QUALITY CONTROL REPORT QCR FORM NUMBER DATE APPROVED QR NUMBER

Welder & Welding Operator Certification QCR-W-2035 WELD-


PROJECT TITLE PACKAGE NUMBER CONTRACTOR / SUBCONTRACTOR
JER PACKAGE # 3, Aromatics Unit 3 SAMSUNG
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME

COMPANY USE ONLY


JERITP NUMBER COMPANY ACTIVITY NUMBER WORK PERMIT REQUIRED?

COMPANY INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General :
JERES-W-011
Welders are tested and certified in accordance with the governing
A1 Codes,standard, and or specifications of the project, (ASME SEC IX,
Sec.9.1
AWS D1.1 or API STD 1104)
JERES-W-011
The test records of welders and welding operators are available for the
A2
initial review and verification.
Para. 9.2
JERES-W-012
Performance Qualification test shall not be performed on production
A3
joints on Company work.
Para. 9.2

JERES-W-011
For fabrication Yard works, a list of all welders shall be available at all
time in work locationfor review by Company inspector.The list includes
A4
the welders name, symbol,processes qualified and all other important
Para.
essential variables as well as certification issue dates.
9.2

For Fabrication Yard works, Welders carry an identification card that


A5 includes a photo,welders name,company identification number, and
welders symbol.
Essential Variables of Welder Qualification Certificate meet project
welding requirements, or service condition and material type of piping &
structures being welded.
A6
(NOTE: Essential
variables are determined in ASME X,Sec. QW-350)

Validation is maintained of the welder(s) continuity of work within the


A7 range of his qualification,every six months as prescribe by ASME IX,
QW-322.1

REMARKS:

REFERENCE DOCUMENTS:
1. JERES-W-011, Welding Requirements for On-Plot Piping (10'February'2010)
2. ASME Section IX-Welding and Brazing Qualifications (2008)
Contractor / Third-Party SATORP
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector CQT Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED