SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:
CPP-NGCP-H-
SAIC-H-
1.2 Coating Equipment Inspection SAIC-H-2026
2026 RH RH
RECEIVING
06-FEB-2023 @ 10:00 AM
INSPECTION
3.0 INSTALLATION
Concrete Coatings and Pre-Installation SAIC-H-
3.1
Inspection
SAIC-H-1003
1003 H H SATR-H-1003
SAIC-H-
3.2 Coating and Final Installation Inspection SAIC-H-1004
1004 I W
4.0 PRE-COMMISSIONING
EPM :
4.1 Not Applicable
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the
1 levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
4
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Contractor Inspection/Test
P
T
F
-
1
0
8
8
D
O
G
U
Z
M
A
N
SAUDI ARAMCO ID/PIEU-30-Oct-2017- REV. 2017.06.00 (Standards Cutoff -June 30, 2017) Rev. 2017.06.00 30-Jun-17
CPP-NGCP-H-
Coating and Final Inspection SAIC-H-1004 30-Oct-17
EPM :
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
NORTH GAS COMPRESSION PLANTS PIPELINE PROJET 10-02029-0003 CPP
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
HWYH-OPTF-1088 COATING INSPECTION OF FOUNDATION N/A N/A H-92
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
VARIOUS N/A N/A
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
06-FEB-2023 @ 10:00 AM 06-FEB-2023 @ 10:00 AM SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
SATIP-H-003-01 3.2
SAUDI ARAMCO INSPECTION LEVEL
W
CONTRACTOR INSPECTION LEVEL
I
YES
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Installation Inspection
Coating shall not be applied when the substrate temperature is less than SAES-H-001
A2
10°C; or less than 3°C above dew point. Sec. 6.1.1
Coating shall not be applied when wind is strong enough to blow sand, SAES-H-001
A3
salt spray, or other foreign matter onto the surface being coated. Sec. 6.1.1 - d)
SAES-H-003
A4 Only Saudi Aramco Approved Products shall be allowed for used.
Sec. 4
The coating shall be visually inspected for defects and shall meet the SAES-H-003
A6
requirements of the coating manufacturer's data sheets. Sec. 9.3.2
B Final Inspection
All defects shall be repaired according to the touch up and repair SAES-H-003
B1
procedures accepted by the Saudi Aramco Inspecto r. Sec. 9.5.1
All defects shall be corrected and all damage from inspections (i.e., SAES-H-003
B2
adhesion testing, wet film thickness tests etc.), shall be repaired. Sec. 9.5.2
REMARKS: Final inspection ( APCS - 1B ) dry/cured coating , visul inspection and dft verification has
been done and found acceptable on Type Ps01A-1nos, PS01-1nos, PS02-1nos, PS03-1nos, H2S-1nos
Skid fdns-6nos, guard rail fdn = 01 nos @ HWYH-OPTF-1088
REFERENCE DOCUMENTS:
1- SAES-H-003 -- Coating Requirements for Concrete Surfaces, 25 September 2012
2- SAES-H-001 - Coating Selection and Application Requirements for Industrial Plants and Equipment, 5 April 2016