3.2 Driving of casing Casing stuck in the Poor driving method Damage to casing Conduct TBT to brief Foreman
ground and handling practices and equipment 2 3 M operatives on correct 2 1 L conduct T
or techniques. Dry driving techniques prior to s
driving of casing Secure casing with of pile-ca
appropriate and valid driving
D-shackles supervise
Apply wetting of activities.
borehole
Use mechanical aids
where necessary
Maintain regular
inspection of
equipment.
4.1 Pile borehole drilling Hit by Auger bit, drill Operators faulty Injury to Rig operators shall be Foreman
bucket, Kelly bar personnel 4 4 M competent, trained and 4 1 L conduct T
Not keeping safe
Damage of have valid operator`s and supe
distance from drill
License. the work
area equipment
Workers shall be
Defective equipment trained in the work of
such as pin lock piling
Inadequate lock of
equipment to drill Inspect all drilling
machine- Auger bit, before start of shift
drilling bucket. work
5|P a g e
RISK ASSESSMENT ERECTION AND INSTALLATION OF HOARDING FENCE
Project Name: Contractor: Consultant: GULF CONSULTING Sub-Contractor:
VILLA MARINA BEACH HOUSE-V09/V10 (B+G+1+PH) PRIME CONTRACTING AND TRADING. GROUP INFRA STRACTURE TRADING
Last Reviewed Date: 06-June-2023 Next Review Date: 06-June-2024Ref. No.: PTC-HSE-PDR-014 REV 00
6|P a g e
RISK ASSESSMENT ERECTION AND INSTALLATION OF HOARDING FENCE
Project Name: Contractor: Consultant: GULF CONSULTING Sub-Contractor:
VILLA MARINA BEACH HOUSE-V09/V10 (B+G+1+PH) PRIME CONTRACTING AND TRADING. GROUP INFRA STRACTURE TRADING
Last Reviewed Date: 06-June-2023 Next Review Date: 06-June-2024Ref. No.: PTC-HSE-PDR-014 REV 00
4.4 Borehole Drilling Collision of Congested work area Workers could Conduct TBT on work Foreman
Equipment during with limited space suffer severe or 4 4 H in a limited space area 4 1 L conduct T
removal of spoils. for equipment even impact Ensure trained banks and supe
movement injury men are assigned to the work
Equipment hitting
direct equipment Provide c
personnel. Operator`s Faulty Workers likely
movement. monitorin
to suffer from
Post vehicle traffic and
entrapment
signs such as speed supervisio
between
limits all times
equipment’s
Post emergency
numbers at prominent
locations on site and
communicate them to
all personnel
4.5 Borehole Drilling Fall due to Cutting of No or irregular Severe impact Conduct TBT on safe Foreman
drill machine cables inspection of drilling injury due to fall 3 3 M handling of drilling 3 1 L conduct T
rig cables of cut cables and equipment and supe
equipment. Ensure regular the work
Lack of attention
inspection of rig
Lack of training and Provide c
machine cables
awareness monitorin
Ensure workmen and
carrying out work are supervisio
adequately trained all times
5.1 Lifting &Installation Struck by Unsafe lifting Injury to Ensure crane and lifting Foreman
of Steel falling/swinging equipment i.e. crane personnel due to 3 2 M gear carry valid third 3 1 L conduct T
reinforcement cage reinforcement cage of insufficient lifting fall of cage and party certification prior to s
or lifting equipment. capacity, lift truck equipment. Ensure crane operator of any lift
Insecure lifting point with inadequate fork Damage of is third-party-certified operation
span or length, for the type of crane Rigger an
on the cage. reinforcement
defective slings, etc. being used lifting
Defective lifting gear. cage due to fall.
7|P a g e
RISK ASSESSMENT ERECTION AND INSTALLATION OF HOARDING FENCE
Project Name: Contractor: Consultant: GULF CONSULTING Sub-Contractor:
VILLA MARINA BEACH HOUSE-V09/V10 (B+G+1+PH) PRIME CONTRACTING AND TRADING. GROUP INFRA STRACTURE TRADING
Last Reviewed Date: 06-June-2023 Next Review Date: 06-June-2024Ref. No.: PTC-HSE-PDR-014 REV 00
11|P a g e
RISK ASSESSMENT ERECTION AND INSTALLATION OF HOARDING FENCE
Project Name: Contractor: Consultant: GULF CONSULTING Sub-Contractor:
VILLA MARINA BEACH HOUSE-V09/V10 (B+G+1+PH) PRIME CONTRACTING AND TRADING. GROUP INFRA STRACTURE TRADING
Last Reviewed Date: 06-June-2023 Next Review Date: 06-June-2024Ref. No.: PTC-HSE-PDR-014 REV 00
12|P a g e