LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
ITEM No. ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
Project
The procedure is identified and traceable to the project's update list Document
A1 Control
of quality documents.
Procedure
JERES-W-011,
The procedure stated the method of evaluating the results of the
A6
hardness test performed. Para. 15.1-15.5
REMARKS:
ATTACHMENT:
1. ASME B31.3, TABLE 331.1.1, Requirements for Heat Treatment
REFERENCE DOCUMENTS: 2. Attachment- Guidelines for Portable Brinell Hardness Testing of Welds (NACE
RP0472,Appendix A)
1. JERES-W-011, Welding Requirements for On-Plot Piping (10'February'2010)
2. NACE RP0472-2000,Methods and Control to Prevent In-Service Cracking of Carbon Steel Welds in P-1 Material in Corrosive
Petroleum Refining Environments.
3. ASME B31.3, Process Piping (2008)
Contractor / Third-Party SATORP
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
Page 1 of 2
QCR FORM NUMBER DATE APPROVED QR NUMBER
QUALITY CONTROL REPORT
Review of Hardness Testing Procedure QCR-W-2012 WELD-
PROJECT TITLE PACKAGE NUMBER CONTRACTOR / SUBCONTRACTOR
JER PACKAGE # 3, Aromatics Unit 3 SAMSUNG
Page 2 of 2