You are on page 1of 2

SAUDI ARAMCO ID/PIEU-31-Mar-2019 - Rev. 2019.03.00 (Standards Cutoff - Mar 31,2019) Rev.2019.03.

00 31-Mar-19

SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER

Fire Alarm System - Manual Pull Station –


SATR-B-6105 10-Jun-19 INST
Pre-Commissioning Test
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.

A General Conformance of Tests


Documented test procedures shall be submitted to Saudi Aramco for 34-SAMSS-820
A1
approval not less than thirty (30) days before commencement of test. Sec.8

Review Factory Acceptance Test (FAT) documents detailing the set-up 34-SAMSS-820
A2
and procedures for the Functional Test to be provided. Sec.8.(a)

Before any testing is performed for Manual Pull Station:


All new systems (Manual Pull Station) shall be inspected and tested SAES-B-014
A3
inaccordance with the requirements of Chapter 14. (NFPA 72-2013 Sec. 3.2
Sec.14.4.1.1)

The CONTRACTOR shall identify, maintain, control, adjust and calibrate


Schedule Q
A4 all tools, gauges, instruments and other measuring and testing devices
Att. IV Sec. 7.1
used for controlling quality.

Test Methods, Fire Alarm Boxes: Manual fire alarm boxes shall be
SAES-B-014
A5 operated per the manufacturer’s published instructions. (NFPA 72-2013
Sec. 3.2
Sec.14.4.3.2 Section 17(e))

Test Methods, Fire Alarm Boxes: Key-operated presignal and general


SAES-B-014
A6 alarm manual fire alarm boxes shall both be tested.(NFPA 72-2013
Sec. 3.2
Sec.14.4.3.2 Section 17(e))

CONTRACTOR personnel performing test and calibrations shall be Schedule Q


A7
trained per applicable international or manufacturer requirements. Att. IV Sec. 7.3

REMARKS:

REFERENCE DOCUMENTS:
1. Schedule G - Material, Tools and Equipment (Pro Forma MP-IK-LS Contract),
2. Schedule Q - Quality Requirements (Pro Forma Contract), Project Specificruary
3. SAES-B-014 - Safety Requirements for Plant and Operations Support Buildings, 2 January 2018
4. 34-SAMSS-820 - Instrument Control Cabinets - Indoor, 13 July 2016
5. 34-SAMSS-831 - Instrumentation for Packaged Units, 14 May 2018
6. NFPA 70 - National Electrical Code (NEC), 2017 Edition
7. NFPA 72 - National Fire Alarm Code, 2013Edition

Saudi Aramco: Company General Use


ATTACHMENTS:

NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).

3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products or
services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing states
that the equipment, material or services either meets appropriate designated standards or has been tested and found suitable for a specified purpose.

4. Labeled - Equipment or materials to which has been attached a label, symbol or other identifying mark of an approved qualified organization
concerned with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the
manufacturer indicates compliance with appropriate standards or performance in a specified manner.
5. Remarks -

Contractor / Third-Party Saudi Aramco


Technician Performing Test* PMT Representative
Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed Work Verified
Name, Title, Department,
Name, Initials and Date:
Company, Initials and Date:

QC Inspector PID Representative


Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use