You are on page 1of 3

REQUEST FOR APPROVAL FORM WH3-RFA-013 Rev: 0

Project Title : LOGOS METROLINK LOGISTIC HUB (MC) WH3

Contractor : CNQC-MTRA JO

Attention To : LMO / TTW

Submission Description : Formwork Method Statement

Submission date : 15 August 2020 Response Date: 21 August 2020

Issued for Approval


Remarks:

Attachments:

Catalogue of Manufacturer / Technical Data Equipment Schedule

Certificate / Approval Letter Equipment Installation Drawing

Sample Others

Architect / Consultant’s Official Review Status:

A - No adverse comment, proceed according to this submission.

B - Proceed in accordance with the comment. No resubmission required.

C - Proceed in accordance with the comment. Revise and re-submit.

D - Do not proceed: incorporate comments and re-submit.

* Comments are to be noted on the continuation sheet.

ER:

Reviewed / Company: Date:


Signed by:

Consultant:

Reviewed / Company: Date:


Signed by:

Page 1 of 3
Submission Date: 15th August 2020 Reference No. WH3-RFA-013 Rev 0

Document Reference:

Submission Description: Formwork Method Statment

Reviewer’s Name and Contractor’s Reply


No Comments Rev.
Company (and name)

Reviewer’s suggested status code:

LMO Archi Consultant M&E Consultant C&S Consultant Other (state) Client/Owner

This section is to record the reviewing party’s suggested status code only: the official status code for the submitted item is
recorded on the first sheet of this document.

Page 2 of 3
Appendix 1.0 Formwork Method Statement

Page 3 of 3

You might also like