You are on page 1of 1

Aramco

Serial CCE Time of Date of


QMIS No. RFI No. Area Location Description SATIP/SAES SAIC Activity IFC Drawing No.
No. Inspector Inspection Inspection
No.

SP-CCE-BLG-11000 CAST -IN-PLACE CONCRETE GRADE & SITE


1 B-39 B-0833
PREPARATION INSPECTION FOR CONCRETE PAVING IN BETWEEN B39-CC-D-B18598-001-00 0810 HRS 16-Jan-2020
SP-CCE-BLG-11000 ACCU PAD AT SOUTH-EAST SIDE OF THE BUILDING B-0833 AS PER SATIP-Q-001-02 SAIC-Q-1011 3.1 TITO NEW
THE ATTACHED HIGHLIGHTED DRAWING (QCI-TITO)

SP-CCE-BLG-11001 FORMWORK INSPECTION FOR THE CONCRETE PAVING


2 SP-CCE-BLG-11001 B-39 B-0833 IN BETWEEN ACCU PAD AT SOUTH-EAST SIDE OF THE BUILDING B-0833 AS SATIP-Q-001-02 SAIC-Q-1012 3.2 B39-CC-D-B18598-001-00 TITO 0820 HRS 16-Jan-2020 NEW
PER THE ATTACHED HIGHLIGHTED DRAWING (QCI-TITO)

SP-CCE-BLG-11002 INSTALLATION OF FBE COATED REBARS, EMBEDDED


ITEMS & FORM CLOSURE INSPECTION FOR THE CONCRETE PAVING IN
3 SP-CCE-BLG-11002 B-39 B-0833
BETWEEN ACCU PAD AT SOUTH-EAST SIDE OF THE BUILDING B-0833 AS PER
SATIP-Q-001-02 SAIC-Q-1013 3.3 B39-CC-D-B18598-001-00 TITO 0830 HRS 16-Jan-2020 NEW
THE ATTACHED HIGHLIGHTED DRAWING (QCI-TITO)

SP-CCE-BLG-11003 FRESH CONCRETE SAMPLING AND TESTING


4 B-39 B-0833
INSPECTION AT BATCH PLANT FOR THE CONCRETE PAVING IN B39-CC-D-B18598-001-00 SIMEON 0840 HRS 16-Jan-2020
SP-CCE-BLG-11003 BETWEEN ACCU PAD AT SOUTH-EAST SIDE OF THE BUILDING B-0833 SATIP-Q-001-01 SAIC-Q-1004 3.3 NEW
AS PER THE ATTACHED HIGHLIGHTED DRAWING (QCI-SIMEON)

SP-CCE-BLG-11004 CONCRETE PUMP / TRANSIT MIXER INSPECTION


5 INTERNAL B-39 B-0833
FOR THE CONCRETE PAVING IN BETWEEN ACCU PAD AT SOUTH- B39-CC-D-B18598-001-00 SIMEON 0850 HRS 16-Jan-2020 INTERNAL
SP-CCE-BLG-11004 EAST SIDE OF THE BUILDING B-0833 AS PER THE ATTACHED SATIP-Q-001-02 SAIC-Q-1010 2.3
HIGHLIGHTED DRAWING (QCI-SIMEON)

SP-CCE-BLG-11005 CONCRETE SAMPLING AND TESTING &


6 B-39 B-0833
PLACEMENT INSPECTION FOR THE CONCRETE PAVING IN BETWEEN B39-CC-D-B18598-001-00 TITO 0900 HRS 16-Jan-2020
SP-CCE-BLG-11005 ACCU PAD AT SOUTH-EAST SIDE OF THE BUILDING B-0833 AS PER SATIP-Q-001-02 SAIC-Q-1060 3.4 NEW
THE ATTACHED HIGHLIGHTED DRAWING (QCI-TITO)