WELD SUMMARY

SAUDI ARAMCO TEST REPORT SATIP NUMBER SATR NUMBER DATE APPROVED QR NUMBER DATE

WELD SUMMARY, WELDER PERFORMANCE and NON-DESTRUCTIVE (NDT) TRACKING SYSTEM SATIP-W-011-01 SATR-W-2008 30/Apr/13 01/04/2020

PROJECT TITLE HYDRO-TEST PACKAGE NUMBER WBS / BI / JO NU,MBER CONTRACTOR / SUBCONTRACTOR LOCATION

JIGCC POWER BLOCK-3,EPC-4 TP-PB03B-C-001-0004 10-01525-0004 SEPCO ARABIA BLOCK#3

WPS PARAMEATER VER

NDT REQUEST DATE 2

NDT REQUEST DATE3


POST VISUAL RESULT

RT REQUEST DATE 1

NDT REQUEST 2
RT REPORT NO1
SPOOL NUMBER

NDT REQUEST3
WELD PROCESS

PWHT REPORT

PT REPORT NO
RTFI REPORT3
DATE WELDED

RT REPORT 2#
RT REQUEST 1

RT REPORT3#
LINE NUMBER

RT RESULT 1

RT RESULT 3

PMI REPORT

PT MT DATE
RT RESULT2

DATE PWHT
VISUAL QRN
WELD TYPE

HT REPORT
WELDER ID

HT RESULT
LINE CLASS

FITUP QRN
HEAT NO A

HEAT NO B
MATERIAL

PMI DATE
REMARKS
DRAWING

RTFI NO1

RTFI NO2
WELD NO

QC NAME

HT DATE
FW/SW

TYPE A

TYPE B
GRADE

BLOCK
SL.No.

PT%
WPS

RT%
SIZE

SCH

PMI
VB-366323-303- A403 GR A312 GR SEPCO-A- W-539 SEPCO-WPS- 30/Jan/19 WELD-
32 01C SW 28 2"-C-31004 1SD0P WP316S/316LS TP316/TP316 L DC167S 52812 010 ELBOW PIPE BW 2 3.91 GTAW SF-0239 ASME-024 YES ACC SEPCO-A- TAJAMUL 3 10 N/A 07/Feb/19 A-0034 0114 18-1799 ACC PMI-S-0163 02/02/2019
SW-0236

VB-366323-303- A312 GR A403 GR SEPCO-A- SEP- SEPCO-WPS- 28/Jan/19 WELD- FAHAD


36 01C SW 30 2"-C-31004 1SD0P TP316/TP316 L WP316S/316LS 52812 DC1675 011 PIPE ELBOW BW 2 3.91 GTAW SF-0994 047 ASME-024 Yes Acc SEPCO-A- JABBAR 3 10 N/A PMI-S-0163 02/02/2019
SW-2108

VB-366323-303- A312 GR A403 GR SEPCO-A- W-088 SEPCO-WPS- 30/Jan/19 WELD-


38 01C SW 32 2"-C-31004 1SD0P TP316/TP316 L WP316S/316LS 52812 DC1675 012 PIPE ELBOW BW 2 3.91 GTAW SF-0248 ASME-024 YES ACC SEPCO-A- TAJAMUL 3 10 N/A PMI-S-0163 02/02/2019
SW-0236

WELD-
VB-366323-303- A403 GR A312 GR SEPCO-A- W-088 SEPCO-WPS- 30/Jan/19
39 01C SW 33 2"-C-31004 1SD0P WP316S/316LS TP316/TP316 L DC167S 52812 012 ELBOW PIPE BW 2 3.91 GTAW SF-0248 ASME-024 YES ACC SEPCO-A- TAJAMUL 3 10 N/A PMI-S-0163 02/02/2019
SW-0236

WELD-
VB-366323-303- A403 GR A312 GR SEPCO-A- W-088 SEPCO-WPS- 01/Feb/19
41 01C SW 35 2"-C-31004 1SD0P WP316S/316LS TP316/TP316 L DC167S 52812 012A ELBOW PIPE BW 2 3.91 GTAW SF-0257 ASME-024 YES ACC SEPCO-A- TAJAMUL 3 10 N/A PMI-S-0163 02/02/2019
SW-0242
SL.No.

WELD NUMBER

BLOCK NUMBER

ISOMETRIC NUMBER

LINE NUMBER

LINE CLASS
PROJECT TITLE

MATERIAL
JIGCC POWER BLOCK-3,EPC-4

GRADE

DATE:
SEPCO CONSTRCUTION:

CONSTRCUTION SINGNATURE:
SPOOL NUMBER

WELD TYPE

SCHEDULE
SAUDI ARAMCO TEST REPORT

DIAMETER
WELD SUMMARY, WELDER PERFORMANCE and NON-DESTRUCTIVE (NDT) TRACKING SYSTEM

WELD PROCESS

HEATNO1 HEATNO2

OLD FIT-UP DATE

OLD FIT-UP INSPECTIONQR


NUMBER

NEW FIT-UP DATE

NEW FIT-UP INSPECTIONQR


TP-PB03B-MPS-000-0002

NUMBER
HYDRO-TEST PACKAGE NUMBER

DATE:
WELDERS SYMBOL

DATE WELDED

SEPCO QC INSPECTOR:
WPS NUMBER

SEPCO QC INSPECTOR SINGNATURE:


WPS PARAMETERS
VERIFIED
WELD SUMMARY

IN PROCESS RFI NO
WBS / BI / JO NU,MBER
SATIP NUMBER

SATIP-W-011-01

POST VISUAL RESULT

POST VISUAL INSPECTION


QR NO
10-01525-0004

NDE REQUIRED(%)

DATE NDE WAS


REQUESTED

NDE REQUEST QR NUMBER

1st RT REPORT NUMBER


SATR-W-2008
SATR NUMBER

RESULT

TRACER WELDS T1

TRACER WELDS T2
2nd RT REPAIR 1REPORT
NUMBER
RESULT
3rd RT REPAIR 2REPORT
NUMBER
SEPCO 2
CONTRACTOR / SUBCONTRACTOR
30/Apr/13

RESULT
DATE APPROVED

%REVIEWE 100%

FILM QUALITY ACC


DATE:

FILM QUALITY REJ

WELD QUALITY ACC


SAUDI ARAMCO PID:

WELD QUALITY REJ

ASSESSMENT REPORT NO
SAUDI ARAMCO PID SINGNATURE:

MT REQUEST NUMBER

MT REPORT NUMBER Bevel

MT REPORT NUMBER Weld


QR NUMBER

MT REPORT NUMBER
GRIND

PT REQUEST NUMBER

PT REPORT NUMBER Bevel

PT REPORT NUMBER Weld

PT REPORT NUMBER GRIND

PWHT
BLOCK#3
LOCATION

PWHT REQUEST NUMBER

PWHT REPORT NUMBER

HT
HT REQUEST NUMBER

HARDNESS TESTING

DATE
REPORT NUMBER

PMI TEST

PMI REQUEST NUMBER

PMI REPORT NUMBER

DATE NDE WAS


COMPLETED