You are on page 1of 1

Transmittal of Documents /‫ت‬2‫لمستندا‬22‫لا‬22‫إرسا‬

Date / ‫لتاريخ‬22‫ا‬: 8/24/2019


Transmittal no /‫لطلب‬22‫ ا‬2‫م‬2‫رق‬: KAIG-MS-ZHBG-00-C-003
Project no. & title: King Abdullah International Gardens

Engineer: Employer: Contractor:

Priority‫ألولوية‬22‫ ا‬/ : Urgent‫ مستعجل‬/ Normal‫ عادي‬/

1. Document type /‫لمستندات‬22‫وع ا‬22‫ن‬

Material samples Catalogues Tests Technical sheets


Manufacturer certificates Schedules ✘ Other (Method Statements)
2. Submittal details /‫لطلب‬22‫فاصيل ا‬22‫ت‬
Contract doc. Ref. &
Item no. Description of items submitted/ quantity Ref.
Compliances
1 Method Statement for Traverse Constuction Point

These are transmitted for:

Your information Approval Review & comment Other

Submitted by /‫لطلب‬11‫ ا‬1‫م‬Antonio


‫مقد‬: L. Sabalberino Signature 1‫لتوقيع‬11‫ا‬:

3. Engineeer's representative comments /‫الستشاري‬22‫مالحظاتا‬:

Approved

Approved as noted

Revise & resubmit

Rejected

Others

Signature / 1‫لتوقيع‬11‫ا‬: Date / ‫لتاريخ‬11‫ ا‬:

KAIG/DOC./FORM/NO.012

You might also like