You are on page 1of 1

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
A

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
A 03/30/20 -
OF THIS DRAWING IS COVERED, FOR ALL ISSUED FOR REVIEW JAA RCJ
CONTROL NUMBER

RCJ
BME

JAA
APPROVAL/CERTIFICATION REQUIREMENTS,

AGENCY
BY:

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
03/30/20

03/30/20
03/30/20

OPERATIONS
CONSTRUCTION
(DCC) NO. _____________________
- DATE:

JUBAIL
Saudi Aramco 2616-ENG (03/99)

SULFUR FORMING & EXPORT FACILITIES


PIPE STRESS ANALYSIS REPORT

SULFUR FORMING & EXPORT FACILITIES


DOC

SAUDI ARABIA
F13
JO / EWO:
APPENDIX-5

L
DWG.TYPE PLANT NO. INDEX
SAUDI ARABIAN OIL COMPANY

RE
-
DISPLACEMENT REPORT

-
DRAWING NO.

12
OF
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

You might also like