Coordinates & Levels of Roof Slab on Site Tower 5,

SU KAIG3-RFI-TT-SU-3491-01 as per the highlighted attached Drawings.

Level and Location for Perimeter wall ( 1st Stage )


SU KAIG3-RFI-CO-SU-03520-00 ( Outer ) Zone 1M, Axis 01AL-01AM , Level Upto
874.00 (As Highlighted )

Level and Location for Infill wall ( Inner ) at Zone 2G ,


SU KAIG3-RFI-CO-SU-03521-00
Axis 02X - 02Y , TOW 871.70 ( As Highlighted)

Level and Location for Diaphragm wall Slab at Zone


SU KAIG3-RFI-CO-SU-03522-00
1E , Axis 01/M , Level Upto 869.00 (as highlighted)

Level and Location for Blinding Under SOG, at Zone


SU KAIG3-RFI-CC-SU-03523-00 2N, Axis 02AR-02AS (As Highlighted)
Concreting for Mass Concrete ( 1st Layer ) Under
Foundation of Diaphragam Wall , Zone 2K , Axis
S KAIG3-RFI-CO-S-10939-00
02/AH , TOC 864.930 , 865.316 , 865.527 , 866.256 ,
866.430 , 867.163 (as highlighted)
Shuttering for Perimeter wall ( 1st Stage ) ( Outer )
S KAIG3-RFI-CO-S-10978-00 Zone 1M, Axis 01AL-01AM , Level Upto 874.00 (As
Highlighted )
Concreting for Perimeter wall ( 1st Stage ) ( Outer )
S KAIG3-RFI-CO-S-10979-00 Zone 1M, Axis 01AL-01AM , Level Upto 874.00 (As
Highlighted )

Steel Reinforcement for MCPE 1 Wall , ZONE 2M


S KAIG3-RFI-MC-S-10980-00
2N , Axis 03/R (as highlighted)
Surface Preparation and Primer Coating for Butress (
BOV-51 & BIV-51 ) and Diaphragm wall ( Wall ) , at
S KAIG3-RFI-CO-S-10981-00
Zone 1N , Axis 01/AM , Level upto 867.50 (as
highlighted)
Single Layer of 4mm thick Modified Bituminous
WaterProofing Membrane for Butress ( BOV-51 &
S KAIG3-RFI-CO-S-10982-00 BIV-51 ) and Diaphragm wall ( Wall ) , at Zone 1N ,
Axis 01/AM , Level upto 867.50 (as highlighted)
Protection Layer of 4mm thick Bituminous
Protection Board for Butress ( BOV-51 & BIV-51 )
S KAIG3-RFI-CO-S-10983-00 and Diaphragm wall ( Wall ) , at Zone 1N , Axis
01/AM , Level upto 867.50 (as highlighted)

Shuttering for Infill wall ( Inner ) at Zone 2G , Axis


S KAIG3-RFI-CO-S-10984-00
02X-02Y ( As Highlighted)

Concreting for Infill wall ( Inner ) at Zone 2G , Axis


S KAIG3-RFI-CO-S-10985-00
02X & 02Y ( As Highlighted)

Steel Reinforcement for Diaphragm wall Slab at


S KAIG3-RFI-CO-S-10986-00 Zone 1E , Axis 01/M , Level Upto 869.00 (as
highlighted)
Shuttering for Diaphragm wall Slab at Zone 1E , Axis
S KAIG3-RFI-CO-S-10987-00
01/M , Level Upto 869.00 (as highlighted)

Concreting for Diaphragm wall Slab at Zone 1E , Axis


S KAIG3-RFI-CO-S-10988-00 01/M , Level Upto 869.00 (as highlighted)

S KAIG3-RFI-CC-S-10989-00 Antitermite Under Blinding Under SOG, at Zone 2N,


Axis 02AR-02AS (As Highlighted)

Installed Base Extrusion and Base Seal between Axis


A KAIG3-RFI-CO-A-1281-01
01/S - 01/T.

Installed ETFE Cushions (without aluminum caps)


A KAIG3-RFI-CO-A-1351-01
between axis 02-Y/02-Z.

Installed ETFE Cushions (without aluminum caps)


A KAIG3-RFI-CO-A-1352-01 between axis 02-Z/02-AA.

Inspection of Excavation for Site Wide Irrigation


C KAIG3-RFI-SW-C-9838-01
Sytem Line at Zone-G - as highlighted

Inspection of Sand covering for protection of pipe


C KAIG3-RFI-SW-C-9840-01 for Heating and Chilled Water Line at Zone-G - As
highlighted
Inspection of(Sand from Source
Excavation - SAS International)
for Telecommunication Line
From C/TL/65 to C/TL/50 Including pits - C/TL/30,
C/TL/37, C/TL/67, C/TL/55, C/TL/68, C/TL/41,
C KAIG3-RFI-SW-C-9889-00
C/TL/66, C/TL/39, C/TL/21, C/TL/28, C/TL/69,
C/TL/50, C/TL/38, C/TL/47 - as highlighted
Excavation for Fire & Security Distribution Line from
C/FS/24 to H/FS/29 including pits - C/FS/50, C/FS/23,
C KAIG3-RFI-SW-C-9890-00
C/FS/31, C/FS/34, C/FS/27, H/FS/29 - as highlighted

Inspection and Compaction test for 5th Layer


C KAIG3-RFI-CO-C-09894-00 backfilling for Infill Wall ( Inner ) , Zone1C & 1D, Axis
01I-01K (as highlighted) ( 5th of 6th Layer ) SP # 146
Inspection and Compaction test for backfilling Sub-
grade 2nd Layer (2 of 6) above Sand covering for
C KAIG3-RFI-SW-C-9905-00
Heating and Chilled Water Line branch at Zone-H -
As highlighted (Stock Pile# 150 A-1-B)
Inspection and Compaction test for backfilling Sub-
grade 1st Layer (1 of 2) above Duct Bank of MV Line
C KAIG3-RFI-SW-C-9906-00
from D/MV/19 to D/MV/06 at Zone-D - As
Highlighted (SP# 150)
Inspection of Sand Bedding Under for
C KAIG3-RFI-SW-C-9920-00 Telecommunication Line From C/TL/65 to C/TL/25 at
Zone - C - as highlighted
Sand bedding for Fire & Security Distribution Line
C KAIG3-RFI-SW-C-9921-00 from C/FS/24 to C/FS/29 At Zone-C - as highlighted
(Sand from Source - SAS International)
Excavation and Blinding Levels for Low Current
C KAIG3-RFI-PG-C-9925-00 Handholes of Fire Alarm & Security (MH/PG/FA/16),
Inside Physic Garden as highlighted in attached
drawing's.
Inspection of Excavation for Telecommunication Line
From C/TL/22 to C/TL/35 and From C/TL/18 to
C KAIG3-RFI-SW-C-9926-00
C/TL/51 Including pits - C/TL/18, C/TL/17 - as
highlighted
Excavation for Fire & Security Distribution Line from
C/FS/16 to C/FS/22 and from C/FS/15 to C/FS/47
C KAIG3-RFI-SW-C-9927-00 including pits - C/FS/15, C/FS/17 - as highlighted

Inspection of Excavation for MV Line Between


C KAIG3-RFI-SW-C-9929-00 C/MV/11 and D/MV/18 , and between C/MV/24 and
D/MV/28 - at Zone C,D - as highlighted
Inspection and compaction test for 3rd Layer
backfilling for Four Foundation at Zone 2R Axis
C KAIG3-RFI-CO-C-09930-00
02AZ-02BA (as highlighted) ( 3rd of 4th Layer )
SP#146
Inspection and compaction test for 4th Layer
Backfilling Under Duct Tunnel , MCPE2 at Zone 2K,
C KAIG3-RFI-MC-C-09931-00
Axis 02AG-02AH (as highlighted) ( 4th of 4th Layer )
SP # 146
Installation of Sub-Surface Drainage
Pipes( Perforated110 mmØ UPVC Class 4 ) at Water
C KAIG3-RFI-WG-C-9932-00 Garden. As per High lighted Attached Approved
Shop Drawing.
Concrete Pouring for Blinding under Low Current
Handholes of Fire Alarm & Security (MH/PG/FA/16),
C KAIG3-RFI-PG-C-9933-00
Inside Physic Garden as highlighted in attached
drawing's.
Installation of Main Fire Water Pipes (250mm,
P KAIG3-RFI-SW-P-0432-01 160mm Ø uPVC Class 5) at Zone C & H as per
attached higlighted approved shop drawing.
Installation of Potable Water Pipes (160mm Ø uPVC
P KAIG3-RFI-SW-P-0433-01 Class 5) at Zone C & H as per attached higlighted
Pre insulated
approved shopChilled pipes,
drawing.
( laying ,Aligment ,Leveling and fit up) Chilled
400mmØ. From point (E:647907.842
M KAIG3-RFI-SW-M-0435-00 N:2714086.606) to (E:647963.096 N:2714123.399) &
From point (E:647961.238 N:2714124.198) to
(E:647905.969 N:2714086.954)
Installation of Ligthning Arrester&Rod
From point
OPR System
(E:647898
with Tripod and Ligthning Down Conductor (25mm x
E KAIG3-RFI-AG-E-0712-01
3mm Tape) at the Aviary Garden as per attached
highlighted drawing.
Installation of Ligthning Arrester Rod OPR System
with Tripod and Ligthning Down Conductor (25mm x
E KAIG3-RFI-CO-E-0713-01 3mm Tape) at the Crescent -2 (axis 02/E) as per
attached highlighted drawing and KAIG3-SCR-PC-E-
Installation of Ligthning Arrester Rod OPR System
0094-00.
with Tripod and Ligthning Down Conductor (25mm x
E KAIG3-RFI-CO-E-0714-01 3mm Tape) at the Crescent -2 (axis 02/M) as per
attached highlighted drawing and KAIG3-SCR-PC-E-
0094-00.
Installation of Ligthning Arrester Rod OPR System
with Tripod and Ligthning Down Conductor (25mm x
E KAIG3-RFI-CO-E-0715-01
3mm Tape) at the Crescent -2 (axis 02/AS) as per
attached highlighted drawing.
Installation of Ligthning Arrester Rod OPR System
with Tripod and Ligthning Down Conductor (25mm x
E KAIG3-RFI-CO-E-0716-01
3mm Tape) at the Crescent -2 (axis 02/AK) as per
attached highlighted drawing.
Installation of Ligthning Arrester Rod OPR System
E KAIG3-RFI-CO-E-0717-01 with Tripod and Ligthning Down Conductor (25mm x
3mm Tape) at the Crescent -2 (axis 02/U) as per
attached highlighted drawing.
Installation of straight UPVC Conduit (Dia. 160mm)
Medium Voltage Ductbank (from Manhole no.
E KAIG3-RFI-SW-E-0746-00
B/MV/23 to B/MV/22) at the Site Work as per
Installation of straightdrawings.
attached highlighted UPVC Conduit (Dia. 160mm)
Medium Voltage Ductbank (from Manhole no.
H/MV/06 to H/MV/30), Ductbank No. HH/D-MV/08
E KAIG3-RFI-SW-E-0747-00 (from Manhole no. H/MV/30 to H/MV/04),
Ductbank No. HH/D-MV/06 (from Manhole no.
Inspection
H/MV/04 toofH/MV/31),
UPVC cunduit (dia 25..)
Ductbank No.and
HH Box for
LC KAIG3-RFI-TG-LC-0975-00 Fire Alarm (VISD CAM) at the Butterfly Garden (GF-
1004 & GF-1005 ETFE Pumps, Wall Ground Level as
per attached highlighted drawing.
5C 8-Jan-23

1M 8-Jan-23

2G 8-Jan-23

1E 8-Jan-23

2N 8-Jan-23

2K 8-Jan-23

1M 8-Jan-23

1M 8-Jan-23

2M 2N 8-Jan-23

1N 8-Jan-23

1N 8-Jan-23

1N 8-Jan-23

2G 8-Jan-23

2G 8-Jan-23

1E 8-Jan-23
1E 8-Jan-23

1E 8-Jan-23

2N 8-Jan-23

1G 8-Jan-23

2H 8-Jan-23

2H 8-Jan-23

G3 8-Jan-23

D2 8-Jan-23

C3 8-Jan-23

C3 8-Jan-23

1C 1D 8-Jan-23

H6 8-Jan-23

D2 8-Jan-23

C3 8-Jan-23

C3 8-Jan-23

4D 8-Jan-23
C3 8-Jan-23

C3 8-Jan-23

C3 8-Jan-23

2R 8-Jan-23

2K 8-Jan-23

4A B 8-Jan-23

4D 8-Jan-23

CH 8-Jan-23

CH 8-Jan-23

CH 8-Jan-23

4B 8-Jan-23

2B 8-Jan-23

2B 8-Jan-23

2N 8-Jan-23

2L 8-Jan-23

2F 8-Jan-23
4B 8-Jan-23

6A 8-Jan-23

4C 8-Jan-23