You are on page 1of 9

REPUBLIC OF THE PHILIPPINES

CITY OF DAPITAN
CONTENTS
OFFICE OF THE
BUILDING OFFICIAL
ARCHITECTURAL PLUMBING & SANITARY
APPROVED BY:
A-1 PERSPECTIVE P-1 SEWERLINE LAYOUT
LOCATION MAP CLEAN WATER LAYOUT
CONTENTS JOINT DETAIL
A-2 SITE DEVELOPMENT PLAN ISOMETRIC PLUMBING LAYOUT BUILDING OFFICIAL
A-3 FLOOR PLAN LEGENDS AND GENERAL NOTES
ROOF PLAN
A-4 ELEVATIONS RECOMMENDED APPROVALS:
A-5 SECTIONS
DOORS & WINDOWS SCHEDULE
LAND USE & ZONING

STRUCTURAL ELECTRICAL HEAD DATE


LINE & GRADE
S-1 SECOND FLOOR FRAMING PLAN E-1 LIGHTING LAYOUT
ROOF FRAMING PLAN POWER LAYOUT
TRUSS DETAIL LOAD SCHEDULE
GENERAL NOTES & SINGLE LINE DIAGRAM
SPECIFICATIONS LEGENDS AND GENERAL NOTES
HEAD DATE
S-2 SLAB SCHEDULE
TYP. TWO-WAY REINFORCED ARCHITECTURAL
CONCRETE SLAB DETAIL
TYP. ONE-WAY REINFORCED
CONCRETE SLAB DETAIL
BEAM SCHEDULE
TYP. BEAM DETAIL
WALL FOOTING DETAIL
HEAD DATE
FOOTING & COLUMN DETAIL STRUCTURAL
1 PERSPECTIVE
A 1 SCALE NDTS.

HEAD DATE
SANITARY

TO
SIN
ON
OC
THIS SITE
TALISAY ELEM. SCHOOL
TALISAY HEAD DATE
Fer
din
CAWA-CAWA
an

ELECTRICAL
BRIDGE d
BAGTING Blu
m
en
trit
tS

BAGTING
t.
Jo

LINABO
se
Riz
al
Ave
nu
e

DAPITAN CITY EXPERIMENTAL SCHOOL


STA. CRUZ
DAPITAN CITY CENTRAL SCHOOL

POTOL
Gov. Guading Adasa St.

City
PLAZA

Hal
lD
riv
e

Mi
HEAD DATE

R
Nol

etiro
i
Me
.
St
RIZAL MEMORIAL INSTITUTE

St
ra

Ta

.
ve
Ri

ng
or
St.

er
on
Le mo

e St
St. .
uste
ris
BRIDGE
a St PIT-USAN

.
arra Filib
o Ib Clar El
ia
tom Mar
isos

MECHANICAL

os St.
Cr

BANONONG

mo Adi
LOCATION MAP

Mi Ulti
Road

2
# 17
-A

ROTUNDA

Road
# 17

A 1
-B

SCALE NDTS.
Road
# 21

evard
Boul
Don
Jo se Ca
Sunset
rreon
St.
DAPITAN CITY HIGH SCHOOL
DAWO
y
a
w
i-
H

Road
# 31
n
a
l

HEAD DATE
io
t

BARANGAY
a
N
E
G
ID
BR
LO
PO

HEAD DATE
ENGINEER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.
PRC NO.: 0170913 CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: 8095008 EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: A-1
INTO TWO-STOREY RESIDENTIAL BUILDING
ENGR. CYRILLE T. MORANTE DATE: 01/06/21 JOSEPH M. SUMATRA DATE:
1 9
CIVIL ENGINEER OWNER
TIN NO.: 766-767-313 LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE
K
AL
W
DE
SI
AD
RO
12
.50

0
7.0
AL

K
AL

S L
N

OP
W
DE

E
IO

SI
AT

LO S
P
2.0

E
N

0
K
AL
W

0
8.0
DE

12
SI

.00

1 SITE DEVELOPMENT PLAN


A 2 SCALE 1:100M.

ENGINEER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.


PRC NO.: 0170913 CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: 8095008 EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: A-2
INTO TWO-STOREY RESIDENTIAL BUILDING
ENGR. CYRILLE T. MORANTE DATE: 01/06/21 JOSEPH M. SUMATRA DATE:
2 9
CIVIL ENGINEER OWNER
TIN NO.: 766-767-313 LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE
A B C A B C
6.40
6.40
3.95 2.45
3.95 2.45

1 1
D
1

2.30
W 8.65
2.30

KITCHEN AREA 1
COMFORT
ROOM W 1.05 6.55 1.05
1

2 2

1.05
D
1

3.00
W PRE-PAINTED SPANISH
3.00

W 1 TYPE END FLASHING


DINING AREA BEDROOM O2
1
10.30

3 3 PRE-PAINTED RIB

11.40
TYPE ROOFING
D
1
W

3.00
1 W
3.00

LIVING AREA 1
BEDROOM O1

8.42
4 SLOPE
4

13.57
UP

2.00
2.00

PORCH W DOWN W
2 1

5 5
1.10 D D
1 1
1" X 12" FASCIA BOARD
W W
3 1

1.05
(EXISITING)
1 GROUND FLOOR PLAN (PROPOSED)

3.05
A 3 SCALE 1:100M. 2 SECOND FLOOR PLAN

2.00
A 3 SCALE 1:100M.
SLOPE

1.05
PRE-PAINTED SPANISH
TYPE GUTTER

3 ROOF PLAN
NOTE: A 3 SCALE 1:100M.

ALL EXISITING CONCRETE BEAM SHOULD BE REPLACED


WITH THE PROPOSED CONCRETE BEAM

ENGINEER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.


PRC NO.: 0170913 CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: 8095008 EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: A-3
INTO TWO-STOREY RESIDENTIAL BUILDING
ENGR. CYRILLE T. MORANTE DATE: 01/06/21 JOSEPH M. SUMATRA DATE:
3 9
CIVIL ENGINEER OWNER
TIN NO.: 766-767-313 LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE
8.65 13.57

1.05 4.05 2.50 1.05 1.05 2.35 3.00 3.00 2.00 1.12 1.05

APEX LINE

0.93

0.93
TOP OF ROOF ONE

1.49

1.49
2F CEILIG LINE
W
D

2.45

2.45
2 W 1
3

7.87

7.87
W
W W W W 2
1 1 1 1
2F FIN. FLR. LN.

0.30

0.30
MAIN CEILING LINE

2.50

2.50
FIN. FLR. LN.

0.20

0.20
NAT. GROUND LN.

1 FRONT ELEVATION 2 LEFT SIDE ELEVATION


A 4 SCALE 1:100M. A 4 SCALE 1:100M.

13.57 8.65

1.05 1.12 2.00 3.00 3.00 2.35 1.05 1.05 4.05 2.50 1.05

APEX LINE

0.93

0.92
1.49

1.50
2F CEILIG LINE

2.45

2.45
7.87

7.87
W W W W
1 1 1 1
2F FIN. FLR. LN.
0.30

0.30
MAIN CEILING LINE
2.50

2.50
FIN. FLR. LN.
0.20

0.20
NAT. GROUND LN.

3 RIGHT SIDE ELEVATION 4 BACK ELEVATION


A 4 SCALE 1:100M. A 4 SCALE 1:100M.

ENGINEER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.


PRC NO.: 0170913 CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: 8095008 EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: A-4
INTO TWO-STOREY RESIDENTIAL BUILDING
ENGR. CYRILLE T. MORANTE DATE: 01/06/21 JOSEPH M. SUMATRA DATE:
4 9
CIVIL ENGINEER OWNER
TIN NO.: 766-767-313 LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE
13.57

1.05 1.12 2.00 3.00 3.00 2.35 1.05

0.93
1.49

D
1
2.45
7.87

W
2 W W W
1 1 1

2.10

2.10
0.30

1.20
2.50

FN. FLR. LN. FN. FLR. LN.

0.80
0.20

CUSTOMIZED HARDWOOD DOOR W/ COMPLETE 3


16" THK. SLIDING GLASS WINDOW W/
D TYPE: ACCESSORIES ON 2" X 6" WDN. FRAME W TYPE: ALUMINUM ANALOK FRAME

1 LOCATION:
REQUIRED:
BEDROOMS AND TERRACE
5 UNITS
1 LOCATION:
REQUIRED:
BEDROOMS
8 UNITS

1 SECTION DETAIL - O1
A 5 SCALE 1:100M.

8.65

1.05 4.05 2.50 1.05


1.50

4.20
2.10
1.50
2.45
7.87

FN. FLR. LN. 0.60 0.60 0.60 FN. FLR. LN.


0.30

3 3
16" THK. FIXED CORNER GLASS WINDOW 16"
THK. THREE PANEL FIXED GLASS
W TYPE: W/ ALUMINUM FRAME W TYPE: WINDOW W/ ALUMINUM FRAME
LOCATION: TERRACE
3 LOCATION: FRONT
2
2.50

REQUIRED: 1 UNIT REQUIRED: 1 UNIT


0.20

3 DOORS & WINDOWS SCHEDULE


A 5 SCALE 1:50M.

2 SECTION DETAIL - O2
A 5 SCALE 1:100M.

ENGINEER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.


PRC NO.: 0170913 CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: 8095008 EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: A-5
INTO TWO-STOREY RESIDENTIAL BUILDING
ENGR. CYRILLE T. MORANTE DATE: 01/06/21 JOSEPH M. SUMATRA DATE:
5 9
CIVIL ENGINEER OWNER
TIN NO.: 766-767-313 LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE
8.65 GENERAL STRUCTURAL NOTES
3
4" THK. MARINE PLYWOOD FLOORING 1.05 3.27 3.27 1.05
AND SPECIFICATIONS
A. GENERAL REQUIREMENTS

1. ALL STRUCTURAL MATERIALS AND WORK SHALL CONFORM TO THE REQUIREMENTS OF THE LATEST EDITION OF THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP 2001)

1.05
2. VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING WORK. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES.
2.30

3. NOTES AND DETAILS ON THE DRAWINGS TAKE PRECEDENCE OVER THE GENERAL NOTES AND TYPICAL DETAILS INCASE OF CONFLICT.
SPLICING OF RB1
FLOOR JOIST 4. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, SUCH DETAILS SHALL BE THE SAME AS FOR SIMILAR WORK SHOWN ON THE DRAWINGS.

5. PIPES, DUCTS, SLEEVES, CHASES, ETC. SHALL NOT BE PLACED IN SLABS, BEAMS OR WALL UNLESS SPECIFICALLY SHOWN. OBTAIN PRIOR WRITTEN APPROVAL FROM THE ENGINEER FOR
INSTALLATION OF ANY ADDITIONAL PIPES, DUCTS, ETC.
RB1 RB1 6. LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR OTHER UTILITIES WHERE NEW WORK IS BEING PERFORMED.

7. TAKE NECESSARY PRECAUTIONS TO MAINTAIN AND INSURE THE INTEGRITY OF THE STRUCTURE DURING CONSTRUCTION. NEITHER THE OWNER NOR ARCHITECT/ENGINEER WILL ENFORCE
2" X 4" WOOODEN SAFETY MEASURES OR REGULATIONS. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO PROVIDE ADEQUATE SHORING AND BRACING OF THE STRUCTURE FOR ALL THE LOADS THAT
RB1 MAYBE IMPOSED DURING CONSTRUCTION, FURTHER, THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES AND SHALL BE SOLELY RESPONSIBLE FOR
3.00

FLOOR JOIST SP. CONFORMING TO ALL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS.
@ 0.40m O.C. 8. OBTAIN PRIOR WRITTEN APPROVAL FROM THE ENGINEER IN CASE OF CHANGES TO THE WORK DRAWINGS.

B. DESIGN CRITERIA

...... REFER STRUCTURAL COMPUTATIONS

2 - 2" X 6" WOODEN

WOODEN TRUSS (T-01)

WOODEN TRUSS (T-01)

WOODEN TRUSS (T-01)


8.42
C. FOUNDATION
11.40

GIRDER RB1 RB1 1. FOOTINGS SHALL BEAR ON SOLID UNDISTURBED EARTH (CONTROLLED, COMPACTED STRUCTURAL FILL OR BOTH) AT LEAST 450 MM BELOW LOWEST ADJACENT FINISHED GRADE.

2. FOOTING IS DESIGNED FOR ASSUMED ALLOWED SOIL.FOUNDATION PRESSURE OF 169 kPa (3500 psf)

RB1 3. SUB-GRADE PREPARATION INCLUDING DRAINAGE, EXCAVATION, COMPACTION AND FILLING REQUIREMENTS, SHALL CONFORM STRICTLY WITH THE RECOMMENDATIONS GIVEN IN THE
3.00

2" X 4" WOODEN SOILS REPORT OR AS DIRECTED BY THE SOILS ENGINEER.

13.57
BRIDGE 4. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AFTER FOOTING EXCAVATION HAVE BEEN COMPLETED AND PRIOR TO CONCRETING TO CONFIRM THE DESIGN FOUNDATION CAPACITY.

5. ROOF AND AREA DRAINAGE SHALL BE DIRECTED AWAY FROM THE FOUNDATIONS.

6. EXCAVATIONS SHALL BE PROPERLY BACKFILLED. BACKFILL FOR WALLS SHALL BE PERVIOUS MATERIAL ACCEPTABLE TO THE GEOTECHNICAL ENGINEER. DO NOT PLACE BACKFILL BEHIND
WALLS BEFORE THEY HAVE ATTAINED THEIR DESIGN STRENGTH. SHORE AND PROTECT WALLS FROM LATERAL LOADS UNTIL THE SUPPORTING MEMBERS ARE IN PLACE AND HAVE
DEVELOPED SPECIFIED STRENGTHS.
FB1 FB1 FB1 RB1 RB1
S1 S1 D. REINFORCED CONCRETE
2.00

1. CONCRETE SHALL BE MIXED, PROPORTIONED, CONVEYED AND PLACED IN ACCORDANCE WITH THE PROVISIONS SET BY THE NSCP 2001.
FB1 FB2 FB1 FB1
RB1 2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS WITH CORRESPONDING MAXIMUM SLUMP AND MAXIMUM SIZE AGGREGATE AS FOLLOWS:
125mm THK. 125mm THK.
TYPES OF CONSTRUCTIONS 28 DAY STRENGTH MAX. SLUMP MAX. SIZE AGG.
FB1 FB1 FB1

1.05
D. SLAB ON GRADE 20.7 MPa (3000 PSI) 125MM (5") 25MM (1")
S2 S2 STAIR LANDINGS AND
1.10

TREADS
FB1 FB1 FB1
125mm THK. 125mm THK.
E. ALL OTHERS (SLABS, BEAMS 20.7 MPa (3000 PSI) 100MM (4") 19MM ( 3 4")
COLUMNS, ETC.)
2.00

FB1 FB1 3. ALL REINFORCING STEEL BARS SHALL CONFORM TO ASTM A615 GRADE 33 FOR 12MM BARS WHILE BARS 16MM AND ABOVE SHALL BE GRADE 60 GRADE 33 MAYBE USED

2.02 1.93 2.45


4. ALL FABRICATION, DETAILING AND PLACING SHALL CONFORM TO THE PROVISIONS SET BY THE NSCP 2001 EDITION.
6.40 5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS:

RB1
1.05

FOOTINGS (CAST AGAINST & EXPOSED TO EARTH) . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75MM (3")


COLUMN TIES OR SPIRALS AND BEAM STIRRUPS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40MM (1 12")
1 SECOND FLOOR FRAMING PLAN SLABS AND WALLS (INTERIOR FACE) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20MM ( 3 4")

A 6 SCALE 1:100M.
6. CLEAR DISTANCE SPACING BETWEEN PARALLELED BARS IN A LAYER SHALL NOT BE LESS THAN 1.60 TIMES THE NOMINAL DIAMETER OF THE BAR, OR 1.33 TIMES MAXIMUM
SIZE AGGREGATE, NOR LESS THAN 38MM (1 12")

2" x 4" WOODEN PURLINS 7. SPLICES SHALL BE SECURELY WIRED TOGETHER AND SHALL LAP AT LEAST 40 TIMES DIAMETER OR 600MM WHICHEVER IS GREATER. STAGGER BOTTOM AT LEAST 1.60M
FROM SPLICES IN OTHER BOTTOM REINFORCEMENT SIMILARLY.
SP. @ 0.50m O.C.
8. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITION AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE.

9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF 7 CONSECUTIVE DAYS IMMEDIATELY AFTER POURING BY THE USE OF CURING COMPOUNDS, OR OTHER

2 ROOF FRAMING PLAN - O1 E.


APPROVED METHODS.

MASONRY AND CONCRETE BLOCKS


A 6 SCALE 1:100M. 1. CONCRETE HOLLOW BLOCKS, UNLESS OTHERWISE SPECIFIED SHALL BE 150MM THICK LOAD BEARING BLOCKS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 750
2" X 4" WDN. WEB MEMBERS 2" X 4" WDN. KING POST PSI (5.175 MPa) WHILE NON-LOAD BEARING SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 400 PSI (2.61 MPa).

2.
2" X 4" WDN. TOP CHORD
3. LINTEL BEAMS SHALL BEAR AT LEAST 200MM (8") ON EACH SIDE OF MASONRY WALL OPENING.

2" X 4" WDN. TOP CHORD 4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS:


WALL THICKNESS VERTICAL BARS HORIZONTAL BARS
1.50

2 - 2" X 4" WDN. BOTTOM CHORD 8 IN. (200MM)


0.75

6 IN. (150MM)
4 IN. (100mm)

F. STRUCTURAL STEEL
2.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 2.47
1. ALL STRUCTURAL STEELS SUCH AS ANGLES, WIDE FLANGE SECTIONS, PIPES, STIFFENER PLATES, BASE PLATES, ETC. SHALL CONFORM TO ASTM A-36.
1.05 4.10 9.47 1.05
2. ALL STRUCTURAL STEEL SHALL BE DETAILED, FABRICATED AND ERECTED BASED ON THE SPECIFICATION FOR DESIGN FABRICATION, AND ERECTION OF STRUCTURAL
13.57 STEEL GIVEN BY THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES (NSCP).

3. CONNECTION BOLTS (3 4 ROUND, UNLESS SHOWN OTHERWISE) SHALL CONFORM TO ASTM A-325. ANCHOR BOLTS (EMBEDDED IN MASONRY OR CONCRETE) SHALL

3 TRUSS DETAIL 4.
CONFORM TO ASTM A307 UNLESS NOTED OTHERWISE ON THE DRAWING.\

ALL WELDING SHALL BE IN CONFORMANCE WITH NSCP STANDARDS AND SHALL BE PERFORMED BY CERTIFIED WELDERS USING E70 XX ELECTRODES.

A 6 SCALE 1:100M.

ENGINEER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.


PRC NO.: 0170913 CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: 8095008 EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: S-1
INTO TWO-STOREY RESIDENTIAL BUILDING
ENGR. CYRILLE T. MORANTE DATE: 01/06/21 JOSEPH M. SUMATRA DATE:
6 9
CIVIL ENGINEER OWNER
TIN NO.: 766-767-313 LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE
@ SUPPORT @ MIDSPAN MARK DESCRIPTION
4 - 16 mm
SLAB SCHEDULE
0.20 0.20

FB2
0.30 0.30 W/ 10 mm STIRRUPS
SHORT SPAN LONG SPAN SPACED @ 5-50 mm, 5-100 mm, 5-150 mm,
SLAB THK. CONT. TOP BAR CONT. TOP BAR REST @ 200 mm O.C. TOWARDS CENTER
MARK (M) BOTT. BARS INTERIOR EXTERIOR BOTT. BARS INTERIOR EXTERIOR
REMARKS 0.25 0.25
4 - 16 mm
CONT. INT EXT CONT. INT EXT FB1
0.30 0.30 W/ 10 mm STIRRUPS
S1 0.125 @ 0.15 @ 0.15 @ 0.15 @ 0.15 TWO WAY SPACED @ 5-50 mm, 5-100 mm, 5-150 mm,
S2 0.125 @ 0.15 @ 0.15 @ 0.15 @ 0.15 ONE WAY REST @ 200 mm O.C. TOWARDS CENTER
0.20 0.20

0.40 0.40
RB1 WOODEN BEAM

10 mm
SPACED @ 5 - 100 mm,
REST 200 mm

3 TYPICAL BEAM DETAIL


S 7 SCALE NDTS.

4" CHB WALL

1 TYP. ONE-WAY REINFORCED CONCRETE SLAB DETAIL SPACED @ 0.40 m. O.C.

SPACED @ 0.60 m. O.C.

S 7 SCALE NDTS. 16 mm THK


CEMENT PLASTER FINISH
EARTH FILL

NATURAL GRADE LINE

0.75
0.20
SPACED @ 0.25M. O.C.

0.40

0.30 4 WALL FOOTING DETAIL


S 7 SCALE 1:100M.

NATIONAL GRADE LINE 1.00

300mm X 300mm COLUMN 0.30

1.30
SPACED @ 5 - 50 mm, 5 - 100 mm,
SPACED @ 0.10 m O.C.
5 - 150 mm, REST @ 200 mm O.C.
BOTH WAYS
TOWARDS THE CENTER

0.30
1.00
0.30
2 TYP. TWO-WAY REINFORCED CONCRETE SLAB DETAIL COMPACTED GRAVEL

C1F1 PLAN
S 7 SCALE NDTS. C1F1 SECTION

5 FOOTING & COLUMN DETAIL


S 7 SCALE 1:50M.

ENGINEER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.


PRC NO.: 0170913 CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: 8095008 EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: S-2
INTO TWO-STOREY RESIDENTIAL BUILDING
ENGR. CYRILLE T. MORANTE DATE: 01/06/21 JOSEPH M. SUMATRA DATE:
7 9
CIVIL ENGINEER OWNER
TIN NO.: 766-767-313 LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE
LOAD SCHEDULE
CKT. NO. LOAD DESCRIPTION QUANTITY VOLTAGE-AMPERE VOLTAGE AMPERE WIRE SIZE CONDUIT SIZE CIRCUIT BREAKER

S C1 LIGHTING OUTLET 7 700 220 3.18 15 A. T 2P CB


C2 CONVENIENCE OUTLET 6 1440 220 6.55 20 A. T 2P CB
C3 SPARE - - 220 - - 20 A. T 2P CB

TOTAL 2140 220 9.73


S

FULL LOAD CURRENT COMPUTATIONS: LEGEND:


IFL = VA /V - LED BULB
IFL= 2140/220
S - 1 GANG SWITCH, FLUSH TYPE
S IFL= 9.73
S - 2 GANG SWITCH, FLUSH TYPE
C1
SIZE OF CONDUIT IN SERVICE ENTRANCE: - PANEL BOARD
S

MAIN PROTECTION: - 1 GANG ACU OUTLET

S USE 40 AT 2P Ckt. BREAKER - WATERPROOF CONVENIENCE OUTLET


wp

SIZE AND TYPE OF CONDUIT: M - KILOWATT HOUR METER

- CIRCUIT BREAKER

1 LIGHTING LAYOUT C2 FROM


- CIRCUIT HOMERUN

E 8 SCALE 1:100M.
MAIN LINE - POWER LINE

- SWITCH LINE

GENERAL NOTES:
M
ALL ELECTRICAL WORKS AND INSTALLATIONS HEREIN SHALL BE
EXECUTED IN ACCORDANCE WITH THE LATEST EDITION OF THE REVISED
ELECTRICAL COD OF THE PHILIPPINES AND SHALL CONFORM WITH THE
REGULATORY REQUIREMENTS OF THE LOCAL ENFORCING AUTHORITY.

40 AT, 2P ALL MATERIALS TO BE USE SHALL BE NEW AND APPROVED TYPE TO


ANY PURPOSE INTENDED ALL WIRES SHALL BE THW/THHN TYPE WITH
INSULATIONS FOR 600 VOLTS.
15 AT, 2P 20 AT, 2P
NO BRANCH CIRVUIT SHALL HAVE A LOAD OF 220 VOLTS, 1 - PHASE, 60
HZ SUPPLY.
C1 C2
ADEQUATE AND EFFECTIVE GROUNDING SHALL BE DONE TO METALLIC
CONDUITS, CABINETS AND EQUIPMENTS.
20 AT, 2P 20 AT, 2P
ELECTRICAL SWITCHES AND CONVENIENCE OUTLETES SHALL BE
INSTALLED AT 1500MM AND 300MM FROM THE FNISH FLOOR LINE
SPARE SPARE
2 POWER LAYOUT RESPECTIVELY.

E 8 SCALE 1:100M. THE WHOLE ELECTRICAL INSTALLATION SHALL BE WITH THE DIRECT
SINGLE LINE DIAGRAM SUPERVISION OF A DULY LICENSED ELECTRICAL ENGINEER OR
LICENSED MASTER ELECTRICIAN.

PROFESSIONAL ELECTRICAL ENGINEER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.
PRC NO.: CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: E-1
INTO TWO-STOREY RESIDENTIAL BUILDING
DATE: JOSEPH M. SUMATRA DATE:
8 9
OWNER
TIN NO.: LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE
LEGEND:
F - FAUCET
WC - WATER CLOSET
FD - FLOOR DRAIN
CO - CLEAN OUT
VTR - VENT THRU ROOF
DC - DIGESTIVE CHAMBER
LC - LEACHING CHAMBER
MH - MANHOLE
LAV - LAVATORY
- CHECK VALVE
- SEWERLINE
- CLEAN WATER
LAV FD -
WC
GENERAL SPECIFICATIONS:
ALL PLUMBING INSTALLATIONS HEREIN SHALL BE CONFORM WITH THE LATEST APPROVED
EDITION OF THE NATIONAL & LOCAL PLUMBING CODE OF THE PHILIPPINES, REGULATIONS
OF THE DEPARTMENT OF HEALTH AND THE REQUIREMENT OF THE UTILITY COMPANY.

LAV ALL PLUMBING FIXTURES AND ACCESSORIES AND MATERIALS SHALL BE BRAND NEW AND
OF THE TYPE APPROVED FOR SPECIFIC SERVICE/PURPOSE AS USE AND LOCATION.

IT IS NOT INTENDED THAT THE DRAWING SHOW EACH AND EVERY PIPE OR FITTING.
HOWEVER, SUCH ITEM WHETHER MENTION OR NOT IN THE SPECIFICATIONS, SHOW OR
NOT IN THE DRAWINGS SHALL BE INSTALLED IT NECESSARY TO COMPLETE THE SYSTEM IN
ACCORDANCE WITH BEST PRACTICE OF THE TRADE.

VERIFY ALL DIMENSION. LOCATION OF THE FIXTURE ACCESSORIES AND PIPES ON OTHER

1 SEWERLINE LAYOUT DRAWINGS OF RELATED TRADES, ALSO REFER TO THE OTHER DRAWINGS (ARHCT'L,
STRUCT'L, AND ELECT'L) INVESTIGATE ALL PURPOSE INTERFERENCE AND CONDITION
P 9 SCALE 1:50M. 4 JOINT DETAILS AFFECTING PLUMBING WORKS.

P 9 SCALE NDTS ALL SANITARY PIPES SHALL RUN IN A PRACTICAL ALIGNMENT OF NOT MORE THAN 2%
SLOPE.

ALL PVC JOINTS SHALL BE SEALED WITH PVC SOLVENT CEMENT.

USE PVC BLUE PIPE TO ALL WATER LINES.

ALL PLUMBING INSTALLATIONS HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION
OF A DULY REGISTERED MASTER PLUMBER.

MASTER PLUMBER: PROJECT TITLE: APPROVED BY: SHEET CONTENTS SHEET NO.
PRC NO.: CAD BY: RENIEL RENZ B. TABILON
PROPOSED RENOVATION/ADDITION 0F
PTR NO.: EXISTING ONE-STOREY RESIDENTIAL BLDG. REVISIONS: P-1
INTO TWO-STOREY RESIDENTIAL BUILDING
DATE: JOSEPH M. SUMATRA DATE:
9 9
OWNER
TIN NO.: LOCATION: LAWAAN, DAPITAN CITY CHECKED BY: ENGR. CYRILLE MORANTE

You might also like