Equipment ID / I.Level
QMIS No. RFI's No. RFI Description Dicipline Location Date of Inspection Time SATIP Activity No. SAIC PMT Name PID Name QC Name Drawing No. RFI Status Deliverd Date
Description PLD PID

SEPCO-A-Fweld- B- Punch weld summay review of Test BLOCK # 03 SAIC-A- MR,AHMED


SATIP-A-
Package: TP-PB03B-BD-001-0013 BY QC BLOCK# 03 unit31 WELDING July 28, 2020 5:00 PM 3.1 H W MR. NISHANTH BISHAL
17683 UNIT 31 004-02 2003 AL GHAMDI
BISHAL

B- Punch weld summay review of Test


SEPCO-A-Fweld- BLOCK # 03 SATIP-A- SAIC-A- MR,AHMED
17684 Package: TP-PB03B-WW-001-0004R2 BY QC BLOCK# 03 unit31 WELDING UNIT 31 July 28, 2020 5:00 PM 004-02 3.1 2003 H W AL GHAMDI MR. NISHANTH BISHAL
BISHAL BEING REVIEWED AND ACCEPTED

SEPCO-A-Fweld- B- Punch weld summay review of Test BLOCK # 03 SAIC-A- MR,AHMED


SATIP-A-
17685 Package: TP-PB03B-SW-000-0001 BY QC BLOCK# 03 unit30 WELDING UNIT 30 July 28, 2020 5:00 PM 004-02 3.1 2003 H W AL GHAMDI MR. RAGHIB BISHAL
BISHAL

SEPCO-A-Fweld- B- Punch weld summay review of Test BLOCK # 03 SAIC-A- MR,AHMED


SATIP-A-
Package: TP-PB03B-SW-000-0002 BY QC BLOCK# 03 unit30 WELDING July 28, 2020 5:00 PM 3.1 H W MR. RAGHIB BISHAL
17686 BISHAL UNIT 30 004-02 2003 AL GHAMDI