Professional Documents
Culture Documents
E-4
GROUND FLOOR POWER LAYOUT ARCH. JOHNNY A. DEGAY
SECOND POWER LAYOUT
TABULATED LOAD SCHEDULE
BUILDING OFFICIAL
E-5
PANEL BOARD DETAIL
LEGENDS LAND USE AND ZONING LINE AND GRADE
SERVICE ENTRANCE
CONDUIT SUPPORT DETAIL
SITE DEVELOPMENT PLAN
P-1 SITE VICINITY MAP
GENERAL NOTES
BASEMENT WATERLINE LAYOUT
P-2
GROUND FLOOR WATERLINE LAYOUT
SECOND FLOOR WATERLINE LAYOUT
P-3 ROOF DECK WATERLINE LAYOUT
BASEMENT SANITARYLINE LAYOUT
P-4 GROUND FLOOR SANITARYLINE LAYOUT
SECOND FLOOR SANITARYLINE LAYOUT
P-5 ARCHITECTURAL CIVIL/STRUCTURAL
KE
ROOF DECK SANITARYLINE LAYOUT
NN
BASEMENT STORM DRAINAGE LAYOUT
ON
P-6 ROOF DECK SANITARYLINE LAYOUT
RO
CAMP 7
AD
SATELLITE WATERLINE ISOMETRIC LAYOUT
TOTAL MARKET P-7 SANITARYLINE ISOMETRIC LAYOUT
KENNON ROAD STORM DRAINAGE ISOMETRIC LAYOUT
CAMP 7 P-8 PLUMBING DETAILS
BRGY. HALL
MISTER
DONUT
TYPICAL REFERENCE MARKS
HIJOS
GRID NUMBER GRID TAG
EATERY
FILIPINO
ELECTRICAL SANITARY
KEN
DRAWINGNUMBER
SHEET LOCATION SECTION TARGET
NON
WESTMONT
SCHOOL RICHGATE
RD
MONTESSORI SQUARE
ENTRANCE LOAKA
N RD. DRAWINGNUMBER
SHEET LOCATION
ELEVATION TARGET
RICHGATE
SQUARE
PARK
ARROW POINTS
TOWARDS NORTH
NORTH INDICATOR
K
EN
ALASKAN
N
MALAMUTE
O
N RD
GENERAL CONSTRUCTION NOTES MECHANICAL ELECTRONICS
VIEW DECK
RICHGATE SQUARE 1. THE PLANS AND SPECIFICATION ARE COORDINATIVE,
ANY CONFLICT BETWEEN THE TWO SHALL BE
REFERRED TO THE ARCHITECT FOR CLARIFICATION.
1 PERSPECTIVES 6.
DAMAGED OF ALL EXISTING UTILITY LINES WITHIN THE
SITE.
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET CONTENT SHEET NO.
PERSPECTIVE
: Unit 37 B Palangdao Building, SITE VICINITY MAP
Lower General Luna, GAJ/JVB/CGF/JPM GAJ PROPOSED TWO STOREY MR. TRANQUILINO G. ARROYO &
RESIDENCE + BASEMENT MS. MA.TERESA JEANETTE L. CAYANAN GENERAL CONTSRUCTION NOTES
Baguio City, Philippines 2600
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER
: (074) 246-1354
: (+63) 939-726-1002
: mb2000dc@gmail.com
GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION
1435 2730
R O A D
LOT 9, BLOCK 8
(7.00 METER WIDE ROAD)
3390
M 4 N 88°39' E 5.94 M S6
3 N 78°57' E 3.39 5
P
2.5 °37'
3M
E R I M E T
9M E
E R F E N
3.7
C E
E GARDENS 5
'
°45
2633
2
N6
250
6
99
2
S 14°31
24
PATIO
2.59 M
A' BUILDING OUTLINE
E
DN
2576
'E
N
E
F
MAIN
7
R
4450
ENTRY
5600
4137
T
(FIRE EXIT 1)
N2
E
M
GARDENS UP
7°2
WIDE ROAD)
R
4' W
E
P
S 02°08' W
8250
0
200
R O A D
8
BUILDING OUTLINE
9.7
B
LOT 8, BLOCK
6M
EXISTING
CONSTRUCTION
(7.00 METER
6.72 M
2200
2565
3850
3800
3150
DRIVEWAY
1 8
C BUILDING OUTLINE
FIREWALL
S 85°37' W 10.80 M
2512
11020
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
A1.a
: (074) 246-1354
: (+63) 939-726-1002 GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION ADDRESS
: mb2000dc@gmail.com
LOT 15, BLOCK 8, PEPPER BARK TREE ST., LOT 14, BLOCK 8, PEPPER BARK TREE ST.,
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER RICHGATE SQUARE, PHASE 3, MONTICELLO RICHGATE SQUARE, PHASE 3, MONTICELLO
PRC No 0022159 TIN No 267-539-355-000 PRC No TIN No RD., CAMP7, BAGUIO CITY RD., CAMP7, BAGUIO CITY
PTR No 5021404 Date (PTR) 01 - 19 - 22 PTR No Date (PTR)
6.00
2
A
3350
UP
6.00
2
12
D
(FIRE EXIT 1)
A
ENTRY
MAIN
DN
723
D
1
OWNER'S PARKING
W
2
3
W
1
6400
EARTHFILL
4150
4150
W
3
2500 1450
UP
GARDENS
GARDENS
D
2
2400 1300
FAMILY ROOM
R O A D
R O A D
FIREWALL
8315
8315
UP
2
2
RNG
KS
REF
D
5
5
BEDROOM
BEDROOM
GUEST'S
D
3
MAIDS
3000
2250
T&B
T&B
2580
D
3
2730
2730
DINING/KITCHEN
Y
3050
Y
6.00
6.00
1
1
A
A
10
W
4165
W
3
PANTRY
CAB
1''
1''
W
4
620
W
4
W/D
LAUNDRY AREA
OUTDOOR
BALCONY
1435
1435
D
FREEZER
D
6
CHEST
10
D
0
2200
2200
200
D
4
1
1
11
D
2
4300
0
0
1
250
200
OUTDOOR
BALCONY
5
233
GARDENS
800
PATIO
X
4137 4137
8250 8250
N
N
A'
A'
C
C
B
B
A
A
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER
: (074) 246-1354
: (+63) 939-726-1002
: mb2000dc@gmail.com
GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION
3850
6.00
2
A
4
97
1292
723 1600 1400 2550
723
W
W
W
9
5
G
RN
3
3
1725
1725
WIC
1800
PR
KITCHEN
KS
GARDENS
W
6
4028
4150
D
7
4150
4300
D
5
SHO
T&B
DN
1900
1900
LAV
1525
WC
GARDENS
1300
9738
9737
D
7
D
3
FIREWALL
FIREWALL
DINING
8315
8315
2
2
W
7
ROOF PLAN
1:100
3255
3255
WATER TANK
2730
BEDROOM
2730
MASTER'S
Y
6.00
6.00
1
1
A
A
4165
4165
LIVING AREA
TV CONSOLE
D
8
1''
1''
BUILDING OUTLINE
W
6
1435
1435
OUTDOOR
BALCONY
2
D
9
1
1
W
8
1
OUTDOOR
BALCONY
OUTDOOR
BALCONY
5
5
233
233
4300
X
4137 4137
8250 8250
N
A'
A'
C
B
C
B
A
A
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER
: (074) 246-1354
: (+63) 939-726-1002
: mb2000dc@gmail.com
GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION
ALUMINUM WINDOWS
ALUMINUM WINDOWS
TILE CLADDING
CLEAR GLASS
WALL FINISH
1
A'
C
A
W
2
D
1
FRONT ELEVATION
1:100
W
5
REAR ELEVATION
1:100
W
1
B
B
W
9
12
D
2
1
W
9
A'
C
150
400
300
445
150
4000 2600 8744
400
400
1440 4300 3150
2000 5300 3300 2600
3000 2600
3150
8890
GROUND FL CEILING LN
11895
SECOND FL CEILING LN
NATURAL GRADE LN
ROOF APEX LN
BASEMENT FL CEILING LN
GROUND FL CEILING LN
SECOND FL CEILING LN
NATURAL GRADE LN
BASEMENT FFL LN
ROOF APEX LN
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
A4.0
: (074) 246-1354
: (+63) 939-726-1002 GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION ADDRESS
: mb2000dc@gmail.com
LOT 15, BLOCK 8, PEPPER BARK TREE ST., LOT 14, BLOCK 8, PEPPER BARK TREE ST.,
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER RICHGATE SQUARE, PHASE 3, MONTICELLO RICHGATE SQUARE, PHASE 3, MONTICELLO
PRC No 0022159 TIN No 267-539-355-000 PRC No TIN No RD., CAMP7, BAGUIO CITY RD., CAMP7, BAGUIO CITY
PTR No 5021404 Date (PTR) 01 - 19 - 22 PTR No Date (PTR)
2" X 2" TUBULAR BAR - HAND RAIL
2" X 2" TUBULAR BAR - HAND RAIL
0.5mm COLOROOF
TILE CLADDING
CLEAR GLASS
CLEAR GLASS
WALL FINISH
3
1
1"
FIREWALL
6
2
2
W
7
1"
2
1
1
3
W
7
PATIO
8745
445
400
400
150
445
400
400
150
2000 3300 2600 2600
2000 3300 2600 2600
5300 3000 3150
5300 3000 3150
11895
11895
BASEMENT FL CEILING LN
BASEMENT FL CEILING LN
GROUND FL CEILING LN
SECOND FL CEILING LN
GROUND FL CEILING LN
SECOND FL CEILING LN
NATURAL GRADE LN
GROUND FLOOR FFL
SECOND FLOOR FFL
NATURAL GRADE LN
BASEMENT FFL LN
BASEMENT FFL LN
ROOF APEX LN
ROOF APEX LN
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
A5.0
: (074) 246-1354
: (+63) 939-726-1002 GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION ADDRESS
: mb2000dc@gmail.com
LOT 15, BLOCK 8, PEPPER BARK TREE ST., LOT 14, BLOCK 8, PEPPER BARK TREE ST.,
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER RICHGATE SQUARE, PHASE 3, MONTICELLO RICHGATE SQUARE, PHASE 3, MONTICELLO
PRC No 0022159 TIN No 267-539-355-000 PRC No TIN No RD., CAMP7, BAGUIO CITY RD., CAMP7, BAGUIO CITY
PTR No 5021404 Date (PTR) 01 - 19 - 22 PTR No Date (PTR)
NOTE:
A
A' B C
SECOND FL CEILING LN
2000
CLEAR GLASS
WITH POWDER COATED
ALUMINUM AWNING WINDOWS
5300
2" X 2" TUBULAR BAR - HAND RAIL
1
KITCHEN/DINING AREA 2" STAINLESS ROUND BAR SUPPORT
3300
: (074) 246-1354
Baguio City, Philippines 2600
: (+63) 939-726-1002
: mb2000dc@gmail.com
Lower General Luna,
: Unit 37 B Palangdao Building,
400
PRC No
SECOND FLOOR FFL
GROUND FL CEILING LN
11895
PTR No 5021404
0022159
3000
FAMILY ROOM GUEST BEDROOM T&B
2600
ARCHITECT
TIN No
GREGORIO M. ANO JR.
400
GROUND FLOOR FFL
Date (PTR) 01 - 19 - 22
BASEMENT FL CEILING LN
267-539-355-000
DATE:
KITCHEN MAID'S BEDROOM T&B
3150
2600
DRAWN BY:
150
BASEMENT FFL LN
GAJ/JVB/CGF/JPM
NATURAL GRADE LN
CHECKED BY:
1:100
MAY 2022
1 1" 2 3
PTR No
PRC No
0.5mm COLOROOF
ENGINEER 445
TIN No
ROOF APEX LN
Date (PTR)
SECOND FL CEILING LN
2000
CLEAR GLASS
WITH POWDER COATED
ALUMINUM AWNING WINDOWS
5300
PROJECT
LOCATION
400
SECOND FLOOR FFL
GROUND FL CEILING LN
2" X 6" CHANNEL BAR
11895
CLEAR GLASS
OWNER
ADDRESS
400
LOT 14, BLOCK 8, PEPPER BARK TREE ST.,
RICHGATE SQUARE, PHASE 3, MONTICELLO
MS. MA.TERESA JEANETTE L. CAYANAN
BASEMENT FL CEILING LN
DINING/KITCHEN EARTHFILL
3150
2600
SHEET NO.
150
A6.0
BASEMENT FFL LN
NATURAL GRADE LN
500
500
F F F
2600
2600
2150
2150
2150
2100
2100
F
1000
900
900
3700
3700
2450 1250
1250 2450
1600
800 800
1200
1200
900
F F
500
3300
3300
2600
2150
F F
2100
2100
2100
1000
1 DOOR SCHEDULE
1:50
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
A7.0
: (074) 246-1354
: (+63) 939-726-1002 GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION ADDRESS
: mb2000dc@gmail.com
LOT 15, BLOCK 8, PEPPER BARK TREE ST., LOT 14, BLOCK 8, PEPPER BARK TREE ST.,
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER RICHGATE SQUARE, PHASE 3, MONTICELLO RICHGATE SQUARE, PHASE 3, MONTICELLO
PRC No 0022159 TIN No 267-539-355-000 PRC No TIN No RD., CAMP7, BAGUIO CITY RD., CAMP7, BAGUIO CITY
PTR No 5021404 Date (PTR) 01 - 19 - 22 PTR No Date (PTR)
3700 3550 1710 1254
950 1800 950
900
500
500
500
F
2850
2600
2600
2600
2150
2100
2100
2100
F F F F
900
2500
1250 1250
3710
500
1 DOORS AND WINDOWS SCHEDULE
2000
1:50
F F
1500
F F F
800
800
5300
5300
500
500
1700
1200
F
2600
2500
2500
F F F F F
2100
F F F
900
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER
: (074) 246-1354
: (+63) 939-726-1002
: mb2000dc@gmail.com
GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION
2000
2100
F F
F F F
1565
1000 782 782
800
5300
500
500
3200
2400
2400
2500
F F
1900
1900
F F F
200
200
1 WINDOW SCHEDULE
1:50
1"X4" ECOFOR STAINED AND SEALED
1000
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
A9.0
: (074) 246-1354
: (+63) 939-726-1002 GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION ADDRESS
: mb2000dc@gmail.com
LOT 15, BLOCK 8, PEPPER BARK TREE ST., LOT 14, BLOCK 8, PEPPER BARK TREE ST.,
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER RICHGATE SQUARE, PHASE 3, MONTICELLO RICHGATE SQUARE, PHASE 3, MONTICELLO
PRC No 0022159 TIN No 267-539-355-000 PRC No TIN No RD., CAMP7, BAGUIO CITY RD., CAMP7, BAGUIO CITY
PTR No 5021404 Date (PTR) 01 - 19 - 22 PTR No Date (PTR)
2 3 250 445.790
250
445.790
400
GROUND FL CEILING LN 14
13
187.5 187.5
2" THK WOOD PLANK
250 250
FOR STAIR TREAD
12 445.790 445.790
334.343
(ON 2"X2"X41" ANGLE BAR 11 2" THK WOOD PLANK
FOR SUPPORT
FOR STAIR TREAD
10 (ON 2"X2"X41" ANGLE BAR
9 FOR SUPPORT
2" x 6" CHANNEL BAR
FOR STAIRS STRINGER 8
334.343
7 2" x 6" CHANNEL BAR
2600
3000
187.5 187.5
334.343
5
4
334.343
2" x 6" CHANNEL BAR
3 FOR STAIRS STRINGER
2
1
GROUND FLOOR FFL
25
800 313 313 450 450 400 400 400 350
350
75 75
1100
1100
300 300
600
750
REF 3/4" MARINE PLYWOOD CABINET,
PAINTED FINISH
KS RNG
0.075 FASCIA BOARD
D 75
75
100 500
100 500
GRANITE FINISH
3 50 GRANITE FINISH COUNTER COUNTER
B A 50
250
50 250
900
900
750
ARCHITECT DRAWN BY: CHECKED BY: ENGINEER PROJECT OWNER SHEET NO.
A10
: (074) 246-1354
: (+63) 939-726-1002 GREGORIO M. ANO JR.
DATE: MAY 2022 DATE: MAY 2022 LOCATION ADDRESS
: mb2000dc@gmail.com
LOT 15, BLOCK 8, PEPPER BARK TREE ST., LOT 14, BLOCK 8, PEPPER BARK TREE ST.,
NOTE: ALL DISCREPANCY MUST BE VERIFIED WITH THE ARCHITECT AND ENGINEER RICHGATE SQUARE, PHASE 3, MONTICELLO RICHGATE SQUARE, PHASE 3, MONTICELLO
PRC No 0022159 TIN No 267-539-355-000 PRC No TIN No RD., CAMP7, BAGUIO CITY RD., CAMP7, BAGUIO CITY
PTR No 5021404 Date (PTR) 01 - 19 - 22 PTR No Date (PTR)