REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
0
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00 6/27/08 0002 100% ISSUE FOR CONSTRUCTION ALL ALL SSJ ASA
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
SSJ
ASA
SSJ
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
6/278
BY DRAWING COMPLETION CERTIFICATE
6/27/08
ENGINEER
6/27/08
ENGINEER
6/27/08
6/27/08
DISCIPLINE
CERTIFIED
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
DHAHRAN
Saudi Aramco 2616-ENG (03/99)
DRAWING TITLE
CONSTRUCTION SCOPE OF WORK
CORPORATE DATA CENTER
DOC
SAUDI ARABIA
FOR
Prepared by:
BI-0273
D88
June 27, 2008
JO / EWO:
A
Saudi Aramco
JO-10-00273-0002
10-00273-0002
DRAWING NO.
CORPORATE DATA CENTER
1
HE- 174992
CONSTRUCTION SCOPE OF WORK
OF
113
SHT.NO.
00
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
1. Project Summary
ALL
0002
00
DISCIPLINE
ENGINEER
4.1. General
6/278
4.2. Architectural Systems
DATE:
PROJECT
ENGINEER 4.3. Structural
SSJ
6/27/08
4.4. General Site Requirements
DATE:
CERTIFIED 4.5. Demolition
6/27/08 4.6. Survey and Layout of Facilities
DATE:
CONSTRUCTION
AGENCY
4.7. Site Preparation and Earthwork
SSJ
6/27/08
4.8. Landscaping and Irrigation
DATE:
OPERATIONS 4.9. Road and Parking Construction
ASA
4.10. Raw Water System
6/27/08
DATE:
4.11. Drinking Water (Sweet Water) System
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5. Detailed Description of Work, Phase 500 – Equipment / Mechanical
SSJ
5.1. General
ENGG CERT
ALL
6.1. General
6.2. HVAC Piping
6.3. Plumbing Piping
6.4. Fuel Piping
6.5. Fire Protection Piping
7. Detailed Description of Work, Phase 700 – Electrical
JO/EWO
7.1. General
0002
00
9.1. General
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
9.3. Insulation
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00 6/27/08 0002 100% ISSUE FOR CONSTRUCTION ALL ALL SSJ ASA
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
SSJ
ASA
SSJ
APPROVAL/CERTIFICATION REQUIREMENTS,
AGENCY
BY:
PROJECT
6/278
BY DRAWING COMPLETION CERTIFICATE
6/27/08
ENGINEER
6/27/08
ENGINEER
6/27/08
6/27/08
DISCIPLINE
CERTIFIED
OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
DHAHRAN
11.2.
11.1.
10.1.
Saudi Aramco 2616-ENG (03/99)
10. Testing
Tie-Ins
12. Pre-Commissioning
DRAWING TITLE
Commissioning
As-Built Drawings
11. Special Technical Requirements
SAUDI ARABIA
D88
JO / EWO:
A
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY
10-00273-0002
DRAWING NO.
4
OF
HE- 174992
113
SHT.NO.
00
EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
This Construction Scope of Work, together with the Drawings, applicable Saudi Aramco
ALL
Standards and Specifications listed in the project documents constitute the basis for the complete
Work to be performed by the Contractor.
The Scope of Work describes the technical contents of the activities required for the project. It
shall be read in conjunction with other Contract Schedules of the Construction Contract and
Construction drawings to obtain a complete understanding of the full requirements of the Contract.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
Contractor shall work on the basis of this Construction Scope of Work, Construction Specifications
and Project Drawings as indicated on the Drawing Control Sheet HD-174991. Construction
Scope of Work, Specifications and Drawings are complementary and are not to be used
separately. Any item mentioned in Scope of Work and not shown on drawings or shown on
drawings but not mentioned in Scope of Work shall be of like effects as if shown or mentioned in
both.
In case of any conflict between the contract documents, the Contractor shall inform Saudi Aramco
Representative and receive his directions before taking any further action.
JO/EWO
0002
This Scope of Work identifies the WORK required to construct a new Corporate Data
DATE
00
locations, dimensions, layouts and installation details. The term CONTRACTOR shall
DISCIPLINE
ENGINEER also include all his subCONTRACTORs and vendor. All work will be scheduled to use
materials on hand at time of scheduling.
6/278
DATE:
PROJECT
ENGINEER The WORK includes, but is not limited to:
SSJ
6/27/08
DATE: 1.1.1 Project Phasing. This project will provide a facility with a raised floor area of
CERTIFIED
approximately 6,000 square meters. The raised floor is divided into four data
6/27/08
halls of 1,500 square meters each. It is anticipated that the mission of this
DATE:
facility will require growth over time, so the design concept provides for planned
CONSTRUCTION
AGENCY expansion. The sitework, architecture, mechanical and electrical designs allow
SSJ
for ease of future construction. For example, in the areas beside the data halls,
6/27/08
DATE: all unsuitable subgrade material will be excavated, removed and replaced with
OPERATIONS
select fill so that when the second phase of construction begins no high-
ASA
vibration excavations will be needed. This idea is repeated in all the other
6/27/08
DATE: design disciplines. In addition, the critical support infrastructure design is such
CONTROL NUMBER
operations.
EDSD
DATE:
In addition to the data halls, there will be an office component, back of the
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
1.1.2 Demolition of utilities, pavement, and other structures on the site; site clearing;
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.1.3 Site Preparation. The contractor shall survey the site; establish horizontal and
SSJ
ALL
expected final grades; establish road bases along design centerlines; provide
interim storm drainage measures; construct a contractor storage area; construct
ALL
minimize the interruption of the normal operation of existing utilities and traffic
circulation. Such plans shall be submitted to Saudi Aramco Representative and
concerned utilities department for approval prior to start of constru The
Contractor shall perform continuous site clean-up during the project and after
demobilization and shall adhere to Saudi Aramco Quality and Safety
Procedures.
0002
qualified personnel.
NO.
REV
1.1.5 Due to the critical nature of the facility, it is designed with redundant power,
00
DISCIPLINE
ENGINEER
cooling and communications systems. In addition, redundant systems are
housed in separate “compartments” to minimize the possibility of a failure of one
DATE:
6/278
system causing a failure in the redundant system or both systems being
PROJECT
ENGINEER affected by the same event. There are also sophisticated monitoring, control,
SSJ fire detection and fire prevention systems.
6/27/08
DATE:
CERTIFIED 1.1.6 Saudi Electric Co. (SECO) will be building a new substation adjacent to the
facility. This substation will be fed by redundant transmission lines and will have
6/27/08
DATE: redundant transformers and 15 KV feeders going to the facility. This project
CONSTRUCTION
AGENCY includes all cables, conduits and wiring from the SECO provided manholes at
SSJ
the substation fence to the new CDC facility.
6/27/08
DATE:
OPERATIONS 1.1.7 The following is the main criteria for the facility:
ASA
• 6000 m2 of computer raised floor with a maximum of 1500 m2 area in
6/27/08
DATE: individual compartments
• Buildings constructed to support 100 watts/ft2 computer floor power and
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
installed for 200 watts/ft2 computer floor power and cooling density
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Master plan allows future expansion to 200 watts/ft2 computer floor power and
SSJ
cooling density
• Master plan allows future expansion to 9,000 m2 computer floor area with the
ENGG CERT
ALL
same total capacity for power and cooling as 200 watts/ft2 over 6000 m2
•
ALL
Also, additional capacity was built into the design to avoid expansion problems
for the following systems:
•
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
1.1.8 The building will consist of precast wall panel exterior walls, and a combination
of precast double T and hollow core roof panels.
NO.
REV
00
DISCIPLINE The data halls will have raised floor for air and power distribution while the
ENGINEER
balance will be slab on grade.
6/278
DATE:
PROJECT
ENGINEER
1.1.9 The electrical system will consist of oil filled exterior transformers feeding interior
SSJ switchgear. 15 KV feeders will be run underground from the substation to the
DATE:
6/27/08 transformers with overhead cablebus being run from the transformers to the
CERTIFIED interior switchgear. From the switchgear, feeders are then run via duct bank,
trench and cablebus to the various distribution systems.
6/27/08
DATE:
CONSTRUCTION
AGENCY
The main critical support components consist of diesel generators, static UPS
SSJ systems and flooded cell batteries.
6/27/08
DATE:
OPERATIONS 1.1.10 The mechanical support system is comprised of water cooled chillers with
ASA cooling towers, a thermal storage tank and CRAH’s in galleries along the
DATE:
6/27/08 perimeter of the raised floor.
CONTROL NUMBER
VERIFICATION
1.1.120 There will be a building management system controlling and monitoring the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
critical mechanical system and an EPMS system monitoring the critical electrical
OF THIS DRAWING IS COVERED, FOR ALL
systems.
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.2 Description of Phases
SSJ
ALL
1.3.1 CONTRACTOR shall obtain work permits before commencement of any WORK.
(Refer to G.I.2.100) Coordination with SAPMT will be done prior to excavation or
thrust boring to be checked and confirm underground utilities and special care is
to be taken on overlapping utilities like electrical, instrument,
telecommunications and other piping.
1.3.2 CONTRACTOR shall comply with all SAUDI ARAMCO Construction Safety
JO/EWO
0002
1.3.3 CONTRACTOR to provide routes to and from work areas and an emergency
evacuation procedure plan/route for approval.
NO.
REV
00
DISCIPLINE
ENGINEER 1.3.4 CONTRACTOR (including all sub-CONTRACTORs) shall be able to identify his
workers by having color-coordinated coveralls with CONTRACTOR’s name on
6/278
DATE: them. The hard hats will match and have CONTRACTOR’ and employees’
PROJECT
ENGINEER names and position on them.
SSJ
6/27/08
DATE: 1.3.5 CONTRACTOR shall remove excess materials, tools, trash etc. from each work
CERTIFIED
location on a daily basis. Areas shall be kept neat and clean during the day.
6/27/08
DATE:
1.3.6 CONTRACTOR shall request a site query for any clarification or change in the
CONSTRUCTION
AGENCY scope prior to execution. All Site Queries shall clearly state, “change in scope” or
SSJ
“no change in scope”. All change orders shall refer to the appropriate site query
6/27/08
DATE: number. After the fact site queries with a “change in scope” shall not be allowed.
OPERATIONS
CONTRACTOR shall maintain a site query log in SAUDI ARAMCO
ASA
Representative agreed format. The log shall include a complete history including
6/27/08
DATE: all dates.
CONTROL NUMBER
VERIFICATION
1.3.7 CONTRACTOR shall request and SAUDI ARAMCO Representative shall issue
EDSD
Work Permits, Cold Work Permits and all other permits in accordance with
DATE:
shall request and SCECO shall issue Work Permits for work under and on either
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
1.3.8 CONTRACTOR shall initiate timely requests for Work Permits per G.I. 2.100 to
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
avoid unnecessary delay.
SSJ
1.3.8.1 CONTRACTOR shall obtain a Work Permit before working in any area
ENGG CERT
ALL
1.3.8.3 CONTRACTOR shall obtain all Work Permits for each day PRIOR to
100% ISSUE FOR CONSTRUCTION
1.3.8.4 All daily work permits shall be obtained prior to the CONTRACTOR
work force starting time.
JO/EWO
0002
6/27/08
NO. DATE
REV
00
DISCIPLINE
ENGINEER
6/278
DATE:
PROJECT
ENGINEER
SSJ
6/27/08
DATE:
CERTIFIED
6/27/08
DATE:
CONSTRUCTION
AGENCY
SSJ
6/27/08
DATE:
OPERATIONS
ASA
6/27/08
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 2.0 - PROJECT DRAWINGS
SSJ
The WORK shall conform to the latest revision of the SAUDI ARAMCO Standard Drawings listed
ENGG CERT
ALL
below, other Standard Drawings as applicable and the Project drawings as listed in the Drawing
Control Log:
ALL
0002
Conduit
P AB-036319 001 Standard Sign, Danger High Voltage Keep Away
P AB-036326 Standard Sign, Underground Electric Cable
6/27/08
DATE
DISCIPLINE
ENGINEER
S AD-036009
S DB-950078 Concrete Thrust Block Details for Utilizing
DATE:
6/278
Pipelines
PROJECT
ENGINEER T AA-036373 001 PVC Direct Buried/Encased Conduit, Typical
SSJ Installation
DATE:
6/27/08 T AA-036748 001 Buried Telephone Cables/Distribution Wires-
CERTIFIED Installation Details
T AB-036897 001 Buried/Underground Cable Route Marker Posts
6/27/08
DATE: and Sign
CONSTRUCTION
AGENCY
SSJ
6/27/08
DATE:
OPERATIONS 2.2 Other Applicable Standards
ASA
DATE:
6/27/08
SAMA Standard PMC-33-1 RFI/EMI Noise Immunity
CONTROL NUMBER
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND T HE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 3.0 - CODES, STANDARDS AND SPECIFICATIONS
SSJ
ALL
The WORK shall conform to the latest edition of the following Industry Codes and
ALL
Specifications.
Code Title
AASHTO M17 Standard Specification for Mineral Filler for Bituminous Paving
Mixtures.
100% ISSUE FOR CONSTRUCTION
0002
ASCE 7-95 Minimum Design Loads for Building and Other Structures
ASHRAE STD 15 Safety Code for Mechanical Refrigeration
NO.
REV
DISCIPLINE
ENGINEER
ASHRAE STD 55 Thermal Environmental Conditions for Human Comfort
ASHRAE STD 62 Ventilation for Acceptable Indoor Air Quality
DATE:
6/278
ASHRAE STD 111 Practice for Measurement, Testing, Adjusting and Balancing of
PROJECT
ENGINEER HVAC Systems
SSJ ASHRAE Handbook HVAC Applications
DATE:
6/27/08 ASHRAE Handbook Systems and Equipment
CERTIFIED ASHRAE Handbook Fundamentals
ASHRAE Handbook Refrigeration
6/27/08
DATE: ASTM D-1556 Test for Density of Soil in Place by the Sand Cone Method
CONSTRUCTION
AGENCY ASTM D-2049 Standard Methods of Test for Relative Density of Cohesion less
SSJ
Soil
6/27/08
DATE: ASTM D-2167 Test for Density of Soil in Place by the Rubber Balloon Method
OPERATIONS ASTM D-2922 Density of Soil and Soil Aggregate in Place by Nuclear Methods
ASA
(Shallow Depth)
DATE:
6/27/08
ASTM D-422 Particle Size Analysis of Soil
CONTROL NUMBER
ASTM D-698 Standard Methods of Test for Moisture - Density Relations of Soil
VERIFICATION
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
IEEE Institute of Electrical and Electronics Engineers
SSJ
ALL
0002
SMACNA 1992 Fire, Smoke and Radiation Damper Installation Guide for HVAC
00
DISCIPLINE
ENGINEER
Systems, 4th edition
SSA Saudi Arabian Standard Organization
DATE:
6/278
SSPC Steel Structures Painting Council.
PROJECT
ENGINEER TIA/EIA Telecommunications Industry Association / Electronic
SSJ Industries Association
DATE:
6/27/08 UBC Uniform Building Code
CERTIFIED UL Underwriter’s Laboratory
UMC Uniform Mechanical Code
6/27/08
DATE: UPC Uniform Plumbing Code
CONSTRUCTION
AGENCY
SSJ
6/27/08
DATE: 3.2 SAUDI ARAMCO Standards, Specifications, General Instructions and Safety Manuals:
OPERATIONS
ASA
The WORK shall conform to the November 2001 listing of all SAUDI ARAMCO Standards
DATE:
6/27/08
and Specifications specifically including the following:
CONTROL NUMBER
VERIFICATION
Code Title
EDSD
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAEP-127 Security and Control of Saudi Aramco Engineering Data
SSJ
ALL
Requisition
SAEP-327 Disposal of Wastewater from Cleaning, Flushing and Hydrostatic Testing
ALL
0002
DISCIPLINE
ENGINEER
SAES-B-069 Emergency Eyewash and Showers
DATE:
6/278
SAES-D-109 Design of Small Tanks
PROJECT
ENGINEER
SSJ SAES-G-005 Centrifugal Pumps
DATE:
6/27/08 SAES-G-101 Regulated Vendors List for Pumps and Mechanical Seals
CERTIFIED
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-J-902 Electrical System For Instrumentation
SSJ
ALL
0002
DISCIPLINE
ENGINEER
SAES-O-100 General Requirements, Safety and Security
DATE:
6/278
SAES-O-101 Standard Security Fence - Type I
PROJECT
ENGINEER SAES-O-105 Gates in Perimeter Fences.
SSJ SAES-O-112 Communications
DATE:
6/27/08 SAES-O-119 Work Permit Procedures
CERTIFIED
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SAES-Q-005 Concrete Foundations
SSJ
ALL
Grouting
SAES-Q-011 Epoxy Grout for Machinery Support.
ALL
0002
DISCIPLINE
ENGINEER
SAES-T-634 Telecommunications - Cable Testing and Acceptance
SAES-T-795 Facilities Grounding System
DATE:
6/278
SAES-T-830 Voice Frequency Loop Transmission Objectives
PROJECT
ENGINEER SAES-T-903 Electrical Protection - Outside Plant
SSJ SAES-T-906 Telecommunications – Structural Coordination
DATE:
6/27/08 SAES-T-911 Telecommunications Conduit System Design
CERTIFIED SAES-T-912 Communications Feeder Cable
SAES-T-914 Telecommunications Distribution Cable
6/27/08
DATE: SAES-T-916 Communications Building Cable Systems
CONSTRUCTION
AGENCY SAES-T-920 Telecommunications Cable Information
SSJ
SAES-T-928 Telecommunications - OSP Buried Plant
6/27/08
DATE: SAES-T-938 Telecommunications: Outside Plant, Systems Design
OPERATIONS
ASA
SAES-W-012 Welding Requirements for Pipelines
DATE:
6/27/08
SAES-X-400 Cathodic Protection of Buried Pipelines
CONTROL NUMBER
Control
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
GI-150.001 Asbestos Regulations
SSJ
ALL
0002
Authorization
SAEP-1142 Qualification of Non-SAUDI ARAMCO NDT Personnel
NO.
REV
DISCIPLINE
ENGINEER
SAEP-3102 Equipment and Spare Parts
DATE:
6/278
3.3 Saudi Electric Company (SECO) Standards and the Industry standards referenced
PROJECT
ENGINEER therein.
SSJ SES-P-119 Substation Standards
DATE:
6/27/08 SES-P-122 Transmission Line Design Standards
CERTIFIED SCS-P-122 Transmission Line Construction Standards
6/27/08
DATE: 3.4 Material Specifications
CONSTRUCTION
AGENCY
SSJ
CONTRACTOR supplied materials shall conform to the latest issue of the following
6/27/08
DATE: Specifications:
OPERATIONS
ASA
Item # Category of Material Specification
6/27/08
DATE:
CONTROL NUMBER
9. RTR (Fiberglass) Sewer Pipe and Fittings for Gravity Flow 01-SAMSS-029
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
10. RTR (Fiberglass) Pressure Pipe and Fittings 01-SAMSS-034
SSJ
ALL
0002
34. SF6 Gas Insulated Circuit Breakers, Outdoor 34.5 KV through 230 KV
16-SAMSS-508
NO.
REV
35. Shop Applied, Internal Cement Mortar Lining of Steel Pipe 01-SAMSS-005
00
DISCIPLINE
ENGINEER
36. Pipe Handling and Nesting 01-SAMSS-024
37. API Line Pipe 01-SAMSS-035
DATE:
6/278
38. Butt Welding Pipe Fittings 02-SAMSS-005
PROJECT
ENGINEER 39. Hot Tap and Stopple Fittings 02-SAMSS-006
SSJ 40. Gate Valves 04-SAMSS-001
DATE:
6/27/08 41. General Requirements for Valves 04-SAMSS-035
CERTIFIED 42. Valve Inspection and Testing Requirements 04-SAMSS-048
43. Pressure Preservative Treatment for Wood Piles, Timber & Ties 09-SAMSS-002
6/27/08
DATE: 44. Concrete Masonry Units and Concrete Building Blocks 09-SAMSS-016 .
CONSTRUCTION
AGENCY 45. Qualification Requirements for Alkyd Enamel Coating System (APCS-6)
SSJ
09-SAMSS-021
6/27/08
DATE: 46. Qualification Requirements for Aluminum-Pigmented Alkyd Coating System (APCS-4)
OPERATIONS 09-SAMSS-035
ASA
47. Qualification Requirements for Coal Tar Epoxy in Buried or Immersion Services
DATE:
6/27/08
(APCS-3) 09-SAMSS-068
CONTROL NUMBER
50. Shop-Applied External Fusion Bonded Epoxy Coating for Steel Line Pipe 09-SAMSS-089
51. Shop-Applied Internal FBE Coatings 09-SAMSS-091
DATE:
BY:
54. External Renovation Coating for Buried Pipelines and Piping (APCS-113) 09-SAMSS-113
0
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
57. Pre-Engineered Metal Buildings 12-SAMSS-014
SSJ
58. Saudi Aramco Security and General Purpose Fencing (Galvanized) 12-SAMSS-021
59. Metal Enclosed, Metal Clad Low Voltage Switchgear 12-SAMSS-502
ENGG CERT
ALL
All other materials must be approved by the SAUDI ARAMCO Representative prior to
use. Samples of these materials must be submitted for approval.
SAUDI ARAMCO’s policy on the use of Saudi manufactured products will be adhered to
100% ISSUE FOR CONSTRUCTION
and strictly enforced and shall be addressed in Schedule “G” of the contract documents.
DESCRIPTION
0002
3.5.1 Design drawings produced specifically for this Project are listed and described
on the drawing control log. Any conflict between project drawings, scope of
6/27/08
DATE
work, the contract, and etc., SAUDI ARAMCO Representative will be informed
and provide direction on how to proceed.
NO.
REV
00
DISCIPLINE
ENGINEER
3.5.2 SAUDI ARAMCO Standard Drawings referred to on the above design drawings
or otherwise applicable to the work by reference therein are made a part of this
DATE:
6/278
specification.
PROJECT
ENGINEER
SSJ 3.6 Vendor Drawings
6/27/08
DATE:
CERTIFIED 3.6.1 CONTRACTOR shall maintain a file of vendor drawings at the site for each
purchase order.
6/27/08
DATE:
CONSTRUCTION
AGENCY 3.7 As-Built Drawings
SSJ
6/27/08
DATE: 3.7.1 CONTRACTOR shall maintain and update as-built drawings as the construction
OPERATIONS progresses, using red lines for addition and changes, and green lines for
ASA
deletions. The CONTRACTOR shall, for each job phase/Work Package, submit
DATE:
6/27/08
three (3) sets of as-built drawings for start up, and a further two (2) sets of as-
CONTROL NUMBER
be readable and suitable for CADD revision and subsequent enter into the
EDSD
3.7.3 SAUDI ARAMCO Representative will from time to time review the “red-line” as-
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ARAMCO Representative that they are not up-to-date, construction will be
SSJ
ALL
3.7.4 CONTRACTOR shall monitor all drawing stick files to insure that only the latest
approved construction drawings, site queries, etc are included. All drawings in
ALL
3.8 Clean Up
3.8.1 During the progress of the Work, the work site and the adjacent areas shall be
kept clean. All rubbish from clearing and grubbing not reused, surplus materials
100% ISSUE FOR CONSTRUCTION
3.8.2 On or before the completion of the Work, unless otherwise specifically directed or
permitted in writing, the Contractor shall:
0002
Leave the work site and all adjacent property affected by his operations in a
neat and satisfactory condition.
NO.
REV
00
DISCIPLINE
3.8.3 Contractor shall restore or replace at his own expense any Saudi Aramco’s
ENGINEER property damaged by his work, equipment, or employees, to a condition at least
equal to that existing prior to the beginning of operations. Suitable material,
6/278
DATE:
equipment, and methods shall be used for such restoration, which shall be done
PROJECT
ENGINEER promptly and shall not be left until the end of the Contract period.
SSJ
6/27/08
DATE: 3.8.4 All construction debris shall be transported off the site as directed by Saudi
CERTIFIED
Aramco Representative.
6/27/08
DATE:
CONSTRUCTION
3.9 Quality Control and Assurance
AGENCY
SSJ
6/27/08
3.9.1 Contractor shall submit to company representative his initial QA/QC plan within 15
DATE:
days of contract signature. The plan shall be a definition of policies, objectives
OPERATIONS
and responsibilities for QA in conjunction with action designed to provide and
ASA
produce consistent workmanship, which meets the levels of quality required. The
6/27/08
DATE: Quality Control Plan shall be prepared as per Schedule “Q” and SAEP-1154
CONTROL NUMBER
3.9.2 It is the responsibility of the Contractor to comply with all relevant codes,
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
3.9.3 The Contractor shall prove the competency of all craftsmen and supervisory staff
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 4.0 - DETAILED DESCRIPTION OF WORK
SSJ
ALL
4.1 General
ALL
4.2.1 The architectural design of the building is based on precast and cast in place
concrete for the wall panels (bearing and non-bearing), elevated floor system
and roofing system. A pre-insulated precast wall panel system will be used for
the exterior. A precast double -T roof system over the raised floor area, hollow
core roof panels over the Back of House area, and composite metal/concrete
JO/EWO
0002
4.2.2 The vertical skin around the raised floor and back of house will be an insulated
DATE
00
maximize full height curtain-wall glazing systems to the northeast and northwest
DISCIPLINE
ENGINEER with shielded glazing to the southwest. There will be an elevated hovering roof
over the entire office component, VIP element and courtyard. The elevated roof
6/278
DATE: will be a metal composite panel and will have a deep recessed connection to the
PROJECT
ENGINEER office mass. The finish materials will be consistent with the high-end finishes in
SSJ the current VIP lobby. There will be a visual connection between the two NOC
6/27/08
DATE: rooms on the second floor for viewing into the raised floor areas in the main
CERTIFIED
component. All office furniture and systems furniture will be in keeping with
6/27/08
Aramco’s standard. The overall design will provide for the inclusion or exclusion
DATE:
of the VIP program and the future addition of office space, up to 1500 m2.
CONSTRUCTION
AGENCY
SSJ
4.2.3 There will also be a security/guardhouse building at the front gate. The first point
6/27/08
DATE: of security will occur at the gate house via, guard presence, card in/card out turn
OPERATIONS
stiles, magnetometer and x-ray equipment. Card in/Card out technology will also
ASA
be applied on the inside of the facility along with biometrics.
6/27/08
DATE:
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
To maximize usable open area, a “column free” design approach will be used in
OF THIS DRAWING IS COVERED, FOR ALL
the layout of data rooms. CRAH galleries will be located along the perimeter of
(DCC) NO. _____________________
the data halls. Columns are located within the CRAH galleries, leaving an
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
unobstructed data floor.
SSJ
ENGG CERT
ALL
of access floor panels, floor coverings, understructure and various electrical, data
and communication accessories.
Understructure is comprised of a heavy duty stringer grid system in a (2’ x 2’) grid
pattern in a basket-weave configuration. Pedestals are at each grid intersection
point.
100% ISSUE FOR CONSTRUCTION
Steel stringers will have a conductive galvannealed coating and will support each
DESCRIPTION
edge of panel. Stringers will be individually and rigidly bolted to the pedestal.
Pedestal assemblies will be hot dipped galvanized all steel welded construction
and will provide an adjustment range of +/- 25 mm (1 inch) for finished floor
heights 150 mm (6”) or greater. Pedestal assemblies will provide means of
leveling and locking the assembly at a selected height. Pedestal assembly will
have an axial load capacity of 2268 kg (5000 pounds) and an average
overturning moment of 1130 Newton Meter (1000 inch-pound). The system will
be laterally stable under seismic conditions.
JO/EWO
0002
pan system capable of supporting a concentrated load of 17.2 Mpa (2500 psi) and
uniform distributed load of 14.36 Kpa (300 psf). Panels will be finished with High-
NO.
REV
Pressure Laminate Anti-Static floor covering, with integral trim, and will comprise
00
DATE:
6/278 4.2.8 Steel Airflow Grates
PROJECT
ENGINEER Steel airflow grates will be provided for ventilation of computer floor areas. They
SSJ will be designed for static loads and will be interchangeable with standard access
6/27/08
DATE: floor panels. Grates will have 56% open area, will allow concentrated loads of 1000
CERTIFIED
lbs, uniform loads of 250 lb/ft2, and will comprise approximately 20% of the raised
6/27/08
floor area.
DATE:
CONSTRUCTION
AGENCY 4.2.9 Return Air Grilles
SSJ
DATE:
6/27/08 Return grilles for plenum area above raised floor rooms to be lay-in eggcrate ¼” x
OPERATIONS ¼” x ¼” type, without dampers. Outer borders will be constructed of heavy
ASA extruded aluminum with interlocking corners, and countersunk screw holes for neat
6/27/08 appearance. Mechanically stake to form rigid frame, finish to be paint..
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
have a specified compressive strength (fc) of no less than 35 Mpa (5000 psi).
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For the office area, the glazed aluminum curtain wall will be a heavy duty structural
SSJ
silicon glazed system. The curtain wall will be minimized on the East, West and
South faces. Glazing will have a minimum frame bite of 12mm (½ inch) for wet
ENGG CERT
ALL
glazed systems. Glazing will be heat treated insulated low-e glazing with 6mm (¼”)
outside pane, 12mm (½”) gas filled gap, and 6mm (¼”) inside pane. Maximum
ALL
glass pane size will not exceed 3.0 m2 (32 ft2). Low-e coating will be a solar control
spectrally selective coating.
At the office area, the wall system will also include cold form metal framing with
batt insulation, insulated prefinished metal wall panels over the air barrier and
sheathing board on the exterior, and gypsum wall board finish on the interior face.
Metal wall panels will be aluminum composite material.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
Wall Louvers include louvers that are not an integral part of mechanical equipment,
including louvers that are connected to ducts. Exterior grilles and screens include
products to provide solar screening, equipment screening and security barrier
systems.
Exterior solar screens will be provided at west facing glazed curtain-walls and
windows.
coating on surface 2.
4.2.10.3 Exterior Doors
NO.
REV
00
DISCIPLINE Exterior personnel doors for office areas will swing outside in the direction of
ENGINEER
egress. Glazed aluminum entrance doors will be heavy duty medium stile doors
DATE:
6/278 with insulated safety glazing, with heavy duty continuous hinges, overhead door
PROJECT
ENGINEER
closer, weather-stripping and threshold. Steel doors and frames will be
SSJ manufactured of commercial quality, stretcher leveled flatness, and galvannealed.
6/27/08
DATE: Exterior personnel doors for the data center will be steel doors and frames of
CERTIFIED
commercial quality, stretcher leveled flatness, and galvannealed.
DATE:
6/27/08 Overhead coiling doors of heavy duty construction will be provided at the loading
CONSTRUCTION
AGENCY
dock. All exit doors will have a heavy duty panic exit device with electro-
SSJ mechanical locking system, auxiliary deadbolt and RX switch for interface with IDS
DATE:
6/27/08 system. Emergency exit doors from security area will be fitted with an automatic
OPERATIONS release system of the REDLAM or SAUDI ARAMCO approved equivalent Alarm
ASA Bolt type or better. Exit only doors will not have any operable exterior hardware.
6/27/08
DATE:
4.2.10.4 Roof Construction
CONTROL NUMBER
VERIFICATION
Structural precast concrete units will be provided and will meet the prescriptive
EDSD
requirements of the governing code for fire resistance. Columns supporting roof will
DATE:
be nominal 600 x 600 (24 inch by 24 inch) or 500 x 500 (20 inch x 20 inch) precast
BY:
columns at the connector. Roof girders and beams will be, at minimum, 35 Mpa
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
location. The main roof members for the data center support areas will be a
(DCC) NO. _____________________
minimum of 35 Mpa (5000 psi) precast hollow core slab; the computer raised floor
will have double-tee precast roof beams. Concrete topping will be 4000 psi
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
concrete topping slab over structural deck. Expansion control will be provided.
SSJ
ENGG CERT
ALL
4.2.11.1 Partitions
Light weight unit masonry partitions will be provided to enclose computer data
centers, storage and support spaces and mechanical rooms. A mix of non-bearing
gypsum wallboard partitions and full-height demountable partitions will be used to
enclose offices and administration areas, conference rooms, public restrooms, and
telephone and telecommunication equipment rooms and closets.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
rating.
0002
Two 4-Wing security automatic revolving doors will be installed in the office area
6/27/08
with complete access control revolving door assembly, including circular walls,
DATE
ceiling, access hatch, ceiling lights, door wings, locks, glass, operator and drive
assembly and emergency collapsing mechanism. The doors will meet or exceed
NO.
REV
00
DATE:
6/27/08 Controller will be microprocessor-based programmable controller with
CERTIFIED self diagnostics and digital display status indicator. Status indicator
must be capable of providing information indicating “go or no-go” status,
6/27/08
DATE: source or probable cause and remedy.
CONSTRUCTION
AGENCY
SSJ
Infra-Red Sensor detection system (IRS): Ceiling mounted infrared
6/27/08
sensors capable of performing the following functions:
DATE:
OPERATIONS • Detect presence of a person after a valid card read and initiate
ASA 180 degree door rotation.
DATE:
6/27/08 • Detect the presence of a person within the door during an invalid
or unauthorized entry or exit, and will result in the door stopping,
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
with a valid card read in a trailing quadrant.
SSJ
ALL
Interior doors for the Corporate Data Center will be of extra-heavy duty seamless
construction with insulation core. All exterior frames will be fully grouted. Interior
doors for the support areas will be of heavy duty seamless construction with
JO/EWO
0002
honey-comb core. Closers will be heavy duty. RX-electrified locks for high-security
areas including computer data center will be provided. High-security exit doors will
6/27/08
be “Fail-safe”. Door Push/Pull plates, door stops, protection plates and door
DATE
00
6/27/08
DATE: 4.2.11.4 Tile Floor Finishes
OPERATIONS
ASA Ceramic floor tile will be used in restroom and locker rooms Large polished
6/27/08 granite tiles with small polished inserts will be used for the lobby, prayer, and food
DATE:
areas.
CONTROL NUMBER
VERIFICATION
EDSD
backing.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Fluid Applied Flooring will be used for many hallways and support rooms for the
OF THIS DRAWING IS COVERED, FOR ALL
data center. The system will include 100% solid clear or pigmented epoxy
(DCC) NO. _____________________
primer/binder, 100% solid flexible, self leveling epoxy matrix resin, color quartz
broadcast aggregate and clear sealer coat. The system will be chemical and stain
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
resistant, waterproof, vehicular traffic bearing, and slip resistant.
SSJ
ALL
with a freestanding wood and laminate work wall will be provided with peninsula
desk surface, return work surface, locking overhead storage with adjustable shelf
with concealed under counter lighting below and a book case. A fabric tack panel
will be installed below the overheads. A locking lateral file and pedestals in a metal
finish with wood fronts will be provided for each office.
00
complete with channels suitable for mounting up to eight (8) Building Engineer’s
DISCIPLINE
ENGINEER Framed Drawings unless noted otherwise.
DATE:
6/278 Building Engineer’s Framed Drawings will be 1 inch larger in all dimension that an
PROJECT “A” size drawing. Each Building Engineer’s Framed Drawing will be created from
ENGINEER
SSJ drawings selected by SAUDI ARAMCO during the Construction of the project. The
DATE:
6/27/08 drawing images selected by SAUDI ARAMCO will be laminated on to an Aluminum
CERTIFIED Composite Material (ACM) consisting of two sheets of smooth .02" aluminum
thermobonded to a polyethylene core in a continuous process (Alucobond or
DATE:
6/27/08 SAUDI ARAMCO approved equivalent).
CONSTRUCTION
AGENCY Once the drawings are laminated to the ACM and the Building Engineer’s Framed
SSJ
Drawing is created, the entire panel shall be coated with an overlay material to
6/27/08
DATE: allow the panels to be written on and erased with “dry-erase” type markers and
OPERATIONS
erasers. Within each vertical 1 inch border (left and right sides) a thumbslot will be
ASA
provided to allow the panels to slide left to right within the frame.
6/27/08
DATE:
Building Engineer’s Framed Drawings will plotted in color. The color yellow shall
CONTROL NUMBER
VERIFICATION
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Drawings Required
ALL
diagrams system
0002
00
specific to
each room diagram
EDSD
each room
DATE:
Utilities
BY:
Control Varies
REVISIONCERTIFICATION
Room
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.2.11.7 Chiller Room Cranes
SSJ
A 5 ton overhead top running single girder crane will be provided in each chiller
ENGG CERT
ALL
room in the Back of House. The cranes in the two (2) end chiller rooms will have
50 foot spans. The remaining four (4) chillers room cranes will have 40 foot spans.
ALL
The cranes are designed to lift and move pumps and chiller components from their
installed locations to the open floor space designated for “chiller tube pull” in front
of each roll up door. Additionally, the cranes are intended to hoist electrical
equipment, such as, automatic transfer switches to/from the ground floor to the
mezzanine.
The cranes are specified in Construction Specification section 14600 – Cranes and
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
Hoists. Structural supports for the cranes can be found in Index M and Index Q
drawings. Other data required for the cranes can be found in Index K and Index P
drawings.
4.3 Structural
utilizing a prestressed concrete hollow core system to obtain flat ceilings and
0002
reduce construction time for partition walls. The exterior walls and internal
prestressed inverted tee beams will support these members. In the data center
6/27/08
DATE
computer compartment areas, double tee prestressed members are used due to
the span distances to eliminate columns in these areas. Roof framing will be
NO.
REV
DISCIPLINE
ENGINEER
4.3.2 Wall and Column Framing
6/278
DATE: Exterior walls above finish floor will be designed using precast concrete to obtain
PROJECT
ENGINEER shop quality. The exterior walls will be designed for direct bearing of prestressed
SSJ roofing members. Non-load bearing interior walls will be designed with reinforced
6/27/08
DATE: concrete masonry units (CMU). All load bearing walls below finish floor will be
CERTIFIED
cast-in-place concrete extending to footings below.
DATE:
6/27/08 Precast interior columns will support prestressed concrete inverted tees and will
CONSTRUCTION extend from finish floor to beams. All columns below finish floor will be cast-in-
AGENCY
SSJ place concrete extending to footings below.
6/27/08
DATE:
OPERATIONS 4.3.3 Slabs and Foundations
ASA
All ground floor slabs will be designed as floating slabs on grade. A 10-foot deep
6/27/08
DATE: trenched concrete system is expected for CRAH gallery areas to allow adequate
CONTROL NUMBER
containment of chilled water piping and drainage systems. Another area of special
VERIFICATION
electrical conduit will enter and exit special concrete structures. Conduit below
these areas, including the computer floor areas, is expected to be more than 3-
DATE:
BY:
footings. For walls, a continuous concrete wall spread footings system will be
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
implemented and a spread pad footings system will be utilized for interior individual
(DCC) NO. _____________________
concrete columns.
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.3.4 Soil Investigation
SSJ
ALL
very dense, fine to medium silty sand to sandy silt, and gray, highly weathered,
moderately strong, closely spaced, limestone boulders with few voids. These
ALL
4.4.1 Contractor shall prepare Hazard Identification Plan (HIP) and shall submit the
same for review to the Loss Prevention Division.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
4.4.2 The Contractor shall also prepare a Quality Control Plan as per Schedule “Q”
and SAEP-1154 “Guidelines for Contractor’s Quality Plan” to ensure the
Contract Specifications are met. The plan, including proposed testing
laboratory, methods, rates of testing, etc. shall be submitted to the Saudi
Aramco Representative for approval prior to the start of construction.
4.4.3 Contractor shall protect existing facilities during construction. All electrical
utilities affected by the construction shall be first de-energized and non-electrical
utilities shall be isolated from the nearest isolation valve before commencing the
JO/EWO
0002
work.
6/27/08
DATE
4.4.4. The Contractor shall prepare construction phasing plan for review and approval
by Saudi Aramco representative.
NO.
REV
00
DISCIPLINE
4.4.5 The Contractor shall obtain all required construction permits from Saudi Aramco.
ENGINEER
6/278
4.4.6 The Contractor shall provide and construct detour roads to maintain existing
DATE:
PROJECT
traffic circulation functional at all times. Detour routes shall be submitted for
ENGINEER approval to concerned departments prior to construction..
SSJ
6/27/08
DATE: 4.4.7 Contractor shall perform Geotechnical Investigation and probe testing for cavity
CERTIFIED
investigation – one probe per each isolated foundation under building foundation
6/27/08 to depth of 10 meters. If cavities are encountered, Contractor shall notify Saudi
DATE:
CONSTRUCTION
Aramco representative for remedial action.
AGENCY
SSJ
6/27/08
4.5 Demolition
DATE:
OPERATIONS
ASA
4.5.1 Contractor shall remove all demolished concrete, asphalt and any other debris
6/27/08
to Saudi Aramco’s approved dumpsite.
DATE:
CONTROL NUMBER
VERIFICATION
4.5.2 Contractor shall take adequate measures to avoid excessive noise, dust
pollution and injury through falling or flying debris. Contractor shall refer to
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
4.5.3 Contractor shall apply water to all areas as required to prevent blowing of dust.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
sufficient to prevent dust nuisance. The Saudi Aramco Representative has the
right in this Contract to require additional watering whenever it is needed for
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
dust control.
SSJ
ALL
saw cut the concrete or asphalt along straight lines to a depth of not less than
50 mm. The remainder of the concrete or asphalt shall be broken out, provided
ALL
the broken area is concealed in the finished work, and the remaining concrete or
asphalt is sound. At locations where the broken face cannot be concealed, it
shall be ground smooth or the saw cut shall be made entirely through the
concrete or the asphalt.
4.5.5 Contractor shall clear the working sites and support facilities of shrubs and other
100% ISSUE FOR CONSTRUCTION
4.5.6 Contractor shall fill depressions caused by clearing and grubbing operations
with satisfactory surface soil material unless further excavation or earthwork is
indicated. Contractor shall place fill material in horizontal layers not exceeding
150 mm loose depth, and thoroughly compact as per SAES-A-114 - Excavation
and Backfill.
JO/EWO
0002
4.5.7 Contractor shall demolish concrete curbs, road signs, sign posts, gates, fence,
guardrails, concrete and asphalt pavements, as shown in Dwg. HA-175524
6/27/08
DATE
Shts. 001-004.
NO.
REV
4.5.8. Contractor shall reset part of fence to new elevation southeast of proposed Data
00
DISCIPLINE
ENGINEER
Center, as shown in Dwg. HA-175504 Sht. 004.
DATE:
6/278
4.5.9 Contractor shall demolish and remove concrete wall and its foundation as
PROJECT
ENGINEER shown in Dwg. HA-175504 Sht. 002.
SSJ
DATE:
6/27/08 4.5.10 Contractor shall demolish and remove the existing box culvert, concrete
CERTIFIED headwall and riprap as shown in Dwg. HA-175504 Sht. 003.
6/27/08
DATE: 4.5.11 Contractor shall demolish the existing sewer manhole near Gatehouse #54 as
CONSTRUCTION
AGENCY shown in Dwg. HA-175504 Sht. 002.
SSJ
6/27/08
DATE: 4.5.12 Contractor shall backfill portion of existing channel to elevation required as
OPERATIONS shown in Dwg. HA-175504 Sht. 003.
ASA
DATE:
6/27/08
4.5.13 Demolition and relocations of buildings are not part of scope of work and shall
CONTROL NUMBER
be done by others. Contractor shall coordinate with Saudi Aramco and other
VERIFICATION
contractors for the timely demolition of facilities, utilities and items noted “to be
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4.6.1 CONTRACTOR shall perform all line and grade surveys required to support the
0
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Surveying Services Division as outlined in SAES-A-100 “Survey Coordinates
SSJ
ALL
4.6.3 Prior to grading, trenching or excavating CONTRACTOR shall verify, mark and
expose all utilities (if any) in the path of construction and take precautions to
preserve their integrity. Extra care shall apply to existing cathodic protection,
communication, fiber optic and electrical cables.
100% ISSUE FOR CONSTRUCTION
4.6.4 Initial survey reference points are provided on the drawings. Any additional
DESCRIPTION
monuments, base lines, etc. required to accurately layout and control the
WORK shall be provided by CONTRACTOR.
4.6.5 CONTRACTOR shall preserve all existing survey reference points and
monuments. Should CONTRACTOR’s operations move or destroy an existing
survey monument, CONTRACTOR shall provide survey services to re-establish
the accurate monument location and shall set the re-established monument to
the satisfaction of the SAUDI ARAMCO Representative.
JO/EWO
0002
4.6.6 Contractor shall field verify the existing conditions and existing utilities prior to
start of work. If any deviations on the Drawings from the existing situation are
observed, the discrepancy shall be brought to the attention of Saudi Aramco
6/27/08
DATE
4.6.7 CONTRACTOR shall check and verify all dimensions and elevations at each
00
DISCIPLINE
ENGINEER
site. Any discrepancies shall be brought to the attention of SAUDI ARAMCO
Representative for resolution.
6/278
DATE:
PROJECT
ENGINEER 4.7 Site Preparation and Earthwork
SSJ
DATE:
6/27/08 4.7.1 The Data Center is sited on a former open storage. There is an existing open
CERTIFIED storage facility that will need to be demolished and removed. The design
concept is to minimize cutting and removal of on-site material. New structures
6/27/08
DATE: will be constructed on high-quality select “sweet sand” fill material. Finished floor
CONSTRUCTION
AGENCY elevation will be selected to provide an average of approximately 3m of select fill
SSJ
material This will provide sufficient depth for the conduit infrastructure below
6/27/08
DATE: grade to feed power to the data center computer compartments
OPERATIONS
ASA
4.7.2 Contractor shall remove all unsuitable materials from within the construction
DATE:
6/27/08
limits. Areas where unsuitable materials are encountered shall be excavated
CONTROL NUMBER
includes, rocks larger than 30 cm, debris or vegetation, organic clay, top soil, or
EDSD
4.7.3 Contractor shall clear the site in advance of earthwork construction. Prior to
REVISIONCERTIFICATION
placing any fill material on the natural subgrade levels, Contractor shall clear the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
area of all vegetation, debris and any other deleterious material, and fill all ruts,
0
soft areas, localized depressions and other defects with suitable material.
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.7.4 Contractor shall proof-roll areas to receive fill and any areas that fail to densify
SSJ
or that rut excessively shall be cut to the depth of the loose material and that
loose material removed. Prior to fill placement, the natural subgrade on which
ENGG CERT
ALL
4.7.5 Contractor shall excavate and remove all material which includes solids and
rock necessary for grading and construction in accordance with the lines and
grades shown on the plans. Excavated material shall be designated as suitable
or unsuitable for use as fill by Saudi Aramco Representative. Suitable
excavated material shall be used to construct fill areas. Unsuitable material
100% ISSUE FOR CONSTRUCTION
such as silts or clays containing organic material, soils containing large amount
DESCRIPTION
of rock, roots, grasses and other vegetation, or any debris shall be disposed of
off-site.
4.7.6 Contractor shall establish and maintain borrow pits in accordance with SAES-A-
111 -“Borrow Pit”.
4.7.7 Contractor shall maintain good drainage and shall construct any necessary and
temporary drainage systems to prevent ponding in the work site.
JO/EWO
0002
4.7.9 Contractor shall excavate and backfill the proposed site and roads accurately to
NO.
REV
DISCIPLINE
ENGINEER
4.7.10 Contractor shall excavate and backfill for the proposed utilities, pipe culvert and
DATE:
6/278
swale accurately to the lines, grades and elevations shown on the drawings.
PROJECT
ENGINEER
SSJ 4.7.11 Excavation and backfill shall be in conformance with SAES-A-114 -“Excavation
DATE:
6/27/08 and Backfill”.
CERTIFIED
DATE:
6/27/08 4.8 Landscaping and Irrigation
CONSTRUCTION
AGENCY
SSJ
4.8.1 Landscaping and irrigation will be provided around the guardhouse, entry gate
DATE:
6/27/08
area the main building entrance and the parking lot.
OPERATIONS
ASA 4.9 Road and Parking Construction
6/27/08
DATE:
4.9.1 Contractor shall grade and compact the subgrade in accordance with SAES-A-
CONTROL NUMBER
VERIFICATION
4.9.2 Contractor shall grade and compact the base course in conformance with
DATE:
BY:
Paving”.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4.9.3 Contractor shall construct roads, bus bay and parking lots, and provide guardrail
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
4.9.4 Contractor shall grade and lay asphalt concrete pavement (base and wearing
courses) and apply prime coat and tack coat in accordance with SAES-Q-006 -
ENGG CERT
ALL
4.9.5 Contractor shall provide curbs as per Saudi Aramco standard drawing AB-
036260-001 “Concrete Curb and Gutter Details”, as shown on the drawings and
in accordance with SAES-Q-001.
4.9.6 Contractor shall install unit pavers as shown on the drawings.. The concrete
compressive strength at 28 days shall be minimum 4000 psi, density shall be
100% ISSUE FOR CONSTRUCTION
4.10 Raw Water System (including fire service lines to building, and fire hydrant lines)
4.10.1 The Work shall include but shall not be limited to the following:
4.10.2 Contractor shall install Raw Water system including valves box. Pipes shall be
CLS (12 LCOU) FBE (Fusion Bonded Epoxy) coated externally and internally
cement coating; and RTR (RW-12FE0U), as noted on the drawings. Fire water
service lines to the building shall be RTR (FW-12FE0U).
JO/EWO
0002
4.10.3 Contractor shall verify all existing conditions and locate all utilities through trial
trenches or using ground penetrating radar prior to start of work.
6/27/08
DATE
4.10.4 Contractor shall provide shop drawings of the proposed valve box based on
NO.
REV
DISCIPLINE
ENGINEER
4.10.5 Installation of Raw Water appurtenances such as butterfly valve, flange adaptor,
DATE:
6/278
etc. shall be in accordance with the manufacturer’s instructions manual and in
PROJECT
ENGINEER accordance with Saudi Aramco Standards.
SSJ
DATE:
6/27/08 4.10.6 Contractor shall coordinate Raw Water works with the works of others.
CERTIFIED
4.10.7 Contractor shall layout the pipes as shown on the Drawings and as approved by
6/27/08
DATE: Saudi Aramco Representative.
CONSTRUCTION
AGENCY
SSJ
4.10.8 Contractor shall verify all horizontal and vertical site dimensions prior to staking
6/27/08
DATE: the system.
OPERATIONS
ASA
4.10.9 Contractor shall provide concrete thrust blocks at all bends, tees and caps of
DATE:
6/27/08
uPVC pipes and as specified in Saudi Aramco Standard Drawings. No thrust
CONTROL NUMBER
4.10.10 Contractor shall test the installed Raw Water pipes, adjust the proper operation
and disinfect the network as per Specifications.
DATE:
BY:
REVISIONCERTIFICATION
4.10.11 Contractor shall perform hydrostatic testing for pressure pipes conforming to the
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
007 “Hydrostatic Testing Fluids and Lay-up Procedure”. All valves shall be field
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4.7.
SSJ
4.10.12 Contractor shall layout all proposed pipes prior to demolishing existing pipes to
ENGG CERT
ALL
interruption of any service unless otherwise agreed with the concerned Utilities
Department.
4.10.13 In case cover of existing raw water pipes is less than 1.0 m due to new grades,
Contractor shall relocate the pipe to the required depth of 1.0 m cover unless
otherwise approved by the concerned Utilities Department.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
4.11.1 Work shall include but shall not be limited to the following:
4.11.2 Contractor shall install Drinking Water system valves box. Pipe shall be uPVC
(12PVOD). and RTR (DW-12FE0U), as noted on the drawings.
4.11.3 Contractor shall verify all existing conditions and locate all utilities through trial
trenches or using ground penetrating radar prior to start of work.
JO/EWO
0002
4.11.4 Installation of Drinking Water appurtenances such as ball valve, saddles, flange
adaptor, etc. shall be in accordance with the manufacturer’s instructions manual
6/27/08
DATE
4.11.5 Contractor shall coordinate Drinking Water works with the works of others.
00
DISCIPLINE
ENGINEER
4.11.6 Contractor shall layout the pipes as shown on the Drawings and as approved by
DATE:
6/278
Saudi Aramco Representative.
PROJECT
ENGINEER
SSJ 4.11.7 Contractor shall verify all horizontal and vertical site dimensions prior to staking
DATE:
6/27/08 the system.
CERTIFIED
4.11.8 Contractor shall provide concrete thrust blocks at all bends, tees and caps for
6/27/08
DATE: uPVC pipes as specified in Saudi Aramco Standard Drawings.
CONSTRUCTION
AGENCY
SSJ
4.11.9 Contractor shall test the installed Drinking Water pipes, adjust the proper
6/27/08
DATE: operation and disinfect the network as mentioned in Saudi Aramco Standards.
OPERATIONS
ASA
4.11.10 Contractor shall perform hydrostatic testing for pressure pipes conforming to the
DATE:
6/27/08
requirement of SAES-S-070 “Installation of Utility Piping System” and SAES-A-
CONTROL NUMBER
007 “Hydrostatic Testing Fluids and Lay-up Procedure”. All valves shall be field
VERIFICATION
4.7.
DATE:
BY:
4.11.11 Contractor shall layout all proposed pipes prior to demolishing existing pipes to
REVISIONCERTIFICATION
interruption of any service unless otherwise agreed with the concerned Utilities
(DCC) NO. _____________________
Department.
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
4.12.1 The Work shall include but shall not be limited to the following:
ALL
4.12.2 Contractor shall install the sewer system including pipes and manholes. Sewer
lines shall be of uPVC Class 3 (80PVOD) and RTR (SWS-80FE0D), as noted
on the drawings.
4.12.3 Contractor shall verify all existing conditions and locate all utilities through trial
trenches or using ground penetrating radar prior to start of work.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
4.12.4 Contractor shall provide shop drawings of all proposed sewer manholes and the
connection to the existing manhole for approval by Saudi Aramco
Representative.
4.12.6 Contractor shall layout the pipes and manholes as shown on the Drawings or as
directed by Saudi Aramco Representative.
JO/EWO
0002
4.12.7 Contractor shall verify all horizontal and vertical site dimensions prior to staking
the system.
6/27/08
DATE
00
DISCIPLINE
ENGINEER
4.12.9 Contractor shall coordinate sewer works with the works of others.
DATE:
6/278
4.12.10 Contractor shall test the sewer system after installation as per Saudi Aramco
PROJECT
ENGINEER Standards.
SSJ
DATE:
6/27/08 4.12.11 Contractor shall provide bypass line(s), pumps and electric generators before
CERTIFIED replacing/connecting to existing sewer lines. Contractor shall check the
elevations of tie-in points, adjust pipe elevation if necessary, and submit a
6/27/08
DATE: statement of method for work to be approved by Saudi Aramco Representative,
CONSTRUCTION
AGENCY prior to start of work. Contractor shall execute the work with minimal
SSJ
interference with normal operation of the system.
6/27/08
DATE:
OPERATIONS 4.12.12 In case cover of existing force main is less than 1.0 m due to new grades,
ASA
Contractor shall relocate the pipe to the required depth of 1.0 m cover unless
DATE:
6/27/08
otherwise approved by the concerned Utilities Department.
CONTROL NUMBER
VERIFICATION
The Work shall include but shall not be limited to the following:
DATE:
BY:
REVISIONCERTIFICATION
4.13.1 Contractor shall provide grouted riprap as shown on the site layout drawing HA-
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4.13.2 Contractor shall provide geotextile on all grouted riprap as shown on the
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
drawing HA-175506.001.
SSJ
4.13.3 Contractor shall build 2-800 dia. FRP pipe culvert located at the Access Road
ENGG CERT
ALL
entrance near the intersection with Old Abqaiq Access Road. The culvert shall
be provided with grouted riprap. Contractor shall construct headwalls at the
ALL
inlet and outlet of the culvert and gabions aprons at the outlet of the culvert.
4.13.4 Contractor shall install the storm sewer system including inlets, pipes and
manholes. Storm sewer lines shall be RTR.(SWS-80FE0D).
.
4.13.5 Contractor shall verify all existing conditions and locate all utilities through trial
100% ISSUE FOR CONSTRUCTION
4.13.6 Contractor shall provide shop drawings of all proposed storm structures for
approval by Saudi Aramco Representative.
4.13.8 Contractor shall layout the pipes and structures as shown on the Drawings or as
directed by Saudi Aramco Representative.
JO/EWO
0002
4.13.9 Contractor shall verify all horizontal and vertical site dimensions prior to staking
the system.
6/27/08
DATE
00
DISCIPLINE
ENGINEER
4.13.11 Contractor shall coordinate drainage works with the works of others.
DATE:
6/278
4.13.12 Contractor shall test the sewer system after installation as per Saudi Aramco
PROJECT
ENGINEER Standards.
SSJ
DATE:
6/27/08 4.14 Site Electrical Work
CERTIFIED
DATE:
6/27/08 4.14.1 This project will provide necessary concrete duct banks to support and provide
CONSTRUCTION for future 115 KV underground cable across the existing roads to the CDC
AGENCY
SSJ
Building electrical substation. The construction shall comply with applicable
6/27/08 Saudi Aramco Standards.
DATE:
OPERATIONS
ASA
4.14.2 Contractor shall construct duct banks across Old Abqaiq Road, Old Abqaiq
6/27/08
Access Road and Patrol Road of CDC Building as shown on Drawings HA-
DATE:
175519 and HA-175520.
CONTROL NUMBER
VERIFICATION
4.14.3 Contractor shall coordinate the exact location of the concrete ductbanks with
EDSD
location of the tie-in point to SEC 115 KV line and on existing field conditions.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
4.15.1 This project will provide necessary infrastructure to support the communications
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
requirements for the new Corporate Data Center. The construction shall comply
SSJ
with Saudi Aramco Standards, and using BICSI TDM methods of construction
and the Company Construction and Installation Standards. The
ENGG CERT
ALL
4.15.2 The Contractor shall provide an outside plant network to serve the
communications services as shown on the drawings listed below:
Reference Drawings
HA-175522.001-002 Conduit and Trench Layout
HA-175523.001 Conduit and Crossing Details
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
4.15.3 The works shall include but not limited to the following:
4.15.3.2 The Contractor shall trench, excavate and install concrete encased
duct bank from the existing MH #3151 to an interface point located 1.5 meters
inside the fence of CDC building via 2 proposed type 1B new manholes as
shown on Dwg. # HA-175522.001.
JO/EWO
4.15.3.2 The Contractor shall trench, excavate and install concrete encased
0002
duct bank from the existing MH #5342B to an interface point located 1.5 meters
inside the fence of CDC building via 1 proposed type 1B new manhole as shown
6/27/08
DATE
on Dwg. # HA-175522.002.
NO.
REV
DATE:
6/278 4.16 Site Painting and Coating Work
PROJECT
ENGINEER
SSJ
4.16.1 All structural steel works shall be painted in accordance with SAES-H-101
6/27/08 Approved Protective Coating System, APCS-6.
DATE:
CERTIFIED
4.16.2 All bolts, anchors, and members embedded in concrete shall be coated with
DATE:
6/27/08 APCS-1C primer only of SAES-H-101 Approved Protective Coating Systems.
CONSTRUCTION
AGENCY
SSJ 4.16.3 All surfaces of concrete which are in contact with earth shall be coated with
DATE:
6/27/08 APCS-10 of SAES-H-101 Approved Protective Coating Systems.
OPERATIONS
ASA 4.16.4 All steel reinforcement shall be fusion bonded epoxy coated per 09-SAMSS-106
DATE:
6/27/08 Epoxy Coating of Steel Reinforcing Bars.
CONTROL NUMBER
VERIFICATION
4.16.6 Provide and install polyethylene vapor barrier under concrete in accordance with
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
4.17.1 Contractor shall construct all concrete items which includes, but is not limited to
the following:
ENGG CERT
ALL
• Valve Boxes.
ALL
4.17.2 All structural and non-structural concrete and reinforcement steel works shall be
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
0002
6/27/08
NO. DATE
REV
00
DISCIPLINE
ENGINEER
6/278
DATE:
PROJECT
ENGINEER
SSJ
6/27/08
DATE:
CERTIFIED
6/27/08
DATE:
CONSTRUCTION
AGENCY
SSJ
6/27/08
DATE:
OPERATIONS
ASA
6/27/08
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 5.0 - DETAILED DESCRIPTION OF WORK
SSJ
ALL
5.1 General
ALL
5.1.1 All work shall comply with the requirements of SAUDI ARAMCO Engineering
and Safety Standards and appropriate SAUDI ARAMCO specifications.
5.1.2 All work shall be performed by qualified personnel who are thoroughly trained
and experienced in the particular scope of work to be executed.
100% ISSUE FOR CONSTRUCTION
5.1.3 All equipment openings shall be covered or plugged to prevent the entry of
DESCRIPTION
foreign matter.
5.1.4 CONTRACTOR shall ensure that all equipment are erected, properly aligned,
leveled, and adjusted for satisfactory operation.
0002
DISCIPLINE
ENGINEER unloading it, lifting it and installing it. Inspecting mechanical equipment
upon receipt and also immediately after moving from storage or pickup
6/278
DATE: area to installation site for damage or defect in main or auxiliary
PROJECT
ENGINEER equipment and submitting written report of damage and defects.
SSJ • Lifting mechanical equipment at the work site and setting on permanent
6/27/08
DATE: foundations.
CERTIFIED
• Bolting equipment to foundations.
6/27/08
• Grouting as required.
DATE:
CONSTRUCTION
• Hooking up all connections, platforms, ladders, instruments, etc. in
AGENCY
SSJ
accordance with the applicable drawings and manufacturer’s
6/27/08
instructions.
DATE:
OPERATIONS
• Making good all damage and defects in coating caused during
ASA
transportation and erection.
6/27/08
• Testing of mechanical equipment for operability prior to commissioning.
DATE:
CONTROL NUMBER
VERIFICATION
5.1. 7 CONTRACTOR must take proper care of mechanical equipment given to him.
This would include space heaters on motors, protective grease on machined
EDSD
commissioning.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
5.1.9 All welding will be seal welding. No stitch, skip or spot welding will be allowed.
ENGG CERT
ALL
5.1.10 All tags and signs, flow arrows and product stenciling shall be by
CONTRACTOR. Wording shall be approved by SAUDI ARAMCO
ALL
5.2.1 Overview
100% ISSUE FOR CONSTRUCTION
The intent is to design mechanical systems where all critical systems and
DESCRIPTION
components are reliable and flexible. This includes, but is not limited to, Chilled
Water Plant, Air Handling Units, piping and control systems. Single failures of
equipment, piping and control systems will not result in overall failure of the
mechanical systems to perform their required functions.
Raised floor air-conditioning will be provided by down flow computer room air-
handlers.
The primary cooling source for the air-handlers will be high efficiency water-
JO/EWO
0002
ton hours.
NO.
REV
A direct digital building automation system (BAS) will be provided to control and
00
DISCIPLINE
ENGINEER
monitor all mechanical systems.
DATE:
6/278
5.2.2 Raised Floor
PROJECT
ENGINEER
SSJ Raised Floor Depth
6/27/08
DATE:
CERTIFIED CFD modeling was conducted to determine the minimum raised floor plenum
(RFP) depth. The models show the RFP should not be less than 48 inches (1.23
6/27/08
DATE: M) deep to allow high density computing operations on the raised floor. In order
CONSTRUCTION
AGENCY to use the raised floor space to maximum efficiency, heat dissipation of
SSJ
computer equipment cannot be spread uniformly throughout the data center.
6/27/08
DATE: When the computer equipment is placed on the floor to achieve the best
OPERATIONS operation of computers, some areas will have a higher heat load density and
ASA
therefore need more cooling. This translates into larger air flow quantities. The
DATE:
6/27/08
48” RFP is deep enough to deliver the additional air flow required for high
CONTROL NUMBER
density areas, with minimum restriction to flow. For a 36” RFP, it is not deep
VERIFICATION
enough to deliver the sizeable amount of air required for the high density areas
EDSD
as hot spots will be developed. The elevated temperatures would shorten the
service and reliability of computer equipment.
DATE:
BY:
REVISIONCERTIFICATION
The project provides CRAH galleries that separate CRAH units from the
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
situate CRAHs on the CRRF, directly adjacent to sensitive electronic equipment.
SSJ
Having the CRAHs on the CRRF required chilled water piping to crisscross the
entire subfloor. Most data center’s facility managers are concerned about the
ENGG CERT
ALL
high potential for chilled water leaks in the subfloor area inherent with locating
CRAHs on the CRRF. CRAHs have a notorious reputation for leaks in the
ALL
subfloor of the CRRF. Numerous and costly schemes have been implemented
to minimize the likelihood of such occurrences. However, these schemes could
not eliminate the high risk of water leaks in the subfloor of the CRRF during
routine CRAH maintenance. In the past 5-10 years, best practices and lessons
learned have changed this conventional approach to locate the CRAHs in
separate adjacent galleries.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
Adjacent CRAH galleries eliminate most of the inherent flaws of locating the
CRAHs directly onto the CRRF. Maintenance of chilled water piping and
associated fittings is restricted to the gallery areas. This eliminates accidental
human factor damage to electrical/electronic equipment located on the CRRF.
Additionally, accidental spillage of chilled water onto the CRRF is avoided.
Maintenance of CRAHs is also restricted to gallery areas, thus again eliminating
accidental human factor damage to electrical /electronic equipment located on
the CRRF.
JO/EWO
0002
At a CRRF computer power density of 200 watts/ft2, the CRAHs will discharge a
considerable amount of noise that is a significant problem for the day-to-day
operation at the CRRF. Locating the CRAHs in separate galleries will enhance
6/27/08
DATE
the operations on the CRRF and contain this noise within the galleries. CRRF
security is also enhanced by restricting entry to the CRRF solely to personnel
NO.
REV
DISCIPLINE
ENGINEER
piping, fittings and appurtenances will be housed in the galleries. The duct wall
penetrations will have combination fire and smoke dampers.
6/278
DATE:
PROJECT
ENGINEER 5.2.3 Thermal Storage System
SSJ
DATE:
6/27/08 In order to provide emergency cooling during power outages that cause chiller
CERTIFIED restarts, the project will have a Thermal Storage Tank (TST). The carbon steel
TST will be 45 feet (13.72 meters) tall and 51 feet (15.54 meters) in diameter,
6/27/08
DATE: with 6 inches of closed cell insulation and outer aluminum cladding, and will hold
CONSTRUCTION
AGENCY 670,000 gallons of chilled water. The TST will have two internal diffusers - one
SSJ
near the top and one near the bottom. The diffusers will reduce the water
6/27/08
DATE: velocity as water enters and leaves the tank. The low velocity water will induce
OPERATIONS less turbulence in the TST and will better maintain the thermal separation in the
ASA
TST between the warmer water at the top and the colder water toward the
DATE:
6/27/08
bottom.
CONTROL NUMBER
VERIFICATION
During normal operation, the chilled water plant will produce 5-10% extra chilled
EDSD
water flow to charge the TST. The extra flow will enter the TST through the
bottom diffuser. Water at the top of the TST will be slightly warmer than the
DATE:
BY:
water entering the bottom of the tank. The warmer water at the top of the tank
REVISIONCERTIFICATION
will flow to the chilled water return and back to the chillers. This normal
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
operation mode will maintain the TST full of chilled water close to the
0
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
When one or more chillers fail, the pump or pumps that circulate chilled water
SSJ
through the failed chiller(s) will stop and the flow through the TST will be
reversed. The colder water at the bottom of the tank will flow to the chilled water
ENGG CERT
ALL
supply header and the chilled water return will flow to the top of the TST. The
coldest chilled water at the bottom of the TST will replace the chilled water from
ALL
the failed chiller(s). The top of the TST will temporarily store the hot return
chilled water. In this manner the TST will supply 4,000 ton hours of cooling
during a failed chiller mode or loss of main power or delay of generator power.
This 4,000 ton-ours of cooling provides chilled water to the raised floor CRAHs
for 15 minutes at a heat load of 200 watts/ft2, the same duration as the UPS
battery system.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
During all modes of operation, the water level in the TST will be constant. The
boundary of the cold and hot water in the tank will move up and down, but the
total amount of water in the tank will not change. Total volume of water in the
chilled water system will also be constant. The only change in volume will be a
very small change due to thermal expansion/contraction as the percentage of
cold and warm water changes in the system.
0002
The main mechanical plant will consist of an N+50% chiller and cooling tower
configuration. Due to the possibility of a chiller refrigerant leak, no more than
two (2) chillers will be in a single room. The plant will therefore have six
6/27/08
DATE
separate chiller rooms and will be provided with a valve arrangement so that
any room can be isolated from the others. Thus, a refrigerant leak can only
NO.
REV
affect the leaking chiller and the single adjoining chiller. There will be a thermal
00
DISCIPLINE
ENGINEER
water storage tank to provide a minimum of 4,000 ton hours of emergency
chilled water to the plant. The complete plant will have a total of twelve chillers
DATE:
6/278
(six future), twelve cooling towers (six future), twelve constant speed primary
PROJECT
ENGINEER chilled water pumps (six future), twelve constant speed condenser water pumps
SSJ (six future) and twelve VFD secondary chilled water pumps (six future). The
DATE:
6/27/08 total plant peak load will be 3,000 tons for Current Project and 5,500 tons for
CERTIFIED Future Project. Chiller installation will be staged to accommodate this load. For
the Current Project, at no time should more than 4 chillers be running when the
6/27/08
DATE: plant is operating at maximum peak load.
CONSTRUCTION
AGENCY
SSJ
5.2.4.1 Water Cooled Chillers
6/27/08
DATE:
OPERATIONS The water cooled centrifugal chillers, will have an actual capacity (after testing
ASA
tolerances have been accounted for) of 750 tons at 45°F chilled water
DATE:
6/27/08
temperature (operating) with a 10°F temperature differential.
CONTROL NUMBER
VERIFICATION
Actual chiller efficiency, after testing tolerances, will be 0.68 kW/ton. All chillers
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
during periods with lower cooling requirements by matching the water flow to the
SSJ
load requirements. Each chiller room will have a refrigerant leak detection
system.
ENGG CERT
ALL
A Schedule of Material for chilled water, condenser water, storm water drainage,
sanitary piping, domestic water piping, sprinkler piping, fuel oil piping, vent
piping, humidification piping, and fire suppression piping is provided in a table in
section 6.6. All chilled water piping will be insulated with closed cell insulation
meeting NFPA and smoke rating. Exposed pipe insulation will have an
100% ISSUE FOR CONSTRUCTION
aluminum jacket. The thickness and type of insulation will comply with Saudi
DESCRIPTION
Aramco Standards. The piping in the galleries will have a capped connection
for future connection. The future connection will be available for either
additional CRAH units or direct cooled computer equipment. Dielectric
couplings shall be provided at all junctions of dissimilar piping materials to
prevent corrosion.
There will be a total of twelve cooling towers (six future) and twelve condenser
JO/EWO
0002
water pumps (six future) making up the condenser water system. All of the
cooling towers will drain to atmospheric sumps. The sumps will be constructed
below the cooling towers and will be sized to provide five minutes supply of
6/27/08
DATE
water at the circulation rate of that cooling tower. The individual cooling tower
will be joined together with manually operated valves to all other cooling towers.
NO.
REV
The cooling towers will be counter flow type and non-combustible construction.
00
DISCIPLINE
ENGINEER
The cooling towers will have a design entering wet bulb temperature of 92
degrees F.
6/278
DATE:
PROJECT
ENGINEER Raw water will be utilized as make-up water to the cooling tower sumps. Two
SSJ (redundant) make-up water lines will supply water to a raw water storage tank in
DATE:
6/27/08 the equipment yard. The system will be piped so the water can be supplied
CERTIFIED from the storage tank to any of the cooling tower sumps as required.
6/27/08
DATE: Each cooling tower sump will be equipped with a dedicated drain and a digital
CONSTRUCTION
AGENCY water level control system that will sense and alarm high and low water levels.
SSJ
Sump sweeping systems with solid separation will be provided for basin
6/27/08
DATE: cleaning.
OPERATIONS
ASA
5.2.5 Computer Room Cooling
6/27/08
DATE:
CONTROL NUMBER
The computer rooms will have 48 inch (1.22 meters) raised floor plenum to
VERIFICATION
distribute cooling air throughout the room. Floor grates with dampers and a
EDSD
minimum of 56% open free area will be in the floor to supply air to room. Each
CRAH will have supply and return ducts and smoke/fire dampers. The CRAH
DATE:
BY:
will be in equipment galleries along the length of the computer rooms. The
REVISIONCERTIFICATION
galleries will provide maintenance space for the CRAH so that the maintenance
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
staff will not have to enter the computer room. There will be 144 (72 future)
0
down flow, chilled water CRAH units to circulate air to cool the raised floor area.
(DCC) NO. _____________________
The CRAH units will be equipped with two way valves, filters, disconnect switch
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and dual power (A & B power) static switches. Reheat and humidification are
SSJ
not provided by the CRAH units. Dual supply and return chilled water mains will
serve all the CRAHs. The dual supply and return piping provides 100%
ENGG CERT
ALL
redundancy for the water supply requirements for the CRAHs. The CRAHs will
be nominal 40 ton units.
ALL
Six outside air make up air handling units (4 duty and 2 standby) will be
installed. These units will humidify and pressurize outside air for the raised floor
areas. The make up air handling units will have electric pre-heat and reheat
coils, chilled water cooling coils, draw through fans, filters and electric steam
humidifiers.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
A 48 inch raised floor height is being recommended based on the power density
requirement of 200 watts/ft2. After modeling several different configurations,
there are clear short cycling problems (heat returning to the front of the IT
JO/EWO
0002
cabinets) associated with a 36 inch raised floor. The poor velocities and
pressures shown in the models are most noticeable when modeling the failure
of the CRAH units. Raising the floor height helps to lower the velocities and
6/27/08
DATE
provide a more uniform pressure gradient across the floor, thereby mitigating
the problems of short cycling.
NO.
REV
00
DISCIPLINE
ENGINEER
5.2.6 Ventilation/Humidification
DATE:
6/278
Data Center
PROJECT
ENGINEER
SSJ • Dedicated air handling units (AHUs) will be provided to offset data center
DATE:
6/27/08
skin and lighting loads and to provide pressurization and humidification.
CERTIFIED These AHU’s will provide fresh air to the Data Center areas.
6/27/08
DATE: • Humidification will be of the electric, steam generating type.
CONSTRUCTION
AGENCY
•
SSJ
Pressurization will be maintained by modulating the outside air dampers
6/27/08
DATE: to maintain the data center positive to adjacent corridors.
OPERATIONS
•
ASA
Dedicated redundant exhaust fans will be provided to purge smoke and
6/27/08
DATE: gaseous fire suppression released into raised floor areas.
CONTROL NUMBER
VERIFICATION
•
DATE:
The project provides six UPS rooms and corresponding battery rooms.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
other fan. The exhaust fans will be 2-speed fans such that each fan will
SSJ
ALL
•
0002
units will be equipped with two-way valves, filters, disconnect switch and
DATE
dual power (A & B power) static switches. Reheat and humidification are
not provided at the CRAH units
NO.
REV
00
DISCIPLINE
ENGINEER Constant Volume System for Support Rooms (Except Battery Rooms) -
Ventilation
6/278
DATE:
•
PROJECT
ENGINEER Dedicated AHUs will be provided to ventilate, condition and pressurize
SSJ these spaces. (See the floor plans for spaces served.) These spaces
6/27/08
DATE: will be areas not normally occupied and will not require comfort cooling.
CERTIFIED
6/27/08
Variable Air Volume (VAV) System for Support Rooms - Ventilation
DATE:
CONSTRUCTION
AGENCY • The VAV system will supply normally occupied support spaces and
SSJ
spaces that require dedicated zone thermostats.
6/27/08
DATE:
OPERATIONS
• Units will be of the variable air volume (VAV) type utilizing shut off VAV
ASA
boxes with SCR type electric heat. See the floor plans for spaces
6/27/08
DATE: served.
CONTROL NUMBER
VERIFICATION
Miscellaneous Cooling
EDSD
DATE:
• Rooms with large cooling loads similar to computer rooms, such as the
BY:
network room, will have N+1 CRAHs to cool the room. The VAV system
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
will provide ventilation. The down flow CRAH in the room will re-circulate
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
Office Area
ENGG CERT
ALL
• The Office Area will be served by two variable volume air handling units.
These units will be equipped with filters, return air bypass sections,
ALL
chilled water cooling coils and draw through fans equipped with variable
frequency drives. There will be an electric preheat coil in the outside air
intake duct. The air distribution systems will be low velocity under the
raised floor variable volume systems. These systems will utilize modular
integrated terminals (MITs) to regulate air flow to maintain zone
temperature via local thermostats mounted on the walls. Interior zones
100% ISSUE FOR CONSTRUCTION
are served by cooling only MIT boxes that are open to the under floor
DESCRIPTION
plenum. Perimeter zones will be served by MIT boxes that are ducted to
modular fan terminals (MFT) with electric reheat for skin load control.
• Local zone thermostats will control the perimeter fan terminals. Static
pressure, temperature and dew point sensors located under the raised
floor will be used to maintain supply air temperature at 60°F, adjustable,
by bypassing return air around the cooling coil. The supply fan speed
will modulate to maintain a static pressure of 0.05 inches under the floor.
Relief fans will be activated whenever the air handlers are activated.
JO/EWO
0002
• The Office Area under floor air handlers function independently. Each
unit will be equipped with its own controller. Air handler control,
NO.
REV
00
monitoring and alarm functions will be by the BMS vendor. However, the
DISCIPLINE
ENGINEER MIT and MFT boxes are local control only.
•
6/278
DATE: A dedicated air handler will serve other Office Area rooms (including the
PROJECT
ENGINEER lobby, prayer room, restrooms, etc.) that are located on the first and
SSJ
second floors not on raised floor. The unit will be equipped with filters,
6/27/08
DATE: electric preheat coil, chilled water cooling coil and draw-through fan
CERTIFIED
equipped with a variable frequency drive. The air distribution system will
6/27/08
be an overhead variable volume system with electric reheat at the
DATE:
CONSTRUCTION
perimeter for skin load control. Supply fan speed will be modulated to
AGENCY maintain duct static pressure at a location in the supply ductwork. There
SSJ
are exhaust fans for the Restrooms, Locker and Food Area. These will
6/27/08
DATE:
operate continuously or on a time schedule.
OPERATIONS
ASA
• The VIP Function Auditorium will be served by its own dedicated air
6/27/08
DATE: handler and return air fan. The unit will be equipped with filters, chilled
CONTROL NUMBER
water cooling coil and draw through fan equipped with a motor starter.
VERIFICATION
via wall mounted thermostats. The return air fan will be activated
BY:
whenever the air handler is activated. The return fan will be equipped
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
with a relief air damper that will modulate with the return air damper of
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
5.3.2 CONTRACTOR shall provide and install exhaust fans centrifugal type
complete with associated accessories as shown on the drawings and in
accordance with project specifications and Saudi Aramco standards and
specifications.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
5.3.3 CONTRACTOR shall provide and install supply and return metal ductworks
complete with fittings, insulation, sealant, hanger and supports as shown on
the drawings and in accordance with project specifications and Saudi Aramco
standards and specifications.
5.3.4 CONTRACTOR shall provide and install exhaust metal ductworks complete
with fittings, sealant, hanger and supports as shown on the drawings and in
accordance with project specifications and Saudi Aramco standards and
specifications.
JO/EWO
0002
5.3.5 CONTRACTOR shall provide and install diffusers, registers and sand trap
louver complete with mounting accessories as shown on the drawings and in
6/27/08
DATE
00
DISCIPLINE
ENGINEER
5.3.6 CONTRACTOR shall provide and install pre-insulated flexible supply ducts
complete with hanger and supports as shown on the drawings and in
DATE:
6/278
accordance with project specifications and Saudi Aramco standards and
PROJECT
ENGINEER specifications.
SSJ
DATE:
6/27/08 5.3.7 CONTRACTOR shall provide and install manual control volume dampers
CERTIFIED complete with mounting accessories as shown on the drawings and in
accordance with project specifications and Saudi Aramco standards and
6/27/08
DATE: specifications.
CONSTRUCTION
AGENCY
SSJ
5.3.8 CONTRACTOR shall provide and install smoke and fire dampers complete
6/27/08
DATE: with mounting accessories as shown on the drawings and in accordance with
OPERATIONS project specifications and Saudi Aramco standards and specifications.
ASA
DATE:
6/27/08
5.3.9 Provide and install filters complete with mounting accessories as shown on the
CONTROL NUMBER
5.3.10 Provide and install pipe condensate drain piping complete with fittings, and
DATE:
BY:
5.3.11 Provide and install flexible duct connector complete with mounting accessories
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DO CUMEN T WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco standards and specifications.
SSJ
5.3.12 Provide and install wall louvers and sand trap louvers complete with mounting
accessories as shown on the drawings and in accordance with project
ENGG CERT
ALL
5.3.14 Provide testing, adjusting and balancing for the HVAC system in accordance
with project specifications and Saudi Aramco standards and specifications
100% ISSUE FOR CONSTRUCTION
5.3.15 CONTRACTOR shall provide and install air terminal units complete with
DESCRIPTION
5.3.16 CONTRACTOR shall provide and install chilled water computer room air
handler (CRAH) units complete with associated accessories as shown on the
drawings and in accordance with project specifications and Saudi Aramco
standards and specifications
5.3.17 CONTRACTOR shall provide and install air handling units complete with
JO/EWO
0002
5.3.18 CONTRACTOR shall provide and install electric unit and cabinet heaters
complete with associated accessories as shown on the drawings and in
NO.
REV
DISCIPLINE
ENGINEER
specifications.
DATE:
6/278
5.3.19 CONTRACTOR shall provide and install intake and exhaust roof hoods
PROJECT
ENGINEER complete with roof curbs as shown on the drawings and in accordance with
SSJ project specifications and Saudi Aramco standards and specifications.
6/27/08
DATE:
CERTIFIED 5.3.20 CONTRACTOR shall provide and install electric duct heaters complete with
associated accessories as shown on the drawings and in accordance with
6/27/08
DATE: project specifications and Saudi Aramco standards and specifications.
CONSTRUCTION
AGENCY
SSJ
5.3.21 CONTRACTOR shall provide and install electric humidifiers complete with
6/27/08
DATE: associated accessories as shown on the drawings and in accordance with
OPERATIONS project specifications and Saudi Aramco standards and specifications.
ASA
DATE:
6/27/08
5.4 Heating, Ventilating and Air-Conditioning (HVAC) Hydronic Systems
CONTROL NUMBER
VERIFICATION
5.4.1 CONTRACTOR shall provide and install centrifugal water chillers complete
EDSD
5.4.2 CONTRACTOR shall provide and install double end suction pumps and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
specifications.
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
5.4.3 CONTRACTOR shall provide and install cooling towers complete with
associated accessories as shown on the drawings and in accordance with
ENGG CERT
ALL
5.4.4 CONTRACTOR shall provide and install thermal energy storage tank and raw
water storage tank complete with associated accessories as shown on the
drawings and in accordance with project specifications and Saudi Aramco
standards and specifications.
5.4.5 CONTRACTOR shall provide and install air separators complete with
100% ISSUE FOR CONSTRUCTION
5.4.6 CONTRACTOR shall provide and install expansion tanks complete with
mounting accessories as shown on the drawings and in accordance with
project specifications and Saudi Aramco standards and specifications.
5.4.7 CONTRACTOR shall provide and install butterfly valves complete with
accessories as shown on the drawings and in accordance with project
specifications and Saudi Aramco standards and specifications.
JO/EWO
0002
5.4.8 CONTRACTOR shall provide and install flow meters complete with
accessories as shown on the drawings and in accordance with project
6/27/08
DATE
5.4.9 CONTRACTOR shall provide and install sump cleaning solid separator
00
DISCIPLINE
ENGINEER
removal system complete with associated accessories as shown on drawings
and in accordance with project specifications and Saudi Aramco standards
DATE:
6/278
and specifications.
PROJECT
ENGINEER
SSJ 5.4.10 CONTRACTOR shall provide and install variable frequency drives complete
DATE:
6/27/08 with mounting accessories as shown on the drawings and in accordance with
CERTIFIED project specifications and Saudi Aramco standards and specifications.
6/27/08
DATE: 5.4.11 CONTRACTOR shall provide and install meters and gages as shown on
CONSTRUCTION
AGENCY drawings and in accordance with project specifications and Saudi Aramco
SSJ
standards and specifications.
6/27/08
DATE:
OPERATIONS 5.4.12 CONTRACTOR shall provide and install HVAC water treatment system
ASA
complete with associated accessories as shown on the drawings and in
DATE:
6/27/08
accordance with project specifications and Saudi Aramco standards and
CONTROL NUMBER
specifications.
VERIFICATION
EDSD
5.4.13 CONTRACTOR shall provide and install liquid leak detection systems
complete with associated accessories as shown on the drawings and in
DATE:
BY:
specifications.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
5.5 Plumbing
SSJ
ALL
Storm Drainage
ALL
Primary roof drainage will be served by roof drains and piped to flow by gravity.
Below grade piping will also flow by gravity to the site distribution system.
Cleanouts will be provided per code. Building elements and functions will also
be considered for locating cleanouts to avoid placement in areas where their
use could cause potential damage.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
0002
to primary roof drains. These drains will be piped independently of the primary
system and will visibly discharge to grade indicating there is a problem with the
primary roof drain system. Areaways will be provided with areaway drain type
6/27/08
DATE
fixtures and will be piped to the site storm collection system and will flow by
gravity.
NO.
REV
00
DISCIPLINE
ENGINEER
Condensate from CRAH units will be piped to floor drains located in the gallery
spaces. These drains will not be trapped but will be provided with antisplash
DATE:
6/278
fittings and funnels. Condensate will be piped to a central sump location outside
PROJECT
ENGINEER the gallery spaces. The sump will serve as an indirect waste connection to the
SSJ storm water system. The outlet from the sump will be through a trapped and
DATE:
6/27/08 vented floor drain and will discharge to the site storm water collection system by
CERTIFIED gravity. The trap will have an automatic self primer to protect the trap water seal.
6/27/08
DATE: An overflow sump will be provided adjacent to the primary and will have a
CONSTRUCTION
AGENCY separate site connection. This will avoid shutdown in the event there is a
SSJ
problem with the primary storm drainage, particularly during heavy rains. The
6/27/08
DATE: discharge main from the CRAH units into the sump, as well as the outlets from
OPERATIONS each sump, will be provided with back water valves for additional protection.
ASA
The primary sump will have a high level alarm panel with local alarm and will
DATE:
6/27/08
also report to the BMS. Cleanouts will be provided per code and Saudi Aramco
CONTROL NUMBER
Standards. Building elements and functions will also be considered for locating
VERIFICATION
cleanouts to avoid placing them in areas where their use could cause potential
EDSD
damage.
DATE:
BY:
Drains and associated piping will be provided in the Data Rooms. Each drain
REVISIONCERTIFICATION
will terminate in the gallery trenches, above the trench finished floor elevation.
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
These drains are for future use in the event chilled water is required for cooling
0
in the Data Rooms. Initially, the drains will be capped within the trench, isolated
(DCC) NO. _____________________
from the main drainage systems and the floor drain body within the Data Room
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
will be fitted with a solid grate which can be retrofitted to a strainer at a later
SSJ
ALL
Sanitary drainage will discharge via an eight inch line from the facility to an on-
site lift station (if needed). Floor drains with vented deep seal traps will be
provided in all toilet rooms and mechanical rooms.
All fixtures, including floor drains, will be vented. Venting systems will terminate
through the roof with minimal roof penetrations.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
Battery Rooms will be provided with trapped and vented floor drains to serve
emergency shower and eye/face wash fixtures and to serve wash down in the
event of electrolyte spills. Drain, waste and vent piping will be high density
polypropylene acid resistant and will be independent of other drainage systems.
Waste will be piped to an acid neutralization tank in a readily accessible location
just outside the facility. Venting serving the acid waste system will be extended
to roof terminations through acid resistant piping and will be dedicated to the
acid waste system. A sampling sump with pH monitor will be provided and
report to the building’s BMS system.
JO/EWO
0002
on/off status, motor failure, lead/lag, multipump operation and tank level with
high level alarm.
NO.
REV
00
DISCIPLINE
ENGINEER
Sweet and Raw Water Systems
DATE:
6/278
One four inch sweet (potable) water service will be required to serve domestic
PROJECT
ENGINEER water requirements for this facility. A twelve inch raw water service will provide
SSJ make-up water, firefighting capability and irrigation. The raw water storage tank
DATE:
6/27/08 will be located near the TESS tank. The BMS will monitor water pressure and
CERTIFIED tank level. The raw water storage tank will provide 72 hours of make-up water
for the condenser water system when operating at peak load.
6/27/08
DATE:
CONSTRUCTION
AGENCY The fire service will be a separate, dedicated raw water service. The sweet
SSJ
water service and the raw water portion used for make-up will be installed with
6/27/08
DATE: strainer, meter, reduced pressure backflow prevention device (RPZ) and bypass
OPERATIONS prior to distribution to the facility. The bypass associated with this service will
ASA
also include an RPZ. Each cold water make up will be three inch and be
DATE:
6/27/08
provided with a dedicated RPZ. RPZs will be centrally located with indirect
CONTROL NUMBER
drains piped directly to the exterior. Floor drains within the room will also be
VERIFICATION
provided. Sweet water distribution will be through insulated copper piping and
EDSD
have ball valves at each branch, each piece of connected equipment or each
fixture. All piping serving equipment with quick closing devices or valves will be
DATE:
BY:
provided with piston type water hammer arrestors. An isolation valve will be
REVISIONCERTIFICATION
Domestic hot water will be generated by either tank type electric water heaters
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
or point of use water heaters. Point of use or “instantaneous” types will be
SSJ
provided for remote, single fixture applications and will be mounted on the wall
below the fixture being served. In the Office Area, staff toilets, locker rooms and
ENGG CERT
ALL
tank type water heater will serve emergency showers located in the Battery
Rooms.
systems. Each pump will be sized to meet 100% of the demand. This
DESCRIPTION
redundancy will allow the sweet water system to continue to operate at full
capacity in the event of a pump failure. Pump status and system pressure will
be monitored by the BMS system.
Plumbing Fixtures
The Hammam in the Security Support Building and Staff toilet areas in the
Office Building will be provided with a combination of wall hung white vitreous
china water closets (Western Style) and floor mounted porcelain enameled cast
JO/EWO
0002
iron water closets with anti-splashing flushing rim (Eastern Style). Wall hung
urinals will also be provided. Lavatories will be white vitreous china under deck
mounted lavatories. These facilities are ADA compliant. A single occupant
6/27/08
DATE
restroom near the loading dock and in Back of House area will also be ADA
compliant and supplied with identical fixtures. Bi-level, ADA compliant electric
NO.
REV
water coolers will be located near staff toilet areas. Each toilet room,
00
DISCIPLINE
ENGINEER
housekeeping area and mechanical room will have floor drains.
DATE:
6/278
Combination emergency showers/eye/face wash will be provided in mechanical
PROJECT
ENGINEER rooms having chemical treatment and battery rooms. These fixtures will receive
SSJ tepid water, piped from a dedicated electric, tank type water heater, through a
DATE:
6/27/08 thermostatic mixing valve. Valve will have factory piped automatic cold water
CERTIFIED bypass suitable for use with emergency showers. Showers in battery rooms will
be fitted with local alarm indicating use/flow, which can also be monitored by the
6/27/08
DATE: buildings BMS System. Floor drains will be provided for units in mechanical
CONSTRUCTION
AGENCY rooms only. All discharge from battery rooms will be piped to an acid
SSJ
neutralization tank within the building.
6/27/08
DATE:
OPERATIONS Exterior, recessed wall hydrants will be provided in various locations. A
ASA
recessed, hot and cold water wall hydrant is suggested for use in trash room
DATE:
6/27/08
and loading dock areas.
CONTROL NUMBER
VERIFICATION
5.5.2 CONTRACTOR shall provide and install packaged water booster pump skid
EDSD
5.5.3 CONTRACTOR shall provide and install all plumbing fixtures with associated
REVISIONCERTIFICATION
5.5.4 CONTRACTOR shall provide and install all acid waste piping and accessories,
(DCC) NO. _____________________
interior and exterior serving Corporate Data Center complete with fittings,
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
sealant, tank vaults, hanger and supports.
SSJ
5.5.5 CONTRACTOR shall provide and install Plumbing control panels and mounting
ENGG CERT
ALL
5.5.6 CONTRACTOR shall provide and install PVC pipe condensate drain piping,
above and below slab, complete with fittings, and supports.
5.5.7 Pre-start up and commissioning of Plumbing water pressure booster units, as per
SAES-K-001.
100% ISSUE FOR CONSTRUCTION
5.5.8 CONTRACTOR shall provide Testing, adjusting and balancing for the
DESCRIPTION
PlumbingSystems.
5.5.9 CONTRACTOR shall provide and install Sweet and Raw Water piping, above
and below slab, complete with fittings, and supports.
5.5.10 CONTRACTOR shall provide and install trap primer manifold and single service
types valve assemblies complete with fittings, and supports.
0002
5.6.1 The contractor shall furnish and install a complete and operating fuel oil system
in accordance with Saudi Aramco Engineering and Safety Standards,
6/27/08
DATE
00
DISCIPLINE
ENGINEER
The fuel oil system scope includes, but not limited to the following as per
drawings Saudi Aramco specifications ad applicable Industry Standards:
6/278
DATE:
PROJECT
ENGINEER • Underground fuel oil storage tanks
SSJ • Underground fuel oil piping
DATE:
6/27/08
• Day tanks
CERTIFIED
• Aboveground fuel oil piping
6/27/08 • Fuel polishing system
•
DATE:
CONSTRUCTION
Fuel oil system controls
AGENCY
SSJ
• Fuel oil monitoring system.
6/27/08
DATE:
OPERATIONS
5.6.2 Underground Fuel Oil Storage Tanks
ASA
6/27/08
The underground fuel oil storage tanks shall be 40,000 gallon capacity,
DATE:
fiberglass reinforced plastic and conform to Underwriters Laboratories Standard
CONTROL NUMBER
VERIFICATION
Each tank shall be provided with piping and access containment chambers as
DATE:
manufacturer.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Each tank shall be pressure tested to 5 psi for two hours prior to putting the tank
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
The tank excavation shall be backfilled with pea gravel. The pea gravel shall be
SSJ
ALL
Day tanks shall be installed to serve each generator. There shall be one day
tank per generator. Each day tank shall be 600 gallon capacity and shall be of
the dimensions indicated on the drawings. Day tanks shall be constructed in
accordance with Underwriters Laboratories Standard UL142 and the applicable
sections of NFPA 30, 31 and the International Fire Code.
100% ISSUE FOR CONSTRUCTION
Day tanks shall be installed with all appurtenances indicated on the drawings,
DESCRIPTION
including but not limited to: level controls, primary and emergency vents, supply
and return piping to the generator and to the underground tanks.
Packaged factory built fuel oil filtration systems shall be installed to provide
filtration for each of the underground tanks. A separate filtration system shall be
installed for each UST. The system shall be operated by timer for normal
operation with a manual override. The system shall comply with the applicable
JO/EWO
0002
00
DISCIPLINE
ENGINEER • A single Tank Selector and Pump Control Panel for control of the selection
of UST and submersible pumps.
DATE:
6/278
• One Day Tank Level Control Panel for each day tank provided. This panel
PROJECT
ENGINEER will provide level control for it’s day tank and transmit control signals to the
SSJ Tank Selector and Pump Control Panel.
DATE:
6/27/08
• Separate motor starters for each submersible fuel oil transfer pump.
CERTIFIED
• Communications to the facilities BMS.
6/27/08
DATE:
CONSTRUCTION
5.6.6 Fuel Oil Monitoring System
AGENCY
SSJ
Provide a single monitoring system that complies with Saudi ARAMCO
6/27/08
DATE:
Standards for performance of both automatic and manual leak detection tests.
OPERATIONS
The monitoring panel shall be UL listed and intrinsically safe, with all
ASA
accessories required for complete fuel system monitoring. An overfill alarm
6/27/08
DATE: shall be provided and mounted near the remote fill station. The overfill alarm
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The Data Center raised floor areas and Electrical and Mechanical Infrastructure
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
installation will be in accordance with Aramco Standards, IFC and NFPA 13.
SSJ
ALL
detectors. The detectors will be spaced according to the function and the use of
each area. A double interlock pre-action system takes two actions to occur
ALL
before water enters the piping. The addressable intelligent detectors, will be first
to activate, causing pre-alarm on the alarm control panel. Upon a sprinkler head
activation, the air is released thru the sprinkler head opening and only then
water enters the piping systems. If a sprinkler head or sprinkler piping is
damaged and causes a loss of air pressure in the piping system,, no water
would enter the piping system; a low air trouble alarm will be send to the Central
100% ISSUE FOR CONSTRUCTION
Alarm Panel.
DESCRIPTION
A wet pipe sprinkler system will be provided for Office Areas, public corridors
within the Data Center and Infrastructure areas and other non-critical areas.
A 4 inch line will be run from the fire line to a flanged tap at both transformer
areas for future sprinklers.
Novec-1230 clean agent gas suppression systems will be provided for the
JO/EWO
0002
raised floor Data Center, Tape Storage Room and under raised floor, and Tape
Processing room.
6/27/08
DATE
00
DISCIPLINE
ENGINEER
5.7.2 CONTRACTOR shall provide and install packaged Fire pump and Jockey pump
assembly units complete with Motor Controllers associated accessories as
DATE:
6/278
indicated on the drawings.
PROJECT
ENGINEER
SSJ 5.7.2 CONTRACTOR shall provide and install all sprinkler heads with associated
DATE:
6/27/08 accessories as shown on the drawings.
CERTIFIED
5.7.3 CONTRACTOR shall provide and install Fire Protection control panels and
6/27/08
DATE: mounting accessories as shown on the drawings.
CONSTRUCTION
AGENCY
SSJ
5.7.4 CONTRACTOR shall provide and install auxiliary drains at all trapped piping
6/27/08
DATE: sections to secure complete sprinkler system drainage.
OPERATIONS
ASA
5.7.5 CONTRACOR shall install the entire dry pre-action piping system with1/8” pitch
DATE:
6/27/08
for secure complete sprinkler system drainage.
CONTROL NUMBER
VERIFICATION
5.7.6 CONTRACTOR shall provide Testing, adjusting and balancing for the Fire
EDSD
Protection Systems.
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
Automatic Sprinkler systems for the Corporate Data Center shall include but not
0
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Wet Sprinkler systems
SSJ
• Raw water cast iron pipes and fittings inside services building including
ENGG CERT
ALL
valves and accessories to serve the fire protection systems in the non-critical
and common areas.
ALL
• Provide wet system cabinets with all related appurtenances where indicated
on drawings.
• Provide piping, hangers and supports and listed sprinkler heads as indicated
in the design documents and specifications and as suited by the facility
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
construction.
• For fire alarm monitoring refer to Electrical Fire Alarm drawings and
specifications.
• Provide raw water steel pipes and fittings including valves and accessories to
serve the fire protection systems in the critical areas for the dry pre-action
systems as indicated on drawings and specifications.
JO/EWO
0002
indicated on drawings.
• Provide piping, hangers and supports and listed sprinkler heads as indicated
NO.
REV
00
DISCIPLINE
in the design documents and specifications and as suited by the facility
ENGINEER construction.
6/278
•
DATE:
PROJECT
For detection systems and monitoring refer to Electrical Fire Alarm drawings
ENGINEER
and specifications.
SSJ
6/27/08
DATE:
CERTIFIED
Clean Agent NOVEC -1230 Gaseous Systems
DATE:
6/27/08 • Provide steel pipes and listed fittings for clean agent systems including valves
CONSTRUCTION and accessories to serve the special hazard systems in the sub-floor spaces
AGENCY
SSJ in data halls, and total flooding systems in tape storage and tape processing
6/27/08 areas.
DATE:
OPERATIONS
ASA • Provide piping, hangers and supports and listed gas nozzles as indicated in
6/27/08 the design documents and specifications and as suited by the facility
DATE:
construction.
CONTROL NUMBER
VERIFICATION
•
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
• Provide electrical wiring and controls associated with the clean agent
OF THIS DRAWING IS COVERED, FOR ALL
systems.
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
6.1 General
ALL
6.1.1 All work shall comply with the requirements of SAUDI ARAMCO Engineering
and Safety Standards and appropriate SAUDI ARAMCO specifications.
6.1.2 All work shall be performed by qualified personnel who are thoroughly trained
and experienced in the particular scope of work to be executed.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
6.1.3 All equipment openings shall be covered or plugged to prevent the entry of
foreign matter.
6.1.4 CONTRACTOR shall ensure that all piping is erected, properly aligned, leveled,
and adjusted for satisfactory operation.
0002
received condition.
NO.
REV
DISCIPLINE
ENGINEER
• Picking up piping from storage area, moving it to work site, unloading it,
6/278
DATE: lifting it and installing it. Inspecting mechanical equipment upon receipt
PROJECT
ENGINEER and also immediately after moving from storage or pickup area to
SSJ installation site for damage or defect in main or auxiliary equipment and
DATE:
6/27/08
submitting written report of damage and defects.
CERTIFIED
• Lifting piping at the work site and setting on permanent foundations.
6/27/08
• Supporting piping from approved hangers and supports.
DATE:
CONSTRUCTION
• Grouting as required.
AGENCY
SSJ
• Hooking up all connections to equipment, instruments, etc. in
6/27/08
accordance with the applicable drawings and manufacturer’s
DATE:
instructions.
OPERATIONS
ASA
• Making good all damage and defects in coating caused during
6/27/08
transportation and erection.
DATE:
• Testing of piping for leaks prior to commissioning.
CONTROL NUMBER
VERIFICATION
6.1.7 CONTRACTOR must take proper care of piping given to him. This would include
EDSD
installation.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
6.1.8 Final testing of all piping shall be by CONTRACTOR and shall be recorded on
(DCC) NO. _____________________
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
6.1.9 All welding will be seal welding. No stitch, skip or spot welding will be allowed.
ENGG CERT
ALL
6.1.10 All tags and signs, flow arrows and product stenciling shall be by CONTRACTOR.
Wording shall be approved by SAUDI ARAMCO Representative and BGP before
ALL
installation.
6.1.11 See table of piping materials in section 6.6 for specific system piping materials.
6.2.1 CONTRACTOR shall provide and install supply and return chilled water piping
DESCRIPTION
complete with pipe fittings, joining material, insulation, hangers and supports as
shown on drawings.
6.2.2 CONTRACTOR shall provide and install supply and return condenser water
piping complete with pipe fittings, joining material, insulation, hangers and
supports as shown on drawings.
0002
Raw and Sweet water for Corporate Data Center shall include but not limited to
NO.
REV
the following:
00
DISCIPLINE
ENGINEER
• Valves
DATE:
6/278
• Pumps
•
PROJECT
ENGINEER Specialties
SSJ
• Support
•
6/27/08
DATE: Piping
CERTIFIED
6/27/08 Provide sweet and raw water copper pipes and fittings inside services building
DATE:
CONSTRUCTION
including valves and accessories to serve the plumbing fixtures in the Data
AGENCY
SSJ
Center and Security Facilities.
6/27/08
DATE:
RTR piping will be used for all utility water piping below grade and must comply
OPERATIONS
with Saudi Aramco material specification 01-SAMSS-034. All RTR piping
ASA
exposed to direct sunlight will have anti-UV black pigmentation.
6/27/08
DATE:
CONTROL NUMBER
Sanitary, Storm, and Condensate Waste facilities for Corporate Data Center shall
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
• Provide drainage and vent system to service plumbing fixtures in the Data
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
• Provide acid resistant drainage and vent pipes and fittings to serve the
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
emergency eyewash and shower located in the battery room of
SSJ
ALL
• All RTR piping exposed to direct sunlight will have anti-UV black
pigmentation.
6.3.3 Materials
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
Inside Corporate Data Center, Gatehouse and associated Service Building sweet
and raw water supply piping and fittings shall be copper, Type-L conforming to
ASTM A88.
Below grade sweet and raw water piping and fittings outside Corporate Data
Center, Gatehouse and associated Service Building shall be RTR, conforming to
ASTM D3262 and ASTM D4161.
Below slab drainage, vent piping and fittings inside Corporate Data Center,
JO/EWO
0002
Above slab drainage, vent piping and fittings inside Corporate Data Center,
Gatehouse and associated Service Building will be PVC.
NO.
REV
00
DISCIPLINE
ENGINEER 6.4 Fuel Piping
6/278
DATE: 6.4.1 Underground Piping
PROJECT
ENGINEER
SSJ Provide composite double wall, fiberglass reinforced plastic piping system for all
6/27/08
DATE: underground fuel oil supply, return, overfill, fill and vent pipe. The piping system
CERTIFIED
shall comply with UL 971 and ASTM Standards D2310 and D2992.
6/27/08
DATE: The underground piping system shall be pressure tested in accordance with
CONSTRUCTION
AGENCY NFPA 30, 31 prior to being placed into service. No loss of pressure will be
SSJ
allowed.
6/27/08
DATE:
OPERATIONS
6.4.2 Aboveground Piping
ASA
6/27/08
DATE: Provide single wall, aboveground fuel oil piping within the generator rooms as
CONTROL NUMBER
B.
EDSD
DATE:
NFPA 30, 31 prior to being placed into service. No loss of pressure will be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
allowed
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
6.5 Fire Protection Piping
SSJ
ALL
Dedicated Raw water fire service for Corporate Data Center shall include but
ALL
• Backflow Preventor
• Valves
• Fire Pumps and Jockey Pumps
• Pump Motor Controllers and Automatic Transfer Switches
100% ISSUE FOR CONSTRUCTION
•
DESCRIPTION
steel Steel
Above Ground Condenser
X
6/27/08
DATE
00
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Piping Material Schedule
SSJ
Service Material
ENGG CERT
ALL
Black Galvanized
RTR Copper SS CI PVC DI
steel Steel
ALL
Legend
RTR = glass-fiber-reinforced thermosetting resin pipe
SS = stainless steel
JO/EWO
0002
CI = cast iron
PVC = poly-vinyl chloride
6/27/08
DATE
DI = ductile iron
Notes:
NO.
REV
00
DISCIPLINE
1. Piping to have Fusion Bonded Epoxy (FBE) coating on interior of pipe.
ENGINEER 2. Piping to have Fusion Bonded Epoxy (FBE) coating on exterior of pipe.
6/278
DATE:
PROJECT
ENGINEER
SSJ
6/27/08
DATE:
CERTIFIED
6/27/08
DATE:
CONSTRUCTION
AGENCY
SSJ
6/27/08
DATE:
OPERATIONS
ASA
6/27/08
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
7.1. General
ALL
This Scope of Work identifies the WORK required to provide Electrical Power for the
Saudi Aramco Corporate Data Center (CDC) Building and associated facilities.
CONTRACTOR shall construct/install the facilities in accordance with this Scope of Work.
The Project Drawings provide construction locations, dimensions, layouts and installation
details. The term CONTRACTOR shall also include all his subCONTRACTORs and
100% ISSUE FOR CONSTRUCTION
vendors.
DESCRIPTION
Major equipment systems in the CDC building include 13.8 kV, 4.16 kV, and
480 V switchgears and transformers, 2 MW 13.8 kV Diesel Generators, UPS and Battery
systems, Programmable Logic Controllers
(PLCs), Power Distribution Units (PDU’s), Remote Power Panels (RPPs)
and rectifiers and battery systems for substation auxiliary loads. 15Kv feeders from SECo
substation to main switchgear room in CDC building.
The project will be completed in two phases. All Phase I work is shown in bold on Contract
JO/EWO
0002
Drawings and specifications. The CONTRACTOR shall refer to Drawing Control Log for
the following sections:
6/27/08
DATE
DISCIPLINE
ENGINEER
INDEX B Drawing # H-175019 FIRE ALARM LAYOUT
INDEX B Drawing # H-175020 FIRE ALARM BELOW FLOOR
DATE:
6/278
INDEX B Drawing # H-175021 PUBLIC ADDRESS SYSTEM
PROJECT
ENGINEER INDEX B Drawing # H-175022 LIGHTNING PROTECTION
SSJ INDEX B Drawing # H-175023 FIRE ALARM BLOCK DIAGRAM
DATE:
6/27/08 INDEX B Drawing # H-175024 FIRE ALARM DETAIL
CERTIFIED INDEX B Drawing # H-175026 LIGHTNING PROTECTION DETAIL
INDEX P Drawing # H-175065 EPMS BLOCK DIAG
6/27/08
DATE: INDEX P Drawing # H-175066 EPMS
CONSTRUCTION
AGENCY INDEX P Drawing # H-175067 EPO
SSJ
INDEX P Drawing # H-175068 EPMS POINTS LIST
6/27/08
DATE: INDEX P Drawing # H-175116 SYMBOLS LIST
OPERATIONS INDEX P Drawing # H-175117 SITE
ASA
INDEX P Drawing # H-175118 LIGHTING
DATE:
6/27/08
INDEX P Drawing # H-175119 LIGHTING
CONTROL NUMBER
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
INDEX P Drawing # H-175129 SINGLE LINE
SSJ
ALL
0002
7.1.1. CONTRACTOR shall perform all electrical work and furnish all equipment in
accordance with the latest edition of SAUDI ARAMCO Engineering Standards
(SAES), Saudi Aramco Materials Specifications (SAMSS), Saudi Aramco
6/27/08
DATE
DISCIPLINE
ENGINEER
CONTRACTOR shall adhere to all safety standards while carrying out his work.
DATE:
6/278
7.1.2 CONTRACTOR shall perform all fabrication works in accordance with Project
PROJECT
ENGINEER Drawings, specifications and SAUDI ARAMCO Engineering Standards. The
SSJ maximum amount of hot work, which is practical, shall be performed in the
DATE:
6/27/08 CONTRACTOR’s laydown yard.
CERTIFIED
7.1.3 All excavation and installation of underground cables and conduits shall be in
6/27/08
DATE: accordance with SAUDI ARAMCO Engineering Standard SAES-P-104 as per
CONSTRUCTION
AGENCY NEC Article 300 and as required by the Project Drawings.
SSJ
6/27/08
DATE: Care shall be taken to avoid damage to existing underground facilities during
OPERATIONS excavation for and installation of new work. If during excavation,
ASA
CONTRACTOR encounters any pipes, cables, concrete or other obstructions
DATE:
6/27/08
not indicated on the drawings, he shall stop, inform the SAUDI ARAMCO
CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
7.1.4 CONTRACTOR shall provide and install wiring and cable systems in accordance
0
Electrical Code (NEC-2005) Article 310. Only compression lugs and cad welding
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
will be used. CONTRACTOR to insure that cable pulling tension is per
SSJ
ALL
7.1.5 CONTRACTOR shall provide and install switchgears, switchboards, control gears
ALL
7.1.6 CONTRACTOR shall provide and install redundant auxiliary AC/DC power
system, including battery rooms and battery charging system will be provided to
support the operation of all the switchgear rooms. The switchgear annunciation
100% ISSUE FOR CONSTRUCTION
and alarm system will be integrated with the switchgears and mounted in the
DESCRIPTION
7.1.8 CONTRACTOR shall provide and install lighting in accordance with SAUDI
JO/EWO
0002
DISCIPLINE
ENGINEER
electrical equipment and devices shall be in accordance with SAUDI ARAMCO
Engineering Standard SAES-P-111 and National Electrical Code (NEC-2005)
DATE:
6/278
Article 250. Grounding equipment and devices shall meet requirements of UL467.
PROJECT
ENGINEER
SSJ 7.1.10 CONTRACTOR shall perform cable testing, witnessed by SAUDI ARAMCO, in
DATE:
6/27/08 accordance with SAUDI ARAMCO Engineering Standard SAES-P-104, Section
CERTIFIED 13.1.
6/27/08
DATE: 7.1.11 CONTRACTOR shall provide and install all wire markers, Raychem Heat
CONSTRUCTION
AGENCY Shrinkable type. Marking shall be typed not hand written.
SSJ
6/27/08
DATE: 7.1.12 CONTRACTOR shall provide and install all above ground cable markers (for the
OPERATIONS underground cable).
ASA
DATE:
6/27/08
7.1.13 All conduit installation shall be in accordance with NEC Article 346 & SAES-P-
CONTROL NUMBER
104. All conduits will be bonded per SAES-P-111 and NEC 250.
VERIFICATION
EDSD
7.1.14 CONTRACTOR shall provide, fabricate and install all required supports. Unistrut
and fittings shall be used for all supports except for single runs where other
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
7.1.15 CONTRACTOR shall provide and supply, engraved and install all phoenolic
0
nameplates with stainless steel screws for all electrical equipments (junction
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
modules, batteries, switches, etc..). Each wire/cable shall be identified with a
SSJ
ALL
7.1.16 CONTRACTOR shall seal unused entries of conduits, fittings and equipment with
ALL
7.1.17 All dimensions shown on the project drawings shall be field verified by
CONTRACTOR prior to installation.
The CDC Building will be provided with 30/40mVA Utility Service for a total building area of
117,000 sf, including raised floor space, MEP equipment space, admin office/conference
spaces and facility operations space.
The entire electrical distribution will consist of medium and low voltage electrical systems
with an emergency backup system and UPS system. Work inside the building will include,
but will not be limited to, telephone and data connections, grounding system, area lighting,
indoor/outdoor lighting, receptacles, conduit/fittings and wires, supports, fire alarm and
detection system, EPMS systems, powering the racks from two RPPs, PDUs, powering
JO/EWO
0002
For the 50 watts/sqft build out phase, the electrical system will consist of the following
(refer to construction documents for quantities of equipment). All underground conduits in
NO.
REV
ductbank related to Phase II work shall be installed Day I with nylon pull wire and capped
00
DISCIPLINE
ENGINEER
for future use.
DATE:
6/278
The Critical electrical distribution system will consist of:
PROJECT
ENGINEER • 13.8kV, 2000A Main Utility Switchgears.
SSJ • 13.8kV, 2000A generator paralleling Switchgears.
DATE:
6/27/08
• 13.8kV, 2000 kW generator sets.
CERTIFIED
• 13.8kV, 600A manual selector switches.
6/27/08 • 13.8kV, 1200A Automatic Transfer switches
DATE:
CONSTRUCTION
AGENCY
SSJ
The critical low voltage electrical distribution system will consist of:
6/27/08
• 3750 KVA, 13.8kV/480V Oil filled Service transformers.
DATE:
OPERATIONS
• 600A, 13.8kV manual selector switches.
ASA
• 480V, 4000A UPS maintenance and Load Bank switchgear.
6/27/08 • 480V, 4000A UPS Input Switchgears.
• 480V, 4000A UPS Output Switchgears.
DATE:
CONTROL NUMBER
VERIFICATION
kW modules.
DATE:
• 300 kVA, 480V-208/120Y Power Distribution Units connected to each N+1 configured
BY:
UPS systems.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
• Remote Power Panels each with (4) 225A, 208/120V, 42 pole panelboards to
OF THIS DRAWING IS COVERED, FOR ALL
• 2.7 mW of Total Connected UPS Power for approximately 60,000 sq ft of raised floor
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
space.
SSJ
ALL
As part of the electrical work for the medium voltage systems, the CONTRACTOR shall
complete the following:
7.3.1 CONTRACTOR shall provide and install two (2) 13.8kV, 2000A metal clad
switchgears (SG-3A01 and SG-3B01) for the CDC Building. All additional
JO/EWO
0002
00
DISCIPLINE
and grounding cables from SECO substation to 13.8kV metal clad switchgears
ENGINEER (SG-3A01 and SG-3B01). Underground terminations shall be by means of
6/278
exothermic welding. Hardware, cables, etc. shall be provided by
DATE:
PROJECT
CONTRACTOR. These 13.8kV underground lines shall be installed per Saudi
ENGINEER
Electrical Company (SECO) Standards SES-P-122 and SCS-P-122.
SSJ
6/27/08
DATE:
CERTIFIED
7.3.3 Two feeders shall be run from SG-3A01 and SG-3B01 to feed SECO station
service transformers. Separate feeders in ductbank shall be run for SCADA RTU
DATE:
6/27/08 and communication.
CONSTRUCTION
AGENCY
SSJ
7.3.4 Underground terminations shall be by means of exothermic welding. Hardware,
6/27/08 cables, etc. shall be provided by CONTRACTOR.
DATE:
OPERATIONS
ASA
7.3.5 CONTRACTOR shall install one (1) 13.8kV Marshalling cabinet in each 13.8kV
6/27/08
electric rooms for SECO SCADA system interface. CONTRACTOR shall provide
DATE:
and install underground concrete encased ductbank from SECO provided
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
7.3.6 CONTRACTOR shall install two (2) 13.8kV EPMS Interface cabinets in 13.8kV
OF THIS DRAWING IS COVERED, FOR ALL
electric rooms. The 13.8kV EPMS Interface cabinets will be supplied by the
(DCC) NO. _____________________
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Interface Cabinet in 13.8kV electric rooms. CONTRACTOR shall provide and
SSJ
ALL
7.3.7 Contractor shall provide cable trays for running control wires between generator
paralleling switchgears (SG3A02/SG3B02) and paralleling gear Control cabinets,
main medium voltage switchgears (SG3A01/SG3B01) , and 5kV switchgears
SG2A01/SG2B01) as shown on the drawings. Contractor shall evaluate cable
tray requirements and submit layout plan to the Engineer for approval. Cable
trays shall be two tier one for control cables and the other for DC distribution
100% ISSUE FOR CONSTRUCTION
system. These trays shall be used to lay control cables, annunciation cables
DESCRIPTION
7.3.8 CONTRACTOR shall provide and install 13.8kV switchgear SG-3A01 and SG-
3B01. Refer to construction documents for quantity of circuit breakers.
CONTRACTOR shall provide and install all associated supports, fittings,
power/control and grounding cables in switchgear.
7.3.9 CONTRACTOR shall provide and install 13.8kV 1200A and 2000A frame circuit
JO/EWO
0002
switchgear.
NO.
REV
7.3.10 CONTRACTOR shall provide and install 2MW, 13.8kV diesel engines
00
DISCIPLINE
ENGINEER
generators (PD-3A01, PD-3B01, PD-3A02, PD-3B02, PD-3A03, PD-3B03).
Refer to construction documents for quantity of diesel engine generators.
DATE:
6/278
CONTRACTOR shall install for each diesel engine all communication cables,
PROJECT
ENGINEER batteries, battery charger, jacket heater, communication cables, and include all
SSJ necessary conduit fittings, supports, etc..
6/27/08
DATE:
CERTIFIED 7.3.11 CONTRACTOR shall provide and install 600A, 13.8kV manual selector switches
for the generators (MTS-3A01, MTS-3B01, MTS-3A02, MTS-3B02, SW-3A03,
6/27/08
DATE: SW-3B03). Refer to construction documents for quantity of manual output
CONSTRUCTION
AGENCY selector switches. CONTRACTOR shall provide and install all associated
SSJ
supports, fittings, power/control and grounding cables.
6/27/08
DATE:
OPERATIONS 7.3.12 CONTRACTOR shall provide and install two (2) 13.8kV, 2000A metal clad
ASA
paralleling switchgear (SG-3A02, SG-3B02) and CONTROL panels for the
DATE:
6/27/08
generators. CONTRACTOR shall provide and install associated power and
CONTROL NUMBER
7.3.13 CONTRACTOR shall provide and install two (2) 1200A 5kV metal clad
DATE:
BY:
switchgear (SG-2A01 and SG-2B01) for the chiller plant. CONTRACTOR shall
REVISIONCERTIFICATION
provide and install associated grounding cables, power and control, alarms and
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
CONTRACTOR.
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.3.14 CONTRACTOR shall provide and install grounding system, underground and
SSJ
ALL
7.3.15 CONTRACTOR shall provide and install a Maintenance Bypass Substation. The
function of the maintenance substation is to provide a complete wrap-around
ALL
bypass from the generator bus to the critical UPS output buses for UPS system
level maintenance and failure recovery.
7.3.16 A permanent 3-megawatt resistive load bank shall be provided to allow full
capacity testing of a UPS system or of an individual generator set. The load bank
shall be connected to the maintenance switchboard and to each UPS module.
100% ISSUE FOR CONSTRUCTION
Provisions shall be made for connection of additional load. The load bank shall
DESCRIPTION
7.3.17 An alternate input feeder shall be provided from the maintenance bypass
switchboard to all other switchgears to allow the maintenance bypass
switchboard to backup all other switchgears in the event of a switchgear
JO/EWO
0002
7.3.18 The maintenance bypass switchboard shall have one (1) 3,750 kVA transformer
6/27/08
DATE
7.3.19 CONTRACTOR shall provide and install duct banks, hand-holes and
00
DISCIPLINE
ENGINEER
underground conduits, cable bus and cables in conduits..
DATE:
6/278
7.3.20 Breaker lifting device shall be provided for each medium voltage SWITCHGEAR
PROJECT
ENGINEER ROOMS
SSJ
DATE:
6/27/08 7.3.21 Contractor shall provide breaker test cabinets and grounding switch. The
CERTIFIED installation of the breaker test cabinet shall be provided by the switchgear
vendor. Test cabinet shall be mounted on the wall of the switchgear room.
6/27/08
DATE: CONTRACTOR shall provide all conduits, wires and supports for complete and
CONSTRUCTION
AGENCY functional installations.
SSJ
6/27/08
DATE: 7.3.22 CONTRACTOR shall provide and install 125VDC battery systems as shown on
OPERATIONS the drawings. Each battery system shall include 125VDC Battery chargers and
ASA
associated conduit and fittings, supports, power, and control cables, grounding
DATE:
6/27/08
cables as well as 125 VDC Panel, battery main disconnect switch, and 125VDC
CONTROL NUMBER
7.4.1 Critical Electrical Distribution: As part of the electrical work for the critical low
REVISIONCERTIFICATION
following:
0
7.4.1.1 CONTRACTOR shall provide and install 3750 KVA, 13.8kV/480V Oil filled
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Service transformers (T-31A01, T-31B01, T-32A01, T-32B01, T-3A01, T-
SSJ
3B01) and associated grounding, power and control cables, supports, conduit
and fittings, underground ductbank and power cables, and overhead cable
ENGG CERT
ALL
7.4.1.2 CONTRACTOR shall provide and install 600A, 13.8kV manual transfer
switches for the oil filled transformers (MTS-31A01, MTS-31B01, MTS-
32A01, MTS-32B01, MTS-3A10, MTS-3B10, MTS-3A12, MTS-3B12). Refer
to construction documents for quantity of manual output selector switches.
CONTRACTOR shall provide and install all associated supports, fittings,
100% ISSUE FOR CONSTRUCTION
7.4.1.3 CONTRACTOR shall provide and install 480V, 4000A metal clad UPS input
switchgears (SG-01A01, SG-01B01, SG-02A01, SG-02B01) and associated
grounding cables, power and control, alarms and communication cables.
Refer to construction documents for quantity of 4000A UPS input
switchgears. All additional materials shall be provided by CONTRACTOR.
7.4.1.4 CONTRACTOR shall provide and install 480V, 4000A metal clad UPS output
switchgear (SG-01A02, SG-01B02, SG-02A02, SG-02B02) and associated
JO/EWO
0002
7.4.1.5 CONTRACTOR shall provide and install 480V, 4000A metal clad Critical
NO.
REV
DISCIPLINE
ENGINEER
02B03) and associated grounding cables, power and control, alarms and
communication cables. Refer to construction documents for quantity of
DATE:
6/278
4000A Critical Output Distribution switchgears. All additional materials shall
PROJECT
ENGINEER be provided by CONTRACTOR.
SSJ
DATE:
6/27/08 7.4.1.6 CONTRACTOR shall provide and install one (1) 480V, 4000A metal clad
CERTIFIED Maintenance and Load Bank switchgear (SG-0A04) and associated
grounding cables, power and control, alarms and communication cables and
6/27/08
DATE: grounding cables. All additional materials shall be provided by
CONSTRUCTION
AGENCY CONTRACTOR.
SSJ
6/27/08
DATE: 7.4.1.7 CONTRACTOR shall provide and install 480V, 4000A metal clad Mechanical
OPERATIONS switchgear (SG-0A01, SG-0B01) and associated grounding cables, power
ASA
and control, alarms and communication cables and grounding cables. Refer
DATE:
6/27/08
to construction documents for quantity of 4000A Mechanical switchgears. All
CONTROL NUMBER
7.4.1.8 CONTRACTOR shall provide and install 480V, 400A Automatic Transfer
Switches (ATS) (ATS-0A01, ATS-0B01, ATS-0A02, ATS-0B02, ATS-0A03,
DATE:
BY:
input to ATS shall be installed during future build out. Refer to construction
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
grounding cables.
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
7.4.1.9 CONTRACTOR shall provide and install grounding system, underground and
above ground, perform exothermic welding on all connections underground.
ENGG CERT
ALL
7.4.1.10 CONTRACTOR shall provide and install duct banks, hand-hole, pull boxes,
ALL
7.4.1.11 The CONTRACTOR shall provide and install four (4) 125VDC battery
systems (SB-0A02, SB-0B02, SB-0A04, SB-0B04) in four (4) separate
rooms. Each battery system shall include 125VDC Battery chargers and
associated conduit and fittings, supports, power, and control cables,
100% ISSUE FOR CONSTRUCTION
grounding cables as well as 125 VDC Panel, battery main disconnect switch,
DESCRIPTION
7.4.2 Non Critical Electrical Distribution: As part of the electrical work for the non-
critical low voltage electrical distribution systems, the CONTRACTOR shall
complete the following:
7.4.2.1 CONTRACTOR shall provide and install 3750 KVA, 13.8kV/480V Oil filled
Service transformers (T-3A04, T-3B04) and associated grounding, power and
JO/EWO
0002
control cables, supports, conduit and fittings and underground power cables,
overhead cable buses. Refer to construction documents for quantity of Oil
filled Transformers.
6/27/08
DATE
7.4.2.2 CONTRACTOR shall provide and install 13.8kV, 600A manual selector
NO.
REV
DISCIPLINE
ENGINEER
construction documents for quantity of manual selector switches.
CONTRACTOR shall provide and install all associated supports, fittings,
DATE:
6/278
power/control and grounding cables.
PROJECT
ENGINEER
SSJ 7.4.2.3 CONTRACTOR shall provide and install 480V, 4000A metal clad House
DATE:
6/27/08 switchgears (SG-0A03, SG-0B03) and associated grounding cables, power
CERTIFIED and control, alarms and communication cables. All additional materials shall
be provided by CONTRACTOR. Refer to construction documents for quantity
6/27/08
DATE: of House Switchgears.
CONSTRUCTION
AGENCY
SSJ
7.4.2.4 CONTRACTOR shall install all electrical and instrument cabling and tie-ins
6/27/08
DATE: to all electrical and instrument components.
OPERATIONS
ASA
7.4.2.5 CONTRACTOR shall install and test all electrical instruments and
DATE:
6/27/08
associated components as described in project construction drawings.
CONTROL NUMBER
VERIFICATION
7.4.2.6 Excavation of sand, rock, sand padding, backfilling, compacting, forming and
EDSD
Voltage Electrical room and other building areas. The work will include, but
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
be limited to telephone and data outlets, OSP facilities and ISP facilities,
SSJ
Communications Rooms.
ENGG CERT
ALL
7.2.4.8 Fabrication of all supports, stanchions etc., necessary for smooth operability
and meeting SAUDI ARAMCO standards and standard drawings. Shop
ALL
drawings will be provided where needed on the project and will be provided
prior to fabrication and/or installation.
7.4.2.11 CONTRACTOR shall provide and install power panel, 208/120 volts, three-
phase, surface mounted and associated conduit, fittings and supports, power
and grounding cable/wiring. All additional materials shall be provided by the
construction CONTRACTOR.
JO/EWO
0002
7.4.2.12 CONTRACTOR shall provide and install lighting panels, 480/277 volts, three-
phase four wires, surface mounted and associated conduit and fittings,
6/27/08
DATE
7.4.2.13 CONTRACTOR shall provide and install indoor lighting system fluorescent
00
DISCIPLINE
ENGINEER
light fixtures and associated conduit and fittings, supports and wiring.
DATE:
6/278
7.4.2.14 CONTRACTOR shall provide and install pole mounted lighting fixtures
PROJECT
ENGINEER controlled by electric photo cells and lighting contactors and associated
SSJ conduit and fittings, supports and wirings.
6/27/08
DATE:
CERTIFIED 7.4.2.15 CONTRACTOR shall provide and install area lighting poles and floodlights
and associated wirings, and grounding cables.
6/27/08
DATE:
CONSTRUCTION
AGENCY 7.4.2.16 CONTRACTOR shall provide and install receptacles inside and outside the
SSJ
CDC building. Outdoor receptacles shall be weather-proof and with circuit
6/27/08
DATE: interrupter type. 120 volts, grounding type as well as the associated covers,
OPERATIONS conduit, fittings, wiring and supports.
ASA
DATE:
6/27/08
7.4.2.17 CONTRACTOR shall provide and install substation grounding system,
CONTROL NUMBER
connections underground.
EDSD
7.4.2.18 CONTRACTOR shall provide and install duct banks, hand-hole and
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
7.4.2.19 CONTRACTOR shall provide and install grounding cables from ground grid to
0
supports, also, in fence gates and fence itself where applicable and required.
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
7.4.2.21 CONTRACTOR shall provide and install aluminum cable trays, supports and
ALL
grounding bonding. Cable trays installed in the wall shall be provided with
cover.
The CONTRACTOR shall provide Code required emergency power for egress
100% ISSUE FOR CONSTRUCTION
lighting and exit signs. The system shall a UL 924 Listed emergency lighting
DESCRIPTION
inverter system with a 90-minute battery backup in compliance with NEC Article
700. Code required emergency power shall be kept completely separate from the
standby generator system. The standby generator system shall be classified as an
Optional Standby System as defined by NEC Article 702. The fire alarm system
shall be provided with an integral battery backup power supply as defined by NFPA
72 and will not rely on the standby generator system for backup power.
The CONTRACTOR shall color all equipment per the below Color Band Scheme to
JO/EWO
Dual
00
Equipment Label
DISCIPLINE Equipment Item Source Color Comments
Abbreviation Location
ENGINEER (Y/N)
6/278
DATE:
PROJECT
ENGINEER
Medium Voltage
SSJ
6/27/08
Switchgear - Utility SG-3A01 N GEAR BLUE
DATE: A
CERTIFIED
Medium Voltage
6/27/08
Switchgear - Utility SG-3B01 N GEAR RED
DATE: B
CONSTRUCTION
AGENCY
SSJ
Generator
6/27/08
DATE: Paralleling SG-3A02 N GEAR ORANGE
OPERATIONS Switchgear - A side
ASA Generator
DATE:
6/27/08 Paralleling SG-3B02 N GEAR ORANGE
Switchgear - B side
CONTROL NUMBER
VERIFICATION
EDSD
PD-3A02 N ORANGE
REVISIONCERTIFICATION
PD-3A03 N ORANGE
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PD-3B01 N ORANGE
0
PD-3B02 N ORANGE
PD-3B03 N ORANGE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
Medium Voltage
Transfer Switch MTS-3A01 Y GEAR BLUE ORANGE
(MTS)
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
6/278
DATE:
PROJECT Low Voltage
ENGINEER SG-0A01 N GEAR BLUE
SSJ Switchgear
DATE:
6/27/08 SG-0A03 N GEAR BLUE
CERTIFIED SG-0A04 N GEAR BLUE
SG-01A01 N GEAR BLUE
6/27/08
DATE: SG-01A02 N GEAR BLUE
CONSTRUCTION
AGENCY SG-01A03 N GEAR BLUE
SSJ
SG-02A01 N GEAR BLUE
6/27/08
DATE: SG-02A02 N GEAR BLUE
OPERATIONS
SG-02A03 N GEAR BLUE
ASA
SG-0B01 N GEAR RED
6/27/08
DATE: SG-0B03 N GEAR RED
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
Medium Voltage
Automatic Transfer ATS-2A02 Y GEAR
Switches
ATS-2A03 Y GEAR
ATS-2A06 Y GEAR
ATS-2A07 Y GEAR
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
ATS-2A10 Y GEAR
ATS-2A11 Y GEAR
Medium Voltage
T-3A01 N
Transformers
T-3A03 N
T-3A04 N
T-3A05 N
T-31A01 N
T-32A01 N
T-3B01 N
JO/EWO
0002
T-3B03 N
T-3B04 N
6/27/08
DATE
T-31B01 N
T-32B01 N
NO.
REV
00
UPS Battery
DSW-01A01
Disconnects
EDSD
DSW-01A02
DATE:
DSW-01A03
BY:
DSW-02A01
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
DSW-02A02
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DSW-02A03
(DCC) NO. _____________________
DSW-01B01 RED
DSW-01B02 RED
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
DSW-01B03 RED
DSW-02B01 RED
DSW-02B02 RED
DSW-02B03 RED
Low Voltage
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
ATS-0B02
0002
ATS-0B03
ATS-0B04
6/27/08
DATE
Static Transfer
STS-0A01
NO.
REV
Switches (STS)
00
DISCIPLINE STS-0A02
ENGINEER
STS-0B01
DATE:
6/278 STS-0B02
PROJECT
ENGINEER
SSJ
6/27/08 Power Distribution
DATE: PDU-0A01
CERTIFIED Units (PDU)
PDU-0A03
6/27/08
DATE: PDU-0A05
CONSTRUCTION
AGENCY
PDU-0A07
SSJ PDU-0A09
6/27/08 PDU-0A11
DATE:
OPERATIONS PDU-0A14
ASA
PDU-0A15
6/27/08
DATE: PDU-0A17
CONTROL NUMBER
PDU-0A19
VERIFICATION
PDU-0A21
EDSD
PDU-0A23
DATE:
PDU-0A25
BY:
PDU-0A27
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
PDU-0A28
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
PDU-0A30
(DCC) NO. _____________________
PDU-0A32
PDU-0A34
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
PDU-0A36
PDU-0A38
PDU-0A41
PDU-0A42
PDU-0A44
PDU-0A46
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
PDU-0A48
PDU-0A50
PDU-0A52
PDU-0A55
PDU-0B01
PDU-0B03
PDU-0B05
PDU-0B07
PDU-0B09
JO/EWO
0002
PDU-0B11
PDU-0B14
6/27/08
PDU-0B15
DATE
PDU-0B17
PDU-0B19
NO.
REV
00
PDU-0B21
DISCIPLINE
ENGINEER PDU-0B23
PDU-0B25
6/278
DATE:
PDU-0B27
PROJECT
ENGINEER PDU-0B28
SSJ
6/27/08
PDU-0B30
DATE:
CERTIFIED
PDU-0B32
PDU-0B34
DATE:
6/27/08 PDU-0B36
CONSTRUCTION PDU-0B38
AGENCY
SSJ PDU-0B41
DATE:
6/27/08 PDU-0B42
OPERATIONS PDU-0B44
ASA PDU-0B46
DATE:
6/27/08 PDU-0B48
PDU-0B50
CONTROL NUMBER
VERIFICATION
PDU-0B52
EDSD
PDU-0B55
DATE:
BY:
Remote Power
RPP-0A001
REVISIONCERTIFICATION
Panels (RPP)
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
RPP-0A002
0
RPP-0A003
RPP-0A004
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
RPP-0A005
RPP-0A006
RPP-0A007
RPP-0A008
RPP-0A009
RPP-0A010
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
RPP-0A011
RPP-0A012
RPP-0A013
RPP-0A014
RPP-0A015
RPP-0A016
RPP-0A017
RPP-0A018
RPP-0A019
JO/EWO
0002
RPP-0A020
RPP-0A021
6/27/08
RPP-0A022
DATE
RPP-0A023
RPP-0A024
NO.
REV
00
RPP-0A025
DISCIPLINE
ENGINEER RPP-0A026
RPP-0A027
6/278
DATE:
RPP-0A028
PROJECT
ENGINEER RPP-0A029
SSJ
6/27/08
RPP-0A030
DATE:
CERTIFIED
RPP-0A031
RPP-0A032
DATE:
6/27/08 RPP-0A033
CONSTRUCTION RPP-0A034
AGENCY
SSJ RPP-0A035
DATE:
6/27/08 RPP-0A036
OPERATIONS RPP-0A037
ASA RPP-0A038
DATE:
6/27/08 RPP-0A039
RPP-0A040
CONTROL NUMBER
VERIFICATION
RPP-0A041
EDSD
RPP-0A042
DATE:
RPP-0A043
BY:
RPP-0A044
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
RPP-0A045
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
RPP-0A046
(DCC) NO. _____________________
RPP-0A047
RPP-0A048
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
RPP-0A049
RPP-0A050
RPP-0A051
RPP-0A052
RPP-0A053
RPP-0A054
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
RPP-0A055
RPP-0A056
RPP-0A057
RPP-0A058
RPP-0A059
RPP-0A060
RPP-0A061
RPP-0A062
RPP-0A063
JO/EWO
0002
RPP-0A064
RPP-0A065
6/27/08
RPP-0A066
DATE
RPP-0A067
RPP-0A068
NO.
REV
00
RPP-0A069
DISCIPLINE
ENGINEER RPP-0A070
RPP-0A071
6/278
DATE:
RPP-0A072
PROJECT
ENGINEER RPP-0A073
SSJ
6/27/08
RPP-0A074
DATE:
CERTIFIED
RPP-0A075
RPP-0A076
DATE:
6/27/08 RPP-0A077
CONSTRUCTION RPP-0A078
AGENCY
SSJ RPP-0A079
DATE:
6/27/08 RPP-0A080
OPERATIONS RPP-0A081
ASA RPP-0A082
DATE:
6/27/08 RPP-0A083
RPP-0A084
CONTROL NUMBER
VERIFICATION
RPP-0A085
EDSD
RPP-0A086
DATE:
RPP-0A087
BY:
RPP-0A088
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
RPP-0A089
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
RPP-0A090
(DCC) NO. _____________________
RPP-0A091
RPP-0A092
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
RPP-0A093
RPP-0A094
RPP-0A095
RPP-0A096
RPP-0A097
RPP-0A098
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
RPP-0A099
RPP-0A100
RPP-0A101
RPP-0A102
RPP-0A103
RPP-0A104
RPP-0A105
RPP-0A106
RPP-0A107
JO/EWO
0002
RPP-0A108
RPP-0A109
6/27/08
RPP-0A110
DATE
RPP-0B001
RPP-0B002
NO.
REV
00
RPP-0B003
DISCIPLINE
ENGINEER RPP-0B004
RPP-0B005
6/278
DATE:
RPP-0B006
PROJECT
ENGINEER RPP-0B007
SSJ
6/27/08
RPP-0B008
DATE:
CERTIFIED
RPP-0B009
RPP-0B010
DATE:
6/27/08 RPP-0B011
CONSTRUCTION RPP-0B012
AGENCY
SSJ RPP-0B013
DATE:
6/27/08 RPP-0B014
OPERATIONS RPP-0B015
ASA RPP-0B016
DATE:
6/27/08 RPP-0B017
RPP-0B018
CONTROL NUMBER
VERIFICATION
RPP-0B019
EDSD
RPP-0B020
DATE:
RPP-0B021
BY:
RPP-0B022
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
RPP-0B023
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
RPP-0B024
(DCC) NO. _____________________
RPP-0B025
RPP-0B026
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
RPP-0B027
RPP-0B028
RPP-0B029
RPP-0B030
RPP-0B031
RPP-0B032
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
RPP-0B033
RPP-0B034
RPP-0B035
RPP-0B036
RPP-0B037
RPP-0B038
RPP-0B039
RPP-0B040
RPP-0B041
JO/EWO
0002
RPP-0B042
RPP-0B043
6/27/08
RPP-0B044
DATE
RPP-0B045
RPP-0B046
NO.
REV
00
RPP-0B047
DISCIPLINE
ENGINEER RPP-0B048
RPP-0B049
6/278
DATE:
RPP-0B050
PROJECT
ENGINEER RPP-0B051
SSJ
6/27/08
RPP-0B052
DATE:
CERTIFIED
RPP-0B053
RPP-0B054
DATE:
6/27/08 RPP-0B055
CONSTRUCTION RPP-0B056
AGENCY
SSJ RPP-0B057
DATE:
6/27/08 RPP-0B058
OPERATIONS RPP-0B059
ASA RPP-0B060
DATE:
6/27/08 RPP-0B061
RPP-0B062
CONTROL NUMBER
VERIFICATION
RPP-0B063
EDSD
RPP-0B064
DATE:
RPP-0B065
BY:
RPP-0B066
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
RPP-0B067
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
RPP-0B068
(DCC) NO. _____________________
RPP-0B069
RPP-0B070
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
RPP-0B071
RPP-0B072
RPP-0B073
RPP-0B074
RPP-0B075
RPP-0B076
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
RPP-0B077
RPP-0B078
RPP-0B079
RPP-0B080
RPP-0B081
RPP-0B082
RPP-0B083
RPP-0B084
RPP-0B085
JO/EWO
0002
RPP-0B086
RPP-0B087
6/27/08
RPP-0B088
DATE
RPP-0B089
RPP-0B090
NO.
REV
00
RPP-0B091
DISCIPLINE
ENGINEER RPP-0B092
RPP-0B093
6/278
DATE:
RPP-0B094
PROJECT
ENGINEER RPP-0B095
SSJ
6/27/08
RPP-0B096
DATE:
CERTIFIED
RPP-0B097
RPP-0B098
DATE:
6/27/08 RPP-0B099
CONSTRUCTION RPP-0B100
AGENCY
SSJ RPP-0B101
DATE:
6/27/08 RPP-0B102
OPERATIONS RPP-0B103
ASA RPP-0B104
DATE:
6/27/08 RPP-0B105
RPP-0B106
CONTROL NUMBER
VERIFICATION
RPP-0B107
EDSD
RPP-0B108
DATE:
RPP-0B109
BY:
RPP-0B110
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
Dual
Equipment Label
Equipment Item Source Color Comments
Abbreviation Location
ALL
(Y/N)
Motor Control
MCC-0A01
Centers
MCC-0A03
MCC-0A05
MCC-0B01
MCC-0B03
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
MCC-0B05
JO/EWO
0002
6/27/08
NO. DATE
REV
00
DISCIPLINE
ENGINEER
6/278
DATE:
PROJECT
ENGINEER
SSJ
6/27/08
DATE:
CERTIFIED
6/27/08
DATE:
CONSTRUCTION
AGENCY
SSJ
6/27/08
DATE:
OPERATIONS
ASA
6/27/08
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
As part of the electrical work for the critical low voltage electrical distribution systems,
the CONTRACTOR shall complete the following:
ALL
7.6.1 CONTRACTOR shall provide and install 750kVA/675kW, 480V UPS modules.
Refer to construction documents for quantity of UPS modules. CONTRACTOR
shall provide and install all associated supports, fittings, power/control and
grounding.
100% ISSUE FOR CONSTRUCTION
7.6.2 CONTRACTOR shall provide and install 480VDC battery systems for the UPS
DESCRIPTION
7.6.3 CONTRACTOR shall provide and install Power Distribution Units (PDU) and
associated power and grounding cables, conduit and supports. Steel floor
stands shall be provided for the PDUs. Each PDU will be bonded to the nearest
JO/EWO
0002
structural column ground pad and nearest raised floor pedestal with a bare
copper ground conductor. Each PDU will have a full status LCD screen for on-
site monitoring, and will be interconnected to the EPMS (Electrical Power
6/27/08
DATE
Monitoring System).
NO.
REV
DISCIPLINE
ENGINEER
provided and installed by CONTRACTOR.
DATE:
6/278
7.6.4 CONTRACTOR shall provide and install Remote Power Panels (RPP) and
PROJECT
ENGINEER associated power and grounding cables, conduit and supports. Power monitoring
SSJ will be provided to monitor the current for each panelboard feeder, and will be
DATE:
6/27/08 connected to the Electrical Power and Monitoring System (EPMS). Steel floor
CERTIFIED stands shall be provided for the RPPs. .Each RPP will be bonded to the nearest
structural column ground pad and nearest raised floor pedestal with a bare
6/27/08
DATE: copper.
CONSTRUCTION
AGENCY
SSJ
Refer to construction documents for quantity of RPPs. Other materials shall be
6/27/08
DATE: provided and installed by CONTRACTOR.
OPERATIONS
ASA
7.6.5 The CONTRACTOR shall provide Emergency Power Off (EPO) system. The
DATE:
6/27/08
system will be as shown on the drawings. It shall be fully documented, easily
CONTROL NUMBER
testable without causing a data center shutdown, and designed to inhibit false
VERIFICATION
The EPO system push button switches shall be well labeled, recessed and
DATE:
BY:
covered with protective transparent covers. The electric power shut off operation
REVISIONCERTIFICATION
will require two separate and distinct actions: first, an "enable" and then, a
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
The main EPO system control panel shall be readily accessible and easily
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
maintainable. EPO control panels shall integrate with the fire alarm control
SSJ
ALL
Each data center component shall be provided with a dedicated EPO system to
ALL
shut down PDUs, RPPs, CRAHs within the compartment without affecting other
compartments.
lights off when areas are unoccupied. The data center staging area, ECC staging
area, network room and security room of the building will be illuminated utilizing 2
foot by 4 foot, two or three lamp, recessed fluorescent luminaires.
• The battery rooms, electrical rooms and generator rooms will be illuminated
with 4-foot pendant mounted fixtures located along aisles. Fixtures will be
fluorescent, vapor tight, and corrosion resistant.
0002
•
00
7.8.1 The fire alarm system shall be provided but not limited with the following:
DATE:
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
alarm system with graphic command center, designed to code minimum and
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
7.8.1.2 CONTRACTOR shall provide and install an overall building fire alarm control
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
panel and graphic annunciator located near the main building entrance.
SSJ
7.8.1.3 CONTRACTOR shall provide and install a central control station for offsite
ENGG CERT
ALL
monitoring.
ALL
7.8.1.5 CONTRACTOR shall provide and install spot smoke detectors (SD)
throughout the building (total coverage). Two detectors per room will be
provided to activate cross zoned pre-action system. Spot SDs on ceiling and
100% ISSUE FOR CONSTRUCTION
below raised floor in data center. Smoke detector systems will be used both
DESCRIPTION
under floor and the ceiling of spaces. Spacing of the smoke detectors shall be
based on the function and use of the area. Smoke detectors will also be
provided in all remaining areas as required (bathrooms, storage, utility and
break rooms).
0002
7.8.1.8 CONTRACTOR shall provide and install Class A wiring “Loop System”, as
specified. Wiring will be installed in conduit. All wiring shall be installed in red
NO.
REV
DISCIPLINE
ENGINEER
7.8.1.9 CONTRACTOR shall provide and install fire alarm control panels connected
DATE:
6/278
via peer to peer network.
PROJECT
ENGINEER
SSJ 7.8.1.10 CONTRACTOR shall provide and install general alarm, general trouble,
DATE:
6/27/08 general supervisory and fan shutdown signals to be transmitted to BMS.
CERTIFIED
7.8.1.11 CONTRACTOR shall provide and install strobe lights, bell, horn and manual
6/27/08
DATE: pull stations as well as the associated conduits, fittings, wirings and supports
CONSTRUCTION
AGENCY
SSJ
7.8.2 Contractor shall install Public Address system as shown on drawings as
6/27/08
DATE: specifications.
OPERATIONS
ASA
7.9 Closed Circuit Television and Access Control Systems
6/27/08
DATE:
CONTROL NUMBER
7.9.1 The security system shall be provided but not limited with the following:
VERIFICATION
EDSD
7.9.1.1 CONTRACTOR shall provide and install a security access control and closed
circuit television cameras (CCTV) systems for the entire interior & exterior of
DATE:
BY:
data center building only and equipment yard. The systems shall be built by
REVISIONCERTIFICATION
a licensed security access control & CCTV system contractor with a minimum
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
7.9.1.2 CONTRACTOR shall provide and install an access control system using card
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
readers to limit authorized personnel entering various parts of the building
SSJ
including offices, data centers, NOC's, equipment areas, etc. The rooms will
be zoned so only authorized personnel can enter their zone.
ENGG CERT
ALL
7.9.1.3 CONTRACTOR shall provide and install color CCTV’s to cover various parts
ALL
of the building including data centers, NOC’s, equipment areas, corridors, etc.
CONTRACTOR shall provide exterior building mounted cameras to cover all
exterior entrances and equipment courtyard.
7.9.1.4 CONTRACTOR shall provide and install door contacts at all doors with card
access and all exterior doors.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
7.9.1.5 All raised floor areas and NOC doors will require badging in/out (anti-pass
back). These doors shall be equipped with an emergency request to exit
button to release doors during a fire alarm condition.
7.9.1.6 The Main Security room will be used to house a workstation to badge
employees and contractors. Also within this room will be a racks designed to
house the field control panels, CCTV digital recording devices and other
security control devices. A loading dock reception security room is also
provided for normal shipping and receiving.
JO/EWO
0002
7.9.1.7 CCTV coverage will include all raised floor areas, Network Operation Centers
(NOC), critical support equipment rooms, the perimeter of the building,
6/27/08
DATE
emergency exit doors, roof, all courtyard areas, certain electrical &
mechanical rooms, hallways and the security lobby/desk and security
NO.
REV
DISCIPLINE
ENGINEER
7.9.1.8 Cameras on the building exterior will have Pan, Tilt, and Zoom (PTZ) and
DATE:
6/278
color capabilities. The CCTV signals will be able to be viewed from any
PROJECT
ENGINEER workstation on the Saudi Aramco network that has proper security
SSJ clearances, or even remotely at another site.
6/27/08
DATE:
CERTIFIED 7.9.1.9 All dimensions shown on the project drawings shall be field verified by
CONTRACTOR prior to installation.
6/27/08
DATE:
CONSTRUCTION
AGENCY 7.9.1.10 CONTRACTOR shall provide and install Digital Video Recorders (DVRs)
SSJ
6/27/08
DATE: 7.9.1.11 CONTRACTOR shall provide and install other materials such as conduits,
OPERATIONS supports, wirings etc.
ASA
DATE:
6/27/08
7.9.2 Gatehouse and Support Buildings:
CONTROL NUMBER
VERIFICATION
7.9.2.1 A separate SACS building will house the SACS equipment at the facility gate.
EDSD
One room will house the SACS equipment and the other will house the UPS
equipment. The SACS system will provide a Multi-Zone Security Computer
DATE:
BY:
Center (MSCC) node. This node will integrate with the Master Computer
REVISIONCERTIFICATION
System (MCS). The SACS building will have two 4 inch conduits between it
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
and the new guard house, and fiber will be provided between the buildings.
0
Fiber will also be provided between the SACS building and the
(DCC) NO. _____________________
communications room inside the data center. This design will be provided by
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
others and furnished and installed by separate contract.
SSJ
7.9.2.2 The guardhouse and SACS building wiring will have the capability to provide
ENGG CERT
ALL
voice and data services (LAN/WAN). There will be three voice circuits to the
guardhouse and one voice circuit to the SACS building. Telephone and data
ALL
7.9.2.3 A support building with break room, prayer room, kitchen and Hammam will
100% ISSUE FOR CONSTRUCTION
with a sunshade that will cover the single traffic lane into the facility in
addition to the guardhouse itself.
7.10.1 Grounding Systems: As part of the electrical work for the grounding systems,
the CONTRACTOR shall complete the following:
0002
DISCIPLINE
ENGINEER
of electrical equipment shall be in accordance with SAUDI ARAMCO
Engineering Standard SAES-P-111 and National Electrical Code (NEC-
DATE:
6/278
2005) Article 250.
PROJECT
ENGINEER
SSJ 7.10.1.3 CONTRACTOR shall provide a concrete encased 4/0 copper cross
DATE:
6/27/08 connection between the long sides of the perimeter grounding electrode
CERTIFIED shall be provided.
6/27/08
DATE: 7.10.1.4 CONTRACTOR shall provide a bonding connection between the concrete
CONSTRUCTION
AGENCY encased grounding electrode conductors and structural steel columns,
SSJ
where applicable, as well as rebar in the concrete footing where the
6/27/08
DATE: grounding electrode traverses.
OPERATIONS
ASA
7.10.1.5 CONTRACTOR shall provide an external direct buried 4/0 copper
DATE:
6/27/08
counterpoise extension shall be provided around the exterior equipment
CONTROL NUMBER
yard.
VERIFICATION
EDSD
7.10.1.7 CONTRACTOR shall provide and install 10 foot by ¾ inch diameter copper-
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
clad steel ground rods at 40-feet on center maximum along the buried
0
ground loop. The ground loop shall be located 2 feet minimum from the
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
7.10.1.8 CONTRACTOR shall provide and install ground buses minimum of three in
each of the computer rooms. One ground bus at a minimum shall be
ENGG CERT
ALL
provided and installed in each of the electrical & mechanical rooms, battery
rooms, UPS rooms, and generator rooms. The ground bus shall be bonded
ALL
to the ground grid. The ground bus shall be surface mounted and shall be
pre-drilled to accept 12-2-two-hole grounding lugs each. See grounding
drawings for exact quantities of ground buses.
7.10.1.9 CONTRACTOR shall provide and install substation grounding system and
ground bars throughout building for connection of all equipment to the
100% ISSUE FOR CONSTRUCTION
grounding system.
DESCRIPTION
7.10.1.10 CONTRACTOR shall provide and install grounding cables from building
ground ring to all ground bars, electrical equipment non-current carrying
metal parts such as enclosures and supports, electrical & mechanical
equipment as indicated on drawings ,fence gates and fence itself where
applicable and required.
7.10.1.11 CONTRACTOR shall provide and install underground building ground grid
around entire building and in the equipment yard and this ground grid shall
JO/EWO
0002
DISCIPLINE
ENGINEER
noted.
DATE:
6/278
7.10.1.13 All connections and fittings shall be UL listed for the purpose. Buried and
PROJECT
ENGINEER embedded connections shall be exothermic weld. Attachments and
SSJ connections that are accessible for future inspection (test wells) shall be
DATE:
6/27/08 mechanical or compression type.
CERTIFIED
7.10.1.14 All dimensions shown on the project drawings shall be field verified by
6/27/08
DATE: CONTRACTOR prior to installation.
CONSTRUCTION
AGENCY
SSJ
7.10.2 Lightning Protection Systems: As part of the electrical work for the lightning
6/27/08
DATE: protection systems, the CONTRACTOR shall complete the following:
OPERATIONS
ASA
7.10.2.1 CONTRACTOR shall provide and install a lightning protection system for
DATE:
6/27/08
the entire building and equipment yard in accordance with NFPA Standard
CONTROL NUMBER
7.10.2.2 CONTRACTOR shall provide and install roof mounted air terminals to
DATE:
BY:
ground grid. A driven ground rod shall be provided at each down conductor
(DCC) NO. _____________________
as a ground terminating device for the air terminal system. The lightning
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
protection system shall be connected to the ground grid system for the
SSJ
building.
ENGG CERT
ALL
7.10.2.3 CONTRACTOR shall provide and install the raised floor bolted stringer
system and this system shall serve as the signal reference (SRG) grid in
ALL
the computer rooms. A 250 MCM bare copper ground conductor shall be
installed below the raised floor around the perimeter of the raised floor area
located on the surface of the concrete slab. The raised floor pedestals shall
be bonded to the ground conductor at 4-foot intervals with a mechanical
clamp. The bolted stringers will serve as the floor bonding system.
100% ISSUE FOR CONSTRUCTION
7.10.2.4 CONTRACTOR shall provide and install the SRG and the SRG shall be
DESCRIPTION
bonded to a ground bus below the raised floor. All metallic piping and
conduit entering the raised floor area shall be bonded to the ground loop.
7.10.2.6 All connections and fittings shall be UL listed for the purpose. Buried and
embedded connections shall be exothermic weld.
JO/EWO
0002
7.10.2.7 All dimensions shown on the project drawings shall be field verified by
CONTRACTOR prior to installation.
6/27/08
DATE
00
DISCIPLINE
ENGINEER
The CONTRACTOR shall provide Temporary power required during construction
and commissioning. Power shall be brought in from the 13.8kV existing line
DATE:
6/278
located on the east of the site along the road to the HF Transmitter site. PDD has
PROJECT
ENGINEER agreed that One (1) MW can be used for temporary power with tie-ins to this
SSJ existing line. A distribution system shall be provided with over current protection,
DATE:
6/27/08 fuses and/or circuit breakers sized per NEC. Temporary wiring will be removed
CERTIFIED immediately upon completion of construction and commissioning.
6/27/08
DATE:
CONSTRUCTION 7.10.4 EPMS (Electrical Power Monitoring System)
AGENCY
SSJ
redundant power feeds from electrically separated UPS power sources, with VPN
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.10.4.5 Full integration to critical utility support equipment such as UPS,
SSJ
Emergency Generators, PDUs, RPPs, Variable Speed Drives, and Chillers (via
BMS), etc. will be provided.
ENGG CERT
ALL
incoming power from the utility power company, UPS inlet power, and UPS outlet
power will be provided.
7.10.4.7 Redundant monitoring and server panels and processors will be
provided as required to insure uninterruptible monitoring. Where required, panels
will be powered by same source as equipment being monitored.
7.10.4.8 Power quality monitoring will be provided using high-speed
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
The electrical system will be tied into the existing SECo SCADA system via
Marshalling Cabinets located at the Main 15kV switchgear room and Remote
JO/EWO
0002
Terminal Units (RTU) located at SECo substation . SCADA system will be provided
by SECo and installed at SECo substation building. The Electrical Contractor shall
6/27/08
DATE
provide Marshalling cabinets in each medium Voltage switchgear room and route
all control cables to RTU.. A limited number of the overall alarms available within
the data center will be transmitted to a central location via SCADA. These points
NO.
REV
00
DISCIPLINE
will include:
ENGINEER
Loss of Power (A-Side)
6/278
DATE:
PROJECT Loss of Power (B-Side)
ENGINEER
SSJ Generator Plant Operational
6/27/08
DATE:
CERTIFIED
Utility Power (A-Side) Amps, Volts, KW, KVA
Utility Power (B-Side) Amps, Volts, KW, KVA
6/27/08
DATE:
CONSTRUCTION
These points will be connected via RTU, to the network room. From the network
AGENCY room, a virtual circuit will be created for interconnection into the main SCADA
SSJ
electrical monitoring system for the Dhahran Complex.
6/27/08
DATE:
OPERATIONS
ASA
7.11 IDAS/SACS Systems
6/27/08
DATE:
CONTROL NUMBER
7.11.1 The IDAS/SACS systems are designed and constructed under another project
VERIFICATION
by Saudi Aramco. The construction contractor for the Corporate Data Center
EDSD
must coordinate activities of the Corporate Data Center construction with the
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 8.0 - DETAILED DESCRIPTION OF WORK
SSJ
ALL
8.1.1 This section covers the Building Management System (BMS) to be provided to
control and monitor the HVAC equipment for the Saudi Aramco corporate Data
Center. The field devices and marshalling cabinets will be provided by the
CONTRACTOR and after the BMS vendor is selected the BMS vendor will install
their control panels and associated components.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.1.2 The BMS vendor shall provide a fully integrated Direct Digital Control (DDC)
Building Management system (BMS) for monitoring and control of HVAC, fuel oil,
water leak detection, water storage, fire detection, fire suppression, power
generation and distribution, UPS, UPS battery, and plumbing. This system must be
able to communicate with the existing Saudi Aramco BMS network located within
the Core Area, TCC, and ECC using standard communication protocol. The BMS
will allow maintenance groups and site engineering team to quickly determine a
precise location for all alarms (every type of system) and fire suppression events;
track status and availability of systems and their components and control and
JO/EWO
monitor all systems in the building. The system will utilize Standard Network
0002
Management Protocol (SNMP) open protocol systems. All of the BMS control and
monitoring systems shall be powered from two sources from the building’s UPS
6/27/08
DATE
systems.
NO.
REV
8.1.3 The new Saudi Aramco Data Center’s BMS system shall be operable from
00
DISCIPLINE operator workstations located in the Utilities Control Room, Chiller Room B42,
ENGINEER
Chiller Room B43, Chiller Room B44, Chiller Room B45, Chiller Room B46, Chiller
DATE:
6/278 Room B47, and Security Room B49. Operator workstations in the IT Network
PROJECT
ENGINEER
Operations Center (NOC), the ECC NOC, and the OSPAS NOC shall be provided
SSJ for monitoring only. The BMS shall have the capability for remote monitoring from
DATE:
6/27/08 the Dhahran Core Area Control Room. It shall also have the capability for web-
CERTIFIED based remote monitoring.
DATE:
6/27/08 8.1.4 The work shall include, but not be limited to, the installation of a standalone control
CONSTRUCTION
AGENCY
panel network and all associated cabling and devices as shown on drawing HA-
SSJ 175008-001. All control components such as communication modules, switches,
DATE:
6/27/08 servers, LAN connectors, etc. shall be mounted in cabinets or racks.
OPERATIONS
ASA 8.1.5 The BMS vendor shall provide a graphical user interface. Special active system
DATE:
6/27/08 graphics and floor plans are required screens on the automation system. The BMS
system must have the ability to display an active electrical power system one-line
CONTROL NUMBER
VERIFICATION
for the entire electrical power system, an active mechanical system one-line
EDSD
diagram for the entire mechanical system and graphic representations of all other
active mechanical systems. The BMS will provide an active floor-plan display
DATE:
BY:
showing the status (temperatures, water flow rates, or equipment status) of all
facility zones by use of changing colors. “Active” means the BMS will indicate the
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
position, status and/or loads of devices such as valves, breakers, and other
OF THIS DRAWING IS COVERED, FOR ALL
devices.
(DCC) NO. _____________________
8.1.6 All monitoring systems are to be compatible with existing and proposed Saudi
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Aramco systems and engineered for off-site BMS monitoring.
SSJ
8.1.7 Provide a common synchronized clock capable of time stamping to 0.001- second
ENGG CERT
ALL
increments. Incorporate the use of a global positioning system (GPS) clock for this
requirement. The time stamp shall be designed to occur at the point of the event,
ALL
8.1.8 Under floor water detection and alarming is required for all raised floor areas,
trenches, UPS rooms and switch gear rooms. Continuous linear detection in a
serpentine pattern is preferred. There shall be full graphics with monitoring in the
BMS system.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.1.9 Employ control logic and configure alarms within the BMS to warn an operator of
impending equipment malfunctions and failures.
8.1.10 Provide redundant managers for the chilled water plant and the secondary chilled
water pumps. The BMS vendor shall provide a control system arranged to
eliminate any single point of failure
8.1.11 An active hydrogen monitoring system will be provided for each battery room.
Provide a lead and redundant hydrogen detection panel for each battery room.
JO/EWO
These systems will be installed outside of the battery rooms and include stand-
0002
alone audible and visual alarms. It will notify the BMS of an alarm condition. The
BMS will also monitor the status of the battery room ventilation fan and generate
6/27/08
DATE
00
DISCIPLINE 8.1.12 A refrigerant monitoring system shall be provided for each Chiller Room per
ENGINEER
specification section 17975-3.4.
6/278
DATE:
PROJECT 8.1.13 CONTRACTOR shall provide a marshalling cabinet associated with each
ENGINEER
SSJ
standalone control panel. CONTRACTOR shall supply, pull cable, and terminate
6/27/08 cable within marshalling cabinets as shown on control system interconnection
DATE:
CERTIFIED diagrams (HA-175059-001 through HA-175059-031). All wires shall be individually
tagged at both ends with approved SAUDI ARAMCO wire markers. Wires shall be
DATE:
6/27/08 labeled clearly “from and to” destination of the individual wire.
CONSTRUCTION
AGENCY
SSJ 8.1.14 CONTRACTOR shall provide all sensing elements, such as temperature sensors,
DATE:
6/27/08 humidity sensors, flow sensors, and differential pressure sensors as part of this
OPERATIONS system per the instrument installation schedules (IIS), instrument specification
ASA sheets (ISS), and specification section 17975. CONTRACTOR shall provide wells
6/27/08 in piping as required for flow meters and temperature sensors.
DATE:
CONTROL NUMBER
VERIFICATION
8.1.15 CONTRACTOR shall install averaging elements in ducts and plenums in crossing
EDSD
or zigzag pattern.
DATE:
8.1.16 CONTRACTOR shall install damper motors on outside of duct in warm areas, not
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
8.1.17 CONTRACTOR shall provide marshalling cabinets with terminal blocks for all
(DCC) NO. _____________________
equipment designated as future on the Piping & Instrument Diagrams. The BMS
vendor shall provide standalone control panel enclosures for all standalone control
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
panels designated as future.
SSJ
8.1.18 CONTRACTOR shall neatly arrange all wires in the marshalling cabinets by using
ENGG CERT
ALL
coiled neatly inside the panels with sufficient length to the farthest terminal strip for
future termination.
8.1.19 BMS vendor shall install Ethernet communication cables as continuous runs from
the control center to remote panels and from remote panel to remote panel, without
splices or intermediate junction boxes. Installing trunk cables in conduit that
carries wires not dedicated to communication across a trunk is not acceptable.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.1.20 Consolidation of process wires between SCP’s is not acceptable. Where a SCP
controls a device, only the wiring between the controlled device and the SCP shall
be installed in the raceways for those devices. Sensors, transmitters and other
devices shall be in raceways dedicated to operation between a SCP and the
process it controls.
8.1.21 Wiring external to the SCP and its dedicated control process shall not be installed
JO/EWO
common trough may not be used to accumulate wiring from multiple SCP’s to
distribute process wiring to end devices.
6/27/08
DATE
8.1.22 Where the interface to the Data Center CRAH’s is provided, this Vendor shall
NO.
REV
provide all wiring from the CRAH’s to the manufacturer’s interface device as well
00
DISCIPLINE as the wiring from the interface device as related to connecting to the BMS
ENGINEER
communication trunk.
6/278
DATE:
PROJECT 8.1.23 The CRAH units shall be wired to alternate between the CRAH’s on different
ENGINEER
SSJ
manufacturer’s interface devices. For example: CRAH 1 shall be interfaced with
6/27/08 manufacturer device 1; CRAH 2 shall be interfaced with manufacturer device 2. If
DATE:
CERTIFIED a manufacturer’s device should fail, then contiguous CRAH units shall not fail to
display information to the front end.
6/27/08
DATE:
CONSTRUCTION 8.1.24 The sensors, indicators and commands from any individual mechanical component
AGENCY
SSJ controller shall be installed in raceway dedicated to that controller and its
DATE:
6/27/08 associated equipment under control. There shall be no intermingling of wiring
OPERATIONS between different controllers and the equipment they service.
ASA
6/27/08 8.1.25 CONTRACTOR shall review all applicable drawings, i.e. Piping & Instrument
DATE:
Diagrams (HA-175009-001 through HA-175012-015) and Point Matrix Drawings
CONTROL NUMBER
VERIFICATION
8.1.26 CONTRACTOR shall perform point-to-point wiring (Continuity) test on all wires and
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
cables installed. Make sure that wires are disconnected from the instruments and
OF THIS DRAWING IS COVERED, FOR ALL
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.1.27 Check and verify all wiring installations for cable and wire markers and terminal
SSJ
ALL
8.1.28 The selected BMS vendor shall coordinate the installation of the standalone control
ALL
8.1.29 The BMS vendor shall report any deficiencies with the wiring between marshalling
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.1.30 The BMS Vendor shall perform loop checks of the complete installation, and verify
design requirements in accordance with the related drawings.
8.1.31 The BMS vendor shall pre-fabricate ALL SCP’s for factory witness testing. This
testing will be performed with actual hardware that will be used at the site. Vendor
JO/EWO
will provide all necessary hardware to simulate system function. Use of software
0002
simulation can be an adjunct but cannot be used instead of actual hardware and
software simulation.
6/27/08
DATE
8.1.32 The BMS vendor perform functional test for all mechanical equipment controlled by
NO.
REV
the BMS. This will be done on the software and equipment in the vendors’ factory
00
DATE:
6/278 8.1.33 If requested, submit all test results to COMPANY Representative for approval.
PROJECT
ENGINEER
SSJ
6/27/08 8.2 Electrical Power Monitoring (EPMS) Systems (REFER TO PHASE 700)
DATE:
CERTIFIED
8.3 Structured Cable Plant/Premises Distribution System (PDS)
6/27/08
DATE:
CONSTRUCTION
AGENCY 8.3.1 General
SSJ
6/27/08
DATE: 8.3.1.1 CONTRACTOR shall perform all communications work in accordance with
OPERATIONS
the latest edition of SAUDI ARAMCO Engineering Standards (SAES), Saudi
ASA
Aramco Materials System Specifications (SAMSS), Building Industry
6/27/08
DATE: Consulting Services International Telecommunications Distribution Methods
CONTROL NUMBER
Project Drawings. In case of conflict, the more stringent code shall apply.
DATE:
CONTRACTOR shall adhere to all safety standards while carrying out his
BY:
work.
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
8.3.1.2 CONTRACTOR shall read, review, and understand scope of work in all
(DCC) NO. _____________________
contract documents;
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.3.1.3 Contractor shall understand that “to provide” is construed to mean furnish,
SSJ
ALL
8.3.1.5 CONTRACTOR shall provide to owner and engineer for approval Product
Data Sheets, Quality Assurance and Factory Tests, Project Materials List,
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.3.1.6 CONTRACTOR shall submit Pull Schedules and Progress Reports during
construction that will be used in the project to owner and engineer for
approval.
0002
00
DISCIPLINE 8.3.1.9 CONTRACTOR shall certify that all contractor personnel working on this
ENGINEER
project site shall be industry certified; including but not limited to BICSI
DATE:
6/278 Technician Level II certified and BICSI Registered Communications
PROJECT Distribution Designer (RCDD) certified.
ENGINEER
SSJ
6/27/08 8.3.1.10 CONTRACTOR shall certify that additional manufacturer-specific installer
DATE:
CERTIFIED training must be acquired prior to commencement of installation.
Manufacturer installation training must reflect all the product technologies
DATE:
6/27/08 specified for this project. The contractor’s field representative shall have a
CONSTRUCTION copy of each person’s certification at the site at all times.
AGENCY
SSJ
DATE:
6/27/08 8.3.1.11 CONTRACTOR shall comply with any/all requests to remove from the job
OPERATIONS site any personnel who are not certified or who do not have a copy of their
ASA certification documentation until proof of certification is provided to the
6/27/08 Owner.
DATE:
CONTROL NUMBER
VERIFICATION
8.3.1.12 CONTRACTOR shall provide and install only a Connectivity Solution that
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
project.
SSJ
8.3.1.14 CONTRACTOR shall ensure the Owner representative is made fully aware
ENGG CERT
ALL
8.3.1.15 CONTRACTOR shall obtain all required work permits prior to starting any
work in accordance with G.I.-0002.100, “Work Permits and Other Proponent
Requirements”.
8.3.1.16 During the course of construction, do not block fire hydrants, fire alarm
boxes, storm gutters/drains, catch basins, traffic flow, private driveways, and
etc. with accordance to GTE 622-105-200.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.3.1.17 All excavation and installation of underground cables and conduits shall be
in accordance with SAUDI ARAMCO Engineering Standards: SAES-T-628
and SAES-T-911 as required by the Project Drawings.
8.3.1.18 Care shall be taken to avoid damage to existing underground facilities during
excavation and installation of new work. If during excavation
CONTRACTOR encounters any pipes, cables, concrete or other
obstructions not indicated on the drawings, he must stop, inform the SAUDI
JO/EWO
ARAMCO.
00
DISCIPLINE
ENGINEER
8.3.1.19 CONTRACTOR shall install wirings and building distribution cables in
DATE:
6/278 accordance with SAUDI ARAMCO Engineering Standard SAES-T-916. Only
PROJECT cad welding method will be used. CONTRACTOR must insure that the cable
ENGINEER
SSJ
pulling tension, minimum bending radius, and the number of bends in one
6/27/08 run of conduit meets SAUDI ARAMCO requirements.
DATE:
CERTIFIED
8.3.1.20 CONTRACTOR shall install grounding of communications facilities and
DATE:
6/27/08 equipments in accordance with SAUDI ARAMCO Engineering Standards:
CONSTRUCTION SAES-T-795 and SAES-T-903.
AGENCY
SSJ
DATE:
6/27/08 8.3.1.21 CONTRACTOR shall place Warning Tape (Tierra Tape) above the cable or
OPERATIONS conduit as per SAUDI ARAMCO Standard Drawing # AA-036748.
ASA
6/27/08 8.3.1.22 CONTRACTOR shall clean and mandrel ducts where cables are to be
DATE:
installed using lubricant in pulling procedure in accordance with SAUDI
CONTROL NUMBER
VERIFICATION
8.3.1.23 CONTRACTOR shall bond and ground pedestal, terminal and cable in
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
8.3.1.24 CONTRACTOR shall install the horizontal raceway system (overhead cable
(DCC) NO. _____________________
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
instructions, relevant SAUDI ARAMCO Standards, NEC Article 318, BICSI
SSJ
ALL
requirements.
8.3.1.27 CONTRACTOR shall apply fire retardant sealing compounds to wall cabling
slots after installation of cables.
0002
8.3.2.1.3 CONTRACTOR shall provide all fiber optic coupler panels and mount
panels in the distribution shelves as indicated on drawings and in
NO.
REV
00
DISCIPLINE specifications.
ENGINEER
6/278 8.3.2.1.4 CONTRACTOR shall provide blank panel locations with filler panels
DATE:
PROJECT as indicated on drawings and in specifications.
ENGINEER
SSJ
6/27/08
8.3.2.1.5 CONTRACTOR shall conform to port counts as indicated on
DATE:
CERTIFIED
drawings and in specifications.
fiber shall be used for all storage area network (SAN) installations as
DATE:
indicated on drawings.
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
indicated on drawings.
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
optic LC-Duplex connectors as indicated on drawings and in
SSJ
specifications
ENGG CERT
ALL
specifications.
8.3.2.1.11 CONTRACTOR shall provide Single mode 9µm (OS1) fiber optic
cable as indicated on drawings and in specifications.
0002
00
8.3.2.2.7 CONTRACTOR shall provide 19” EIA Category 3 patch panel for
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
in specifications.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
various PVC compounds and sheathed with a white low smoke PVC
SSJ
ALL
568B.2.
ALL
DISCIPLINE
ENGINEER
8.3.2.2.15 CONTRACTOR shall install 4-pair Category 6e UTP cables from the
DATE:
6/278 TR to the information outlets as shown on drawings.
PROJECT
ENGINEER
SSJ
8.3.2.2.16 CONTRACTOR shall install Category 3 cables to the information
6/27/08 outlets as shown on drawings.
DATE:
CERTIFIED
8.3.2.3 Server Cabinets and Communications Racks
6/27/08
DATE:
CONSTRUCTION 8.3.2.3.1 CONTRACTOR shall provide all communication and server cabinets
AGENCY
SSJ as indicated on drawings and in specifications.
6/27/08
DATE:
OPERATIONS
8.3.2.3.2 CONTRACTOR shall provide free-standing communication
ASA
equipment cabinets for equipment mounting as indicated on
6/27/08
drawings and in specifications.
DATE:
CONTROL NUMBER
VERIFICATION
DATE:
8.3.2.3.4 CONTRACTOR shall provide vertical wire mangers for the mounted
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
specifications.
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.3.2.4 Cable Management
SSJ
ALL
and in specifications.
ALL
8.3.2.4.2 CONTRACTOR shall provide wire basket type cable tray which shall
be of wire-mesh construction and be configured in a 2" x 4" grid
pattern wires welded at the intersection points. The Basket type
various sizes shall be as indicated on drawings and in specifications.
8.3.2.4.5 CONTRACTOR shall provide all 6” & 10” wide vertical cable
management panels that have metal ring type with solid cover panels
as indicated on drawings and in specifications.
8.3.2.4.6 CONTRACTOR shall provide all open and closed cable distribution
JO/EWO
8.3.2.4.7 CONTRACTOR shall provide all cable hook and loop ties with #10
screws as required and/or indicated on drawings and in
specifications. Provide plenum rated where required.
NO.
REV
00
DISCIPLINE
ENGINEER
8.3.2.4.8 CONTRACTOR shall install overhead cable trays, RGS conduits and
6/278 information outlets as shown on drawings.
DATE:
PROJECT
ENGINEER
SSJ
8.3.2.4.9 CONTRACTOR shall provide all cable tray and ladder rack systems
6/27/08
as indicated on drawings and in specifications.
DATE:
CERTIFIED
8.3.2.5 Grounding
6/27/08
DATE:
CONSTRUCTION 8.3.2.5.1 CONTRACTOR shall install grounding wires, bond and ground the
AGENCY
SSJ
equipments in the Telecommunications Room (TR) as shown on
6/27/08
drawings.
DATE:
OPERATIONS
ASA
8.3.2.5.2 CONTRACTOR shall provide a complete telecommunications
6/27/08
Grounding system, as indicated on drawings and in specifications.
DATE:
CONTROL NUMBER
VERIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
8.3.2.5.5 CONTRACTOR shall install grounding wires, bond and ground the
equipment cabinets as shown on Telecommunications and electrical
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
drawings.
SSJ
ALL
8.3.2.6.2 CONTRACTOR shall obtain owner approval for each termination and
test plan prior to execution of the work.
8.3.2.6.3 CONTRACTOR shall test all fiber optic backbone cables after the
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.3.2.6.4 CONTRACTOR shall test all Category 3 backbone cables after the
installation is fully completed.
8.3.2.6.5 CONTRACTOR shall test all Category 6e backbone cables after the
installation is fully completed.
used.
0002
00
6/278
8.3.2.6.9 CONTRACTOR shall comply with the latest TIA/EIA 568-B test
DATE:
PROJECT
standards, and any test equipment instruction, and guidelines.
ENGINEER
SSJ
6/27/08
8.3.2.6.10 CONTRACTOR shall test and certify equipment and ensure all
DATE:
CERTIFIED
appropriate test accessories are included. The test equipment shall
comply with TIA/EIA for Level III accuracy. The test equipment for
6/27/08 UTP cables shall be certified and capable of testing Category 6
DATE:
CONSTRUCTION cables.
AGENCY
SSJ
6/27/08
8.3.2.6.11 CONTRACTOR shall provide notification of any planned testing to
DATE:
OPERATIONS
the owner 10 days prior to any test.
ASA
6/27/08
8.3.2.6.12 CONTRACTOR shall develop the test plans defining all the tests
DATE:
required to ensure that the cable plant meets technical and
CONTROL NUMBER
VERIFICATION
tested. The test plan and test forms shall be reviewed and must be
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
8.3.2.6.13 CONTRACTOR shall provide all test results will be in writing giving
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
all readings, date, tested by and totals.
SSJ
ALL
8.3.2.6.15 CONTRACTOR shall test all cables and repair and re-test at the
ALL
8.3.2.6.16 CONTRACTOR shall reflect on the as- built plan any changes during
installation.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.4.1 General
JO/EWO
0002
00
DISCIPLINE 8.4.1.2 CONTRACTOR shall adhere to all safety standards while carrying out his
ENGINEER
work.
6/278
DATE:
PROJECT 8.4.1.3 CONTRACTOR shall read, review, and understand scope of work in
ENGINEER
SSJ
statement of work, construction drawings, bill of materials, and material and
6/27/08 execution specifications.
DATE:
CERTIFIED
8.4.1.4 CONTRACTOR shall understand that “to provide” is construed to mean
DATE:
6/27/08 furnish, install, test, terminate label and to make fully functional independent
CONSTRUCTION of the work of others without exception.
AGENCY
SSJ
6/27/08 8.4.1.5 CONTRACTOR shall construe “contract documents” to include all materials
DATE:
OPERATIONS and executions specifications produced and published for this project.
ASA
6/27/08
8.4.1.6 CONTRACTOR shall provide all materials and labor needed to complete the
DATE:
scope of work as defined in the contract documents.
CONTROL NUMBER
VERIFICATION
8.4.1.7 Based on the construction documents, the CONTRACTOR will work closely
EDSD
which will be used as master topology for the installation and configuration
BY:
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
8.4.1.8 CONTACTOR shall document all design details prior to device installation
(DCC) NO. _____________________
and configuration. This detailed design will incorporate all layer 2 and layer 3
design specifics, as well as all protocols, ports, speeds, interfaces,
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
configurations, VLAN’s, trunks, IP addresses, subnets, failover mechanisms,
SSJ
and any other relevant design details. CONTRACTOR shall submit final
design by means of shop-drawings process to be reviewed and approved by
ENGG CERT
ALL
8.4.1.9 CONTRACTOR shall provide to owner and engineer for approval Product
Data Sheets, Quality Assurance and Factory Tests, Project Materials List,
and Shop Drawings.
8.4.1.10 CONTRACTOR shall submit all Field Test Reports, As-Built – Record
Documents, Warranty and Certificate information post construction that will
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
8.4.1.13 CONTRACTOR shall comply with any/all requests to remove from the job
00
DISCIPLINE site any personnel who are not certified or who do not have a copy of their
ENGINEER
certification documentation until proof of certification is provided to the
DATE:
6/278 Owner.
PROJECT
ENGINEER
SSJ
8.4.1.14 CONTRACTOR shall be certified by all systems and equipment
6/27/08 manufacturers or vendors relevant to this project. The final deliverable for
DATE:
CERTIFIED the project by the contractor shall be a complete system and equipment
registered by the manufacturers certifying the installed solution in the
DATE:
6/27/08 project.
CONSTRUCTION
AGENCY
SSJ 8.4.1.15 CONTRACTOR shall ensure that the owner, engineer and/or the owner’s
DATE:
6/27/08 representative is made fully aware in writing of any materials not in
OPERATIONS compliance with thedata network material and installation specifications,
ASA
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
and software to support the final design and bill of materials approved by owner.
OF THIS DRAWING IS COVERED, FOR ALL
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
and will reflect discounts based on longevity of term.
SSJ
ALL
8.4.2.4 CONTRACTOR shall obtain the best possible discounts based on volume-
purchases, that of the CONTRACTOR and the owner. CONTRACTOR will then pass
the savings to the owner in the form of a rebate in the final bid..
been installed, tested --per the Quality Assurance (QA) and Quality Control (QC)
sections within the Statement of Work (SOW) and the Specification Document (SD).
Owner will indicate acceptance in writing to the CONTRACTOR.
8.4.3.1 CONTRACTOR shall install all hardware and software provided as defined
within the Specification Document (SD) and Bill of Materials (BOM). The actual
physical locations and elevations are defined within the SD.
JO/EWO
0002
8.4.3.3 CONTRACTOR shall install all software versions per pre-approved owner
revision levels and per vendor recommended installation procedures. Any known
NO.
REV
00
DISCIPLINE faults (bugs) within the software revision level specified by owner will be documented
ENGINEER
and presented to the owner, and will be signed off with approval, prior to the
DATE:
6/278 installation of the software version.
PROJECT
ENGINEER
SSJ
8.4.3.4 CONTRACTOR shall label all switch chassis at the bottom center of each
6/27/08 device according to the SD labeling specification.
DATE:
CERTIFIED
8.4.3.5 CONTRACTOR shall properly cable all power cables to an A and B power
DATE:
6/27/08 source within the cabinet, and label each power cable in accordance to the SD
CONSTRUCTION labeling specification.
AGENCY
SSJ
6/27/08 8.4.3.6 CONTRACTOR shall install all device modules according to manufacturer
DATE:
OPERATIONS specifications, and as defined within the SD.
ASA
6/27/08
8.4.3.7 CONTRACTOR shall burn in all active components as defined within the
DATE:
SD. CONTRACTOR will replace any items that are found to be defective.
CONTROL NUMBER
VERIFICATION
New/replaced modules will undergo the same burn in procedure and are required to
pass.
EDSD
DATE:
provided equipment per the manufacturer’s directions. A facility ground bus will be
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
made available near the cabinets for the ground wire to be attached. The contractor is
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
procedures.
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.4.3.9 CONTRACTOR shall hard set all port speeds and duplex settings. No
SSJ
ALL
8.4.3.10 CONTRACTOR shall name all network ports and interfaces, as defined by
the owner’s port-naming standards.
ALL
8.4.4.2 CONTRACTOR shall ensure that all deployed systems shall be fully
documented and configurations saved/backed up for future system recovery or
validation. The backup mechanism should be on a secure owner-provided Network
Management System (NMS) using SCP or other owner-defined method.
CONTRACTOR shall configure the device so that the Network Operations Center
(NOC) can monitor the device. Once monitoring has been enabled and verified, then
the contractor shall ensure the final configuration is backed up and documented.
JO/EWO
0002
8.4.4.3 CONTRACTOR shall work with the owner in developing an accurate test
and acceptance plan that clearly documents system functionality to ensure that the
6/27/08
DATE
deployed systems work as specified, and are properly integrated within the owner’s
network. The contractor will write this plan, present it to the owner, obtain approvals,
NO.
REV
and utilize the detailed step-by-step process in the testing phases of the project.
00
DISCIPLINE
ENGINEER
8.4.4.4 CONTRACTOR shall ensure that their written testing and acceptance
DATE:
6/278 (T&A) plan is approved by the owner prior to actual testing.
PROJECT
ENGINEER
SSJ
8.4.4.5 CONTRACTOR shall encompass each of the individual network layers
6/27/08 (Core, Distribution, Aggregation, and Access) into their testing and acceptance plan,
DATE:
CERTIFIED as well as end-to-end network system functionality and testing.
DATE:
6/27/08 8.4.4.6 CONTRACTOR shall not configure and deploy any systems until the T&A
CONSTRUCTION plan has been developed, documented, and approved for release.
AGENCY
SSJ
6/27/08 8.4.4.7 CONTRACTOR shall encompass the failure and failover of both logical
DATE:
OPERATIONS and physical elements within their T&A plan, and will document how the network
ASA responds to certain failovers. These tests should encompass various scenarios; such
6/27/08 as:
DATE:
CONTROL NUMBER
VERIFICATION
• Failure of a port/s
BY:
• Failure of interface/s
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
• Failure of a Supervisor module/s
SSJ
ALL
• Chassis failure
8.4.4.8 CONTRACTOR shall provide testing documentation which will document
evidence of stateful, or non-stateful failover, as well as the time the network requires
to recover from the failover.
8.4.4.9 CONTRACTOR shall document and record all testing to be submitted for
the owner’s review. It is critical that rapid failover and recovery is integrated into the
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
network, and that this high availability mechanism is tested and validated via the
owner-approved Quality Control process.
8.4.5.2 CONTRACTOR shall present this process to the owner for approval in
6/27/08
DATE
their response.
8.4.5.3 CONTRACTOR shall thoroughly comply with all owner Change Control
NO.
REV
00
DISCIPLINE processes and will not modify or impact any production systems without prior written
ENGINEER
approval of the owner.
6/278
DATE:
PROJECT 8.4.5.4 CONTRACTOR shall be held liable for damages to, or loss of, production
ENGINEER
SSJ
systems that are impacted due to the contractor’s modifications or changes, without
6/27/08 written approval from the owner. Owner will remain indemnified of any responsibility
DATE:
CERTIFIED not directly related to owner specific direction(s).
DATE:
6/27/08 8.4.5.5 CONTRACTOR shall request all hardware or software configuration
CONSTRUCTION changes, as well as software versions, prior to the actual change.
AGENCY
SSJ
new facility be thoroughly integrated with the existing exterior gateway routing
protocols for the new data center. Multiple OSPF areas will be utilized in the design
EDSD
and it is critical that the contractor provide staff with extensive experience in the
DATE:
between the ECC and IT ASBR Routers at the Corporate Data Center to allow traffic
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Aramco Engineering Standards (SAES).
SSJ
8.4.6.3 CONTRACTOR shall base ensure that all exterior routing configurations
ENGG CERT
ALL
will be based on industry and vendor specified best practices and methodologies.
ALL
mechanisms into the network using various protocols (i.e. OSPF timers, VRRP/HSRP
etc...).
8.4.7.1 CONTRACTOR shall work closely with the owner’s network teams to
develop the necessary detailed interior gateway routed protocol (IGP) design for all
interfaces leaving the facility. Currently SA uses OSPF and will require that the new
facility be thoroughly integrated with the existing exterior gateway routing protocols for
JO/EWO
the new data center. Multiple OSPF areas will be utilized in the design and it is critical
0002
that the contractor provide staff with extensive experience in the design, configuration,
and troubleshooting of similar networks.
6/27/08
DATE
00
DISCIPLINE
ENGINEER
8.4.7.3 CONTRACTOR shall base ensure that all exterior routing configurations
6/278 will be based on industry and vendor specified best practices and methodologies.
DATE:
PROJECT
ENGINEER
SSJ
8.4.7.4 CONTRACTOR shall ensure that high availability and failover is
6/27/08
incorporated into all configurations.
DATE:
CERTIFIED
8.4.7.5 CONTRACTOR shall use the approved detailed design document as a
DATE:
6/27/08 hierarchical topology and guide for the deployment.
CONSTRUCTION
AGENCY
SSJ
8.4.7.6 CONTRACTOR shall configure all high availability and failover
6/27/08
mechanisms into the network using various protocols (i.e. OSPF timers, VRRP/HSRP
DATE:
OPERATIONS
etc.).
ASA
6/27/08
8.4.8 Switched Network Design
DATE:
CONTROL NUMBER
VERIFICATION
8.4.8.1 CONTRACTOR shall work closely with the owner’s network teams to
develop the necessary detailed switched network design for all interfaces leaving the
EDSD
facility. The owner requires that the new facility be thoroughly integrated with the
DATE:
APPROVAL/CERTIFICATION REQUIREMENTS,
8.4.8.3 CONTRACTOR shall ensure that all switched configurations will be based
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
on industry and vendor specified best practices and methodologies.
SSJ
ALL
documentation show roots, how BPDU’s are managed, failover, manual layer 2 load
balancing, trunking configurations, pruning methodologies, and any other switched
ALL
network best practices as defined by the vendor. Full management of all VLAN’s,
affiliated networks, IP addressing, and spanning tree protocol is critical to the
functional operation and high availability of the network.
8.4.9 Configuration
0002
8.4.9.2 CONTRACTOR shall follow all vendor recommended best practices and
design or deployment guidelines for all aspects of the network.
6/27/08
DATE
8.4.10 Security
NO.
REV
00
DISCIPLINE 8.4.10.1 CONTRACTOR shall be responsible for configuring any access-lists (layer
ENGINEER
3 IP based), or extended access-lists (Layer 3 IP based and Layer 4 TCP/UDP port
6/278 based) as required and defined in detail by the owner during the detailed design
DATE:
PROJECT process.
ENGINEER
SSJ
6/27/08
8.4.10.2 CONTRACTOR shall not be responsible for any firewalls, intrusion
DATE:
CERTIFIED
detection, intrusion prevention, or other adaptive security solutions. The security
devices and the services they provide are provided by others.
6/27/08
DATE:
CONSTRUCTION 8.4.11 Acceptance
AGENCY
SSJ
6/27/08
8.4.11.1 CONTRACTOR shall document all testing performed on the network.
DATE:
OPERATIONS
ASA
8.4.11.2 CONTRACTOR shall forward all network testing documentation to the
6/27/08
owner’s network teams for review. Once these documents are received, the owner
DATE:
will schedule final testing with the CONTRACTOR. The owner’s network teams will
CONTROL NUMBER
VERIFICATION
then observe all testing procedures as executed during the initial vendor pre-test.
EDSD
8.4.11.3 CONTRACTOR shall ensure that all network testing is witnessed by the
DATE:
owner. The contractor will also confirm that all testing passes in accordance with the
BY:
previously owner-approved testing documentation. Only then can the owner decide to
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
8.4.12 Documentation
SSJ
8.4.12.1 CONTRACTOR shall provide full documentation for all physical and logical
ENGG CERT
ALL
within the documentation will be in their native formats, so that the drawings, tables,
and other document components can used in the future by the owner. Locked,
password protected, Adobe PDF or other file formats that can not be edited, will be
rejected.
JO/EWO
0002
6/27/08
NO. DATE
REV
00
DISCIPLINE
ENGINEER
6/278
DATE:
PROJECT
ENGINEER
SSJ
6/27/08
DATE:
CERTIFIED
6/27/08
DATE:
CONSTRUCTION
AGENCY
SSJ
6/27/08
DATE:
OPERATIONS
ASA
6/27/08
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 9.0 - DETAILED DESCRIPTION OF WORK
SSJ
ALL
9.1 General
ALL
9.1.1 CONTRACTOR shall paint, coat and insulate equipment, piping and materials in
accordance with Saudi Aramco standards and the Project Specifications.
9.1.2 All painting and coating is considered “critical” per SAUDI ARAMCO standards
100% ISSUE FOR CONSTRUCTION
9.2.1 CONTRACTOR shall paint all metal surfaces on supports in accordance with
SAES-H-101 and APCS-26.
9.2.2 CONTRACTOR shall paint all below grade concrete surfaces for anchors and
JO/EWO
0002
DISCIPLINE
ENGINEER
and 12-SAMSS-007.
DATE:
6/278
9.2.4 CONTRACTOR shall paint vents and drains in accordance with SAES-H-101
PROJECT
ENGINEER and APCS-26.
SSJ
DATE:
6/27/08 9.2.5 All damaged epoxy-coating shall be repaired with patching material conforming
CERTIFIED to 09-SAMSS-106. When epoxy-coated reinforcing bars are cut in the field, the
ends of the bars shall be coated with the same material used for repair of
6/27/08
DATE: coating damage. Repair shall be done in accordance with the patching material
CONSTRUCTION
AGENCY manufacturer’s recommendations. The maximum total amount of coating
SSJ
damage on rebars received at the job site shall not exceed 2.0% of the surface
6/27/08
DATE: area of each bar. Bars with damage exceeding this amount shall be rejected.
OPERATIONS Fading of the color of the coating shall not be the cause for rejection of epoxy-
ASA
coated reinforcing bars. All visible coating damage due to handling, shipment
DATE:
6/27/08
and placing shall be repaired per 09-SAMSS-106 and manufacturer’s
CONTROL NUMBER
recommendations.
VERIFICATION
EDSD
a uniform topcoat finish for all steelwork, handrails, ladders etc. All surface
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
preparation, paint, and paint application shall comply with SAUDI ARAMCO
0
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
9.2.8 Concrete manholes shall be coated internally with APCS-3 epoxy and externally
ALL
below grade with APCS-10 bituminous paint per SAES-H-101 or better. Exterior
concrete surfaces above grade shall be coated with APCS-1B coating system
per SAES-H-003. Before coating, concrete surfaces shall be sealed with a low
molecular weight epoxy sealer. (Refer to SAES-A-104).
9.2.9 Steel reinforcing bars in concrete shall be epoxy coated per 09-SAMSS-106.
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
9.2.10 CONTRACTOR shall dampproof all footings and foundations per the project
“Materials Specification Section 071113 – Bituminous Dampproofing”.
9.2.11 CONTRACTOR shall apply water repellent to unpainted concrete, concrete unit
masonry and plaster per the project “Materials Specification Section 071900 –
Water Repellents”.
9.2.12 CONTRACTOR shall apply fluid applied membrane air barriers to walls per the
project “Materials Specification Section 072726 – Fluid Applied Membrane Air
JO/EWO
0002
9.2.13 CONTRACTOR shall apply fire proofing materials to structural members per the
6/27/08
DATE
9.2.14 CONTRACTOR shall paint interior surfaces per the project “Materials
00
DISCIPLINE
ENGINEER
Specification Section 099123 – Interior Painting”.
DATE:
6/278
9.2.15 CONTRACTOR shall coat above ground chilled water piping surfaces the
PROJECT
ENGINEER requirements of Section 6.0 and per 09-SAMSS-089.
SSJ
DATE:
6/27/08 9.2.16 CONTRACTOR shall coat above ground condenser water piping surfaces the
CERTIFIED requirements of Section 6.0 and per 09-SAMSS-091.
6/27/08
DATE: 9.3 Insulation
CONSTRUCTION
AGENCY
SSJ
9.3.1 CONTRACTOR shall supply and install jacketed insulation (to keep water cool)
6/27/08
DATE: on all above ground safety shower and eye wash piping installed by this project.
OPERATIONS CONTRACTOR’s proposed insulation and associated installation procedure
ASA
shall be approved by SAUDI ARAMCO Representative prior to installation.
DATE:
6/27/08
Piping shall be flushed and hydrotested prior to installation of insulation.
CONTROL NUMBER
VERIFICATION
9.3.3 CONTRACTOR shall insulate all mechanical piping, equipment and materials per
REVISIONCERTIFICATION
9.3.4 CONTRACTOR shall insulate all plumbing piping, equipment and materials per
(DCC) NO. _____________________
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SSJ
ALL
10.1 Commissioning
ALL
10.1.2 Contractor shall receive and store equipment to maintain warranty in accordance
with equipment vendors’ requirements.
10.1.3 Contractor shall uncrate, inspect for damage, document damage, and initiate any
claims necessary to correct damage.
10.1.4 Contractor shall place equipment following vendor recommendations for lifting,
skidding, etcetera.
10.1.5 Once equipment is uncrated and checked, Contractor shall wrap equipment with
plastic to prevent infiltration of dust, construction debris, and other contaminants.
JO/EWO
0002
10.1.6 Contractor shall remove shipping braces, locking devices, and other similar
devices in accordance with equipment manufacturer recommendations prior to
6/27/08
DATE
DISCIPLINE
ENGINEER 10.1.8 Contractor shall protect equipment tops with suitable material such as plywood or
6/278
equivalent where work me be performed overhead of the equipment to prevent
DATE:
PROJECT
debris entry or damage from workmen or incidental / accidental damage from
ENGINEER work in the area.
SSJ
DATE:
6/27/08 10.1.9 Contractor shall protect equipment following hookup of each unit with heavy duty
CERTIFIED plastic or equivalent barrier to prevent entry to dust, debris and to prevent marring
and scratching until ready for startup and testing.
6/27/08
DATE:
CONSTRUCTION
10.1.10 Contractor shall remove temporary protective barrier prior to startup testing.
AGENCY
SSJ 10.1.11 For electrical switchgear and distribution equipment: Contractor shall clean all
DATE:
6/27/08 internal parts, crevices, spaces, cubicles, etc by vacuuming and other necessary
OPERATIONS methods until a dust free condition is achieved, prior to startup and testing.
ASA
10.1.12 Contractor shall not commence power-up and testing until a Commissioning
6/27/08
DATE: Agent has approved with cleaning to a dust free condition.
CONTROL NUMBER
VERIFICATION
10.1.13 Contractor shall review pre-functional test with Commissioning Agent prior to
EDSD
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 11.0 - SPECIAL TECHNICAL REQUIREMENTS
SSJ
11.1 Tie-Ins
ENGG CERT
ALL
11.1.1 CONTRACTOR to provide a tie-in schedule and confirm time and date with
ALL
11.2.1 CONTRACTOR shall keep a complete and accurate record of all As-Built
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
changes made during construction of this Project at the construction site. SAUDI
ARAMCO Representative shall have full access to these drawings at all times.
0002
11.2.3 CONTRACTOR's surveyor field books shall be included with the As-Built
Drawings.
6/27/08
DATE
11.2.4 Four copies of all QA/QC documentation (indexed and bound) shall be
submitted to SAUDI ARAMCO Representative on the completion of this Project.
NO.
REV
00
DISCIPLINE
ENGINEER
11.2.5 All drawings shall have a revised copy of the material take off (MTO), reflecting
all changes made during construction in regard to quantities, substitutions or
DATE:
6/278 deletions.
PROJECT
ENGINEER
SSJ 11.2.6 Three sets of hand marked as-builts will be required prior to each partial
DATE:
6/27/08 Mechanical Completion.
CERTIFIED
11.2.7 SAUDI ARAMCO Representative will periodically check that as-built drawings
6/27/08
DATE: are up to date. If not, all work will stop until the as-built drawings are up-to-date
CONSTRUCTION
AGENCY and reflect the installed facilities.
SSJ
6/27/08
DATE:
OPERATIONS
ASA
6/27/08
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION
ASA
SAUDI ARABIAN OIL COMPANY
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SECTION 12.0 PRE-COMMISSIONING
SSJ
GI-2.710 will be carefully followed for pre-commissioning, punch listing and turnover activities.
ENGG CERT
ALL
All Pre-commissioning and Commissioning will be performed in accordance with the following:
ALL
12.1 CONTRACTOR shall perform all required Pre-commissioning including labor, tools and
100% ISSUE FOR CONSTRUCTION
DESCRIPTION
equipment for the performance of all necessary checks, tests, adjustments, repairs and
modifications for the final acceptance of the facilities. It shall be noted that assistance
shall be done by qualified personnel.
12.2 CONTRACTOR shall supply commissioning assistance including labor, tools and
equipment for all required checks, tests, adjustments, turning blinds, cleaning and
modifications required for the initial startup of the Facilities.
12.3 SAUDI ARAMCO Pre-commissioning Forms will be used for all testing and inspections.
JO/EWO
Other forms (for testing and/or inspections not included in the SAUDI ARAMCO Pre-
0002
12.4 CONTRACTOR shall flow test the completed system per the requirements of SAES-B-
017, document any deficiencies and/or obtain SAUDI ARAMCO approval signatures.
NO.
REV
00
DISCIPLINE The test procedure must be approved two weeks prior to beginning any testing.
ENGINEER
CONTRACTOR is responsible for assuring test water is drained and the general area put
6/278 back into its original condition.
DATE:
PROJECT
ENGINEER
SSJ
6/27/08
DATE:
CERTIFIED
6/27/08
DATE:
CONSTRUCTION
AGENCY
SSJ
6/27/08
DATE:
OPERATIONS
ASA
6/27/08
DATE:
CONTROL NUMBER
VERIFICATION
EDSD
DATE:
BY:
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
DRAWING TITLE DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION