1200
6-7 N 29 37' W 4.69 M LAND USE AND ONING
650 1278
7
7-1 N 17 37' W 2.35 M
1200
100.00
ROOF C 6 Tie Line N. 54 10' W., 3170.36 M.
From BLLM 1, CONS. CAD. 545-D NEW HEAD DATE
EXTERIOR PERSPECTIVE
3100
LINE AND GRADE
A 99.50
A0-101 SCALE NTS
5
99.00
HEAD DATE
LOT 22 ARCHITECTURAL
BLOCK 9
4950
15378
98.50 LOT 20
ROOF A BLOCK 9
4 HEAD DATE
98.00
STRUCTURAL
3
1400
97.50
HEAD DATE
2425
97.00 SANITARY
ROOF B D
1500
96.50
1 HEAD DATE
1200 ELECTRICAL
96.00 1 7 6 5 4
3
2
1200
1
7 UP
HEAD DATE
MECHANICAL
6
4
5
SID
EWA
LK
MANHOLE
HEAD DATE
ELECTRONICS
ROAD RIGHT OF WAY
C
A3-102
Arct's Architect's Information ARCHITECT REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RAJ SHEET NO.
Logo
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA EXTERIOR PERSPECTIVES
TECHNICAL DESCRIPTION DATE : 21.11.16
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
ARE THE PROPERTY AND DOCUMENTS OF SITE DEVELOPMENT PLAN
----- "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION, CEBU OWNER
PURPOSE OF
CHECKED : -- A0-101
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, BARANGAY SAC-SAC,
TIN.: LOCATION: CONSOLACION, CEBU, PHILIPPINES LOCATION: CONSOLACION, CEBU REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
ISSUANCE RECOMMENDED
HEAD ARCHITECTURAL DATE
A B C D E F A B C D E F SECTION
450
450
D1
100.50 2 11 GROUND FLOOR
ROOF LINE
7 7 SPACE AREA
1175
D1
LINE GENSET
10
SE TBACK AREA: 1.90 SQM
1375
1375
2875
PARKING AREA 48.15 SQM
100.00
6 W2
07 OFFICE 6 PORCH 8.05 SQM
1100
2250
QUARTERS
1400 W1 LAUNDRY W1
W2
AREA: 7.15 SQM
03
06 AREA: AREA: 6.05 SQM 10
1.35 SQM LIVING AREA 27.10 SQM
3100
3250
2950
2950
D1 D2
D1
LANAI D1 08 T&B 09
99.50
2000
T&B DINING AREA 18.72 SQM
1900
09 07 AREA:
W1
1850
1500
AREA: 16.75 SQM STO T&B
1350
AREA: W1
04 4.45 SQM W2 BALCONY D2 WINE CELLAR
D1 AREA: AREA: 09
W1
05
2.05 SQM
03
07
1.45 SQM 1.95 SQM
3
2
AREA: 4.20 SQM 10 AREA: 5.15 SQM KITCHEN 16.65 SQM
3 3 1 5 D2 5
500
2 2 UP 08
DIRTY KITCHEN 12.50 SQM
1150
D1 D2
99.00 1 1 05
W2
08
D2 11
UP UP D1 07
2600
06 LANAI 16.75 SQM
MASTER'S
3650
W2
3500
3875
3875
3875
OVEN 06
3000
2725
98.50
02
AREA: 18.72 SQM KITCHEN DIRTY AREA: 15.30SQM BEDROOM 1
15125
15125
AREA:
AREA: 16.65 SQM KITCHEN 5.50 SQM AREA: 14.80 SQM QUARTERS 6.05 SQM
1275
RANGE AREA: D2
13600
13600
D2
3 12.50 SQM 01
06
T&B 1.95 SQM
500
2
1 4 4
1375
1150
1150
1150
98.00 HALLWAY POWDER ROOM 2.05 SQM
1325
UP STO
REF D2
AREA: 11.75 SQM DWN 02
T&B
2475
3
3 18 3 LAUNDRY ROOM 1.35 SQM
2550
2 AREA:
1 LIVING W1 17
STO
1150
02 16 D2 4.10 SQM
UP AREA D1
1975
W2
04
15 12 AREA: 1.4SQM GENSET 1.90 SQM
5350
OPEN 12
SUBTOTAL AREA 162.67 SQM
3825
3825
3975
TO BELOW 11
1800
1250
10 10 D2
9 9
5325
03
8 8
BEDROOM 2 D2 SECOND FLOOR
2000
7 7 05
97.00
4000
W1 6 PARKING D 6 AREA: 11.50 SQM D
1050
01 D1 UP SPACE AREA
AREA A3-102 A3-102
01 1 2 3 4 5
2 1 2 3 4 5
T&B 2
2200
AREA: 48.15 SQM
HALLWAY 11.75 SQM
1500
1500
D2 AREA:
1500
1500
PORCH BALCONY 04 3.10 SQM W2
96.50 AREA: 8.05 SQM 04 MASTER'S BEDROOM 15.30 SQM
AREA: 8.05 SQM
1 ROOF LINE 1 WALK-IN-CLOSET 5.50 SQM
W2 W2 W2
1500
01 02 03
UP
ROOF LINE BALCONY 4.20 SQM
1 7 6 5 4
3610
3 T&B 4.45 SQM
900
2
1960
1
7 UP BEDROOM 1 14.80 SQM
C C
A3-102 A3-102
Arct's Architect's Information ARCHITECT REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RAJ SHEET NO.
Logo
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA FLOOR PLANS
DATE : 21.11.16
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
ARE THE PROPERTY AND DOCUMENTS OF
----- "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION, CEBU OWNER
PURPOSE OF
CHECKED : -- A1-101
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, BARANGAY SAC-SAC,
TIN.: LOCATION: CONSOLACION, CEBU, PHILIPPINES LOCATION: CONSOLACION, CEBU REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
ISSUANCE RECOMMENDED
HEAD ARCHITECTURAL DATE
SECTION
A B C D E F A B C D E F
8593
8593 1805 4200 2589
1805 4200 2589 902 3000 1400 BUILDING OFFICIAL DATE
902 902 2500 1400 902 600 600 1189
850 850
8 8
625
GENSET 7 7
1175
1853
500
550
1200
AREA: 1.90 SQM OFFICE
3203
700
AREA: 7.15 SQM
1125
QUARTERS
6 6
625
700
4953
2250
AREA: 6.05 SQM
1350
LAUNDRY
700
1125
CH: 0000 MM
T&B
1500
3100
3250
AREA:
CH: 0000 MM WINE CELLAR
875
850
T&B
750
4.45 SQM
LANAI
750
1750
AREA: 5.15 SQM
STO T&B BALCONY
1500
AREA: 16.75 SQM
1125
875
1250 850
750
2.05 SQM CH: 0000 MM CH: 0000 MM
5 5
600
450
825
900
600
1055 BEDROOM 1
1375
DINING AREA W.I.C. MASTER'S BEDROOM AREA: 14.80 SQM
900 900
1500
3875
2000
3650
1550
KITCHEN OVEN
DIRTY
1800
625
AREA: 16.65 SQM 5.50 SQM
KITCHEN
4875
5100
14800
AREA:
600
CH: 0000 MM
1275
CH: 0000 MM
1500
12.50 SQM
1325 1450
825
450
700 1350
CH: 0000 MM
3000 4 4
700
975
1650
1525
REF
CH: 0000 MM HALLWAY 550
3 T&B 3
2625
CH: 0000 MM AREA: 11.75 SQM
1225
300
STO. AREA:
1100
4.10 SQM
5050
1075
00SQM
LIVING
3750
750
AREA CH: 0000 MM
1750
AREA: 27.10 SQM
1375
PARKING
5475
CH: 0000 MM
BEDROOM 2
1175
AREA CH: 0000 MM AREA: 11.50 SQM
4000
650
650
AREA: 48.15 SQM
1750
CH: 0000 MM
2 T&B 2
1625
900
1200
BALCONY
1650
1650
PORCH AREA:
1250
AREA: 8.05 SQM
3.10 SQM
750
750
AREA: 8.05 SQM
450
CH: 0000 MM
1 CH: 0000 MM
1
450
1200 2500 1050 1400 1172
825 975 2800 1200 400 1600 1000 1000 650 300 300 500
13122 550 1000 1000 650 300 650 800 700
2550 4000 1300 650 300 1146 1200
7850 2500 1946
A GROUND FLOOR REFLECTED CEILING PLAN B SECOND FLOOR REFLECTED CEILING PLAN
A2-101 SCALE 1 : 100M A2-101 SCALE 1 : 100M
150MM 9W RECESSED LED SLIM LED STRIPLIGHT WITH DIFFUSER 108MM 6W UP-DOWN SCONCE 25MM X 25MM THK WOOD SLATS SPACED
DOWN LIGHT, COOL WHITE, 4000K FOR COVE LIGHTING ON CEILING, DECORATIVE WALL LIGHTING 25MM, SMOOTH WALNUT FINISH, W
25MM THK MARINE PLYWOOD BACKING
6W LED DECORATIVE PENDANT LIGHT, COOL WHITE, 2000K VERTICAL 18W LED STRIPLIGHT ON
TRICOLOR, 2000K ALUMINUM CHANNEL, FOR COVELIGHT 4.5MM THK FICEM BOARD W
18W LED STRIPLIGHT ON ALUMINUM
WHITE LATEX PAINT, MATTE FINISH
12W LED DECORATIVE CHANDELIER, CHANNEL W POLYCARBONATE 3W WATERPROOF ALUMINUM LED
TRICOLOR, 2000K DIFFUSER COOL WHITE, 2000K STEP LIGHT, FOR OUTDOOR LIGHTING
9W LED DECORATIVE CHANDELIER, 9W LED DECORATIVE CHANDELIER, 60MM 10W 1000LM LED
TRICOLOR, 2000K TRICOLOR, 2000K TRACKLIGHT, 4000K, WHITE BODY COLOR
Arct's Architect's Information ARCHITECT REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RAJ SHEET NO.
Logo
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA REFLECTED CEILING PLANS
DATE : 21.11.16
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
ARE THE PROPERTY AND DOCUMENTS OF
----- "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION, CEBU OWNER
PURPOSE OF
CHECKED : -- A2-101
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, BARANGAY SAC-SAC,
TIN.: LOCATION: CONSOLACION, CEBU, PHILIPPINES LOCATION: CONSOLACION, CEBU REVISION : 001
REPUBLIC OF THE PHILLIPINES
3 DEPARTMENT OF PUBLIC WORKS AND
HIGHWA S
OFFICE OF THE BUILDING OFFICIAL
CEBU CIT
ISSUANCE RECOMMENDED
2
HEAD ARCHITECTURAL DATE
POLISHED CONCRETE 200MM X 2000MM WOOD LAMINATE SECTION
E GENSET
C K LIN SMOOTH FINISH TILE W 3MM GROUT SPACING
SETBA
AREA 1.90 S M
SEMI GLOSS FINISH
600MM X 600MM WHITE CERAMIC TILE
OFFICE
W 3MM GROUT SPACING MATTE AREA 7.15 S M
LAUNDR UARTERS 600MM X 600MM BATHROOM
AREA AREA 6.05 S M
1.35 S M 700MM X 1500 MM OUTDOOR CONCRETE CERAMIC TILE W 3MM GROUT BUILDING OFFICIAL DATE
W 3MM GROUT SPACING T B SPACING SEMI GLOSS FINISH
LANAI
T B AREA WINE CELLAR
AREA
AREA 16.75 S M STO T B 300MM X 300MM CERAMIC TILE W 4.45 S M BALCON
AREA AREA AREA 4.20 S M
AREA 5.15 S M 200MM X 2000MM WOOD LAMINATE
2.05 S M 3MM GROUT SPACING MATTE
1.45 S M 1.95 S M TILE W 3MM GROUT SPACING
SEMI GLOSS FINISH
7 A GRND. FLR. TILE LA OUT PLAN B SCND. FLR. TILE LA OUT PLAN
A3 101 SCALE 1 100 M A3 101 SCALE 1 100 M
6
4
5
A B C D E F 1 2 3 4 5 6 7 8
14161 18111
1375 11221 1564 11625 6486
975 1600 5546 1275 1500 3825 1150 3875 2950 1375 2161
250 1350 3600
4075 850 750 2100 1400 4586 1300 2200 800
ROOF A APEX LINE ROOF A APEX LINE
EL. 10250.00 MM EL. 10250.00 MM
800 1150
1350
ROOF B APEX LINE
SMOOTH CONCRETE DARK
EL. 9100.00 MM
BROWN MATTE PAINT FINISH
W2 W2 W2
ALUMINUM CLADDING DARK
01 02 03
ROOF C APEX LINE BROWN MATTE PAINT FINISH
S NTHETIC VERTICAL
EL. 8900.00 MM
3800
3600
GARDEN
3000
3000
2ND FLR. CEILING LINE 2ND FLR. CEILING LINE
EL. 8300.00 MM EL. 8300.00 MM
SECOND FLR. LINE W1
SECOND FLR. LINE
EL. 5300.00 MM EL. 5300.00 MM W1
10250
10250
01
400
04
1ST FLR. CEILING LINE 1ST FLR. CEILING LINE W1
03
EL. 4900.00 MM EL. 4900.00 MM D1
06
2750
2750
W1
GARDEN FLR. LINE 02 CONCRETE WITH 25MM GROVE GARDEN FLR. LINE CONCRETE WITH 25MM GROVE
2900
A A I ARCHITECT REPUBLIC ACT 9266 SEAL PRO ECT TITLE APPROVED B SHEET CONTENTS DRAWN RA SHEET NO.
L
DRAWINGS AND SPECIFICATIONS DUL SIGNED
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA TILE LA OUT PLANS
FRONT ELEVATION DATE 21.11.16
TWO STORE RESIDENCE RHEA MAE RETANA
ARE THE PROPERT AND DOCUMENTS OF SERVICE
ARE THE PROPERT AND DOCUMENTS OF RIGHT SIDE ELEVATIONS
ARCHITECTS AND ASSOCIATES WHETHER THE
OB ECT FOR WHICH THE ARE MADE IS EXECUTED OR
NOT IT SHALL BE UNLAWFUL FOR AN PERSON
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION CEBU OWNER
PURPOSE OF
CHECKED A3 101
PRC R .N . DATE TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PRO ECT NO.
FOR OTHER PRO ECTS OR BUILDINGS WHETHER
PTR N . DATE EXECUTED PARTL OR IN WHOLE.
VISTA VERDE SUBDIVISION BARANGA SAC SAC
TIN. LOCATION CONSOLACION CEBU PHILIPPINES LOCATION CONSOLACION CEBU REVISION 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWA S
OFFICE OF THE BUILDING OFFICIAL
CEBU CIT
ISSUANCE RECOMMENDED
F E D C B A
HEAD ARCHITECTURAL DATE
8 7 6 5 4 3 2 1 SECTION
14161
1342 11044 1775
17296
2750 2289 4500 1505
2496 14150 650
896 1150 7050 7748 BUILDING OFFICIAL DATE
ROOF A APEX LINE
450 500 3050 2100 900 500 2800 2175 1500 1275 EL. 10250.00 MM
1150
ROOF A APEX LINE
ROOF B APEX LINE
200
EL. 10250.00 MM
1150
EL. 9100.00 MM
ROOF B APEX LINE
200
ALUMINUM CLADDING DARK
EL. 9100.00 MM ROOF C APEX LINE BROWN MATTE PAINT FINISH
EL. 8900.00 MM
3600
SMOOTH CONCRETE DARK
ROOF C APEX LINE
3000
BROWN MATTE PAINT FINISH 2ND FLR. CEILING LINE D2
EL. 8900.00 MM W2
EL. 8300.00 MM 11
3600
08
3000
2ND FLR. CEILING LINE W2
SECOND FLR. LINE
EL. 8300.00 MM EL. 5300.00 MM
10250
07
2750
W1
GARDEN FLR. LINE CONCRETE WITH 25MM GROVE
2350
01 D1
EL. 4900.00 MM 03 500MM O.CO GREEK
EL. 2600.00 MM
2750
W2 W2
CONCRETE WITH 25MM GROVE VILLA WHITE PAINT
GARDEN FLR. LINE
2350
06 05
500MM O.CO GREEK FINISH
EL. 2600.00 MM D1
02
VILLA WHITE PAINT
GROUND LVL. 2 FLR. LINE FINISH
EL. 2000.00 MM
550
500
1500
GROUND LVL. 1 FLR. LINE STEEL GATE DARK DRA
EL. 1500.00 MM MATTE PAINT FINISH SIDEWALK LINE
1500
EL. 0.00 MM
SIDEWALK LINE
EL. 0.00 MM
8 7 6 5 4 3 2 1
A B C D E E
17296
4096 12550 650 14161
EL. 10250.00 MM
1150
ROOF B APEX LINE
200
800
W2 D2
01 05
3000
3800
2ND FLR. CEILING LINE F
3000
EL. 8300.00 MM 2ND FLR. CEILING LINE
SECOND FLR. LINE BAL MASTER S BAL EL. 8300.00 MM
EL. 5300.00 MM CON BEDROOM HALLWA CON SECOND FLR. LINE
10250
10250
DROP CEILING
400
EL. 4900.00 MM D1
06
1ST FLR. CEILING LINE
EL. 4900.00 MM
2750
2750
EL. 2600.00 MM GARDEN FLR. LINE
3400
2900
GROUND LVL. 2 FLR. LINE D1 EL. 2600.00 MM
LANAI 04
EL. 2000.00 MM GROUND LVL. 2 FLR. LINE
550
550
500
500
EL. 1500.00 MM GROUND LVL. 1 FLR. LINE LIVING AREA
1500
EL. 1500.00 MM
PARKING AREA
1500
SIDEWALK LINE
EL. 0.00 MM SIDEWALK LINE
EL. 0.00 MM
A A I ARCHITECT REPUBLIC ACT 9266 SEAL PRO ECT TITLE APPROVED B SHEET CONTENTS DRAWN RA SHEET NO.
L
DRAWINGS AND SPECIFICATIONS DUL SIGNED
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA REAR ELEVATIONS
LEFT SIDE ELEVATIONS DATE 21.11.01
TWO STORE RESIDENCE RHEA MAE RETANA
ARE THE PROPERT AND DOCUMENTS OF SERVICE
ARE THE PROPERT AND DOCUMENTS OF CROSS LONGITUDINAL SECTION
ARCHITECTS AND ASSOCIATES WHETHER THE
OB ECT FOR WHICH THE ARE MADE IS EXECUTED OR
NOT IT SHALL BE UNLAWFUL FOR AN PERSON
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION CEBU OWNER
PURPOSE OF
CHECKED A3 102
PRC R .N . DATE TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PRO ECT NO.
FOR OTHER PRO ECTS OR BUILDINGS WHETHER
PTR N . DATE EXECUTED PARTL OR IN WHOLE.
VISTA VERDE SUBDIVISION BARANGA SAC SAC
TIN. LOCATION CONSOLACION CEBU PHILIPPINES LOCATION CONSOLACION CEBU REVISION 001
1900 REPUBLIC OF THE PHILLIPINES
3900 DEPARTMENT OF PUBLIC WORKS AND
950 950 950 950 950 950
50 650 150 650 50 HIGHWAYS
3000 50 50
OFFICE OF THE BUILDING OFFICIAL
50
750 750 750 750
50
900 800 CEBU CITY
50MM x 65MM ALUMINUM
50MM X 150MM THK SOLID 50 650 50 FRAMING COATED WITH DARK 850 750
ISSUANCE RECOMMENDED
700
WOOD DOOR JAMB, OAK GRAY MATTE PAINT FINISH 50 50 50 50
50
400
FINISH 50MM x 65MM ALUMINUM
50
50
FRAMING COATED WITH DARK HEAD ARCHITECTURAL DATE
2000
GRAY MATTE PAINT FINISH 10MM THK TEMPERED
2300
SECTION
2250
44MM THK SOLID WOOD
700
50MM X 150MM THK SOLID 50MM X 150MM THK SOLID
1450
GLASS, CLEAR
PANEL DOOR, OAK FINISH
2950
WOOD DOOR JAMB, OAK WOOD DOOR JAMB, OAK
400
550 550
FINISH FINISH
2400
25MM x 25MM ALUMINUM
2150
2150
2100
2100
700
FRAMING COATED WITH DARK
44MM THK SOLID WOOD 44MM THK SOLID WOOD
10MM THK TEMPERED GRAY MATTE PAINT FINISH
PANEL DOOR, OAK FINISH PANEL DOOR, OAK FINISH
GLASS, CLEAR BUILDING OFFICIAL DATE
900
900
900
900
600
GROUND LEVEL
FINISH FLOOR LINE
EL. +1500MM
1 SET/SINGLE SWING 1 SET/SLIDING 1 SET/SLIDING 1 SET/SLIDING 6 SETS/SLIDING
D1 ELEVATION D1 ELEVATION D1 ELEVATION D1 ELEVATION D1 ELEVATION
01 SCALE 1:50MTS. 02 SCALE 1:50MTS. 03 SCALE 1:50MTS. 04 SCALE 1:50MTS. 5-10 SCALE 1:50MTS.
LOCATION: MAIN ENTRANCE LOCATION: DINING AREA LOCATION: DINING AREA LOCATION: SIDE DOOR ENTRANCE LOCATION: KITCHEN, QUARTERS, TOILET, STO., LAUNDRY
QUANTITY: 1 SET QUANTITY: 1 SET QUANTITY: 1 SET QUANTITY: 1 SET QUANTITY: 1 SET
CONSTRUCTION: DOUBLE DOOR, SINGLE SWING CONSTRUCTION: SLIDING DOOR W/ FIXED WINDOWS CONSTRUCTION: SLIDING DOOR W/ FIXED WINDOWS CONSTRUCTION: SINGLE SWING DOOR CONSTRUCTION: SINGLE SWING DOOR
3700
900 900 900 900
1200 50 50
550 550
50
900 800
850 750 50 50 50MM x 65MM ALUMINUM
50
FRAMING COATED WITH DARK
50 50 50 50 50MM x 65MM ALUMINUM GRAY MATTE PAINT FINISH
50
GRAY MATTE PAINT FINISH
50MM X 150MM THK SOLID 50MM X 150MM THK SOLID
3000
2950
WOOD DOOR JAMB, OAK WOOD DOOR JAMB, OAK
FINISH FINISH
2500
2450
10MM THK TEMPERED 10MM THK TEMPERED
2150
2150
GLASS, CLEAR GLASS, CLEAR
2100
2100
250 1000 200 250 1000 1000 250
44MM THK SOLID WOOD 44MM THK SOLID WOOD
PANEL DOOR, OAK FINISH PANEL DOOR, OAK FINISH 25MM x 25MM ALUMINUM 850 850 850
FRAMING COATED WITH DARK
900
900
625
900
GRAY MATTE PAINT FINISH
700 250
700 250
SECOND LEVEL
FINISH FLOOR LINE
F F F
EL. +5300MM
10MM THK TEMPERED 10MM THK TEMPERED
4 SETS/SLIDING 5 SETS/SLIDING 1 SET/SINGLE SWING 1 SET/SLIDING GLASS, BROWN TINT FINISH GLASS, BROWN TINT FINISH
2625
2625
LOCATION: BEDROOM ENTRANCE, BALCONY LOCATION: BEDROOM TOILETS, HOME OFFICE LOCATION: WINE CELLAR LOCATION: MASTER'S BEDROOM
QUANTITY: 4 SETS QUANTITY: 6 SETS QUANTITY: 1 SET QUANTITY: 1 SET
F F F
CONSTRUCTION: SINGLE SWING DOOR CONSTRUCTION: SINGLE SWING DOOR CONSTRUCTION: DOUBLE FRENCH DOOR, SINGLE SWING CONSTRUCTION: SLIDING DOOR 75MM x 100 MM ALUMINUM 75MM x 100 MM ALUMINUM
FRAMING COATED WITH DARK FRAMING COATED WITH DARK
GRAY MATTE PAINT FINISH GRAY MATTE PAINT FINISH
6975
6975
A SCHEDULE OF DOORS F F F
700
700
A4-101 SCALE 1 : 50 M 600 10MM THK TEMPERED 10MM THK TEMPERED
1200 500 GLASS, BROWN TINT FINISH GLASS, BROWN TINT FINISH
600 600 50 50
50 500 50
50MM x 65MM ALUMINUM
1200 50 50 10MM THK TEMPERED 10MM THK TEMPERED
50
600
275 275 50 GRAY MATTE PAINT FINISH
50 275 275 50MM x 65MM ALUMINUM F F F
50 500 50
2450
2450
FRAMING COATED WITH DARK 10MM THK TEMPERED
50MM x 65MM ALUMINUM
1200
1100
1800
10MM THK TEMPERED 10MM THK TEMPERED
GLASS, CLEAR
50
GLASS, CLEAR
1050
900
250
250
GROUND LEVEL
200
200
FINISH FLOOR LINE
EL. +1500MM
1 SET/CASEMENT 1 SET/SLIDING 4 SETS/CASEMENT 1 SET/FIXED
W1 ELEVATION W1 ELEVATION W1 ELEVATION W1 ELEVATION
02 SCALE 1:50MTS. 03 SCALE 1:50MTS. 04-07 SCALE 1:50MTS. 01 SCALE 1:50MTS.
LOCATION: KITCHEN LOCATION: QUARTERS LOCATION: TOILETS, LAUNDRY, STORAGE LOCATION: LIVING AREA
QUANTITY: 1 SET QUANTITY: 1 SET QUANTITY: 4 SETS QUANTITY: 1 SET
CONSTRUCTION: CASEMENT WINDOW CONSTRUCTION: SLIDING WINDOW CONSTRUCTION: CASEMENT WINDOW CONSTRUCTION: FIXED
B SCHEDULE OF WINDOWS
A4-101 SCALE 1 : 50 M
A ' A ' I ARCHITECT REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RAJ SHEET NO.
L
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA SCHEDULE OF DOORS
SCHEDULE OF WINDOWS DATE : 21.11.16
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
ARE THE PROPERTY AND DOCUMENTS OF
----- ARCHITECTS AND ASSOCIATES WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION, CEBU OWNER
PURPOSE OF
CHECKED : -- A4-101
PRC R . N .: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR N .: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, BARANGAY SAC-SAC,
TIN.: LOCATION: CONSOLACION, CEBU, PHILIPPINES LOCATION: CONSOLACION, CEBU REVISION : 001
REPUBLIC OF THE PHILLIPINES
600 DEPARTMENT OF PUBLIC WORKS AND
500 HIGHWAYS
50 50 OFFICE OF THE BUILDING OFFICIAL
50
600
500 CEBU CITY
1800 50 50 ISSUANCE RECOMMENDED
50
600
75MM x 100 MM ALUMINUM
500 600 600 600
FRAMING COATED WITH DARK 1800 HEAD ARCHITECTURAL DATE
50 50
50
75MM x 100 MM ALUMINUM
F GRAY MATTE PAINT FINISH 50 50 600 600 600 SECTION
50 500 50
FRAMING COATED WITH DARK
50MM x 65MM ALUMINUM F
50 50 GRAY MATTE PAINT FINISH
2800
50MM x 65MM ALUMINUM
2700
1900
50
FRAMING COATED WITH DARK
600
FRAMING COATED WITH DARK
2000
GRAY MATTE PAINT FINISH
GRAY MATTE PAINT FINISH
50MM x 65MM ALUMINUM
10MM THK TEMPERED 10MM THK TEMPERED FRAMING COATED WITH DARK 10MM THK TEMPERED 10MM THK TEMPERED
1800
1900
1200
1100
GLASS, BROWN TINT FINISH GLASS, CLEAR GRAY MATTE PAINT FINISH GLASS, CLEAR GLASS, BROWN TINT FINISH
F BUILDING OFFICIAL DATE
F
25MM x 25MM ALUMINUM
1800
10MM THK TEMPERED
50
FRAMING COATED WITH DARK
GLASS, CLEAR GRAY MATTE PAINT FINISH
50
50
1000
900
800
50
600
SECOND LEVEL
FINISH FLOOR LINE
EL. +5300MM
4 SETS/CASEMENT 1 SET/SLIDING 1 SET/SWING
W2
3 SETS/FIXED
ELEVATION W2 ELEVATION W2 ELEVATION W2 ELEVATION W2
3 SETS/FIXED
ELEVATION
4,5,9,10 SCALE 1:50MTS. 06 SCALE 1:50MTS. 07 SCALE 1:50MTS.
01-03 SCALE 1:50MTS. 08 SCALE 1:50MTS.
A SCHEDULE OF WINDOWS
A4-102 SCALE 1 : 50 M
250 250 250 250 250 250
18
SECOND LEVEL SECOND LEVEL
250 250 250 250 250 250
11 12
11 10MM THK TEMPERED
10 GLASS, CLEAR
10
3800
3800
9 9
8 8
7 7 POLISHED CONCRETE POLISHED CONCRETE
STAIRS W/ 50MM THK STAIRS W/ 50MM THK
6 WOOD STEPS WOOD STEPS
1 2 3 4 5 6
900
UP 5
4
3
GROUND LEVEL 2 GROUND LEVEL
FINISH FLOOR LINE 1 FINISH FLOOR LINE
EL. +1500MM EL. +1500MM
250 250 250
250 250 900
2150 PLAN ELEVATION A ELEVATION B
B STAIR DETAILS
A4-102 SCALE 1 : 50 M
3
15381
2 1060 1190 3600 1500 6000 2031
7 1 840 350 1200 1200 1200 150 1200 150 1500 1500 1500 1500 150 1750 131
UP
1000
4
2000
500 500
1000
3600 150 1200 150 150 1750 129
1500 6000 2029 SIDEWALK LINE
9529 EL. 0.00 MM
ELEVATION A
PLAN
C GATE DETAILS
A4-102 SCALE 1 : 50 M
A ' A ' I ARCHITECT REPUBLIC ACT 9266 SEAL PRO ECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RA SHEET NO.
L
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA SCHEDULE OF WINDOWS
STAIR DETAILS DATE : 21.11.16
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
ARE THE PROPERTY AND DOCUMENTS OF GATE DETAILS
----- ARCHITECTS AND ASSOCIATES WHETHER THE
OB ECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION, CEBU OWNER
PURPOSE OF
CHECKED : -- A4-102
PRC R . N .: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PRO ECT NO.:
FOR OTHER PRO ECTS OR BUILDINGS, WHETHER
PTR N .: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, BARANGAY SAC-SAC,
TIN.: LOCATION: CONSOLACION, CEBU, PHILIPPINES LOCATION: CONSOLACION, CEBU REVISION : 001
RE UBLIC OF THE HILLI INES
DE ARTMENT OF UBLIC WORKS AND
HIGHWA S
OFFICE OF THE BUILDING OFFICIAL
CEBU CIT
ISSUANCE RECOMMENDED
HEAD ARCHITECTURAL DATE
SECTION
21570 16300
2000 3000 3000 3000 3000 7570 6200 5000 2000 3100
900
BUILDING OFFICIAL DATE
2000
900
900
700
700
1100
1000
2600
2000
C FENCE DETAILS
A 102 SCALE 1 100 M
A A I ARCHITECT RE UBLIC ACT 9266 SEAL RO ECT TITLE A RO ED B SHEET CONTENTS DRAWN RA SHEET NO.
L
DRAWINGS AND S ECIFICATIONS DUL SIGNED
STAM ED OR SEALED AS INSTRUMENTS OF SER ICE A RO OSED RE TER RETANA FENCE DETAILS
DATE 21.11.16
TWO STORE RESIDENCE RHEA MAE RETANA
ARE THE RO ERT AND DOCUMENTS OF SER ICE
ARE THE RO ERT AND DOCUMENTS OF
ARCHITECTS AND ASSOCIATES WHETHER THE
OB ECT FOR WHICH THE ARE MADE IS E ECUTED OR
NOT IT SHALL BE UNLAWFUL FOR AN ERSON
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION CEBU OWNER
UR OSE OF
CHECKED A5 101
RC R .N . DATE TO DU LICATE OR MAKE CO IES OF SAID ISSUANCE
DOCUMENTS FOR USE IN THE RE ETITION OF AND
ERMIT RO ECT NO.
FOR OTHER RO ECTS OR BUILDINGS WHETHER
TR N . DATE E ECUTED ARTL OR IN WHOLE.
TIN. LOCATION ISTA ERDE SUBDI ISION BARANGA SAC SAC LOCATION CONSOLACION CEBU RE ISION 001
CONSOLACION CEBU HILI INES
RE UBLIC OF THE HILLI INES
DE ARTMENT OF UBLIC WOR S AND
D B A 2 3 4 HIGHWA S
6500 5125 OFFICE OF THE BUILDING OFFICIAL
1650 4050 800 2000 2125 1000 CEBU CIT
1150 900 1250 1900 300 1000 300 500 2750 1350 300 ISSUANCE RECOMMENDED
SECOND FLOOR SECOND FLOOR HEAD ARCHITECTURAL DATE
CEILING LINE CEILING LINE SECTION
EL. +8300MM EL. +8300MM
F F F
F
3000
3000
W2
01
5
F F F
SECOND LEVEL SECOND LEVEL
1000
1000
3000 500
FINISH FLOOR LINE FINISH FLOOR LINE
EL. +5300MM EL. +5300MM
W1 W1 HALLWA ART OF MASTER S BEDROOM
GROUND FLOOR GROUND FLOOR
450 400
500 400
01 01
200
6800
6800
CEILING LINE CEILING LINE
EL. +4900MM EL. +4900MM
670
670
F F F
2400
670
D1 D1
2950
01 02
670
GROUND LEVEL 2 GROUND LEVEL 2
FINISH FLOOR LINE FINISH FLOOR LINE
EL. +2000MM EL. +2000MM
1000
DINING AREA
GROUND LEVEL 1 GROUND LEVEL 1
500
450
FINISH FLOOR LINE FINISH FLOOR LINE LIVING AREA
EL. +1500MM EL. +1500MM
A ELEVATION A B ELEVATION B
AI 101 SCALE 1 50 M AI 101 SCALE 1 50 M
A B D 5 4 3 2
6425 8850
1075 4200 1150 3875 1150 3825
525 3950 800 650 750 1500 975 1000 575 2750 650
3000
D2 D2 D2
D2
01 02 12 03
1000
FINISH FLOOR LINE FINISH FLOOR LINE
EL. +5300MM EL. +5300MM
HALLWA ART OF MASTER S BEDROOM HALLWA
GROUND FLOOR GROUND FLOOR
400
400
1100 200
6800
6800
CEILING LINE CEILING LINE
EL. +4900MM EL. +4900MM
D1
03
2900
700
D1
3400
06
900
1100
GROUND LEVEL 2 GROUND LEVEL 2 D1
FINISH FLOOR LINE FINISH FLOOR LINE 04
500 600
500
FINISH FLOOR LINE LIVING AREA FINISH FLOOR LINE LIVING AREA
EL. +1500MM EL. +1500MM
A A I ARCHITECT RE UBLIC ACT 9266 SEAL RO ECT TITLE A ROVED B SHEET CONTENTS DRAWN RA SHEET NO.
L
DRAWINGS AND S ECIFICATIONS DUL SIGNED
STAM ED OR SEALED AS INSTRUMENTS OF SERVICE A RO OSED RE TER RETANA LIVING AND DINING AREA
ERS ECTIVES AND ELEVATIONS DATE 21.11.19
TWO STORE RESIDENCE RHEA MAE RETANA
ARE THE RO ERT AND DOCUMENTS OF SERVICE
ARE THE RO ERT AND DOCUMENTS OF
ARCHITECTS AND ASSOCIATES WHETHER THE
OB ECT FOR WHICH THE ARE MADE IS E ECUTED OR
NOT IT SHALL BE UNLAWFUL FOR AN ERSON
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION CEBU OWNER
UR OSE OF
CHEC ED AI 101
RC R .N . DATE TO DU LICATE OR MA E CO IES OF SAID ISSUANCE
DOCUMENTS FOR USE IN THE RE ETITION OF AND
ERMIT RO ECT NO.
FOR OTHER RO ECTS OR BUILDINGS WHETHER
TR N . DATE E ECUTED ARTL OR IN WHOLE.
VISTA VERDE SUBDIVISION BARANGA SAC SAC
TIN. LOCATION CONSOLACION CEBU HILI INES LOCATION CONSOLACION CEBU REVISION 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
E D 5 4 HIGHWAYS
2965 OFFICE OF THE BUILDING OFFICIAL
50 500 1115 500 196 925 4 00 CEBU CITY
00 00 500 00 2 00 00 ISSUANCE RECOMMENDED
GROUND FLOOR GROUND FLOOR GROUND FLOOR HEAD ARCHITECTURAL DATE
CEILING LINE DROP CEILING CEILING LINE DROP CEILING CEILING LINE DROP CEILING
SECTION
EL. 4900MM EL. 4900MM EL. 4900MM
400 400 4 0
1100
1100
SEE CABINET DETAILS SEE CABINET DETAILS
12 0
D1 D1
0 05
100
100
100
950
950
W1 D1
0
02 06
1100
50
50
50
600
GROUND LEVEL 2 GROUND LEVEL 2 GROUND LEVEL 2
FINISH FLOOR LINE FINISH FLOOR LINE FINISH FLOOR LINE
EL. 2000MM EL. 2000MM EL. 2000MM
SECOND FLOOR DROP CEILING SECOND FLOOR DROP CEILING SECOND FLOOR DROP CEILING
CEILING LINE CEILING LINE CEILING LINE
150
150
150
EL. 00MM EL. 00MM EL. 00MM
1 00
1 00
F
SEE WALL DETAILS
2600
000
000
000
D2
11
2150
650 D2
650
1
550
550
SECOND FLOOR SECOND FLOOR SECOND FLOOR
400
FINISH FLOOR LINE FINISH FLOOR LINE FINISH FLOOR LINE
EL. 5 00MM EL. 5 00MM EL. 5 00MM
650 5050 90
4 5 600 1500 600 4 5 1400 650 1 90 2500
2 00 50 00 250 00 50 1200 1500 4 5 4 5 400 990 600 1 00 600
SECOND FLOOR DROP CEILING SECOND FLOOR DROP CEILING SECOND FLOOR DROP CEILING
150
CEILING LINE CEILING LINE CEILING LINE
150
150
EL. 00MM EL. 00MM EL. 00MM
50
50
F F
2200
000
000
000
1 50
1 50
D2 D2 D2
0 2 05
400 400
SECOND FLOOR SECOND FLOOR SECOND FLOOR
400
400
FINISH FLOOR LINE FINISH FLOOR LINE FINISH FLOOR LINE
EL. 5 00MM EL. 5 00MM EL. 5 00MM
Arct's Architect's Information ARCHITECT REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RAJ SHEET NO.
Logo
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA KITCHEN & BEDROOMS
PERSPECTIVES AND ELEVATIONS DATE : 21.11.19
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
ARE THE PROPERTY AND DOCUMENTS OF
----- "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION, CEBU OWNER
PURPOSE OF
CHECKED : -- AI-102
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, BARANGAY SAC-SAC,
TIN.: LOCATION: CONSOLACION, CEBU, PHILIPPINES LOCATION: CONSOLACION, CEBU REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
ISSUANCE RECOMMENDED
HEAD ARCHITECTURAL DATE
SECTION
1025
150 150
200 200
2250
DROP CEILING
825
3000
3000
3000
ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel
1350
175
SPACED AT 25MM WITH 25MM
ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel ellivoel
300
250 250 250 250 250 250 250 250 250 250 250 250
THK MARINE PLYWOOD
600 150
BACKING, WALNUT STAIN
900
850
750
SECOND FLOOR SECOND FLOOR SECOND FLOOR 200MM X 300MM BLACK WALL
FINISH FLOOR LINE FINISH FLOOR LINE FINISH FLOOR LINE
EL. +5300MM EL. +5300MM EL. +5300MM TILE, SEMI-GLOSS
3000
450 2000 943 700 2000 800 HEADBOARD, LIGHT GRAY
500 500 500 500 472 472 500 500 500 500
1100
2900
W1 D1 MASTER S BEDROOM
950
950
02 06
H DECO WALL DETAILS
AI-103 SCALE 1 25 M
50
50
50 100
25 150
DROP CEILING
850
850
800
50
25 25
EL. +2000MM
KITCHEN CABINET TYPICAL CEILING SLATS
A A I ARCHITECT REPUBLIC ACT 9266 SEAL PRO ECT TITLE APPROVED BY SHEET CONTENTS DRAWN RA SHEET NO.
L
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA
T B, OFFICE, WINE CELLAR
PERSPECTIVES AND ELEVATIONS DATE 21.11.19
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
ARE THE PROPERTY AND DOCUMENTS OF CEILING DETAILS, WALL DETAILS
----- ARCHITECTS AND ASSOCIATES WHETHER THE
OB ECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CONSOLACION, CEBU OWNER
KITCHEN CABINET ELEVATIONS
PURPOSE OF
CHECKED -- AI-102
PRC R .N . DATE TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PRO ECT NO.
FOR OTHER PRO ECTS OR BUILDINGS, WHETHER
PTR N . DATE EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, BARANGAY SAC-SAC,
TIN. LOCATION CONSOLACION, CEBU, PHILIPPINES LOCATION CONSOLACION, CEBU REVISION 001
REPUBLIC OF THE PHILLIPINES
GENERAL STRUCTURAL NOTES AND SPECIFICATIONS DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
(A) GENERAL REQUIREMENTS 2. ALL CONCRETE SHALL DEVELOP A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS TABLE 1.0 LAP SPLICE AND ANCHORAGE LENGTH OFFICE OF THE BUILDING OFFICIAL
WITH CORRESPONDING MAXIMUM SLUMP AND MAXIMUM SIZE AGGREGATE AS CEBU CITY
NOTES:
1. ALL STRUCTURAL MATERIALS AND WORK SHALL CONFORM TO THE REQUIREMENTS FOLLOWS: TABLE 1. LAP SPLICE AND ANCHORAGE LENGTH
1. TYPE "A" BUNDLED BARS
ISSUANCE RECOMMENDED
OF THE LATEST EDITION OF THE NATIONAL STRUCTURAL CODE OF THE PHILIPPINES
(NSCP 2015). TYPE OF CONSTRUCTION 28 DAY STRENGTH MAX. SLUMP MAX. SIZE AGG. BAR SIZES LAP SPLICES LENGTH ANCHORAGE TYPE "B" INDIVIDUAL BARS HEAD ENGINEERING DATE
(MM) LENGTH (M)
A. SLAB ON GRADE
28.0 MPa (4,000 PSI) 100MM (4") 19MM (3/4") TYPE "A" TYPE "B"
2. NOT MORE THAN 33% OF THE BARS SECTION
2. VERIFY ALL DIMENSIONS, ELEVATIONS AND SITE CONDITIONS BEFORE STARTING STAIR LANDINGS AND TREADS SHALL BE SPLICED WITHIN THE
10 0.40 0.30 0.60
WORK. NOTIFY THE ENGINEER IMMEDIATELY OF ANY DISCREPANCIES. B. ALL OTHERS (SLABS, BEAMS, REQUIRED LAP LENGTH
28.0 MPa (4,000 PSI) 100MM (4") 19MM (3/4") 12 0.45 0.35 0.60
COLUMNS, ETC)
3. NOTES AND DETAILS ON THE DRAWINGS TAKE PRECEDENCE OVER THE GENERAL 16 0.61 0.40 0.60
NOTES AND TYPICAL DETAILS IN CASE OF CONFLICT. 3. ALL REINFORCING STEEL BARS SHALL CONFORM TO ASTM A615 GRADE 40 FOR 12MM 20 0.76 0.56 0.60
AND SMALLER BARS WHILE BARS 16MMM Ø AND ABOVE SHALL BE GRADE 60. GRADE 25 1.10 0.90 0.68 BUILDING OFFICIAL DATE
4. WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE
WORK, SUCH DETAILS SHALL BE THE SAME AS FOR SIMILAR WORK SHOWN ON THE 33 MAY BE USED FOR 10MM Ø BARS. 28 1.40 1.20 0.86
32 1.90 1.40 1.12
DRAWINGS. 4. ALL FABRICATION, DETAILING AND PLACING SHALL CONFORM TO THE PROVISIONS
36 2.41 1.84 1.43
5. PIPES, DUCTS, SLEEVES, CHASES, ETC. SHALL NOT BE PLACED IN SLABS, BEAMS, OR SET BY THE NSCP 2015 EDITION AND LATEST ACI-315. FLR. SLAB OR BEAM
WALLS UNLESS SPECIFICALLY SHOWN OR NOTED NOR SHALL ANY STRUCTURAL 5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS:
MEMBER BE CUT FOR PIPES, DUCTS, ETC. UNLESS SPECIFICALLY SHOWN. OBTAIN TABLE 2.0 TYPICAL STANDARD HOOK DETAIL
LENGTH
10MM Ø HORIZONTAL BARS
DOWEL
PRIOR WRITTEN APPROVAL FROM THE ENGINEER FOR INSTALLATION OF ANY FOOTINGS (CAST AGAINST & EXPOSED TO EARTH) . . . . . 75MM (3")
DETAILING DETAILING SPACED @ 600MM O.C. 400
ADDITIONAL PIPES, DUCTS, ETC. COLUMN TIES OR SPIRALS AND BEAM STIRRUPS . . . . . . . 40MM (1 1/2") DIMENSION DIMENSION (EVERY 3 LAYERS)
LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR SLABS AND WALLS (INTERIOR FACE). . . . . . . . . . . . . . . . . . 20MM (3/4") d d
OTHER UTILITIES WHERE NEW WORK IS BEING PERFORMED.
6. CLEAR DISTANCE SPACING BETWEEN PARALLED BARS IN A LAYER SHALL NOT BE NOTE:
J
db
A OR G
6. LOCATE AND PROTECT UNDERGROUND OR CONCEALED CONDUIT, PLUMBING OR ALL JOINTS AND CELLS CONTAINING
LESS THAN 1.50 TIMES THE NOMINAL DIAMETER OF THE BAR, OR 1.33 TIMES MAXIMUM
12db
90° HOOK REINFORCING BARS SHOULD BE FILLED
LENGTH
ARCHITECT/ENGINEER WILL ENFORCE SAFETY MEASURES OR REGULATIONS. IT
DOWEL
OTHERWISE SHOWN ON DRAWINGS, SPLICES SHALL BE STAGGERED WHENEVER
SHALL BE THE CONTRACTORS RESPONSIBILITY TO PROVIDE ADEQUATE SHORING POSSIBLE. TABLE 2. RECOMMENDED END HOOKS ALL GRADES
400
AND BRACING OF THE STRUCTURE FOR ALL THE LOADS THAT MAYBE IMPOSED 180° HOOK 90° HOOK FLR. SLAB OR BEAM
8. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY FINISHED BEND
DURING CONSTRUCTION. FURTHER, THE CONTRACTOR SHALL DESIGN, CONSTRUCT BAR SIZES (MM)
DIAMETER (MM) J A OR G (MM)
AND MAINTAIN ALL SAFETY DEVICES AND SHALL BE SOLELY RESPONSIBLE FOR POSITION AND SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. A OR G (MM)
10 60 130 80 155
CONFORMING TO ALL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF 7 CONSECUTIVE DAYS
8. OBTAIN PRIOR WRITTEN APPROVAL FROM THE ENGINEER IN CASE OF CHANGES TO IMMEDIATELY AFTER POURING BY THE USE OF CURING COMPOUNDS, OR OTHER
12
16 100
80 155
180
105
130
205
255 TYPICAL CHB WALL PARTITION
THE WORKING DRAWINGS. APPROVED METHODS. 20 115 205 155 305
25 155 280 205 410 CONNECTION DETAILS
28 245 285 300 485
(B) DESIGN CRITERIA (D) MASONRY AND CONCRETE BLOCKS 32 275 435 340 560
36 305 485 375 610
- - - REFER TO STRUCTURAL COMPUTATIONS 1. CONCRETE HOLLOW BLOCKS, UNLESS OTHERWISE SPECIFIED SHALL BE 150MM
THICK. LOAD BEARING BLOCKS SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF
10MM Ø VERTICAL BARS
750 PSI (5.175 MPa) WHILE NON-LOAD BEARING SHALL HAVE A MINIMUM TABLE 3.0 TYPICAL STANDARD STIRRUPS AND TIE HOOK DETAIL SPACED @ 400MM O.C.
(C) FOUNDATION COMPRESSIVE STRENGTH OF 400 PSI (2.76 MPa). SLAB ON GRADE
100
1. FOOTINGS SHALL BEAR ON SOLID UNDISTURBED EARTH (CONTROLLED, COMPACTED 2. PROVIDE 1-16MMØ VERTICAL BARS AT CORNERS, INTERSECTIONS, END OF WALLS, 12db FOR 20 & 25
STRUCTURAL FILL OR BOTH) AT LEAST 450MM BELOW LOWEST ADJACENT FINISHED EACH SIDE OF OPENINGS. 6db FOR 10, 12, & 16 6d 6d GRAVEL BED
b b
DOWEL LENGTH
600
GRADE.
3. LINTEL BEAMS SHALL BEAR AT LEAST 200MM (8") ON EACH SIDE OF MASONRY WALL 400
150MM THICK
DETAILING DIMENSION
DETAILING DIMENSION
DETAILING DIMENSION
2. FOOTING IS DESIGNED FOR ASSUMED ALLOWABLE SOIL/FOUNDATION PRESSURE OF OPENING. EXTERIOR CHB WALL
h
168 kPa (3500 psf).
4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS: 200
= 40 BAR DIAM.
COLUMN BAR SPLICE
6. EXCAVATIONS SHALL BE PROPERLY BACKFILLED. BACKFILL FOR WALLS SHALL BE STIFFENER PLATES, BASE PLATES, ETC. SHALL CONFORM TO ASTM A-36. GENERAL USE SEISMIC USE L/4
THICKNESS
BEAM
12MM Ø x 1M LENGTH
CHB WALL REINFORCEMENT:
LENGTH
SPACED @ 600MM O.C. @ MID-DEPTH OF SLAB VERTICAL BARS : 10mmØ @ 400mm O.C.
400
N.G.L.
OPENING
CHB WALL PARTITION
40 BAR Ø
LENGTH
12MM Ø TOP
DOWEL
D/3
3 - 10MM Ø 3 - 10MM Ø
4 - 10MM Ø BOT. BARS
THICKNESS
FLR. SLAB OR BEAM TEMP. BARS TEMP. BARS WHERE JOINT IS AT POINT OF
DOWEL BARS TO DOWEL BARS TO STRESS, PROVIDE SHEAR BARS.
THICKNESS
REFER TO ENGINEER.
MATCH CHB VERT. BARS MATCH CHB VERT. BARS
0.60M (MIN)
0.60M (MIN)
12MM Ø VERT.
BARS TYPICAL BEAM OR SLAB
TYPICAL CHB WALL PARTITION TYPICAL SLAB TYPICAL SLAB 0.200 0.200
1175
100.50
100.50
100.00
533
3100
100.00
99.50
9875
99.50 UP
99.00
UP UP
99.00
4950
98.50
15275
13600
98.50
98.00 UP
UP UP
98.00
97.50
3900
97.50
97.00
900
UP
8859
1500
97.00
96.50
96.50 96.00
NOTE:
5350 5596
96.00
SIDEWALK
15530
LOGO Engineer's Information Civil Engineer REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RHEINA RETANA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA
AS SHOWN ABOVE
DATE : 21.11.01
TWO STOREY RESIDENCE
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
S1-101
ARE THE PROPERTY AND DOCUMENTS OF
ENGR. REX A. RETANA "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
CEBU, CITY RHEA MAE RETANA PURPOSE OF
CHECKED : --
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
OWNER PERMIT PROJECT NO.:
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION : 001
REPUBLIC OF THE PHILLIPINES
ALONG SHORT DIRECTION ALONG LONG DIRECTION
DEPARTMENT OF PUBLIC WORKS AND
BAR THICKNESS
MARK
DIAMETER (mm)
CONT. EDGE MIDSPAN DISCONT. EDGE CONT. EDGE MIDSPAN DISCONT. EDGE
REMARKS
HIGHWAYS
12 OFFICE OF THE BUILDING OFFICIAL
S- 1 125 200 200 200 200 200 200 TWO WAY
12
CEBU CITY
8595 S- 2 125 200 200 200 200 200 200 TWO WAY
1Omm BAR DIA. ISSUANCE RECOMMENDED
12 SPACED @ 250mm O.C.
S- 3 125 200 200 200 200 200 200 TWO WAY
1805 4200 2590 BOTHWAYS
S- 4
12
125 200 200 200
10 mm dia. TEMP BARS SPACED @300 mm O.C.
ONE WAY HEAD ENGINEERING DATE
S- 5
12
125 200 200 200 200 200 200 TWO WAY VAPOR BARRIER GRAVEL BASE SECTION
12 10 mm dia. TEMP BARS SPACED @300 mm O.C.
S- 6 125 200 200 200 ONE WAY SUBGRADE COMPACTED TO
95% OF MAXIMUM MOISTURE
12 10 mm dia. TEMP BARS SPACED @300 mm O.C.
S- 7 125 200 200 200 ONE WAY @ OPTIMUM CINTENT
12 10 mm dia. TEMP BARS SPACED @300 mm O.C.
S-8 125 200 200 200 ONE WAY
S- 9
12
125 200 200 200 200 200 200 TWO WAY BUILDING OFFICIAL DATE
12
S- 10 125 200 200 200 200 200 200 TWO WAY
12
2875
S.O.G 10 100 300 300 300 10 mm dia. TEMP BARS SPACED @ 300 mm O.C.
2100
3100
1900
MAIN BARS ALONG LONG SPAN (L)
1000
LONG SPAN
W/4
1150
MAIN BARS
W/4
3800
3800
W/4
13600
W/4
1300
TEMPERATURE BARS
2550
C TYPICAL TWO WAY SLAB DETAIL
1900
OPEN
TO BELOW
1650
NOTES: D TYPICAL ONE WAY SLAB DETAIL
S2-101 SCALE
2000
1. BARS ALONG THE SHORTER SPAN SHALL BE PLACED BELOW THOSE ALONG THE LONGER SPAN AT NTS
MIDSPAN AND OVER THE LONGER SPAN AT SECTIONS NEAR SUPPORT.
4150
2500
L/3 L/4
MAIN BARS
150mm
1. BAR "A" = TOP BARS @ LEFT SIDE
TEMPERATURE BARS
t (SLAB THICKNESS) 2. BAR "B" = BOTTOM BARS @ MIDSPAN
3. BAR "C" = TOP BARS @ RIGHT SIDE
L/8
PROVIDE 20MM CLEAR CONCRETE COVER
8865
1500
6500 2650 1946 RC WALL FOOTING BOTHWAYS
11096
NATURAL GRADE LINE
150
200
12 MM TRANSVERSE REBARS 1OO MM THICK GRAVEL BED
SPACED @ 250 MM 0.C. 500
SECOND FLOOR FRAMING PLAN 3-12 MM LONGITUDINAL REBARS SUBGRADE COMPACTED TO G RAMP DETAILS
A 95% OF MAXIMUM MOISTURE S2-101 SCALE 1:50
S2-101 SCALE 1 : 75 M @ OPTIMUM CINTENT
LOGO Engineer's Information Civil Engineer REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RHEINA RETANA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA
AS SHOWN ABOVE
DATE : 21.11.01
TWO STOREY RESIDENCE
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
S2-101
ARE THE PROPERTY AND DOCUMENTS OF
ENGR. REX A. RETANA "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
CEBU, CITY RHEA MAE RETANA PURPOSE OF
CHECKED : --
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND OWNER
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION : 001
REPUBLIC OF THE PHILLIPINES
L/4 STIRRUPS L/3 LEFT MIDSPAN RIGHT DEPARTMENT OF PUBLIC WORKS AND
THICKNESS
SEE BEAM SCHEDULE SEE BEAM SCHEDULE SE BEAM SCHEDULE
>300
BEAM
SPAN, L CROSS SECTION
LONGITUDINAL SECTION COLUMN VERTICAL BARS BUILDING OFFICIAL DATE
(SEE COLUMN SCHEDULE) BEAM BOTTOM BARS @ MIDSPAN
(SEE BEAM SCHEDULE)
L/8
30 BAR Ø 30 BAR Ø
40 BAR Ø
30 BAR Ø 50 BAR Ø
THICKNESS
SCHEDULE OF SECOND FLOOR
TYPICAL COLUMN BEAM CONNECTION DETAIL
THICKNESS
D/3
D
REINFORCED CONCRETE BEAMS B BEAM/SLAB (D)
COLUMN VERTICAL BARS VERT. BARS 8 - 20mm Ø 8 - 20mm Ø 4 - 20mm Ø VERT. BARS 8 - 20mm Ø 8 - 20mm Ø 8 - 20mm Ø
SIZE 300mm x 400mm 10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm,
TIES
(SEE COLUMN SCHEDULE) TIES
5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL
TOP BARS 3 - 16mm Ø 3 - 16mm Ø 3 - 16mm Ø SEE COLUMN SCHEDULE 300mm 300mm 300mm 300mm 300mm 300mm
FLOOR TO FLOOR DISTANCE
FIN. FLR. SLAB LINE SIZE 300 mm x 300 mm 300 mm x 300 mm 300 mm x 300 mm
10mm Ø: 1 SET 1-50mm, 10-100mm, 10mm Ø: 1 SET 1-50mm, 10-100mm, 10mm Ø: 1 SET 1-50mm, 10-100mm,
VERT. BARS 8 - 20mm Ø 8 - 20mm Ø 4 - 20mm Ø TIES
5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL
RB 10mm Ø: 3 SETS 1-50mm, 10-100mm, 10mm Ø: 3 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm, 300mm 300mm 300mm
300mm 300mm 300mm TIES
5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL
BEAM/GIRDER 300mm 300mm 300mm C14 300mm 300mm 300mm
C6 300mm 300mm
300mm
SIZE 250mm x 300mm SIZE 400 mm x 400 mm 400 mm x 400 mm 400 mm x 400 mm
MAX. SLOPE 1:6 BOTTOM OF BEND VERT. BARS 8 - 25mm Ø 8 - 25mm Ø 8 - 20mm Ø
TOP BARS 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø
SIZE 300 mm x300 mm 300 mm x 300 mm 300 mm x 300 mm 10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm,
150
TIES
BOTTOM BARS 2 - 16mm Ø 2 - 16mm Ø 2 - 16mm Ø VERT. BARS 8 - 20mm Ø 8 - 20mm Ø 4 - 20mm Ø
5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL
300mm 300mm 300mm
SIDE BARS NONE NONE NONE SPECIAL 10MMØ TIES TIES
10mm Ø: 3 SETS 1-50mm, 10-100mm, 10mm Ø: 3 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm,
5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL C15 300mm 300mm
STIRRUPS
10MMØ BAR SPACED @ SPACED @ 50MM O.C. 300mm 300mm 300mm
300mm
SIZE 300 mm x 300 mm 300 mm x 300 mm 300 mm x 300 mm 10mm Ø: 1 SET 1-50mm, 10-100mm, 10mm Ø: 1 SET 1-50mm, 10-100mm, 10mm Ø: 1 SET 1-50mm, 10-100mm,
SIDE BARS NONE NONE
10MMØ BAR SPACED @
NONE
E VERT. BARS 8 - 20mm Ø 8 - 20mm Ø 4 - 20mm Ø
TIES
5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL
STIRRUPS
1@50mm, 5@100mm, 5 @150mm, REST @ 200mm O.C. TO CL S3-101 SCALE NTS TIES
10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 2 SETS 1-50mm, 10-100mm, 10mm Ø: 1 SET 1-50mm, 10-100mm,
5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL 5-150mm, REST @ 200mm TO CL
MATERIAL SPECIFICATIONS:
MATERIAL SPECIFICATIONS: MATERIAL SPECIFICATIONS: fc' = 21 MPa (3,000 psi)
fc' = 21 MPa (3,000 psi) fy = 276 MPa (40,000 psi) FOR 12MMØ BARS AND BELOW
fc' = 21 MPa (3,000 psi) fy = 276 MPa (40,000 psi) FOR 12MMØ BARS AND BELOW fy = 414 MPa (60,000 psi) FOR 16MMØ BARS AND ABOVE
fy = 276 MPa (40,000 psi) FOR 12MMØ BARS AND BELOW fy = 414 MPa (60,000 psi) FOR 16MMØ BARS AND ABOVE
fy = 414 MPa (60,000 psi) FOR 16MMØ BARS AND ABOVE
LOGO Engineer's Information Civil Engineer REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RHEINA RETANA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA
AS SHOWN ABOVE
DATE : 21.11.01
TWO STOREY RESIDENCE
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
S3-101
ARE THE PROPERTY AND DOCUMENTS OF
ENGR. REX A. RETANA "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
CEBU, CITY RHEA MAE RETANA PURPOSE OF
CHECKED : --
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND OWNER
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
column reinforcement ISSUANCE RECOMMENDED
t(mm)
A
t(mm)
75
100mm THK GRAVEL BASE 100mm THK GRAVEL BASE
FOOTING DIMENSIONS
L
SECTION L
THICKNESS EXCAVATIO
MARK WIDTH LENGTH (mm) N (DEPTH) REINFORCEMENTS
(mm) (mm)
F1 1350 2200 300 1200 16mmø @ 200 mm (L/T)
F2 1350 2200 300 1200 16mmø @ 200 mm (L/T)
A TYPICAL TIE BEAM TO FOOTING DETAILS
S4-101 SCALE NTS F3 1350 1850 300 1200 16mmø @ 200 mm (L/T)
F4 1350 1850 300 1200 16mmø @ 150 mm (L/T)
F5 1350 2250 300 1200 16mmø @ 200 mm (L/T)
F6 1800 1800 300 1200 16mmø @ 200 mm (L/T)
TIE BEAM
column reinforcement column reinforcement
(SEE SCHEDULE)
B2
B1
BOTTOM BARS
0.05
SECTION A - A
FOOTING 1 PLAN FOOTING 2 LENGTH, L
(SECTION OF TIE BEAM)
LOGO Engineer's Information Civil Engineer REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RHEINA RETANA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA
AS SHOWN ABOVE
DATE : 21.11.01
TWO STOREY RESIDENCE
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
S4-101
ARE THE PROPERTY AND DOCUMENTS OF
ENGR. REX A. RETANA "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
CEBU, CITY RHEA MAE RETANA PURPOSE OF
CHECKED : --
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND OWNER PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
4005 2200 4475 HIGHWAYS
1500 1500 1300 1000 1300 1300 1300 OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
1300 1300 ISSUANCE RECOMMENDED
HEAD ENGINEERING DATE
SECTION
RAINWATER GUTTER
10260
17650
3840
RAINWATER GUTTER
NOTE:
1325
5350 7950
NOTE:
RAINWATER GUTTER
300
FASCIA BOARD C CHANNEL - RAFTER
SQUARE TUBE
RAINWATER GUTTER
LOGO Engineer's Information Civil Engineer REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : RHEINA RETANA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA
AS SHOWN ABOVE
DATE : 21.11.01
TWO STOREY RESIDENCE
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
S6-101
ARE THE PROPERTY AND DOCUMENTS OF
ENGR. REX A. RETANA "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
CEBU, CITY RHEA MAE RETANA PURPOSE OF
CHECKED : --
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
OWNER PERMIT PROJECT NO.:
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
12MMØ TOP BARS OFFICE OF THE BUILDING OFFICIAL
LANDING
LANDING SPACED @ 200 MM O.C. CEBU CITY
ISSUANCE RECOMMENDED
10mm Ø FRONT TEMP. BARS
200
12mm Ø INNER FACE BARS
@ 150mm O.C. UP TO 1.5M FROM
10MMØ TRANSVERSE BARS
16
SPACED @ 300 MM O.C.
15
14 12MMØ BOTTOM BARS
3M - 4M HEIGHT
13 BUILDING OFFICIAL DATE
SPACED @ 200 MM O.C.
12 12mm Ø STEM FRONT BARS
SPACED @ 300mm O.C.
11
10
9 10mm Ø STEM INNER BARS
SPACED @ 450mm O.C.
1000
6
5 10MMØ NOSING BAR
12MMØ FORMING BAR SPACED @ 250MM O.C.
4
3
2 12mm Ø FOOTING MAIN BARS
SPACED @ 150 mm O.C.
A STAIR DETAILS
S5-101 SCALE NTS B RETAINING WALL 1
S5-101 SCALE NTS 10mm Ø HOR. BARS
@ 300mm O.C.
BASE OF STEM
200
200
200
FINISHED GRADE LINE
10mm Ø TEMP. BARS
10mm Ø TEMP. BARS
FLR. LEVEL LINE @ 450mm O.C. @ 200mm O.C.
12MMØ BARS SPACED
12MMØ BARS SPACED 10mm Ø STEM HORIZONTAL
12mm Ø STEM INNER
@ 200 MM O.C. BARS @ 300mm O.C.
@ 200MM O.C. OUTER FACE BARS @ 300mm O.C.
4560.00
10mm Ø STEM HORIZONTAL
2000.00
12MMØ TRANSVERSE BARS O.C. TO THE TOP OF STEM
12mm Ø FOOTING BARS
SPACED @ 150 MM O.C. FLOOR LEVEL 12mm Ø STEM INNER
@ 150mm O.C.
BARS @ 150mm O.C.
LOGO Engineer's Information Civil Engineer REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: STRUCTURAL
: RHEINA RETANA DETAILS
DRAWN SHEET NO. OF
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA
AS SHOWN ABOVE
DATE : 21.11.01
TWO STOREY RESIDENCE
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
S5-101
ARE THE PROPERTY AND DOCUMENTS OF
ENGR. REX A. RETANA "ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
CEBU, CITY RHEA MAE RETANA PURPOSE OF
CHECKED : --
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
PRC Reg. No.: DATE: TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND OWNER PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: DATE: EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
M4 OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
ISSUANCE RECOMMENDED
HEAD ARCHITECTURAL
SECTION
GENSETSK OFFICE
K
AREA: 1.90 SQM
BUILDING OFFICIAL
AREA: 7.15 SQM
TO PB1 C3
QUARTERS N9 R2
SJ F2 AREA: 6.05 SQM
LAUNDRY T&B SR2
J
AREA: 1.35 SQM I1 AREA:
WINE CELLAR
4.45 SQM
AREA: 5.15 SQM
SI1 N3 BALCONY
T&B LANAI N8 R1
G SG F2 F1 F1 SI2 AREA: 4.20 SQM
AREA: 16.75 SQM
STO SN89 SR1
C4 AREA:
2.05 SQM SF123 H SH 12 T&B N4 N2 SO123
C5 C5 C5 N7 N6 O3
SN7 BEDROOM 1
SC45 MASTER'S BEDROOM AREA: 14.80 SQM
W.I.C.
E2 AREA: N1 O1
C4 DINING AREA C1 D2 SE12 5.50 SQM AREA: 15.30SQM
OVEN
DIRTY N5 O2
AREA: 18.72 SQM KITCHEN N7 SN12
C2 AREA: 16.65 SQM KITCHEN SN456
AREA:
SN13
C3 D1 E1 12.50 N4 SN456 N2
SQM
C4 C1 D2 SA234 SO12
SC123 A4 SL1 O1 SO4
SD12 L1 HALLWAY L1
C1 A4 T&B
E2 AREA: 11.75 SQM
C1 REF
SD3 D3 STO. O4
TO PB1 C2 M3 AREA:
A3 A3 L1 Q1 4.10 SQM
B2 B2 SQ1
SP4
A2 BEDROOM 2
LIVING SB123 B1 B1 B1 AREA: 11.50 SQM
P4
AREA SM12 SP123
AREA: 27.10 SQM SM34 A3 A3 L1
PARKING SP5
P2 P1 P2
AREA SL23 T&B
SA12 B1 AREA: 48.15 SQM B1 BALCONY P5
SA34 AREA: 8.05 SQM L1 P3 P3 AREA:
3.10 SQM
M2 SP12
B3 L2
TO PB1 C1 PORCH L3 TO PB1 C5
A1 AREA: 8.05 SQM A1 B1 B1 B1
M1
TO PB1 C4
PREPARED BY: PROFESSIONAL ELECTRICAL ENGINEER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : SJCA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED, LIGHTING OUTLET LAYOUT
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE SWITCH LAYOUT DATE : 21.11.17
SHERWIN JUN C. ABARQUEZ
ARE THE PROPERTY AND DOCUMENTS OF
"ARCHITECTS AND ASSOCIATES" WHETHER THE
A PROPOSED REXTER RETANA LEGEND/SYMBOL
ELECTRICAL ENGINEER
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
TO DUPLICATE OR MAKE COPIES OF SAID TWO STOREY RESIDENCE RHEA MAE RETANA PURPOSE OF
CHECKED : -- E-1
PRC Reg. No.: 0068978 DATE: 12/19/2021 PRC Reg. No.: DATE: DOCUMENTS FOR USE IN THE REPETITION OF AND
CONSOLACION, CEBU OWNER ISSUANCE:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
EXECUTED PARTLY OR IN WHOLE. PERMIT PROJECT NO.:
PTR No.: 6048114 DATE: 12/31/2021 PTR No.: DATE:
TIN.: 469-601-580-000 TIN.: LOCATION: BRGY. SAC-SAC, CONSOLACION, CEBU PHILIPPINES LOCATION: CONSOLACION, CEBU PHILIPPINES REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
3 CEBU CITY
ISSUANCE RECOMMENDED
HEAD ARCHITECTURAL
SECTION
F3
F3
2 F3
F3 BUILDING OFFICIAL
LIGHTING LAYOUT LEGEND
INE
SETBACK L
SYMBOL DESCRIPTION SYMBOL DESCRIPTION
3
BUILDING LINE
2
1
UP T2 M KILOWATT HOUR METER W.P. WEATHERPROOF OUTLET
S3
SS123
ST123
SAFETY SWITCH BOX
S1 ONE-GANG SWITCH
S3
CIRCUIT BREAKER S2 TWO-GANG SWITCH
S3
SPLIT-TYPE AIRCON UNIT G
T1 GENSET
3HP
UP
1 S2
6 5 4
3 MANUAL TRANSFER SWITCH
S2 S2 2
FLOOR STANDING AIRCON UNIT
1 3HP
UP
T1
S1 S1 S1 S1
6
TO PB1 C3 4
5
PREPARED BY PROFESSIONAL ELECTRICAL ENGINEER REPUBLIC ACT 9266 SEAL PRO ECT TITLE APPROVED BY SHEET CONTENTS DRAWN S CA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED, LIGHTING OUTLET LAYOUT
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE SWITCH LAYOUT DATE 21.11.1
SHERWIN UN C. ABAR UE
ARE THE PROPERTY AND DOCUMENTS OF
ARCHITECTS AND ASSOCIATES WHETHER THE
A PROPOSED REXTER RETANA LEGEND/SYMBOL
ELECTRICAL ENGINEER
OB ECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
TO DUPLICATE OR MAKE COPIES OF SAID TWO STOREY RESIDENCE RHEA MAE RETANA PURPOSE OF
CHECKED -- E-1
PRC R . N . 00689 8 DATE 12/19/2021 PRC R .N . DATE DOCUMENTS FOR USE IN THE REPETITION OF AND
CONSOLACION, CEBU OWNER ISSUANCE
FOR OTHER PRO ECTS OR BUILDINGS, WHETHER
EXECUTED PARTLY OR IN WHOLE. PERMIT PRO ECT NO.
PTR N . 6048114 DATE 12/31/2021 PTR N . DATE
TIN. 469-601-580-000 TIN. LOCATION BRGY. SAC-SAC, CONSOLACION, CEBU PHILIPPINES LOCATION CONSOLACION, CEBU PHILIPPINES REVISION 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
ISSUANCE RECOMMENDED
HEAD ARCHITECTURAL DATE
GENSET SECTION
OFFICE
QUARTERS AREA: 7.15 SQM
BUILDING OFFICIAL DATE
W.P.
AREA: 1.35 SQM
T&B
T&B LANAI AREA:
W.P. AREA: 16.75 SQM
STO T&B 4.45 SQM WINE CELLAR
AREA:
2.05 SQM
BALCONY AREA: 5.15 SQM
AREA: 4.20 SQM
TO PB1 C6
TO PB1 C8
REF
HALLWAY
W.P. AREA: 11.75 SQM T&B
W.P.
STO. AREA:
LIVING 00SQM
4.10 SQM
AREA
AREA: 27.10 SQM
W.P.
PARKING
AREA BEDROOM 2
AREA: 48.15 SQM AREA: 11.50 SQM
T&B
PORCH BALCONY
AREA: 8.05 SQM AREA:
AREA: 8.05 SQM TO PB1 C7 3.10 SQM
PREPARED BY: PROFESSIONAL ELECTRICAL ENGINEER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : SJCA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE
POWER LAYOUT
DATE : 21.11.17
SHERWIN JUN C. ABARQUEZ
ARE THE PROPERTY AND DOCUMENTS OF
"ARCHITECTS AND ASSOCIATES" WHETHER THE
A PROPOSED REXTER RETANA
ELECTRICAL ENGINEER
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
TO DUPLICATE OR MAKE COPIES OF SAID TWO STOREY RESIDENCE RHEA MAE RETANA PURPOSE OF
CHECKED : -- E-2
PRC Reg. No.: 0068978 DATE: 12/19/2021 PRC Reg. No.: DATE: DOCUMENTS FOR USE IN THE REPETITION OF AND
CONSOLACION, CEBU OWNER ISSUANCE:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
EXECUTED PARTLY OR IN WHOLE. PERMIT PROJECT NO.:
PTR No.: 6048114 DATE: 12/31/2021 PTR No.: DATE:
TIN.: 469-601-580-000 TIN.: LOCATION: BRGY. SAC-SAC, CONSOLACION, CEBU PHILIPPINES LOCATION: CONSOLACION, CEBU PHILIPPINES REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
ISSUANCE RECOMMENDED
HEAD ARCHITECTURAL
SECTION
GENSET
AREA: 1.90 SQM OFFICE BUILDING OFFICIAL
TO PB1 C17
1.5HP
HALLWAY
5HP
AREA: 11.75 SQM T&B
TO PB2 C13
STO. AREA:
4.10 SQM
LIVING 00SQM
AREA
AREA: 27.10 SQM
1.5HP
PARKING TO PB1 C15
AREA
AREA: 48.15 SQM BEDROOM 2
AREA: 11.50 SQM
T&B
PORCH BALCONY
AREA:
AREA: 8.05 SQM AREA: 8.05 SQM
3.10 SQM
PREPARED BY: PROFESSIONAL ELECTRICAL ENGINEER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : SJCA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE
AIRCON OUTLET LAYOUT
DATE : 21.11.17
SHERWIN JUN C. ABARQUEZ
ARE THE PROPERTY AND DOCUMENTS OF
"ARCHITECTS AND ASSOCIATES" WHETHER THE
A PROPOSED REXTER RETANA
ELECTRICAL ENGINEER
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
TO DUPLICATE OR MAKE COPIES OF SAID TWO STOREY RESIDENCE RHEA MAE RETANA PURPOSE OF
CHECKED : -- E-3
PRC Reg. No.: 0068978 DATE: 12/19/2021 PRC Reg. No.: DATE: DOCUMENTS FOR USE IN THE REPETITION OF AND
CONSOLACION, CEBU OWNER ISSUANCE:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
EXECUTED PARTLY OR IN WHOLE. PERMIT PROJECT NO.:
PTR No.: 6048114 DATE: 12/31/2021 PTR No.: DATE:
TIN.: 469-601-580-000 TIN.: LOCATION: BRGY. SAC-SAC, CONSOLACION, CEBU PHILIPPINES LOCATION: CONSOLACION, CEBU PHILIPPINES REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
ISSUANCE RECOMMENDED
PB1
GENSET ROOM BUILDING OFFICIAL
10 RANGE 1500 6.52 230 20 2 2X3.5 sq.mm. THHN in 20mmø PVC CONV. OUTLET SHALL BE INSTALLED 0.3048m (1')
15 2,000 8.69 230 30 2 ABOVE FINISH FLOOR LINE EXCEPT FOR T&B AND KITCHEN
BEDROOM 2 A.C.U. (SPLIT-TYPE) 1.5HP 2X5.5 sq.mm. THHN in 25mmø PVC WHICH SHALL BE 1.37m & 1.07m RESPECTIVELY.
16 MASTER'S BEDROOM A.C.U. (SPLIT-TYPE) 1.5HP 2,000 8.69 230 30 2 2X5.5 sq.mm. THHN in 25mmø PVC
USE BOLT-ON INDUSTRIAL TYPE MOLDED CASE
17 BEDROOM 1 A.C.U. (SPLIT-TYPE) 1.5HP 2,000 8.69 230 30 2 2X5.5 sq.mm. THHN in 25mmø PVC CIRCUIT BREAKER.
TOTAL 19,455 84.59 230 250 2 2X38 sq.mm. THHN in 65mmø PVC
ALL ELECTRICAL WORKS HEREIN SHALL BE DONE
UNDER THE DIRECT SUPERVISION OF A DULY LICENSED
IT = ( 84.59 +0.25(8.69)) GENSET KVA = 86.76A X 230V GENSET SIZE: = 86.76A X 230V ELECTRICAL ENGINEER.
PB2
2X50sq.mm THHN
CB RATING 2X38sq.mm THHN PB2
CKT. LOADS switches WATTS AMPERE VOLTS
AT POLE
CONDUCTOR SIZE PB1
NO. S1. S2 S3
11 MICROWAVE 1500 6.52 230 20 2 2X3.5 sq.mm. THHN in 20mmø PVC
CKT 150A,2P CKT
1500 2X5.5 sq.mm. THHN in 20mmø PVC
CKT 125A,2P CKT
12 OVEN 6.52 230 20 2 # 2P 2P #
LIVING ROOM A.C.U. (FLOOR-TYPE) 5HP 6,000 26.09 230 40 2 2X8.0 sq.mm. THHN in 32mmø PVC
# 2P 2P # 12 20A 20A
11
13 2 15A 15A
1 2P 2P
2P 2P
14 DINING ROOM A.C.U. (SPLIT-TYPE) 3HP 3,500 15.22 230 30 2 2X5.5 sq.mm. THHN in 25mmø PVC 13 40A 30A
14
3 15A 15A
4 2P 2P
18 WINE CELLAR A.C.U. (SPLIT-TYPE) 1.5HP 230 30 2 2X5.5 sq.mm. THHN in 25mmø PVC 2P 2P
2,000 8.69 19 30A 30A
18
19 OFFICE A.C.U. (SPLIT-TYPE) 1.5HP 2,000 8.69 230 30 2 2X5.5 sq.mm. THHN in 25mmø PVC 6 20A 15A
5 2P 2P
2P 2P
SPARE 20 20A 20A
21
20 1000 4.34 230 20 2 2X3.5 sq.mm. THHN in 20mmø PVC 7 20A 20A
8 2P
2P 2P
21 SPARE 1000 4.34 230 20 2 2X3.5 sq.mm. THHN in 20mmø PVC 20A
22
SPARE
10 20A 20A
9
22 1000 4.34 230 20 2 2X3.5 sq.mm. THHN in 20mmø PVC 2P 2P
TOTAL 19,500 84.78 230 150 2 2X50 sq.mm. THHN in 80mmø PVC 15 30A 30A
16
2P
PREPARED BY: PROFESSIONAL ELECTRICAL ENGINEER REPUBLIC ACT 9266 SEAL PRO ECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : S CA SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE
SCHEDULE OF LOADS
AND COMPUTATION DATE : 21.11.17
SHERWIN UN C. ABARQUEZ
ARE THE PROPERTY AND DOCUMENTS OF
ARCHITECTS AND ASSOCIATES WHETHER THE
A PROPOSED REXTER RETANA SINGLE LINE DIAGRAM
ELECTRICAL ENGINEER
OB ECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
TO DUPLICATE OR MAKE COPIES OF SAID TWO STOREY RESIDENCE RHEA MAE RETANA PURPOSE OF
CHECKED : -- E-4
PRC Re . N .: 0068978 DATE: 12/19/2021 PRC Re . N .: DATE: DOCUMENTS FOR USE IN THE REPETITION OF AND
CONSOLACION, CEBU OWNER ISSUANCE:
FOR OTHER PRO ECTS OR BUILDINGS, WHETHER
EXECUTED PARTLY OR IN WHOLE. PERMIT PRO ECT NO.:
PTR N .: 6048114 DATE: 12/31/2021 PTR N .: DATE:
TIN.: 469-601-580-000 TIN.: LOCATION: BRGY. SAC-SAC, CONSOLACION, CEBU PHILIPPINES LOCATION: CONSOLACION, CEBU PHILIPPINES REVISION : 001
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
GENERAL PLUMBING NOTES : HIGHWAYS
2. KEEP AWAY, AT A SUFFICIENT DISTANCE BUT NOT LESS 1/2 INCH (12.5 mm.) 1/8 BEND
ALL SERVICE PIPES, VALVES, AND FITTINGS FROM SURFACES AND LOCATIONS
WHICH MAY REQUIRED FINISH COATS OR COVERING. 100MMØ PVC
PVC WYE 100MMØ PVC P-TRAP
BEND PVC DRAIN PIPE
3. EXTEND THE PIPING TO ALL FIXTURES, OUTLETS, AND EQUIPMENTS FROM REQUIRED
GATE VALVES INSTALLED IN EACH BRANCH NEAR RISERS.
WALL CLEAN-OUT DETAIL FLOOR CLEAN-OUT DETAIL FLOOR DRAIN DETAIL FLOOR CLEAN-OUT DETAIL
VARIES
BY MOLDEX, EMERALD BRAND OR APPROVED EQUAL.
100
DOWN SPOUT
SHALL BE 75mmØ POLYVINYL CHLORIDE (PVC) PIPE SERIES 1000 HIGH IMPACT 100mm. THK CHB WALL
VENT THRU WALL DETAIL 10mmØ VER & HOR
300
BY MOLDEX , EMERALD BRAND OR APPROVED EQUAL.
BARS @ 200mm. O.C.
LEGEND: CLEAN OUT
WATER SUPPLY LINE CO 150mmØ DRAIN PIPE
125 100
100
MASTER PLUMBER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : JPB SHEET NO.
GENERAL NOTES
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA SANITARY / DRAINAGE DATE : 11/08/21
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
KEZIA RECCA R. VILLAMAYOR ARE THE PROPERTY AND DOCUMENTS OF CONNECTION DETAILS
"ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CEBU, CITY OWNER
GENERAL NOTES
PURPOSE OF
CHECKED : P1-301
PRC Reg. No.: 0013362 DATE: 10/19/2022 TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: 5695011 DATE: 04/08/2021 EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: 764-747-864 LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION :
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
A B C D E F HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
ISSUANCE RECOMMENDED
8440
HEAD ARCHITECTURAL DATE
3
1355 3995 655 2435 SECTION
100.50 2
1200
650 1278
7
1200
100.00
ROOF C 6
2000 1000
3100
99.50
INLET
600
5
99.00 MANHOLE MANHOLE 500
60
1350
100
LOT 22 220 220
BLOCK 9
4950
15378
98.50 LOT 20 400
ROOF A BLOCK 9 MANHOLE OUTLET 50 50
4
98.00
1400
WITH 12mm REBARS
97.50
SPACED @ 150 mm O.C.
BOTHWAYS
3450
2425
97.00
ROOF B 100 mm THK. CONCRETE SLAB,
500 500
C.O. C.O. C.O.
2 WITH 12 mm REBARS
1500
SPACED AT 150mm O.C.
300
96.50
BOTHWAYS
1
1200 12mm dia. VERTICAL BARS 150 mm CHB WITH PLASTER
96.00 1 SPACED @ 400mm
1200 12mm dia. HORIZONTAL BARS
7 SPACED @ 400 mm
DIGESTIVE LEACHING
6
CHAMBER WELL
4 150 mm CHB WITH PLASTER
5
SID
EWA 100 mm THK. CONCRETE SLAB,
LK
MANHOLE
WITH 12 mm REBARS
SPACED AT 150mm O.C.
BOTHWAYS
ROAD RIGHT OF WAY
MASTER PLUMBER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : JPB SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA ROOF DRAINAGE LAYOUT
SEPTIC VAULT DETAILS DATE : 11/08/21
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
KEZIA RECCA R. VILLAMAYOR ARE THE PROPERTY AND DOCUMENTS OF
"ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CEBU, CITY OWNER
PURPOSE OF
CHECKED : P2-302
PRC Reg. No.: 0013362 DATE: 10/19/2022 TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: 5695011 DATE: 04/08/2021 EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: 764-747-864 LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION :
REPUBLIC OF THE PHILLIPINES
A B C D E F DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
1505 4500 2440 CEBU CITY
ISSUANCE RECOMMENDED
1000 3770 730 3
A B C D E F HEAD ARCHITECTURAL DATE
505 3550 SECTION
CB
450
100.50 2 1000 3770 730 BUILDING OFFICIAL DATE
505
7
1175
LINE GENSET
CK
SETBA
AREA: 1.90 SQM
1375
LINE
ROOF 8
450
100.00
6
2250
QUARTERS
1400
LAUNDRY
AREA: ROOF LINE
1.35 SQM
AREA: 6.05 SQM
7
3250
2950
1375
LANAI
2875
99.50 T&B
1850
1350
AREA:
AREA: AREA:
CB
OFFICE 6
1100
2.05 SQM
1.45 SQM 1.95 SQM AREA: 7.15 SQM
5
500
3100
2950
99.00 T&B
2000
1900
AREA:
1500
4.45 SQM BALCONY WINE CELLAR
3650
3500
3875
OVEN AREA: 4.20 SQM AREA: 5.15 SQM
3000
DINING AREA
5
CB
15125
1150
AREA: 16.65 SQM KITCHEN
RANGE AREA:
2600
13600
12.50 SQM
500
4 MASTER'S
3875
3875
1375
BEDROOM
1150
98.00 STO W.I.C.
2725
REF CB
AREA: 15.30SQM BEDROOM 1
15125
AREA:
3 5.50 SQM AREA: 14.80 SQM
2550
1275
LIVING
13600
AREA
4
5350
1150
1150
HALLWAY
1325
3825
AREA: 11.75 SQM
T&B
1250
2475
3
5325
CB AREA:
STO
1150
4.10 SQM
97.00
1975
PARKING
1050
AREA: 00SQM
AREA
2 OPEN
3825
AREA: 48.15 SQM
3975
TO BELOW
1800
1500
1500
2000
CB
AREA: 8.05 SQM
1
4000
AREA: 11.50 SQM
2
1500
T&B
2200
1500
AREA:
1
1500
BALCONY
3610
3.10 SQM
AREA: 8.05 SQM
900
ROOF LINE 1
1960
ROOF LINE
6
4
5
MANHOLE
SIDEWALK
2450 1900 2500 1945
ROAD RIGHT OF WAY
1000 4350 1300 4445
2000 700 1500 6000 2183
11095
5500 5595 2587
2000 11095
MASTER PLUMBER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : JPB SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA GR. FLR DRAINAGE LAYOUT
2ND. FLR DRAINAGE DATE : 11/08/21
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
KEZIA RECCA R. VILLAMAYOR ARE THE PROPERTY AND DOCUMENTS OF
LAYOUT
"ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CEBU, CITY OWNER
PURPOSE OF
CHECKED : P3-303
PRC Reg. No.: 0013362 DATE: 10/19/2022 TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: 5695011 DATE: 04/08/2021 EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: 764-747-864 LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION :
8 REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
0 7 HIGHWAYS
45
5 6 OFFICE OF THE BUILDING OFFICIAL
137 117
5 CEBU CITY
3 ISSUANCE RECOMMENDED
F 25
0
2 29
50 5 HEAD ARCHITECTURAL DATE
CB
E 0
44 SECTION
0
2 135
D 0 75
73 4
5 2
38 650 151
00 T
SE0 SQM
3
3
C 45 70 CB
N .9
GEREA: 1 S CB
BUILDING OFFICIAL DATE
B 37 550 ER QM
0
115 375
R:T6.05 S
A
3
A 5 NE
A
U A
Q ARE B
1
150 00 05 LI T&AREAS: QM
TY EN 25
10 5 CK O 1.9
5
IR
D ITCH
38 2
B A STAREAS: QM A: M
K A1R2.E50 SQ
25
SE
T 1.4
5
OV
E N CB
53 1
I QM N M 0
NA.75 S HE 5 SQ ANGE ST
O 150
Y LAEA: 16 C 6.6
KIRTEA: 1
R
N DR: AR A 36
10
2 L AUARE SQM
A
5 CB
1.3 B
T&REAS: QM A
RSEQM
F
A 05 RE
2. A
G 2 K ING M
NINA: 1
8.7
A R REA8.15 SQ
DI
0
140 AR
E P A A: 4 4
E
0 50 AR
185 32
0 CB
V I NGA SQM O LE
50 LI ARE: 27.10 150
0
NH
00 AR
EA MA
30 3500 3
218 87
0 60
90 19 5
LK AY 25
C.H05 SQM W 8
0
50 A F
R
EW HT O
00 O :8
136 PREA
25
50
CB A S I D
R IG 0 7
AD 6000 5
45
53
50 0
125
6
R O 9
6
55
5
0 137 75
105 28
00 7 0
F 50 5
150 5 29 0
1
109 40
15
0 1 E 24 190 00
70
00 0 D 15
20 550 73
0 E 0 38
75 5 2
4
N 0 151
00 LI 26
3
C 45 70 F
B 37 OO IC.E15 SQM
0 5
R 115 127
F
0 0 A 5 F :7
O REA LA
R 75
24 132
5
20 150 00 05 A L
E SQ
C 5.15
M
25
2
0
10 5 NE 115 38
W I REA:
A
O
1
MSQM 40
0 0 1800 1
O 0 0
NYSQM DRA: 14.8 150
INE O E 00
C .20
L A: 4 B RE B 22
FL BA
A T&AREAS: QM
A GROUND FLOOR DRAINAGE ISOMETRIC RO O
B
T&REA:SQM
AR E
E R'SOM M 4.1
0
MASTER PLUMBER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : JPB SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA GR. FLR DRAINAGE ISOMETRIC
2ND. FLR DRAINAGE DATE : 11/08/21
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
KEZIA RECCA R. VILLAMAYOR ARE THE PROPERTY AND DOCUMENTS OF
ISOMETRIC
"ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CEBU, CITY OWNER
PURPOSE OF
CHECKED : P4-304
PRC Reg. No.: 0013362 DATE: 10/19/2022 TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: 5695011 DATE: 04/08/2021 EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: 764-747-864 LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION :
REPUBLIC OF THE PHILLIPINES
A B C D E F DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
1505 4500 2440 ISSUANCE RECOMMENDED
1000 3770 730 3
A B C D E F HEAD ARCHITECTURAL DATE
505 3550 SECTION
450
100.50 2 BUILDING OFFICIAL DATE
505
7
1175
LINE GENSET
AC K
SETB
AREA: 1.90 SQM
1375
LINE
ROOF 8
450
100.00
6
2250
QUARTERS
1400
LAUNDRY
ROOF LINE
AREA:
1.35 SQM
AREA: 6.05 SQM
7
3250
2950
1375
2875
99.50 LANAI
T&B
1850
1350
AREA:
OFFICE 6
1100
2.05 SQM AREA: AREA:
1.45 SQM 1.95 SQM AREA: 7.15 SQM
5
500
3100
2950
99.00 T&B
2000
1900
AREA:
1500
4.45 SQM BALCONY WINE CELLAR
3650
3500
3875
OVEN AREA: 4.20 SQM AREA: 5.15 SQM
3000
15125
KITCHEN
1150
AREA: 16.65 SQM
2600
RANGE
13600
AREA:
12.50 SQM MASTER'S
500
3875
3875
1375
W.I.C. BEDROOM
1150
98.00 STO
2725
REF
AREA: 15.30SQM BEDROOM 1
15125
AREA:
3 5.50 SQM AREA: 14.80 SQM
2550
1275
LIVING
13600
AREA
4
5350
1150
1150
HALLWAY
1325
3825
AREA: 11.75 SQM
T&B
2475
1250
5325
AREA:
STO
1150
4.10 SQM
1975
97.00 PARKING AREA: 00SQM
1050
AREA
2 OPEN
3825
3975
AREA: 48.15 SQM
TO BELOW
1800
1500
1500
2000
AREA: 8.05 SQM
1
4000
AREA: 11.50 SQM
2
1500
T&B
2200
1500
AREA:
1500
1 BALCONY 3.10 SQM
3610
AREA: 8.05 SQM
900
ROOF LINE 1
1960
ROOF LINE
6
4
5
MANHOLE
SIDEWALK
2450 1900 2500 1945
ROAD RIGHT OF WAY
1000 4350 1300 4445
2000 700 1500 6000 2183
11095
5500 5595 2587
2000 11095 B SECOND FLOOR SANITARY LAYOUT
A GROUND FLOOR SANITARY LAYOUT P5-305 SCALE 1 : 75 M
P5-305 SCALE 1 : 75 M
MASTER PLUMBER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : JPB SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA GR. FLR SANITARY LAYOUT
2ND. FLR SANITARY DATE : 11/08/21
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
KEZIA RECCA R. VILLAMAYOR ARE THE PROPERTY AND DOCUMENTS OF
LAYOUT
"ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CEBU, CITY OWNER
PURPOSE OF
CHECKED : P5-305
PRC Reg. No.: 0013362 DATE: 10/19/2022 TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: 5695011 DATE: 04/08/2021 EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: 764-747-864 LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION :
REPUBLIC OF THE PHILLIPINES
8 DEPARTMENT OF PUBLIC WORKS AND
HIGHWAYS
0 7 OFFICE OF THE BUILDING OFFICIAL
45
5 5 6 CEBU CITY
ISSUANCE RECOMMENDED
137 117
3
F 25
0
2 29
50 5
HEAD ARCHITECTURAL
SECTION
DATE
E 4 0
24
0
135
D 0
73 25 3875 50
5 1 4
00 T 1 36 BUILDING OFFICIAL DATE
C 45 70 SE0 SQM
N .9 3
37 50 GEREA: 1 RSSQM
B
0
A E
T 5 115 375
A 35 AR: 6.0
NE
1
5
150 00 05 I QUAREA B
T&AREAS: QM
L TY EN 25
10 5 CK O 1.9
5
DIRITCH : 38 2
BA STAREAS: QM K AREA0 SQM 25
SE
T 1.4
5
OV
EN
12.
5
53 1
AI N M
M
0
N 75 SQ
H6E.65 SQRANGE ST
O 150
Y LAA: 16. C
KIRTEA: 1
DR:
E
AR 10
N A 36
2 L AUAREASQM
.35
1 B
T&ARE5A:SQM EAM RE
F
R
2.0 A SQ
G18.72 K ING M
IN A R REA8.15 SQ
DINARE
0 A :
140 P A A: 4 4
E
0 50 AR
185 32
0
I V INGEA 0 SQM O LE
NH
50 L AR : 27.1 0
150
00 AR
EA MA
30 3500 3 8
218 87
0 0
90 196 5
LK AY 25
H W 7
0
QM
R:C8.05 S
50
00 O
P A E WA T OF 45
0
136 25
50
AR
E
SID RIGH 6
AD 6000 5
5
50 6 137 75
53 0
125 R O 9
55
28
0
105 F 50
29 0 5
7 E 40
00 0 24 190 00
15 1 150 110
95 D 15
0
70 73
0 E 00 38
75 5 2
4
00 0 N 151
20 550 00 LI 26
3
C 45 70 F
B 37 OO IC.E15 SQM
0 5
R 115 127
F
A 5 OF A: 7 LA
R 75
24 132
5
150 00 05
E
AR L M
00 5 CE 15 SQ 0 25
2
20 10 I NEREA: 5
. 115 38
W A
O
1
MSQM 40
0 0 1800 1
RO .80
0
NYSQM D : 14 150
INE O BEAREA
00
L LAC 20 B 22
OF BA E
:4
.
T&AREAS: QM
A GROUND FLOOR SANITARY ISOMETRIC RO
&B A:
T ARE5 SQM
A R
ER'SOM M
ST RO5.30SQ O QM
4.1
0
MASTER PLUMBER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : JPB SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA GR. FLR SANITARY ISOMETRIC
2ND. FLR SANITARY DATE : 11/08/21
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
KEZIA RECCA-----
R. VILLAMAYOR ARE THE PROPERTY AND DOCUMENTS OF
ISOMETRIC
"ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CEBU, CITY OWNER
PURPOSE OF
CHECKED : P6-306
PRC Reg. No.: 0013362 DATE: 10/19/2022 TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: 5695011 DATE: 04/08/2021 EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: 764-747-864 LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION :
REPUBLIC OF THE PHILLIPINES
DEPARTMENT OF PUBLIC WORKS AND
A B C D E F HIGHWAYS
OFFICE OF THE BUILDING OFFICIAL
CEBU CITY
1505 4500 2440 ISSUANCE RECOMMENDED
450
100.50 2
505
7
1175
E GENSET
E TB ACK LIN AREA: 1.90 SQM
1375
S LINE
ROOF 8
450
100.00
6
2250
QUARTERS
1400
LAUNDRY
ROOF LINE
AREA:
1.35 SQM
AREA: 6.05 SQM
7
3250
2950
1375
2875
99.50 LANAI
T&B
1850
1350
AREA:
OFFICE 6
1100
2.05 SQM AREA: AREA:
1.45 SQM 1.95 SQM AREA: 7.15 SQM
5
500
3100
2950
99.00 T&B
2000
1900
AREA:
1500
4.45 SQM BALCONY WINE CELLAR
3650
3500
3875
OVEN AREA: 4.20 SQM AREA: 5.15 SQM
3000
DINING AREA
98.50 AREA: 18.72 SQM KITCHEN DIRTY 5
15125
1150
AREA: 16.65 SQM KITCHEN
2600
RANGE AREA:
13600
12.50 SQM
MASTER'S
500
3875
3875
1375
W.I.C. BEDROOM
1150
98.00 STO
2725
REF AREA: 15.30SQM BEDROOM 1
15125
AREA:
3 5.50 SQM AREA: 14.80 SQM
2550
1275
LIVING
13600
AREA
4
5350
1150
1150
HALLWAY
1325
3825
AREA: 11.75 SQM
T&B
2475
3
1250
5325
AREA:
STO
1150
4.10 SQM
1975
97.00 PARKING AREA: 00SQM
1050
AREA
2 OPEN
3825
3975
AREA: 48.15 SQM TO BELOW
1800
1500
1500
2000
AREA: 8.05 SQM
1
4000
AREA: 11.50 SQM
2
1500
T&B
2200
1500
AREA:
1500
1 BALCONY 3.10 SQM
3610
AREA: 8.05 SQM
900
ROOF LINE 1
1960
ROOF LINE
6
4
5
M
MANHOLE
SIDEWALK
2450 1900 2500 1945
ROAD RIGHT OF WAY 1000 4350 1300 4445
2000 700 1500 6000 2183
11095
5500 5595 2587
A
2000
GROUND FLOOR HOT AND COLD WATER LINE LAYOUT
11095
B SECOND FLOOR HOT AND COLD WATER LINE LAYOUT
P7-307 SCALE 1 : 75 M
P7-307 SCALE 1 : 75 M
MASTER PLUMBER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS:
GR. FLR HOT & COLD
DRAWN : JPB SHEET NO.
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA WATER LAYOUT
DATE : 11/08/21
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
KEZIA RECCA R. VILLAMAYOR ARE THE PROPERTY AND DOCUMENTS OF 2ND. FLR HOT & COLD
"ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CEBU, CITY OWNER
WATER LAYOUT
PURPOSE OF
CHECKED : P7-307
PRC Reg. No.: 0013362 DATE: 10/19/2022 TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: 5695011 DATE: 04/08/2021 EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: 764-747-864 LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION :
REPUBLIC OF THE PHILLIPINES
8 DEPARTMENT OF PUBLIC WORKS AND
0 7 HIGHWAYS
45 OFFICE OF THE BUILDING OFFICIAL
5 5 6 CEBU CITY
137 117 ISSUANCE RECOMMENDED
3
F 25
0
2 29
50 5 HEAD ARCHITECTURAL DATE
40
SECTION
E 24 135
0
D 0 5 875 0
73 15 1 2 3 65 4
00 T
SE0 SQM
3
3
C 45 70 N .9
GEREA: 1
BUILDING OFFICIAL DATE
B 37 550 E Q RS M 0
115 375
R:T6.05 S
A
3
A 5 NE
A
U A
Q ARE B
1
150 00 05 LI T&AREAS: QM
TY EN 25
10 5 CK O 1.9
5
I R
D ITCH
38 2
B A STAREAS: QM A: M
K A1R2.E50 SQ
25
S ET 1.4
5
OV
EN 53 1
A.I75 SQM EN
0
M 150
N H SQ ANGE O
A 16 C 6 6 5 ST
L EA: KITEA: 1
. R
D RY AR AR
10
2 UN EA: QM 36
LA AR 5 S
1.3 B
T&ARE5A:SQM A
RSEQM
F
RE
2.0 A
G 2 K ING M M
N 18.
7
R REA8.15 SQ
140
0
DINI EA:
AR
A
P A A: 4
E 4
0 0 AR
25 185
NGA SQM E
3
I L
V HO
005 LI ARE: 27.10 0
150 N
00 AR
EA MA
30 3500 3
218 87
0
196 900 5
K AY 25 8
C.H05 SQM AL OF W
0
50
R W
00
136 50
25
PREA
A
O :8 E
SID RIGH
T 0 7
45
50 6 AD 6000 5 6
53 0
125 R O 9
5
137 75
0 55 28
105
F 50 5
7 0
29 0
40
00 15 1 150 110
95 E 24 190 00
0
70 D 15
00 0 0 5
20 550 73 4
5
NE
7 2
00 38 151
00 I 26
C 45 70 F
L 3
B 37 OO E QM 0 5
127
FI:C7.15 S
R 115
A 5
F
O A L AR 75
24 132
5
150 00 05
E
00 AR L QM
CE5.15 S
20 10 5 E 115
0
38
25
2
W IN EA:
AR
O
1
MSQM 40
0 0 1800 1
O 0 0
E O NYSQM DR: 14.8 00 150
LIN L 4 C .20 BEAREA B 22
OF BA EA: T&AREAS: QM
A GROUND FLOOR HOT AND COLD WATER LINE ISOMETRIC RO
&B A:
AR
E R'SOM M 4.1
0
MASTER PLUMBER REPUBLIC ACT 9266 SEAL PROJECT TITLE APPROVED BY: SHEET CONTENTS: DRAWN : JPB SHEET NO.
GR. FLR HOT & COLD WATER LINE
DRAWINGS AND SPECIFICATIONS DULY SIGNED,
STAMPED OR SEALED AS INSTRUMENTS OF SERVICE A PROPOSED REXTER RETANA ISOMETRIC DATE : 11/08/21
TWO STOREY RESIDENCE RHEA MAE RETANA
ARE THE PROPERTY AND DOCUMENTS OF SERVICE
KEZIA RECCA R. VILLAMAYOR ARE THE PROPERTY AND DOCUMENTS OF 2ND. FLR HOT & COLD WATER
"ARCHITECTS AND ASSOCIATES" WHETHER THE
OBJECT FOR WHICH THEY ARE MADE IS EXECUTED OR
NOT, IT SHALL BE UNLAWFUL FOR ANY PERSON,
WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT
CEBU, CITY OWNER
LINE ISOMETRIC
PURPOSE OF
CHECKED : P8-308
PRC Reg. No.: 0013362 DATE: 10/19/2022 TO DUPLICATE OR MAKE COPIES OF SAID ISSUANCE:
DOCUMENTS FOR USE IN THE REPETITION OF AND
PERMIT PROJECT NO.:
FOR OTHER PROJECTS OR BUILDINGS, WHETHER
PTR No.: 5695011 DATE: 04/08/2021 EXECUTED PARTLY OR IN WHOLE.
VISTA VERDE SUBDIVISION, CONSOLACION CEBU,
TIN.: 764-747-864 LOCATION: PHILIPPINES LOCATION: CEBU CITY REVISION :