You are on page 1of 16

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00A 20/05/2018 30-17107 RTD
OF THIS DRAWING IS COVERED, FOR ALL 00A ISSUED FOR 90% REVIEW
CONTROL NUMBER

RTD
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

20/05/2018
CERTIFIED
20/05/2018

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:

RABIGH
Saudi Aramco 2616-ENG (03/99)

MATERIAL REQUISITION CONTROL VALVES


INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS
DOC

SAUDI ARABIA
PETRO RABIGH

C070
WBS # 30-17107

REQUISITION FOR
CONTROL VALVES

ISSUED FOR REVIEW

J
DETAIL DESIGN

DWG.TYPE PLANT NO. INDEX


NITROGEN (N2) GAS

JO / WBS: #30 - 17107


WER-17-30-40000-152-001-04

XXXX
DRAWING NO.

1 1111-8550-RQ-C070-
INSTRUMENT AIR BACK UP SYSTEM BY

OF
16
SHT.NO.

00A
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00A 20/05/2018 30-17107 RTD
OF THIS DRAWING IS COVERED, FOR ALL 00A ISSUED FOR 90% REVIEW
CONTROL NUMBER

RTD
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

20/05/2018
CERTIFIED
20/05/2018

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:

RABIGH
Saudi Aramco 2616-ENG (03/99)

MATERIAL REQUISITION CONTROL VALVES


INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS
DOC

SAUDI ARABIA
PETRO RABIGH

J C070
DWG.TYPE PLANT NO. INDEX

JO / WBS: #30 - 17107


XXXX
DRAWING NO.

2 1111-8550-RQ-C070-
OF
16
SHT.NO.

00A
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

TABLE OF CONTENTS
RTD

1 GENERAL 3
2 SCOPE OF VENDOR'S SUPPLY 3
2.1 Equipment / Materials 3
ISSUED FOR 90% REVIEW

2.2 Spare Parts 3


2.3 Special Tools 4
DESCRIPTION

2.4 Operational Materials (Consumables) 4


2.5 Surface Painting and Preservation 4
3 SCOPE OF SERVICES 5
3.1 Vendor's Drawing and Document Requirements 5
3.2 Test and Inspection 6
3.3 Field Service 6
30-17107
JO/EWO

4 PURCHASER-FURNISHED EQUIPMENT / MATERIALS 6


5 SHIPPING AND PACKING INSTRUCTIONS 6
20/05/2018
DATE

5.1 The Maximum Weight and Measurement of Cargo 6


5.2 Special Packing Instruction 7
00A
NO.
REV

DISCIPLINE
ENGINEER
6 EXCEPTIONS, ALTERNATIVES AND CLARIFICATIONS 7
RTD
20/05/2018 6.1 Base Proposal 7
DATE:
PROJECT
ENGINEER
6.2 Exception to the Proposal7
7 QUALITY ASSURANCE 7
20/05/2018
DATE:
CERTIFIED 8 PRECEDENCE OF DOCUMENTS 8
9 SUB VENDOR 8
DATE:
CONSTRUCTION
AGENCY 10 SPECIAL NOTE 8

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 3
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
1 GENERAL

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
This requisition covers specific purchase conditions pertaining to the purchase of materials
ENGG CERT

and/or equipment to be used for Installation of the Instrument Air (IA) backup system by nitrogen
gas. As such, it is a supplement to the "Request for Quotation" and/or the "General Purchase
RTD

Conditions" to be transmitted to Vendor.

Note: Unless otherwise specified, the latest issue of all documents shall be applied.
The terms of “Company” means PetroRabigh.
ISSUED FOR 90% REVIEW

The terms of “Purchaser” means PetroRabigh.


DESCRIPTION

2 SCOPE OF VENDOR'S SUPPLY


Vendor shall furnish the following Equipment/Materials including the accessories, spare parts,
tools, etc., mentioned below.
Item Type of
Tag No. Qty Data sheet No Data sheet No
No. Valve
PRESSURE CONTROL VALVE 1111-8550-DS-C070-XX11 SH.1
1 C070-PV-0502A 1 12”, CL 150#, RF FLANGED GLOBE OF 1 REV.00A
30-17107
JO/EWO

1a,2a For above tags CALCULATION/SIZING SHEET


1b,2b For above tags DIMENSIONAL DRAWINGS
Total 1
20/05/2018
DATE

2.1 Equipment / Materials


00A
NO.
REV

DISCIPLINE
Equipment and/or Materials to be covered by this requisition are;
ENGINEER
RTD [X] As per ATTACHMENT-1: “Equipment/Materials List”
20/05/2018
DATE: [] As per “Equipment Items” mentioned below
PROJECT
ENGINEER
Item No. Description Quantity Equipment
20/05/2018 Category
DATE:
CERTIFIED

2.2 Spare Parts


DATE:
CONSTRUCTION
AGENCY
2.2.1 Spare Parts (for Construction/Installation, Pre-commissioning and Commissioning)
DATE: Spare Parts are required during construction/installation, pre-commissioning and commissioning,
OPERATIONS
as per the list of Vendor’s recommended spare parts.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 4
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
1.0.1.1 Vendor shall recommend the start-up spare parts of the equipment, and provide a

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
price list.
ENGG CERT

1.0.1.2 Those should be delivered to site together with parent equipment.


RTD

2.2.2 Operating Spare Parts

1.0.1.3 Vendor shall submit “Equipment Spare Parts Interchangeability Record (SPIR)”
1.0.1.4 These spare parts may be purchased by Company in accordance with the
approved
ISSUED FOR 90% REVIEW

E-SPIR Package.
DESCRIPTION

2.2.3 Discontinuance of Manufacture or Supply of Spare Parts


Vendor shall identify in his quotation any equipment, materials or components for which Vendor
plans to discontinue manufacturing or supplying spare parts within the next ten (10) years.
Even if there is no such discontinuance, Vendor shall state in his quotation that Vendor intends
to manufacture or supply spare parts for the next ten (10) years. Lack of this statement may
cause the rejection of Vendor’s offer by Purchaser.

2.3 Special Tools


30-17107
JO/EWO

Vendor shall supply special tools and devices necessary for fabrication, lifting, erection, testing
and maintenance of the equipment and materials of Vendor's supply. These shall be easily
20/05/2018
DATE

identifiable and shall be supplied in a lockable steel box except large devices. Vendor shall also
provide a list and documentation of such special tools. The price shall be indicated separately
and included in the lump sum price.
00A
NO.
REV

DISCIPLINE
ENGINEER
RTD 2.4 Operational Materials (Consumables)
20/05/2018
DATE:
Vendor shall supply operational materials (consumables) as per the list of consumables.
PROJECT
ENGINEER
1.0.1.5 Vendor shall inform Purchaser of the specifications, quantities and maintenance
DATE:
20/05/2018 frequency of operational consumables, such as chemicals, lubricants, catalyst, fillings and
CERTIFIED recording chart, if any, for 90 days operation including initial charge and for continuous
operation thereafter.
DATE:
CONSTRUCTION
1.0.1.6 If the consumables are Vendor’s exclusive products, Vendor shall provide the price
AGENCY list.

DATE: 1.0.1.7 Purchaser will purchase the consumables listed in accordance with the above item
OPERATIONS (2) after Purchaser’s review.

DATE: 2.5 Surface Painting and Preservation


CONTROL NUMBER
VERIFICATION
EDSD

2.5.1 Surface Painting


DATE:

[] Not Required [] Primer Coat(s)


BY:
REVISIONCERTIFICATION

[X] Up to finish coat


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 5
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
In accordance with: [] Vendor recommendation approved by Purchaser,

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
[X] Applicable Saudi Aramco standard
ENGG CERT

RTD

5.1.1 Preservation/Rust Prevention


All-important parts (such as machined surfaces) of Equipment/Materials shall be rust-proofed
adequately in accordance with Vendor Standard, if not specified in the applicable documents.
Vendor standard procedure shall be provided to the Purchaser including MSDS for the
ISSUED FOR 90% REVIEW

substances.
Rust prevention effective up to and including two (2) months ocean transportation and six (6)
DESCRIPTION

months unsheltered outdoor storage at site, unless noted otherwise.


3 SCOPE OF SERVICES
Vendor shall furnish all the necessary services for design and fabrication as per following;

3.1 Vendor's Drawing and Document Requirements


1.0.1.1 Submission
Vendor shall submit to Purchaser the documents in accordance with the requirements
30-17107
JO/EWO

specified in Attachment-2 (Vendor Drawings and Documents Requirement). All documents


to be submitted to Purchaser shall bear this requisition number.
20/05/2018
DATE

It should be noted that proposal documents requested in Attachment-1 are inevitable for
bid evaluation. Lack of any of these documents in his proposal may cause the rejection of
00A
NO.
REV

Vendor’s offer by Purchaser.


DISCIPLINE
ENGINEER
RTD

DATE:
20/05/2018 1.0.1.2 Manufacturing Schedule and Status Report
PROJECT
ENGINEER
Vendor shall provide in the proposal a time schedule for the submission of documents,
fabrication including order and material delivery from sub vendors, testing and inspection,
20/05/2018
DATE: ready for shipment at workshop and port for export, etc.
CERTIFIED

DATE: 1.0.1.3 Unit of Measurement


CONSTRUCTION
AGENCY
MKS system of units shall be used in accordance with data sheet
DATE:
OPERATIONS
1.0.1.4 Language
DATE: All Vendor drawings and documents shall be in English language.
CONTROL NUMBER
VERIFICATION

1.0.1.5 Electronic Files Hand Over


EDSD

Vendor shall supply Purchaser with electronic data of their documents / drawings, and the
DATE:
BY:

requirements specified in the table “Vendor Drawing and Documents” in this requisition.
REVISIONCERTIFICATION

Original document shall be produced by the following media.


APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 6
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
Bentley Micro station :Drawings

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Microsoft WORD :Text Document, Operating Instruction
ENGG CERT

Microsoft EXCEL : Spreadsheets


RTD

Microsoft Power Point : Graphics


Others : Scanned File
1.0.1.6 Packing List (Shipping Document)
Vendor shall supply Purchaser and Forwarder with electronic data (by Microsoft EXCEL)
ISSUED FOR 90% REVIEW

of their packing list as soon as possible when it became available, but not later than 10
days before contracted delivery date.
DESCRIPTION

1.0.1.7 Spare Parts Interchangeability Record (SPIR)

[] Not required [x] required


Vendor shall submit the SPIR.

3.2 Test and Inspection


For Inspection level – 2 & 3, vendor shall prepare Inspection and Test Plan (quality control
30-17107
JO/EWO

plan) for review and Approval in accordance with requirements of SAEP-1151 and the
Purchase Order and particularly SAUDI ARAMCO Inspection & Testing Requirements,
Forms-175. ITP shall be submitted to PetroRabigh for review and approval prior to Pre-
20/05/2018
DATE

Inspection Meeting, and shall be approved prior to start of fabrication.


00A
NO.
REV

3.3 Field Service


DISCIPLINE
ENGINEER
RTD If Vendor’s fieldwork or services are mandatory to guarantee the quality and performance
DATE:
20/05/2018 of the equipment, Vendor shall quote the price of such necessary fieldwork or services
PROJECT
ENGINEER
with details. Such fieldwork and services shall cover the necessary work, such as
supervision, instructions, installation, alignment, adjustment, calibration, inspection and
20/05/2018 witness.
DATE:
CERTIFIED The details shall be divided into three phases of field activity, i.e. installation/assembly,
adjustment/alignment and performance test.
DATE:
CONSTRUCTION Personnel to be dispatched must be able to speak the English language sufficiently to
AGENCY
perform the duties.
DATE:
OPERATIONS 4 PURCHASER-FURNISHED EQUIPMENT / MATERIALS
No equipment/materials shall be delivered by Purchaser.
DATE:
CONTROL NUMBER
VERIFICATION

5 SHIPPING AND PACKING INSTRUCTIONS


EDSD

DATE:
BY:

5.1 The Maximum Weight and Measurement of Cargo


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

The maximum weight and measurement of any item of cargo shall be as follows:
Measurements: Length 11.8 m, Width 2.3 m, Height 2.3 m, Weight 20 metric tons
(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 7
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0.1.8 In the event that the cargo exceeds the above figures, Vendor shall prepare its plan for
ENGG CERT

transportation subject to Purchaser’s approval.


1.0.1.9 Vendor shall recommend, if required, unloading procedures for Equipment.
RTD

5.2 Special Packing Instruction


Company’s packing instruction specified in any applicable document such as SAMMS of
Company’s standard shall be followed as mandatory requirement.
ISSUED FOR 90% REVIEW
DESCRIPTION

6 EXCEPTIONS, ALTERNATIVES AND CLARIFICATIONS

6.1 Base Proposal


Vendor shall submit a base proposal for equipment complying strictly with this requisition and all
applicable documents. Conflicting requirements in these documents shall be referred to
Purchaser for resolution prior to submission of the proposal.
Vendor's proposal shall state that the equipment offered in the base proposal complies strictly
with Purchaser's specified requirements.
30-17107
JO/EWO

6.2 Exception to the Proposal


20/05/2018
DATE

Vendor agrees that the only exceptions and alternatives to be considered by Purchaser shall be
limited to those separately specified in a proposed exception list accompanying Vendor's
00A
NO.
REV

proposal. Refer to the format in Attachment-3.


DISCIPLINE
ENGINEER
RTD Purchaser has no responsibility to discover any exceptions or alternatives entered in other parts
20/05/2018 of Vendor's proposal than the said exception list. If Vendor is awarded the order, it must comply
DATE:
PROJECT with the Applicable Documents as revised only to reflect the exceptions and alternatives listed
ENGINEER
and accepted by Purchaser.

DATE:
20/05/2018 Note: Alternative proposal is evaluated only in the case where a base proposal is submitted.
CERTIFIED

DATE:
CONSTRUCTION 7 QUALITY ASSURANCE
AGENCY

The vendor shall submit following documents with its quotation.


DATE:
OPERATIONS
1.0.1.10 ISO 9001 Certificate. Where Vendor does not have such a certificate, Vendor shall
state the reasons for its not having the certificate or, if it has applied for, but not yet
DATE: received such a certificate, the status of it application.
CONTROL NUMBER
VERIFICATION

1.0.1.11 A latest assessment report by the certification body


EDSD

1.0.1.12 Vendor’s Corporate Quality Manual


DATE:

1.0.1.13 Sample of Quality Plan for a previous, similar project


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Vendor shall submit the Quality Plan for this Purchase Order to Purchaser for review and
(DCC) NO. _____________________

approval before the kick-off meeting with Purchaser.

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 8
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
Even if Vendor is certified under ISO 9001 by an inter-nationally recognized certification body,

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Company and Purchaser reserve the right to monitor Vendor’s quality system and carry out the
ENGG CERT

quality audits.
RTD

Monitoring or inspection by Company and Purchaser does not relieve Vendor of:

(1) The obligation to provide its own Quality Assurance/Quality Control.


(2) Guarantees for materials, workmanship and performance.
ISSUED FOR 90% REVIEW

8 PRECEDENCE OF DOCUMENTS
DESCRIPTION

In the event of conflict between any of the requirements of the applicable documents, including
the documents, specifications, and standards referenced herein, for purpose of determining the
requirements of the applicable documents, the order of precedence of the documents shall be as
follows:

1 This requisition
2 Purchaser's drawing/data sheet/specifications
3 Applicable Company general specifications
30-17107
JO/EWO

4 Amendment to Saudi Aramco Standards


5 Company’s Engineering Standards (SAES)
20/05/2018
DATE

6 Company’s Material System Specifications (SAMSS)


7 Company’s standard drawings (Mandatory)
00A
NO.
REV

DISCIPLINE
ENGINEER
8 Company’s standard drawings (Non-mandatory)
RTD
20/05/2018
9 Industrial code standard, e.g. ASME, ANSI (Note)
DATE:
PROJECT
ENGINEER
If Vendor discovers any inconsistency or conflict within the documents comprising this
20/05/2018 Requisition he shall forthwith in writing notify Purchaser of the details of such inconsistency or
DATE:
CERTIFIED conflict and shall be resolved by Purchaser.

DATE:
Note: Where Company’s Standards/Specifications (SAES & SAMSS) call for specific revision
CONSTRUCTION numbers or date of industrial codes, such versions of industrial codes shall govern.
AGENCY

Where no specific revision numbers or dates for industrial codes are specified in the Company’s
DATE:
Standards/Specifications, the latest versions of the industrial codes shall govern.
OPERATIONS

9 SUB VENDOR
DATE:
Vendor shall submit the list for sub-vendors based on Vendor’s quotation.
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 9
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
10 SPECIAL NOTE

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
1.0.1.14 Vendor shall input the unit price in List of Control Valves, shall select the
ENGG CERT

economical body type in his quotation.


RTD

1.0.1.15 If there are any tapped (threaded) bolt holes of end flanges, Vendor shall provide
the machine bolts for the tapped hole.
1.0.1.16 Vendor shall input all the diagnostic data of the valve origin after the positioner
setting and the vendor have a responsibility to guarantee all the required function.
ISSUED FOR 90% REVIEW

1.0.1.17 Purchaser shall have rights to specify actuator orientation until Purchaser approves
the drawings as “For Construction”.
DESCRIPTION

1.0.1.18 Electronic equipment shall be certified to Class-I Zone 2,IgnitionTemp:200


degC(T3); EEx-d
1.0.1.19 All instrument enclosures shall be protected to IP65 as a minimum.
1.0.1.20 All electrical and electronic instrumentation shall have ISO M20X1.5 cable entries.
If the cable entry cannot meet the size, vendor shall propose proper adaptors.

1.0.1.21 Materials for pneumatic tubing shall be 316L SS, while 316 SS for valves and
30-17107
JO/EWO

fittings, and air tubing, fitting or connection nipple sizes shall not be less than 1/4" NPT.
Compression fittings shall be double ferrule type.
All instrument tubing fittings shall be selected preferably from Swagelok (US).
20/05/2018
DATE

1.0.1.22 Generally, Equal percentage flow characteristic shall be selected except for level
control applications which should be Linear (unless indicated otherwise) and that of On-off
00A
NO.
REV

control applications which should be Quick Opening.


DISCIPLINE
ENGINEER
RTD 1.0.1.23 Positive material identification (PMI) shall be applied to the wetted parts such as
DATE:
20/05/2018 body, plug, seat ring and cage, etc.
PROJECT
ENGINEER 1.0.1.24 Inspection and Testing shall be conducted in accordance with 04-SAMSS-048.

20/05/2018 1.0.1.25 Vendor shall supply control valve with permanently attached 316SS tag plate
DATE:
CERTIFIED indicating, as minimum:
-Tag Number
DATE: - Manufacturer’s Name
CONSTRUCTION
AGENCY
- Model No.
- Serial No.
DATE: - Body Material, Size and Flange Rating
OPERATIONS - Trim material
- Trim Size
DATE:
- Actuator Model. Size and Bench Set
- Rated Cv value
CONTROL NUMBER
VERIFICATION

- Failure mode
EDSD

- Input Signal
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 10
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

RTDISSUED FOR 90% REVIEW


DESCRIPTION

ATTACHMENT-1
30-17107
JO/EWO

EQUIPMENT / MATERIALS LIST


20/05/2018

ZCOM NO.:
DATE

PLANT NO.: C070


00A
NO.
REV

Item Type of
DISCIPLINE Tag No. Qty Data sheet No Data sheet No
ENGINEER No. Valve
RTD
20/05/2018
PRESSURE CONTROL VALVE 1111-8550-DS-C070-XX11 SH.1
DATE: 1 C070-PV-0502A 1 12”, CL 150#, RF FLANGED GLOBE OF 1 REV.00A
PROJECT
ENGINEER 1a,2a For above tags CALCULATION/SIZING SHEETS
1b,2b For above tags DIMENSIONAL DRAWINGS
20/05/2018
DATE: Total 1
CERTIFIED

DATE: PIPING AND INSTRUMENT DIAGRAM


CONSTRUCTION
AGENCY
DOCUMENT NO. TITLE REVISION SHEETS
DATE:
OPERATIONS
1111-8110-25-C070-0061 Piping & Instrumentation Diagram 00A 001

DATE:
CONTROL NUMBER
VERIFICATION

Note: Data Sheets and P&IDs are attached at end of this document.
EDSD

APPLICABLE SAUDI ARAMCO STANDARDS


DATE:
BY:

SAUDI ARAMCO ENGINEERING STANDARDS


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

SAES-J-700, SAES-L-108, SAES-A-112


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 11
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
SAUDI ARAMCO ENGINEERING PROCEDURE:

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

SAEP-1151, SAEP-3101, SAEP-302


RTD

SAUDI ARAMCO MATERIAL SPECIFICATION STANDARDS:

34-SAMSS-711, 04-SAMSS-002, 04-SAMSS-048

SAUDI ARAMCO NON MATERIAL REQUIREMENT:


ISSUED FOR 90% REVIEW

SA-7928, SA-7925
DESCRIPTION

SAUDI ARAMCO INSPECTION AND TESTING REQUIREMENTS (SA-175 FORMS):

175-340100

INSPECTION LEVEL:

LEVEL- 2

ATTACHMENT-2
30-17107
JO/EWO

VENDOR'S DRAWINGS AND DOCUMENTS REQUIREMENTS


20/05/2018
DATE

Submission of documents shall be in accordance below table. "Instructions for Vendor Documentation".

For For As-Built


00A
NO.
REV

For Approval Const.


DISCIPLINE Proposal Doc.
ENGINEER
RTD No. of Issue No. of No. of No. of
DOCUMENTS & DRAWINGS
DATE:
20/05/2018 Print Date Print Print Print
PROJECT
1. SHIPPING INFORMATION after P.O
ENGINEER

1) Net weight, gross weight and measurement E


20/05/2018
DATE: 2) Packing, knockdown and transportation
CERTIFIED
procedure (incl. packing style --- 5W --- E ---
sketch/drawing)
DATE:
3) Rust prevent procedure E 5W --- E ---
CONSTRUCTION
AGENCY 4) Long term preservation procedure at
--- 5W --- E ---
construction Site
DATE:
SPARE PARTS, SPECIAL TOOLS AND
OPERATIONS 2.
OPERATIONAL CONSUMABLE
DATE:
1) Start-up spare parts list E 12W E E ---
2) Spare parts and operating material data --- --- --- E E
CONTROL NUMBER
VERIFICATION

3) Capital spare parts list --- --- --- --- ---


EDSD

4) Sectional dwg and part lists for spare parts --- 12W E E E
5) Special tool list --- --- --- --- ---
DATE:

6) Operational consumable list --- --- --- --- ---


BY:

7) Lubricants schedule --- --- --- --- ---


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

8) Utility consumption data --- 12W E E E


9)
(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 12
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
For For As-Built

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For Approval Const.
Proposal Doc.
ENGG CERT

No. of Issue No. of No. of No. of


DOCUMENTS & DRAWINGS
Print Date Print Print Print
RTD

after P.O
ENGINEERING
3.
DOCUMENTS/DRAWINGS (GENERAL)
DRAWINGS
1) Control Valve Specification E 4W E E E
ISSUED FOR 90% REVIEW

2) Dimensional outline drawings --- 4W E E E


DESCRIPTION

3) Sectional drawings --- 4W E E E


4) Accessories drawings --- 4W E E E
5) Pneumatic hook-up drawing --- 4W E E E
6) Electrical hook-up drawing --- 4W E E E
7) Loading data and anchoring details for
--- --- --- --- ---
volume tank
8) Dimension and weight lists E 4W E E E
4. Calculations
1) CV calculation sheets E 4W E E E
30-17107
JO/EWO

2) Noise calculation sheets E 4W E E E


3) Calculation sheet for volume tank --- --- --- --- ---
20/05/2018
DATE

5. Data sheets and Performance Curves


1) Control valve data sheets E 4W E E E
00A
NO.
REV

6. Specifications & Procedures


DISCIPLINE
ENGINEER 1) Catalog 3X --- --- --- ---
RTD
2) WPS & PQR --- 5W E E E
20/05/2018
DATE:
3) Welder List or Qualification Records --- 5W E E E
PROJECT
ENGINEER
4) PWHT procedure, if applicable --- 5W E E E
20/05/2018 5) Impact test procedure --- 5W E E E
DATE:
CERTIFIED 6) NDE procedure --- 5W E E E
7) Hardness test procedure --- 5W E E E
DATE:
8) Positive material identification procedure --- 5W E E E
CONSTRUCTION
AGENCY
9) NDE/PMI Personnel List with Qualification 5W
--- E E E
Program
DATE:
OPERATIONS 10) Material traceability control procedure --- 5W E E E
Paint specifications including Touch-up 5W
11) --- E E E
DATE:
paint
5W
CONTROL NUMBER

Rust prevention and preservation


VERIFICATION

12) --- E E E
procedure
EDSD

13) Test and Inspection Procedure --- 5W E E E


DATE:

14) Installation/Operation/Maintenance Manual --- (note-4) E E ---


BY:

15) Cryogenic Test Procedure --- 5W E E E


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

5W
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

16) Welders/Operators Qualification Records --- E E E


7. Reports (Records)
(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 13
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH
For For As-Built

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
For Approval Const.
Proposal Doc.
ENGG CERT

No. of Issue No. of No. of No. of


DOCUMENTS & DRAWINGS
Print Date Print Print Print
RTD

after P.O 3X + E
1) Inspection Record Book (IRB)
(note-5)
8. MISCELLANEOUS DOCUMENTS
1) Scope of Supply List E 2W E E E
2) Deviation / Clarification List E --- --- --- ---
3) Vendor's Document and Drawing List --- 2W E E ---
ISSUED FOR 90% REVIEW

4) Manufacturing schedule (incl. design,


E 2W E E ---
DESCRIPTION

procurement )
5) Manufacturing status report --- --- ---
6) Minutes of meeting --- (note-6) E E ---
7) Sub-vendor’s List E 2W E E ---
8) Inspection and Test Plan --- 8W E E E
9) IRB Index --- 8W E E ---
10) Certificate of explosion proof type electrical
--- 4W E E E
equipment
11) Copy of ISO 9001 certificate E --- --- --- ---
12) Vendor's Quality Manual E --- --- --- ---
30-17107
JO/EWO

13) Quality Plan for This Project E 2W --- E ---


20/05/2018
DATE

NOTES:
00A
NO.
REV

(1) Definitions: W = Week, M = Month, E = Electronic Files(through FTP), X = Xerox


DISCIPLINE
ENGINEER
(2) Vendor will be responsible for paying all charges for submitting documents when mailing.
RTD (3) In addition to the status reports for the previous month's status, Vendor shall submit "un-priced
20/05/2018
DATE: sub-orders" after placing of sub-orders with sub-vendors.
PROJECT
ENGINEER (4) Not later than (3) months prior to delivery
(5) Not later than 2 week after inspection
DATE:
20/05/2018 (6) Not later than 1 week after meeting
CERTIFIED

DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 14
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

PETRO RABIGH

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
ENGG CERT

RTDISSUED FOR 90% REVIEW


DESCRIPTION
30-17107
JO/EWO
20/05/2018

ATTACHMENT-3
DATE

EXCEPTIONS TO JOB SPECIFICATION


00A
NO.
REV

DISCIPLINE
ENGINEER This lists all Vendor’s proposed exceptions to JOB SPECIFICATION. Vendor agrees that its PROPOSAL is
RTD
in full compliance with the JOB SPECIFICATION except for the exceptions described below. If an exception
20/05/2018
DATE: is rejected, Vendor’s PROPOSAL will be adjusted pursuant to the effects noted.
PROJECT
ENGINEER
Effect on Base
Recommended Revision
DATE:
20/05/2018 Item Description of Reason for PROPOSAL if
To JOB
CERTIFIED No. Proposed Exception Proposed Exception OWNER Rejects
SPECIFICATION
Exception
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
00A
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

MATERIAL REQUISITION CONTROL VALVES DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS DOC


C070 J 1111-8550-RQ-C070- 15
XXXX
OF 00A
RABIGH SAUDI ARABIA JO / WBS: #30 - 17107 16
EDSD/2616-0399.doc
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
00A 20/05/2018 30-17107 RTD
OF THIS DRAWING IS COVERED, FOR ALL 00A ISSUED FOR 90% REVIEW
CONTROL NUMBER

RTD
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

20/05/2018
CERTIFIED
20/05/2018

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________ DATE:

RABIGH
Saudi Aramco 2616-ENG (03/99)

MATERIAL REQUISITION CONTROL VALVES


INSTRUMENT AIR BACK UP SYSTEM BY N2 GAS
DOC

SAUDI ARABIA
PETRO RABIGH

J C070
DWG.TYPE PLANT NO. INDEX

JO / WBS: #30 - 17107


XXXX
DRAWING NO.

16 1111-8550-RQ-C070-
OF
16
SHT.NO.

00A
REV.NO.

EDSD/2616-0399.doc
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

You might also like