SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standard Cutoff : June 2014) Rev 8 COS6/30/2014

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Fireproofing Concrete SATIP-B-006-01 31-Dec-14 CIVIL


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE& QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

1.0 DOCUMENT REVIEW

1.1 Concrete Mix Design Approval SAIC-Q-1006 SAIC-Q-1006 RH RH If Plant-batched concrete is specified

Approval of Material Application


1.2
Procedure
SAIC-B-2001 SAIC-B-2001 RH RH

Review Qualifications for Propriety Fire Also refer to SATIP-B-006-02 for Proprietary
1.3
Proofing Applicator
SAIC-B-2002 SAIC-B-2002 RH RH Fireproofing materials

2.0 MATERIAL RECEIVING

Proprietary Fireproofing Materials Also see SATIP-B-006-002 for Proprietary Fireproofing


2.1
Receiving Inspection
SAIC-B-2003 SAIC-B-2003 H W materials.

Cast-in Place Ready Mix Concrete


2.2
Receiving Inspection
SAIC-Q-1009 SAIC-Q-1009 W W

3.0 APPLICATION

Pre-placement/ Site Preparation


3.1
Inspection
SAIC-B-1001 SAIC-B-1001 H H

Fireproofing Concrete Application


3.2
Inspection
SAIC-B-1002 SAIC-B-1002 H W

3.3 Fireproofing Concrete Curing Inspection SAIC-B-1003 SAIC-B-1003 W S

4.0 ACCEPTANCE

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standard Cutoff : June 2014) Rev 8 COS6/30/2014

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Fireproofing Concrete SATIP-B-006-01 31-Dec-14 CIVIL


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE& QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

4.1 Concrete Fireproofing Final Inspection SAIC-B-1004 SAIC-B-1004 H W

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PID FORM REV 1 - 010109 (Standard Cutoff : June 2014) Rev 8 COS6/30/2014

SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. APPROVED DATE DISCIPLINE:

Fireproofing Concrete SATIP-B-006-01 31-Dec-14 CIVIL


PROJECT TITLE: WBS/BI/JO/NO. CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE& QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. ACTIVITY CODE PROCEDURE RECORD SAUDI
CNTRCTR
ARAMCO

GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels
1
of Saudi Aramco participation based upon the Contractor’s performance.

2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative
3
is not present.

4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
H 100% Hold Point for QC Inspection or Test. R Review of Documents
W Witness Inspection/Test RH Hold Point Review and Approval of Documents
S Surveillance I 100% Contractor Inspection

Saudi Aramco: Company General Use