You are on page 1of 16

EDSD REV

REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0 6600031497
05/02/18 FOR Approval
ISSUEDT.A
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER J.F.
APPROVAL/CERTIFICATION REQUIREMENTS, 7

AGENCY
PROJECT
BY:

ENGINEER
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
DISCIPLINE

CERTIFIED
T

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
R
AI

YANBU
L
E
Saudi Aramco 2616-ENG (03/99)

Facilities Project
R
T
R
A
F

TRAFFIC CONTROL PLAN


FI
C
M

YANBU South Terminal, Rehabilitation of Onshore


O
V
E

DOC
DWG.TYPE

SAUDI ARABIA
M
E

JO / EWO:
PLANT NO.

K32/K33
N
Facilities Project

A
INDEX
C
TRAFFIC CONTROL PLAN
SAUDI ARABIAN OIL COMPANY

BI-10-00567
O
N
Enppi Doc#3810-300-TC-PLN-000

T
R

DRAWING NO.

3810-300-TC-Pl-006
O
YANBU South Terminal, Rehabilitation of Onshore

12
OF
SHT.NO.
P
L

0
REV.NO.

S-000-1654-008
A
OF ITS OWNER.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN

M.
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0 6600031497
05/02/18 FOR Approval
ISSUEDT.A
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER J.F.
APPROVAL/CERTIFICATION REQUIREMENTS, 7

AGENCY
PROJECT
BY:

ENGINEER
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
DISCIPLINE

CERTIFIED
T

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
R

0
AI

YANBU
REV
L
E
Saudi Aramco 2616-ENG (03/99)

Facilities Project
R

DATE
T

May 02, 2018


R
A
F

TRAFFIC CONTROL PLAN


FI
C
M

DESCRIPTION

YANBU South Terminal, Rehabilitation of Onshore


Issued for Approval
O
V
E

DOC
DWG.TYPE

SAUDI ARABIA
M

BY
E

JO / EWO:
Joseph Fernando

PLANT NO.

K32/K33
N
REVISION HISTORY

A
INDEX
C
SAUDI ARABIAN OIL COMPANY

BI-10-00567
O

T.ALI
N

CHECKED
T
R

DRAWING NO.

3810-300-TC-Pl-006
O
L

12
OF
SHT.NO.
P

APPROVED

Amr Mashaly
L

0
REV.NO.

S-000-1654-008
A
OF ITS OWNER.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN

M.
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval

OF ITS OWNER.
ENGG CERT

ISSUEDT.A

AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
TABLE OF CONTENTS

1.0 PURPOSE.................................................................................................................. 4
2.0 SCOPE 4
DESCRIPTION

3.0 REFERENCES........................................................................................................... 4
4.0 DEFINITIONS............................................................................................................. 4
5.0 RESPONSIBILITY......................................................................................................4
5.1 Construction Contractors...............................................................................4
5.2 Field HSE Personnel.....................................................................................5
5.3 Project Administration Section.......................................................................5
6600031497

5.4 Transport.......................................................................................................5
JO/EWO

7
05/02/18

5.5 Rescue.......................................................................................................... 6
5.6 Driver............................................................................................................ 6
DATE

5.7 Staffs Driving Company Vehicles..................................................................7


NO.
REV

5.8 Passenger.....................................................................................................7
0

DISCIPLINE
ENGINEER 6.0 PROCEDURE........................................................................................................7
DATE: 6.1 Requirements to operate Motor Vehicles.......................................................7
PROJECT
ENGINEER 6.1.1 Driver Qualification............................................................................7
6.1.2 Speed Limits for vehicles...................................................................7
DATE:
CERTIFIED
6.1.3 Driver Training...................................................................................7

DATE:
6.1.4 Vehicle Maintenance and Inspection / Checklist................................7
CONSTRUCTION
AGENCY 6.2 Accidents and Emergency Procedures..........................................................8
6.3 Unsafe Driving Practices Citations and Penalties..........................................9
DATE:
OPERATIONS 6.4 General Guidelines.......................................................................................9
6.5 Transporting Cargo......................................................................................11
DATE:
6.6 Vehicle Entry to Hazardous Areas...............................................................11
CONTROL NUMBER
VERIFICATION

6.7 Traffic Flow Plan..........................................................................................12


EDSD

6.7.1 Attachments...................................................................................12
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 3


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval

OF ITS OWNER.
ENGG CERT

ISSUEDT.A

AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
1.0 PURPOSE

The purpose of this standard is to define the minimum requirements for safe
1 operation of motor vehicles both on-site and off-site. To identify the type of
emergencies that possibly affects the site personnel / properties and
environment. Limit the severity of such emergencies on personnel, property and
DESCRIPTION

the environment.

2.0 SCOPE

This procedure applies to all Construction Contractors and its subcontractor’s


employees who operator or ride in motor vehicles on-site or off-site, in the
1 performance of official duties and work assignments for construction of Oily
Water treatment and Disposal System package (17 Km of 8” buried RTR
Pipeline and two new evaporation ponds crossing Jeddah road near KP-19 area).
6600031497
JO/EWO

Traffic and Vehicles Safety requirements, regulations and rules of Saudi Aramco
7
05/02/18

as well as the Saudi Government Traffic rules shall apply to all personnel of
Construction Contractor, subcontractors and visitors within the Saudi Aramco
DATE

premises whether it is owned, leased or privately owned vehicle.


NO.
REV

3.0 REFERENCES
0

DISCIPLINE
ENGINEER
 KSA Traffic Rules and Regulations
DATE:
PROJECT  Saudi Aramco Construction Safety Manual 2011 5th Edition
ENGINEER

 Enppi Doc#3810-300-HS-PLN-003 ‘Emergency Response Plan’


DATE:
CERTIFIED
 Saudi Aramco General Instruction (GI 6.025) – Control of Remote Area
DATE: Travel and Search / Rescue Procedure
CONSTRUCTION
AGENCY
 Saudi Aramco General Instruction (GI 6.030) – Traffic and Vehicle
DATE: Safety
OPERATIONS

4.0 DEFINITIONS
DATE:
CONTROL NUMBER
VERIFICATION

 Motor Vehicle – A self-propelled vehicle commonly wheeled, powered by an


1 internal combustion engine such as motorcycle, van, bus, truck, tractor, trailer, or
EDSD

semi-trailer that does not operate on rails, such as trains or trams and used for
DATE:

commercial purposes on the highways in the transportation of passengers,


BY:

passengers and property, or property or cargo.


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

5.0 RESPONSIBILTY
(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 4


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval
5.1 Construction Contractor

OF ITS OWNER.
ENGG CERT

Are the most responsible for the implementation of this procedure in the project
ISSUEDT.A

to help ensure the safety of all personnel on-site and off-site.


AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
They are also responsible for ensuring that a responsible person is appointed to
coordinate all journeys, including any rescue journey.
They will assume overall command of the emergency response operations.
5.2 Field HSE Personnel

1  Monitor the effectiveness of this procedure.


DESCRIPTION

 Provide training and awareness of all driver / operator and personnel


onsite.
 Ensure that any safety orientation requirements are given to concerns
personnel.

 Maintain a statistical record of incident for trending and reference.


 Shall function as Incident Coordinator during vehicle / journey emergency.
6600031497
JO/EWO

 Ensure daily preventive maintenance checked/and post-trip vehicle


7
05/02/18

inspections.
DATE

 Ensure that all safety equipment suitable for any emergency (Safety
triangle, spare tires, tools and fire extinguisher) is brought along.
NO.
REV

DISCIPLINE
 Assist in the updating of this procedure to fit the present Saudi Aramco and
ENGINEER local authority regulations.

DATE: 5.3 Administration Section


PROJECT
ENGINEER
Construction Contractor are responsible to maintain up-to-date records of project
employees authorized to operate Construction Contractor motor vehicles
DATE: including records of motor vehicle accidents, traffic violations and disciplinary
CERTIFIED
actions imposed upon violations.
DATE: 5.4 Transport
CONSTRUCTION
AGENCY
 Responsible for determining and coordinating the urgency and priority of
required journeys.
DATE:
OPERATIONS
 Responsible for determining personnel and vehicle requirements, and
equipment requirements for all extended rescue journeys. He shall ensure
DATE: the coordination and acquisition of equipment and supplies that affects the
extended rescue journey.
CONTROL NUMBER
VERIFICATION

 Validate suitability of the vehicle for the journey.


EDSD

 Responsible for developing contingency plans for each journey in the event
DATE:
BY:

of delay and initiating emergency response action should the situation


warrants or when vehicles become overdue.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Ensure that the drivers carry out all required vehicle inspections and report
(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 5


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval
all defects.

OF ITS OWNER.
ENGG CERT

 Check the distance involved and timing to ensure that the driver is not
ISSUEDT.A

working beyond allowable driving hours.


AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
 Plan journeys for daylight hours if at all possible; if the vehicle must be
driven at night, take into account road and weather conditions and length of
trip before the vehicle leaves for that journey.
 Ensure that the driver knows and understands the action to be taken in an
emergency.
 Ensure the continuity of communication capability before the journey; if
DESCRIPTION

gaps exist, develop workable contingency plan before departure.


 Maintain a statistical record of incident for trending and reference.
 Awareness of the intended route and security issues and the identification
of any hazards.
 Provide escort vehicles whenever mobile cranes and other heavy transport
 Realistic schedules
6600031497
JO/EWO

 Verification of driver standards


7
05/02/18

 Shall be fully aware of all routes, hazards, and conditions that are likely to
DATE

be encountered on journeys they will:


 Ensure that the drivers are informed of these facts.
NO.
REV

DISCIPLINE  Prepare a realistic schedule to complete the journey.


ENGINEER

 Check hours and timing to ensure drivers do not work outside


DATE:
PROJECT
authorized driving hours.
ENGINEER
5.5 Material Controller
DATE:
CERTIFIED 1 The person in charge to ensure that trailers drivers well noted before site entry
with the internal permitted roads as it clearly highlighted on the drawing and the
flowing instruction to be informed for material suppliers to grantee those long
DATE:
CONSTRUCTION vehicle drivers are oriented with the site internal roads.
AGENCY
 Responsible to provide all required documents prior to entry/exit to YST
DATE: Security Gate.
OPERATIONS
 Ensure that transported materials do not exceed the vehicle’s manufactured
design.
DATE:

 Ensure loads properly secured prior to entry/exit at the gate and travelling
CONTROL NUMBER
VERIFICATION

inside/outside the vicinity of YST.


EDSD

 Secure loads extending beyond the front or rear are marked with warning
DATE:

devices.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

5.6 Rescue
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Report to the incident location when activated.


(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 6


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval
 Take instructions from the incident Coordinator during an emergency

OF ITS OWNER.
situation.
ENGG CERT

ISSUEDT.A

 To be in ready state to perform a rescue, if required.


AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
 Ensure that all equipment suitable for rescue (basket stretcher, ropes etc.) is
brought along to the scene when activated.
 Assist in handling the injured during loading and unloading into ambulance
and during movements, if instructed to do so.
 Should there be need for rescue to any personnel in the area; JGULF will
refer it to the responding local rescue team if the situation is beyond its
DESCRIPTION

capacity.
5.7 Driver
All drivers are responsible to maintain a valid vehicle driving license and
insurance recognized by Governmental Authority permitting them to legally drive
in the Kingdom of Saudi Arabia. Drivers are responsible for the overall safety of
their vehicles and passengers.
Drivers should abide by all traffic laws in the Kingdom and ensure that their
6600031497

vehicles are inspected and maintained properly before each trip. Inspection shall
JO/EWO

include the basic equipment such as tires, brakes, lights, fluids levels, glass and
05/02/18

mirrors, etc. Deficiencies should be corrected immediately.


DATE

The owners and operators of all vehicles are responsible to follow Saudi Aramco
and Government traffic rules.
NO.
REV

DISCIPLINE Additional responsibilities not limited to the following are as follows:


ENGINEER

 Check that the loads are properly secured before departure.


DATE:
PROJECT
ENGINEER
 Checking all documentation required are available valid prior to trip.
 Notify the Transport Coordinator before departing and upon arrival at
DATE:
CERTIFIED
destination.
 Test communication equipment (mobile phone and battery level, radio, etc.)
DATE: before departure.
CONSTRUCTION
AGENCY
 Conduct daily preventive maintenance check/and post-trip vehicle
DATE:
inspections.
OPERATIONS
 Wear seat belts throughout the journey and also his passengers.

DATE:
 Follow procedures regarding driving hours and rest periods.
CONTROL NUMBER

 Follow defensive driving principles.


VERIFICATION
EDSD

 Not to drive if lack of sleep or under the influence of alcohol or drugs


DATE:

 Instruct passengers on the safety and emergency requirements.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

5.8 Staffs Driving Company Vehicles.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Adheres to traffic rules and regulations and safe driving instructions.


(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 7


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval
 Reports any near misses and incidents including minor collision to transport,

OF ITS OWNER.
Admin or HSE Section.
ENGG CERT

ISSUEDT.A

5.9 Passenger
AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
 Arrive at pick-up point at least 5 minutes before the scheduled departure.
 Shall be aware on the details of the journey such as name of driver, contact
number and vehicle number.
 Complies with vehicle passenger rules (fastening seatbelts, no smoking, etc.)
 Monitors driver compliance with driver’s rules and regulations and reports to
DESCRIPTION

HSE or Admin Section of any non-compliance.


 Reinforces good driving behaviors.
 Not to interfere or distract the attention of the driver.
 Know and obey emergency procedures.
 Advise the driver of safety concerns and unsafe behaviors.
6600031497

6.0 PROCEDURE
JO/EWO

6.1 Requirements to Operate Motor Vehicles


05/02/18

6.1.1 Driver Qualification


DATE

Shall have a valid Saudi Arabian Government license for the class of vehicle
being driven and must successfully completed Safety Orientation program, Saudi
NO.
REV

DISCIPLINE Aramco Driver Improvement Program (DIP) and Qyadati driver improvement
ENGINEER
program.
DATE: 6.1.2 Speed Limits for Vehicles
PROJECT
ENGINEER
The maximum allowable limit for private, contractor and visitors including that
DATE:
Construction Contractor owned or leased vehicles are posted on the roads within
CERTIFIED the project premises.
Construction Contractor shall comply with the Traffic Speed Limits given by
DATE:
CONSTRUCTION
Saudi Aramco wherein 40KPH is the speed limit in all site.
AGENCY
Road and traffic conditions may necessitate speed lower than the posted speed
DATE: limits. All vehicles should be driven at lower speeds and not unsafe speed unsafe
OPERATIONS for operating conditions when traffic may be restricted due to increase traffic,
roadway conditions, and environmental hazards and/or when directed by a
DATE:
uniformed police government authority.
CONTROL NUMBER

6.1.3 Driver Training


VERIFICATION
EDSD

 All drivers must attend general safety induction by Saudi Aramco


prior to mobilization at site. The training course will cover:
DATE:
BY:

 Incident reporting
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Environmental hazards
(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 8


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval
 Project driving safe practices

OF ITS OWNER.
ENGG CERT

ISSUEDT.A

 Equipment inspection and maintenance


AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
 Government / Local Restrictions (KSA Traffic Rules &
Regulations)

 Police and military checkpoint protocols

 Local incident information

 Responsibility for care, cleanliness, and inspection of vehicles


DESCRIPTION

and equipment.

 Ensure all drivers are successfully completing QYADATI driver


improvement program. The drivers Qyadati Certificate of completion
should be available at all times.

 Shall attend an approved defensive driving training course within the


last two years.
6600031497
JO/EWO

 Shall regularly attend toolbox meeting to keep updated of latest


7
05/02/18

regulations and road situations.


DATE

 Flagman shall be trained his duties and responsibilities prior for


deployment at work site.
NO.
REV

DISCIPLINE 6.1.4 Vehicle Inspection / Checklist


ENGINEER

1  Tyres - Every two weeks, check your tyre pressures and the
DATE:
PROJECT condition of your tyres (including the spare). Look out for cuts or
ENGINEER
wear and make sure your tread is within limits.
DATE:
CERTIFIED  Toolkit - If your car has a spare wheel, then at the very least you
need to carry a jack and wheel removing tools (plus a locking wheel
DATE: nut key if appropriate).
CONSTRUCTION
AGENCY
 Engine oil - Use your dipstick to check oil levels every couple of
DATE:
weeks, and before any long journey, and top up if needed. Pop your
OPERATIONS car back to the garage if you're topping up more than usual.

 Water - Every week, while your engine's cold, check your coolant
DATE:
level is between the MIN and MAX marks.
CONTROL NUMBER
VERIFICATION

 Windscreen wipers - Replace your windscreen wipers once a year


EDSD

to prevent smearing.
DATE:
BY:

 Screen wash - By law, your screen wash system must work. Keep it
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

regularly topped up with a good screen wash additive – one that


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

clears oily grime.


(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 9


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval
 Windscreen - Keep an eye out for stone damage and, if you spot

OF ITS OWNER.
any chips, get them repaired as soon as possible (they can grow
ENGG CERT

ISSUEDT.A

and crack if left alone). If the damage can't be repaired, or it's in a


place where it could distract you, your windscreen may need to be
AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
replaced.

 Lights - Check all your lights – including indicators, reversing lights,


brake lights and fog lights – once a week. Look out for blown bulbs
and cracks or dirt on the lenses.

 Power steering - Make sure your garage fills your hydraulic fluid
DESCRIPTION

reservoir when they service your car. Then all you have to do, once
a month, is check its levels; if necessary, you can top up with a
recommended fluid.

 Bodywork - Give your car panels an occasional once-over for any


damage, or signs of rust.

 Vehicle Inspection Checklist -


6600031497

6.2 Accidents and Emergency Procedures


JO/EWO

7
05/02/18

When a vehicle within the YST premises is involved in an accident, the


priority at the scene of the accident should always be to provide assistance
DATE

to anyone injured and cooperate fully with authorities.


NO.
REV

 Render aid to the injured and call for medical assistance.


DISCIPLINE
ENGINEER

 Drivers shall immediately report vehicle incidents, whether they occur


DATE: on-site or off-site. This notification shall be made by the timeliest and
PROJECT
ENGINEER appropriate means (e.g. cell phone, telephone, radio or messenger).

DATE:  Drivers are not leaving the incident site unless there is an emergency
CERTIFIED
need.
DATE:
CONSTRUCTION  Should the driver and passengers failed to reached the destination or
AGENCY
did not come back on expected time due to incident, concerned
department shall call the involved personnel for monitoring.
DATE:
OPERATIONS
 Protect the scene. Place warning devices such as flares or reflective
triangles to warn other drivers. If the accident involves a spill of gasoline
DATE:
or other flammable liquid, remove all sources of ignition from the scene
CONTROL NUMBER

or the accident. If this is not possible, move a safe distance away from
VERIFICATION

the scene.
EDSD

DATE:

 Identify yourself to authorities and other party and cooperate as


BY:

necessary.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 Do not make statements regarding responsibility or argue with anyone.


(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 10


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval

OF ITS OWNER.
Begin gathering information to report the accident and for the investigation.
ENGG CERT

ISSUEDT.A

6.3 Unsafe Driving Practices Citations and Penalties


AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
Saudi Aramco Traffic Violations Consequence Guidelines shall be
implemented within YST perimeters.

Saudi Arabian Government Traffic Violations Consequence Guidelines while


driving inside the KINGDOM.
DESCRIPTION

6.4 General Guidelines

 Drivers shall have a valid Saudi Arabian Government license for the
class of vehicle being driven.

Drivers shall conduct pre-trip vehicle check.

 Plan his journey such as considering the safest route. Avoid driving at
6600031497

night if the route is known to be extremely dangerous such as the


JO/EWO

7
05/02/18

absence of street lights and unsafe road conditions.


DATE

 Not to drive if passengers were not wearing seat belt.

 Never use mobile phones while driving. Stop at the safest area before
NO.
REV

DISCIPLINE using phones.


ENGINEER

DATE:  Wearing of seat belts is mandatory for the driver and the passengers.
PROJECT
ENGINEER
This applies to all Construction Contractors vehicles.

DATE:
 Vehicles shall conform to the Saudi Arabian Law regarding
CERTIFIED roadworthiness, licensing, insurance, spares and safety equipment.

DATE:  The maximum permitted speed limit and other posted traffic control shall
CONSTRUCTION
AGENCY be followed.

DATE:  Passengers of vehicles shall not get on or off vehicles in motion.


OPERATIONS

 The maximum number of passengers to be carried in the vehicle shall


DATE: be in accordance with the design seating capacity as per the class of the
vehicle.
CONTROL NUMBER
VERIFICATION
EDSD

 Passengers shall board and alight only through designated doors.


Emergency exit doors will be used only in case of emergency.
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

 Unless specifically designated for this purpose, motor vehicles should


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

not be used to push or pull other vehicles.


(DCC) NO. _____________________

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 11


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval
 When visibility is limited, flagmen should be used or other appropriate

OF ITS OWNER.
precautions shall be taken to ensure that backing of motor vehicles can
ENGG CERT

ISSUEDT.A

be done safely.
AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
 Headlights shall be turned on any time there is insufficient visibility to
see pedestrians or other vehicles.

 Vehicles shall not be operated with defects that impair safe operation,
such as malfunctioning brakes or worn tires.

 Vehicle shall not be left unattended while the engine is running.


DESCRIPTION

 Vehicles shall be parked only at the areas intended for loading and
unloading.

 Vehicle shall not be parked within Five (5) meters of the fire hydrants, in
the driving lanes, or entrances/exits to parking lots or buildings.

 Drivers who must wear corrective lenses or contact lenses shall wear
6600031497

the lenses at all times while driving.


JO/EWO

7
05/02/18

 Drivers who must wear a hearing aid in order to meet the hearing
requirements shall wear the hearing aid while driving.
DATE

 Drivers shall not operate a motor vehicle, and the Construction


NO.
REV

DISCIPLINE Contractor shall not require or permit a driver to operate a motor vehicle,
ENGINEER while the driver’s ability or alertness is so impaired, or so likely to
become impaired, through fatigue, illness or any other cause, as to
DATE:
PROJECT make it unsafe for him to begin or to continue to operate a motor vehicle.
ENGINEER

 Heavy vehicles should have an alarm that sounds when reversing, or


DATE:
CERTIFIED the driver should use the horn to alert others before reversing. A
signalman shall direct any heavy vehicle while reversing if visibility is
DATE: obscured.
CONSTRUCTION
AGENCY
 Traffic signs shall be provided and installed by construction contractor
DATE: and shall be posted within the facilities.
OPERATIONS

 Construction Contractor shall assigned a trained and certified flagman


DATE: on stationed at strategic and critical areas to control traffic flow.
CONTROL NUMBER
VERIFICATION

6.5 Transporting Cargo


EDSD

 Cargo shall be loaded and secured to prevent it from sliding, shifting, or


DATE:
BY:

falling.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

 If the load extends 1.2 m (4 feet) or more beyond the body of the
(DCC) NO. _____________________

vehicle, a red flag or cloth at least 0.2 m (12 inches) or flashing lights or

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 12


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
FOR Approval
other type of warning lights should be provided at the extreme rear end

OF ITS OWNER.
of the cargo to provide greater visibility. No cargo should extend over the
ENGG CERT

ISSUEDT.A

sides.
AI

FI

M
J.F.

O
R

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN
E

V
E

A
T

T
L

M.
 Load-securing equipment (e.g., ropes, chains, chocks, straps, wire) shall
be visually inspected before use to ensure that it is free of defects and in
good operating condition.

 Hauling of heavy loads shall be escorted by light vehicles equipped with


blinking lights duly authorized by KSA’s traffic police.
DESCRIPTION

 As much as possible, heavy loads such as vessels, columns, etc., shall


be erected immediately upon arrival at site.

6.6 Vehicle Entry into Hazardous Areas

 Construction Contractors and its subcontractor will restrict the entry of its
vehicles into plant and this will be covered always by vehicle movement
permit and hot work permit and/or any permit being implemented by the
6600031497

client.
JO/EWO

7
05/02/18

 Barricades shall be erected and signs shall be conspicuously posted if


entry of vehicles into process or storage areas is prohibited or prohibited
DATE

without an approved vehicle entry permit.


NO.
REV

 Vehicles shall only travel on designated roads. Vehicles are not


DISCIPLINE
ENGINEER permitted to travel or cut across dirt or graveled open areas or medians.
Roads that are temporarily closed using barricades and signs shall not
DATE: be traveled upon. Vehicles are not permitted to enter operating areas
PROJECT
ENGINEER without proper authorization.

DATE:  Smoking is strictly prohibited inside all vehicles entering or operating


CERTIFIED
inside the fenced area of the operating plant except to designated
smoking shelters.
DATE:
CONSTRUCTION
AGENCY  If the Emergency Alarm is sounded, all vehicles shall be parked, so as
not to obstruct the roadway and all internal combustion engines shall be
DATE:
OPERATIONS
switched off. The ignition key shall be left in the vehicle and the driver
shall go immediately to his Safe Assembly Area.
DATE:
 Vehicles other than the emergency vehicles such as Fire truck,
CONTROL NUMBER

ambulance, etc. shall not be driven in the Plant if the alarm has
VERIFICATION

sounded.
EDSD

DATE:
BY:

6.7 Traffic Flow Plan


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Traffic Flow Plan shows the assigned Vehicle Parking Areas, Loading &
(DCC) NO. _____________________

Unloading Areas, Pedestrian walkways, primary vehicle routes and secondary

TRAFFIC CONTROL PLAN DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

YANBU South Terminal, Rehabilitation of Onshore DOC 3810-300-TC-Pl-006 13


K32/K33 A
Facilities Project OF 0
YANBU SAUDI ARABIA JO / EWO: BI-10-00567 12

S-000-1654-008
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0 6600031497
05/02/18 FOR Approval
ISSUEDT.A
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER J.F.
APPROVAL/CERTIFICATION REQUIREMENTS, 7

AGENCY
PROJECT
BY:

ENGINEER
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
DISCIPLINE

CERTIFIED
T

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
R
AI

YANBU
L

6.7.1
E
Saudi Aramco 2616-ENG (03/99)

Facilities Project
R
T
R
A
F

TRAFFIC CONTROL PLAN


FI
C
M

YANBU South Terminal, Rehabilitation of Onshore


O
V
E

DOC
routes inside and outside YST Facility.

DWG.TYPE

SAUDI ARABIA
M
E
Attachment (1)

JO / EWO:
PLANT NO.

K32/K33
N
T

A
Enppi accommodation to YST

INDEX
C
SAUDI ARABIAN OIL COMPANY

BI-10-00567
O
N
T
R

DRAWING NO.

3810-300-TC-Pl-006
O
L

12
14
OF
SHT.NO.
P
L

0
REV.NO.

S-000-1654-008
A
OF ITS OWNER.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN

M.
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0 6600031497
05/02/18 FOR Approval
ISSUEDT.A
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER J.F.
APPROVAL/CERTIFICATION REQUIREMENTS, 7

AGENCY
PROJECT
BY:

ENGINEER
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
DISCIPLINE

CERTIFIED
T

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
R
AI

YANBU
L
E
Saudi Aramco 2616-ENG (03/99)

Facilities Project
R
T
R
A
F

TRAFFIC CONTROL PLAN


FI
C
M

YANBU South Terminal, Rehabilitation of Onshore


O
V
E

DOC
DWG.TYPE

SAUDI ARABIA
M
E
Attachment (2)

JO / EWO:
Traffic Flow YST

PLANT NO.

K32/K33
N
T

A
INDEX
C
SAUDI ARABIAN OIL COMPANY

BI-10-00567
O
N
T
R

DRAWING NO.

3810-300-TC-Pl-006
O
L

12
15
OF
SHT.NO.
P
L

0
REV.NO.

S-000-1654-008
A
OF ITS OWNER.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN

M.
EDSD REV
REVISION CERTIFICATE
REVISIONCERTIFICATION VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
0 6600031497
05/02/18 FOR Approval
ISSUEDT.A
OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER J.F.
APPROVAL/CERTIFICATION REQUIREMENTS, 7

AGENCY
PROJECT
BY:

ENGINEER
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
DISCIPLINE

CERTIFIED
T

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:
R
AI

YANBU
L
E
Saudi Aramco 2616-ENG (03/99)

Facilities Project
R
T
R
A
F

TRAFFIC CONTROL PLAN


FI
C
M

YANBU South Terminal, Rehabilitation of Onshore


O
V
E

DOC
DWG.TYPE
area

SAUDI ARABIA
M
E
Attachment (3)

JO / EWO:
PLANT NO.

K32/K33
N
T

A
INDEX
C
SAUDI ARABIAN OIL COMPANY

BI-10-00567
O
17 Km of 8” buried RTR Pipeline and two new

N
evaporation ponds crossing Jeddah road near KP-19

T
R

DRAWING NO.

3810-300-TC-Pl-006
O
L

12
16
OF
SHT.NO.
P
L

0
REV.NO.

S-000-1654-008
A
OF ITS OWNER.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENTN

M.

You might also like