Professional Documents
Culture Documents
- Open the drain tap located in the lower left part of the radiator.
- Open the bleed screw on the upper part of the radiator, right side.
FILLING THE SYSTEM
- Close the drain tap and keep the bleed screw open.
- Fill the circuit with the specified fluid through the expansion reservoir filler fitting until fluid emerges through the bleed screw.
ENGINE COOLING CIRCUIT Fluid [I] PARAFLU UP CUNA NC 596-16 - ASTM D 3306 5.27 1.2 8v
1.4 8v
1.4 16v
1.4 16v TJet
ENGINE COOLING CIRCUIT Fluid [I] PARAFLU UP CUNA NC 596-16 - ASTM D 3306 7.3 1.3 Multijet 75 CV
ENGINE COOLING CIRCUIT Fluid [I] PARAFLU UP CUNA NC 596-16 - ASTM D 3306 7.4 1.3 Multijet 90 CV
- Top up the fluid again until the tank level is up to the MAX mark.
- Remove the air from the circuit by pumping the accelerator regularly and gradually (every 30 secs) up to a speed of around 3000
rpm. This operation should be carried out until the thermostat opens and the fan switches on and off at least 3 times. During this
operation keep the climate control system switched off to prevent the fan from coming on for reasons unconnected to the heating of
the coolant. If there is a noticeable drop in the level in the tank below the MIN reference during this stage, let the engine idle and open
the cap very carefully, topping up the fluid to the MAX level, then close the cap fully and remove all the air from the system.
- Then switch off the engine and leave it to cool down.