. CERAMIC GLAZED TILES(VERIFY

0.90
1.25 5.40m, EQUAL O.C. = 0.90m EACH 1.30 COLOR); REST IN PLAIN CEMENT

0.65
+0.05m SHOWER F.L.

0.45
PLASTER; PAINTED FINISH

0.10
7.95
+0.00m F.G.L.

1.2
A-10
1.1 PLAN
A 10
1.3 SECTION - B
A 10

FEMALE
1 TOILET &BATH DETAIL
A 10 SCALE: 1:50 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM FEMALE TOILET & BATH DETAIL JULIUS M. GACETA
ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A10
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 11 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
1a 1b 1c
1c 1b 1a
7.95
7.95
1.85 2.12 2.12 1.85
3.98 3.98

2.70 0.60

G'
LAUNDRY AREA

2.83
D 100 DELIVERY/
2 SERVICE AREA +0.00m
560mm x 840mm x 150mm DOUBLE BOWL F.F.L. 2.2
2.35

STAINLESS STEEL KITCHEN SINK IN 100mm THK 100mm x 100mm STAINLESS STEEL FLOOR
CHB COUNTER SUPPORT, PLAIN CEMENT A-10 DRAIN STRAINER IN EVERY FRONT
PLASTER; PAINTED FINISH BOTTOM OF LAUNDRY SINK

W
6 D D
300mm x 300mm THK GLAZED
4 4 KITCHEN

0.45
VITRIFIED CERAMIC TILE 100mm THK CHB COUNTERTOP
4.80

25 FF-03 SUPPORT BELOW

1.17
+0.10m

0.73
F.F.L. 1.2
A-11
WET STORAGE DRY STORAGE C
2.45

FF-03 FF-03
+0.075m +0.10m 2.90 2.15 2.90
F.F.L. F.F.L.
800mm SINGLE BOWL
D CONCRETE SINK IN 100mm THK
6 REINFORCED CONCRETE COUNTER
F'
W
2.1 LAUNDRY AREA DETAILED PLAN
A 11 SCALE: 1:50 M
3

1.1 KITCHEN DETAILED PLAN


A 11
0.65
0.55 0.10

PLAIN HOSE BIB

100mm R.C. COUNTERTO[P

0.10
0.20
100mm R.C. SINK

0.30

0.10
0.85
100mm x 100mm STAINLESS STEEL
1.00 DRAINER

0.55
100mm THK CHB COUNTERTOP
1c 1b 1a 2.4
SUPPORT

A-11

0.10
+0.00m F.G.L.

6mm THK FIBER CEMENT BOARD on 19mm x


2% SLOPE
+3.00m TOP OF BEAM
50mm x 0.40mm THK METAL FURRING
SPACED @ 600mm O.C.
100mm THK R.C. CANOPY w/
25mm x 25mm DRIP GROOVE
2.3 R.C. SINK DETAILED SECTION
A 11 SCALE: 1:40 M
0.40

+2.60m BOTTOM OF BEAM/


CEILING LINE
800mm SINGLE BOWL
CONCRETE SINK IN 100mm THK
100mm THK CHB INTERIOR WALL IN PLAIN REINFORCED CONCRETE COUNTER
CEMENT PLASTER; PAINTED FINISH

2.30
KITCHEN 0.05 0.90 0.05
3.40

0.60 300mm x 300mm THK GLAZED VITRIFIED


EQUALLY SPACED @ 0.10m EACH
2.90

CERAMIC TILE
FACE OF EXTERIOR WALL IN PLAIN

0.85
GOOSENECK SINK FAUCET CEMENT PLASTER; PAINTED FINISH
WET STORAGE DRY STORAGE 150mm THK CHB EXTERIOR
WALL IN PLAIN CEMENT
2% SLOPE 25mm x 25mm DRIP MOLD
560mm x 840mm x 150mm DOUBLE BOWL PLASTER PAINTED FINISH

0.10
+0.10m KITCHEN F.L. STAINLESS STEEL KITCHEN SINK IN 100mm
THK CHB COUNTER SUPPORT, PLAIN 2.3
+0.075m WET STO. F.L. CEMENT PLASTER; PAINTED FINISH
A-11 10mm RSB SPACED @ 200mm O.C.
0.10

0.05
+0.00m F.G.L. 1.00

2.2 SECTION A R.C CANOPY SMOOTH OFF-FORM FINISH

A 11 SCALE: 1:40 M

1.2 SECTION 01
A 11
2.4 CONCRETE CANOPY DETAILED SECTION
A 11 SCALE: 1:20 M

1 KITCHEN DETAIL 2 LAUNDRY AREA DETAIL


A 11 SCALE: 1:50 M A 11 SCALE: 1:50 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM KITCHEN DETAIL JULIUS M. GACETA
LAUNDRY AREA DETAIL ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A11
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 12 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
0.70 0.70
0.90 0.85 0.85

2.10

2.10

2.10

2.10

2.10
F.F.L. F.F.L. F.F.L. F.F.L. F.F.L.

50mm THK SINGLE-LEAF SINGLE-ACTION HOLLOW CORE FLUSH SWING DOOR 50mm THK SINGLE-LEAF SINGLE-ACTION HOLLOW CORE FLUSH SWING DOOR
50mm THK SINGLE-LEAF SINGLE-ACTION HOLLOW CORE FLUSH SWING DOOR w/
D 50mm THK SINGLE-LEAF SINGLE-ACTION SOLID WOOD PANEL SWING DOOR w/ D w/ 6mm THK MARINE PLYWOOD FACING T&B/ EXTERIOR SIDE AND 6mm D w/ 6mm THK MARINE PLYWOOD FACING T&B/ EXTERIOR SIDE AND 6mm D 50mm THK SINGLE-LEAF SINGLE-ACTION HOLLOW CORE FLUSH SWING DOOR w/ D 6mm THK ORD. PLYWOOD ON 50mm x 100mm THK WOODEN DOOR JAMB.
1 10mm GROOVE on 50mm x 100mm THK WOODEN DOOR JAMB 2 ORD.PLYWOOD FACING INTERIOR SIDE ON 50mm x 100mm THK WOODEN DOOR 3 ORD.PLYWOOD FACING INTERIOR SIDE ON 50mm x 100mm THK WOODEN DOOR 4 6mm THK ORD. PLYWOOD ON 50mm x 100mm THK WOODEN DOOR JAMB 5 PROVIDE 4.5mm THK CLEAR GLASS
JAMB. PROVIDE STAINLESS STEEL KICKPLATE ON PUSH SIDE JAMB. PROVIDE LOUVER

ADMIN. AREA, PLAY AREA, BACKSTAGE, CLINIC, PRAYER ROOM, STORAGE @ HE/ SHE TOILET MAIN DOOR, HE/ SHE T&B MAIN DOOR, STORAGE @ TRAINING CONJUGAL ROOM, BREASTFEEDING ROOM, RECORDS ROOM, ADMIN. OFFICE,
LOCATION LOCATION DELIVERY/ SERVICE AREA, MAIN STORAGE MAIN DOOR LOCATION LOCATION LOCATION CONSULTATION ROOM
PRAYER ROOM AREA, ELECTRICAL ROOM, MAIN STORAGE SERVICE DOOR KITCHEN DRY & WET STORAGE
QUANTITY 7 SETS QUANTITY 2 SETS QUANTITY 7 SETS QUANTITY 7 SETS QUANTITY 1 SET
a. LOCKSET: STAINLESS STEEL LEVER TYPE LOCKSET a. LOCKSET: STAINLESS STEEL LEVER TYPE LOCKSET a. LOCKSET: STAINLESS STEEL LEVER TYPE LOCKSET
HARDWARE HARDWARE a. LOCKSET: STAINLESS STEEL LEVER TYPE LOCKSET HARDWARE a. LOCKSET: STAINLESS STEEL LEVER TYPE LOCKSET HARDWARE HARDWARE
b. HINGE: 4 PCS 89mm x 89mm STAINLESS STEEL w/ b. HINGE: 4 PCS 89mm x 89mm STAINLESS STEEL w/ b. HINGE: 4 PCS 89mm x 89mm STAINLESS STEEL w/
b. HINGE: 4 PCS 89mm x 89mm STAINLESS STEEL w/ FIXED PIN, 2 BALL BEARING b. HINGE: 4 PCS 89mm x 89mm STAINLESS STEEL w/ FIXED PIN, 2 BALL BEARINGS
FIXED PIN, 2 BALL BEARING FIXED PIN, 2 BALL BEARINGS FIXED PIN, 2 BALL BEARING

0.85 1.20 1.10 1.10 0.90 0.60 0.60

0.15

0.15

0.15
0.30

0.30
0.15

0.40

0.40
2.10

2.10

2.10

2.10

2.10

2.10

2.10

1.85
1.95

1.95
1.35

1.06
1.00

0.85

0.30

0.10
F.F.L. F.F.L. F.F.L. F.F.L. F.F.L. F.F.L.

OUTSIDE INSIDE

50mm THK SINGLE-LEAF DOUBLE-ACTION HOLLOW CORE 50mm THK SINGLE-LEAF SINGLE-ACTION HOLLOW CORE FLUSH SWING DOOR w/ 6mm THK
D FLUSH SWING DOOR w/ 6mm THK ORD. PLYWOOD ON D 50mm THK SINGLE-LEAF SINGLE-ACTION COLD-ROLLED D MARINE PLYWOOD FACING T&B/ EXTERIOR SIDE AND 6mm ORD.PLYWOOD FACING D 35mm THK FLOOR MOUNTED PVC PARTITION AND DOOR w/ D 35mm THK FLOOR MOUNTED PVC PARTITION AND D 35mm THK FLOOR MOUNTED PVC PARTITION
6 50mm x 100mm THK WOODEN DOOR JAMB. PROVEIDE 7 STEEL SHEET w/ STEEL FRAME 8 INTERIOR SIDE ON 50mm x 100mm THK WOODEN DOOR JAMB. PROVIDE STAINLESS STEEL 9 STAINLESS SUPPORT 10 DOOR w/ STAINLESS SUPPORT 11 AND DOOR w/ STAINLESS SUPPORT
4.5mm THK CLEAR GLASS DOOR HANDLE AND KICKPLATE ON PUSH SIDE

MALE/ FEMALE T&B MAIN DOOR, PWD TOILET @ TRAINING AREA,


LOCATION KITCHEN, CONJUGAL RECEPTION AREA LOCATION EMERGENCY EXITS LOCATION LOCATION PWD CUBICLE @ MALE/ FEMALE T&B LOCATION SHOWER CUBICLE LOCATION TOILET CUBICLE
PWD TOILET @ CLINIC
QUANTITY 2 SETS QUANTITY 2 SETS QUANTITY 4 SETS QUANTITY 2 SETS QUANTITY 3 SETS QUANTITY 3 SETS
a. LOCKSET: STAINLESS STEEL LEVER TYPE LOCKSET a. HINGE: 4 PCS STAINLESS STEEL a. LOCKSET: STAINLESS STEEL SLIDE LATCH a. LOCKSET: STAINLESS STEEL SLIDE a. LOCKSET: STAINLESS STEEL SLIDE
HARDWARE HARDWARE HARDWARE HARDWARE a. LOCKSET: STAINLESS STEEL SLIDE LATCH HARDWARE HARDWARE
b. HINGE: 4 PCS 89mm x 89mm STAINLESS STEEL w/ b. DOOR CLOSER: HYDRAULIC SELF-CLOSING DEVICE b. HINGE: 4 PCS 89mm x 89mm STAINLESS STEEL w/ FIXED PIN, 2 BALL BEARING LATCH LATCH
b. HINGE: 2 PCS BUTT HINGE
FIXED PIN, 2 BALL BEARING c. PANIC DEVICE: STAINLESS STEEL PUSH BAR c. PANIC DEVICE: STAINLESS STEEL PUSH PLATE b. HINGE: 2 PCS BUTT HINGE b. HINGE: 2 PCS BUTT HINGE

1.20 4.20 1.20


0.60 0.60 1.50 1.50 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60

0.30
0.60
0.60

0.60

0.60
F
0.85

1.20

F
1.50

2.10

2.10
2.10

2.10

2.10

2.10

2.10
0.65

1.80
F
1.50
1.50

1.50
0.90
0.60

F.F.L. F.F.L. F.F.L. F.F.L. F.F.L. F.F.L. F.F.L.

4.5mm THK CLEAR GLASS ON POWDER COATED


W W 4.5mm THK CLEAR GLASS ON POWDER COATED W 4.5mm THK CLEAR GLASS ON POWDER COATED W 4.5mm THK CLEAR GLASS ON POWDER COATED ALUMINUM FRAME W 4.5mm THK CLEAR GLASS ON POWDER COATED W 4.5mm THK CLEAR GLASS ON POWDER COATED W 4.5mm THK CLEAR GLASS ON POWDER COATED
ALUMINUM FRAME SLIDING WINDOW w/ FIXED
1 2 ALUMINUM FRAME fixed WINDOW 3 ALUMINUM FRAME fixed WINDOW 4 AWNING WINDOW 5 ALUMINUM FRAME AWNING WINDOW 6 ALUMINUM FRAME AWNING WINDOW 6 ALUMINUM FRAME AWNING WINDOW
WINDOW

ADMIN. AREA, PLAY AREA, BACKSTAGE, CLINIC, PRAYER


MALE/ FEMALE T&B, SHE TOILET, PWD TOILET, KITCHEN, ELECTRICAL RM., MALE/ FEMALE T&B, HE
LOCATION ROOM, STORAGE @ PRAYER ROOM, PLAY AREA, LOCATION ADMIN. OFFICE LOCATION KITCHEN LOCATION MESS HALL LOCATION LOCATION LOCATION CONJUGAL ROOM
CONSULTATION ROOM TRAINING AREA HE/SHE TOILET TOILET, TRAINING AREA STORAGE, CLINIC PWD TOILET

QUANTITY 14 SETS QUANTITY 1 SET QUANTITY 1 SET QUANTITY 3 SETS QUANTITY 8 SETS QUANTITY 11 SETS QUANTITY 2 SETS

1 DOORS & WINDOWS SCHEDULE


A 12 SCALE: 1:50 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM DOORS & WINDOWS SCHEDULE JULIUS M. GACETA
ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A12
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 13 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
1100mm x 1830mm COMMERCIAL
12mm HEAVY DUTY FIBERGLASS
BACKBOARD WITH 50mm x 50mm
ANGULAR STEEL FRAME

0.75
A B

1.10
PROVIDE STEEL PLATE FOR
CONNECTION (VERIFY DIMENSION
22.20 UPON INSTALLATION)

0.35
1.83
3.05 15.35 3.00 0.69 0.46 0.69
UNOBSTRUCTED SPACE BASKETBALL COURT UNOBSTRUCTED SPACE
1.64 3.62 4.84 3.62 1.64

0.75
0.60 3.64 0.60

2.65
1.10
1.50

3.05
1

5.40
0.35
1100mm x 1830mm COMMERCIAL
1.27

UNOBSTRUCTED SPACE 12mm HEAVY DUTY FIBERGLASS


BACKBOARD WITH 50mm x 50mm PROVIDE STEEL PLATE FOR
ANGULAR STEEL FRAME CONNECTION (VERIFY DIMENSION PART OF PLAYING COURT
PROVIDE STEEL PLATE FOR UPON INSTALLATION) 400mm x 400mm x4.5mm THK
CONNECTION (VERIFY DIMENSION 1100mm x 1830mm COMMERCIAL
BLEACHERS

0.40
UPON INSTALLATION) BOLT WITH NUTS

0.20
12mm HEAVY DUTY FIBERGLASS
5.55

BACKBOARD WITH 50mm x 50mm


400mm x 400mm CONCRETE
ANGULAR STEEL FRAME
0.90 1.20 PEDESTAL

2.1 PLAN 2.2 BACKBOARD DETAIL


A 13 A 13 2.3 BASKETBALL STAND ELEVATION
A 13

2 BLEACHERS

2 BASKETBALL STAND DETAIL


A 13 SCALE: 1:50 M
5.55

14.38

14.38
BLEACHERS

20mm THK PLYWOOD ON


1 21 x 1 21 x 2.50mm ANGLE BAR
SPACED AS SHOWN

3 3.60

20mm THK PLYWOOD ON

0.30
SPACE

SEAT
O

1 21 x 1 21 x 2.50mm ANGLE BAR


UT

BLEACHERS
4.55

SI

SPACED AS SHOWN
DE
R1

0.30
WALK
.8

0.45
2

25mm x 2.00mm FLAT BAR


UNOBSTRUCTED

0.30
1.50
SEAT
31.10

0.45
1.35
28.75
4 25mm x 2.00mm FLAT BAR

0.30
WALK
IN
SI

0.30
SEAT
DE

0.45
R1
.8
2
4.55

BLEACHERS
3.1 PLAN
A 13
3.3 SECTION
A 13

1 21 x 1 21 x 2.50mm ANGLE BAR


AL 2
GO 6.0

BLEACHERS
O ER

20mm THK PLYWOOD ON


ER LIN

20mm THK PLYWOOD ON


F

1 21 x 1 21 x 2.50mm ANGLE BAR


NT T

1 21 x 1 21 x 2.50mm ANGLE BAR


14.38

14.38
CE OIN
5.45

SPACED AS SHOWN SPACED AS SHOWN


O E-P
FR RE
M
TH

0.45
6 BLEACHERS
25mm x 2.00mm FLAT BAR

0.45
1.35
1 21 x 1 21 x 2.50mm ANGLE BAR

0.45
5.45

BLEACHERS

3.2 ELEVATION
1.08

UNOBSTRUCTED SPACE A 13
7 3.4 ISOMETRIC
A 13

DETAILED PLAN OF
1 BASKETBALL COURT 3 BLEACHERS DETAIL
A 13 SCALE: 1:100 M A 13 SCALE: 1:30 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM DETAILED PLAN OF BASKETBALL COURT JULIUS M. GACETA
BASKETBALL STAND DETAIL ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
BLEACHERS DETAIL
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A13
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 14 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
9.00

1.50 3.00 3.00 1.50

0.45 2.55 2.55 0.45

A B

0.10
1.50
22.20
BACK BOUNDARY LINE

0.40
3.05 6.00 3.35 6.00 3.00

0.75
UNOBSTRUCTED SPACE BADMINTON COURT BADMINTON COURT UNOBSTRUCTED SPACE

EDGE OF PAVEMENT
1.50
LONG SERVICE LINE STANDARD
BADMINTON COURT
1

0.40
1.27
UNOBSTRUCTED SPACE

1.47
DOUBLE

DOUBLE
SINGLE

SINGLE
4.00
RIGHT LEFT

6.75
BLEACHERS
5.55

0.57
SHORT SERVICE LINE
2.2

2.00
200mm O.C, B.W.
A-13

0.15
NET

16.50
2 BLEACHERS
3.00

2.00
SHORT SERVICE LINE
13.50
5.55

6.75
200mm O.C, B.W.

DOUBLE

DOUBLE
SINGLE

SINGLE
4.00
BLEACHERS LEFT RIGHT

0.60
2.5
A-13
3 LONG SERVICE LINE

0.75
BACK BOUNDARY LINE

1.50
SPACE

BLEACHERS
4.55

EDGE OF PAVEMENT
2.2 STAND POST, NET DETAILS
A 14 SCALE: 1:20 M
UNOBSTRUCTED

2.1 PLAN
A 14 SC: 1:100 M
31.10

1.75

6.90
4.55

0.10
BLEACHERS STANDARD BADMINTON COURT

0.80
1.37
1.62
CONCRETE STAND

0.57
100mm THK CONCRETE SLAB,
PLAIN CEMENT FINISH

0.15
5 0.45

0.10

DOUBLE

DOUBLE
SINGLE

SINGLE
0.05 0.35 0.05

BORDER WHITE COLOR

BLEACHERS UNOBSTRUCTED 0.45 2.55 2.55 0.45 UNOBSTRUCTED


SPACE SPACE
1.50 6.00 1.50

0.05
5.45

0.20

0.15
13.50

2.3 ELEVATION 1

0.05
SCALE: 1:80 M

0.10
A 14

0.05
0.75

0.65
6

0.55
BLEACHERS

0.50
1.50 13.50 1.50

6.75 6.75

0.05
0.75 4.00 2.00 2.00 4.00 0.75

0.45

SHORT SERVICE LINE

SHORT SERVICE LINE


LONG SERVICE LINE

LONG SERVICE LINE


5.45

BLEACHERS

1.62
1.72
UNOBSTRUCTED UNOBSTRUCTED
+0.10m COURT F.L. SPACE SPACE
2.5 ELEVATION 2
1.08

UNOBSTRUCTED SPACE A 14 SCALE: 1:20 M


7 +0.00m F.G.L. 0.60
100mm THK CONCRETE SLAB,
PLAIN CEMENT FINISH
2.4 ELEVATION 2
A 14 SCALE: 1:80 M

DETAILED PLAN OF
1 BASKETBALL COURT with INTEGRATED BADMINTON COURT 2 BADMINTON COURT DETAIL
A 14 SCALE: 1:100 M A 14

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM DETAILED PLAN OF BASKETBALL COURT WITH JULIUS M. GACETA
INTEGRATED BADMINTON COURT ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
BADMINTON COURT DETAIL
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A14
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 15 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
A B

0.10
22.20

3.23 3.00 9.00 3.00 3.18


UNOBSTRUCTED SPACE VOLLEYBALL COURT UNOBSTRUCTED SPACE
1.50

1.00
1
STANDARD VOLLEYBALL
COURT

3.45
BLEACHERS

11.25
5.55

200mm O.C, B.W.

2.15
0.60
UNOBSTRUCTED SPACE
3.00

1.15
2 BLEACHERS

200mm O.C, B.W.


5.55

0.30
BLEACHERS

6.00
EDGE OF PAVEMENT
PLAIN CEMENT FINISH

9.00
STAND POST, NET DETAILS
SCALE: 1:20 M
50mm SPIKING LINE
SPACE

BLEACHERS

3.00
UNOBSTRUCTED
31.10

NET 15.00

24.00
9.10

4 2.10 5.40 5.40 2.10

0.90 9.00 0.89


PLAYING AREA

3.00
3.00 1.50 1.50 3.00
LINE WHITE PAINT SERVICE AREA SERVICE AREA
50mm THK BORDER

50mm SPIKING LINE BLEACHERS STANDARD BADMINTON COURT

2.25
2.55
2.65
CONCRETE STAND

9.00
5 100mm THK CONCRETE SLAB,
PLAIN CEMENT FINISH

0.30
0.10
6.00
PLAIN CEMENT FINISH
BLEACHERS

ELEVATION 1
5.45

SCALE: 1:80 M

50mm THK BORDER UNOBSTRUCTED SPACE


LINE WHITE PAINT

6 BLEACHERS 24.00
3.00

3.00 18.00 3.00


UNOBSTRUCTED PLAYING AREA UNOBSTRUCTED
SPACE 9.00 9.00 SPACE

6.00 3.00 3.00 6.00


EDGE OF PAVEMENT
SPIKING AREA SPIKING AREA
5.45

BLEACHERS
3.45

2.55
CONCRETE STAND
UNOBSTRUCTED SPACE
7 +0.10m COURT F.L.
100mm THK CONCRETE SLAB,
PLAIN CEMENT FINISH

0.10
+0.00m F.G.L. 0.60
1.1 PLAN
A 15 SC: 1:100 M
ELEVATION 2
SCALE: 1:80 M

DETAILED
1 BASKETBALL COURT with INTEGRATED VOLLEYBALL COURT
A 15 SCALE: 1:100 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM DETAILED PLAN OF BASKETBALL COURT WITH JULIUS M. GACETA
INTEGRATED VOLLEYBALL COURT ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A15
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 16 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
1c 1b 1a 1 2 3 4 5 5' 6 6' 7 7a 7b 7c

50.00

7.95 34.10 7.95

3.98 3.98 1.50 5.55 5.55 4.55 4.55 5.45 5.45 1.50 3.98 3.98

FF-03 FF-03

WF1 WF1 WF1 WF1 WF1 WF1 WF1 WF1 WF1 WF1

C C'
WF2 WF2
FF-03 STO. WF2 WF2

WF6

WF6
WF6

WF6
FF-03 FF-01
FF-03

WF1

WF3
(SHE)
(HE)
WF2 FF-01
WF1

STORAGE PWD FF-01

WF2
WF1
FF-01 FF-01
WF2 ROOM PRAYER ROOM CLINIC TOILET
5.05

5.05
WF2
FF-03 FF-01 FF-03 WF6
FF-02 FF-02 FF-02

WF1
TOILET & BATH FACILITY

WF1
WF6 STAGE AREA TOILET FACILITY

WF1
(SHE) (HE)

WF2
FF-03

WF2
WF1
FF-01 FF-01 (PWD)

WF6
B' FF-01 FF-03
B'
WF2
TOILET & BATH
FF-01 (MALE) FF-01
FF-01 FF-01
TOILET & BATH WF6
WF1 WF1 WF1 WF1 WF1 WF1

1.35
WF2
(FEMALE)
WF2

WF2

WF1
B B

WF2
WF2
WF1
WF2
WF1

WF2

WF2

WF1
WF2
4.60

3.25
WF6 FF-01
FF-03
FF-05
FF-01

G' G'
0.70

DELIVERY/
WF1
SERVICE AREA
FF-03

2.35
WF1 WF1 WF1

H' CONJUGAL
2.40

KITCHEN
ROOM 1 CONJUGAL BREASTFEEDING
WF1

FF-03

WF1
WF1

WF1
4.80

4.80
WF1
FF-02
ROOM 2 ROOM
4.10

FF-02 FF-06
DRY WET
STORAGE STORAGE
WF1

WF1

2.45
RECEPTION AREA FF-03 FF-03
1.70

FF-02

WF1
29.00

29.00
F' F'
WF1 WF1

PLAY AREA
WF1

WF1

WF1
WF1

WF1
WF1
4.80

4.80
WF4
FF-03 FF-03
FF-06
BASKETBALL COURT WITH
FF-05 INTEGRATED BADMINTON AND
VOLLEYBALL COURT
FF-04

WF1 LEGEND
E' E' FLOOR FINISH SCHEDULE
WF1 MESS HALL
FF-03 CODE DESCRIPTION
FF-05
FF-01 300mm x 300mm CERAMIC TILES

STORAGE ROOM
4.80

4.80
WF1
WF4

WF1
FF-02 600mm x 600mm CERAMIC TILES
FF-03

CONCRETE SLAB ON GRADE PAINTED


WF1
WF1

WF1

WF1

FF-03
FINISH

CONCRETE SLAB ON GRADE WITH


FF-04
POWER FLOOR PAINT FINISH
WF1

D' D' FF-05


MARKING SIDELINE/ BASELINE PAINTED
WHITE
WF1 WF3 WF3
ELEC'L.
RECORDS
ROOM ROOM FF-06 ANTI-SLIP RUBBER FLOORING
2.35

FF-03 FF-02

WF1 RECEPTION AREA WALL/ PARTITION FINISH SCHEDULE


ADMIN. OFFICE FF-03
WF1

WF1

WF1
WF1

WF1
WF1
WF4
4.95

4.95
FF-02 CODE DESCRIPTION
WF1 FF-03
PLAIN CEMENT PLASTERED PAINTED
CONSULTATION
WF1

WF1 FINISH
2.60

ROOM
FF-02 5 LAYER OF 300mm x 300mm CERAMIC
WF5
GLAZED TILES(VERIFY COLOR); REST IN
A' WF1 WF4 WF4
A WF2

0.40
PLAIN CEMENT PLASTER; PAINTED FINISH

WF1 WF1 WF1 WF1 WF1 WF1 PVC ACCORDION DOOR PARTITION
WF3

A A' GA. 24 OVERHEAD ROLLING STEEL


1.50 2.48 3.98 SERVICE DOOR w/ COLD-ROLL FORMED
WF4 CHANNEL and ANGLE; MANUAL
OPERATION
3.98 3.98 5.55 5.55 9.10 5.45 5.45 3.97 3.98

7.95 1.50 31.10 1.50 7.95 WF5 SIDE-FOLDING STEEL GATE

WF6 PVC TOILET PARTITION (VERIFY COLOR)

1 SCHEDULE OF FINISHES
A 16 SCALE: 1:100 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM SCHEDULE OF FINISHES JULIUS M. GACETA
ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A16
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 17 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
1c 1b 1a 1 2 3 4 5 5' 6 6' 7 7a 7b 7c

50.00

7.95 34.10 7.95

3.98 3.98 1.50 5.55 5.55 4.55 4.55 5.45 5.45 1.50 3.98 3.98

CF-02 CF-02 CF-02 CF-02 CF-02

C C'
STO.

CF-01 CF-01 1200mm x 600mm


(SHE) PVC ROOF VENTILATION
STORAGE PWD (HE)
PRAYER ROOM CLINIC CF-01
ROOM CF-01 CF-01 TOILET CF-01
5.05

5.05
CF-02

CF-02
CF-01
TOILET & BATH FACILITY
CF-01 TOILET FACILITY
STAGE AREA (SHE) (HE)
CF-01 CF-01 (PWD)
CF-01
B' CF-01 CF-01
B'
TOILET & BATH
(MALE)
TOILET & BATH CF-01

1.35
CF-02 CF-02 CF-02 CF-02 CF-02
(FEMALE)
CF-01
B B
4.60

CF-01

CF-01
CF-02

CF-02

3.25
CF-03 CF-03 CF-03 CF-03 CF-03

G' G'
0.70

DELIVERY/
SERVICE AREA

2.35
CF-01

H' CONJUGAL
2.40

ROOM 1 KITCHEN
CONJUGAL BREASTFEEDING
CF-01
4.80

4.80
CF-02

CF-02
CF-01
ROOM 2
CF-01

CF-01
ROOM
4.10

DRY WET
CF-01 CF-01 STORAGE STORAGE

2.45
RECEPTION AREA
1.70

CF-03 CF-03 CF-03 CF-03 CF-03 CF-01 CF-01


CF-01
29.00

29.00
F' F'
BASKETBALL COURT WITH 1200mm x 600mm WOODEN
INTEGRATED BADMINTON AND VENTILATION SLATS ON FIBER CEMENT
BOARD CEILING WITH INSECT SCREEN
VOLLEYBALL COURT

PLAY AREA
CF-02

CF-02
4.80

4.80
CF-01

CF-01
CF-01

E' E'
MESS HALL
0.50mm THK LONGSPAN G.I. ROOFING SHEETS
ON EXPOSED STEEL TRUSS WITH R-14 SINGLE CF-01
FOIL SINGLE BUBBLE INSULATION

STORAGE ROOM
4.80

4.80
CF-03 CF-03 CF-03 CF-03 CF-03
CF-01

CF-01
CF-02

CF-02
CF-01
LEGEND AND SYMBOLS
CEILING FINISH SCHEDULE
CODE DESCRIPTION

D' D' 6mm THK FIBER CEMENT CEILING BOARD


ON 19mm x 50mm x 0.40mm THK METAL
ELEC'L. CF-01 FURRING SPACED @ 600mm O.C.
ROOM RECORDS
(PROVIDE ROOFING HEAT INSULATION)
ROOM
2.35

CF-01 CF-02 PVC EAVES IN CUSTOM COLOR


CF-01 ADMIN. OFFICE RECEPTION AREA
CF-01

CF-01
CF-01
CF-01
0.50mm THK LONGSPAN G.I. ROOFING
4.95

4.95
SHEETS ON EXPOSED STEEL TRUSS
CF-03
CF-03 CF-03 CF-03 CF-03 CF-03 WITH R-14 SINGLE FOIL SINGLE BUBBLE
CONSULTATION INSULATION
ROOM
2.60

CF-01
LIGHTING SCHEDULE

A' A SYMBOL DESCRIPTION

0.40
400 WATTS, METAL HALIDE
CF-02 CF-02 HIGHBAY LAMP
A A' 2- 36 WATTS, FLOURESCENT LAMP,
1.50 2.48 3.98 MIRRORIZED FIXTURE

2- 18 WATTS, FLOURESCENT LAMP,


3.98 3.98 5.55 5.55 9.10 5.45 5.45 3.97 3.98
MIRRORIZED FIXTURE
7.95 1.50 31.10 1.50 7.95
1- 40 WATTS, WALL LAMP

15 WATTS PIN LIGHT FIXTURE

1 REFLECTED CEILING PLAN


A 17 SCALE: 1:100 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM REFLECTED CEILING PLAN JULIUS M. GACETA
ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A17
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 18 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
2 1
1c A-4 1b 1a 1 2 3 A-5 4 5 5' 6 6' 7 7a 7b 7c

9.50 33.40 9.50

0.20 1.00 8.30 10.85 11.90 10.65 8.30 1.00 0.20

1.00 0.20

1.00 0.20
BUILDING LINE TRAINING AREA BUILDING LINE BUILDING LINE
C C'

B' B'

0.20
1.65
COVERED COURT BUILDING LINE

B B 1
A-4

G' G'
13.35

H'
11.50

0.50mm THK LONGSPAN


G.I. ROOFING SHEET
31.40

29.00

29.00

31.40
F' F'

BUILDING LINE
BUILDING LINE

0.50mm THK PRE-PAINTED


G.I. ROLL

E' E'

COVERED COURT BUILDING LINE


150mm x 200mm PVC
GUTTER ON INTERNAL
BRACKETS
11.50

D' D'
13.35

A' BUILDING LINE BUILDING LINE


A
COVERED COURT BUILDING LINE
0.20 1.00

0.20 1.00
1.65

A A'
0.20

0.20 1.65 31.10 1.65 0.20

34.80

1 ROOF PLAN
A 18 SCALE: 1:100 M

PROJECT & LOCATION: SHEET CONTENTS: DESIGNED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO.: SHEET NO.:

REPUBLIC OF THE PHILIPPINES NATIONAL BUILDING PROGRAM ROOF PLAN JULIUS M. GACETA
ARCHITECT II
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS STRUCTURAL IMPROVEMENT OF
REGIONAL OFFICE NO. 1 PUBLIC BUILDINGS A18
Planning and Design Division AND CONSTRUCTION OF EVACUATION GERALDINE B. RACINES
Bridges & Other Public Works Design Section CENTERS /QUARANTINE FACILITIES
ARCHITECT II - COS
RUEL O. BODESTYNE ALBERTO B. ESQUEJO, JR. EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III A
CHECKED: 19 47
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION REGION 1 CHIEF, BRIDGES & OTHERS PUBLIC WORKS DESIGN SECTION CHIEF, PLANNING AND DESIGN DIVISION OIC - ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
DONALD R. RIMANDO
ARWAS, BANI, PANGASINAN ARCHITECT III DATE: DATE: DATE: DATE:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE NO. 1
Planning and Design Division
Bridges & Other Public Works Design Section
AGUILA ROAD, SEVILLA, SAN FERNANDO CITY, LA UNION

C.Y. 2021 PROJECT

NATIONAL BUILDING PROGRAM


STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND
CONSTRUCTION OF EVACUATION CENTERS /QUARANTINE FACILITIES
REGION 1
ARWAS, BANI, PANGASINAN

SUBMITTED: RECOMMENDED: APPROVED:

ALBERTO B. ESQUEJO, JR EMMANUEL W. DIAZ, CESE RONNEL M. TAN, CESO III


CHIEF, PLANNING AND DESIGN DIVISION OIC-ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR

DATE: DATE: DATE:

You might also like