PRE-QUALIFICATION QUESTIONNAIRE
Engineering, Procurement, Construction
Related Explanation
Description Yes / No
Clause (By Identifying Attachment)
2. are the identification and review implemented to the organization's The identification and review is
implemented in GSB-PQHSE-I2.2
activities, facilities, products, and services ? Yes Prosedur Identifikasi dan Evaluasi
Kepatuhan Peraturan Perundangan serta
(check the contribution of the auditee's section / function) Persyaratan K3L Point 1 Tujuan
- CONTROL OF QUALITY
are the procedures for control of the items below established, The procedure is stated in GSB-PQHSE-
Yes
documented, socialized, implemented, and maintained ? S3.2 Inspeksi Hasil Kerja Produksi,
The procedure is stated in GSB-PQHSE-
- control of quality refer to quality operational control procedures ? Yes S3.2 Inspeksi Hasil Kerja Produksi,
(attach list of all applicable procedures)
8.2 MONITORING AND MEASUREMENT / GENERAL
is the procedure for monitoring and measurement established, Yes It is stated in GSB-PQHSE-I2-6
socialized, implemented and maintained ? Pemantauan dan Pengukuran
It is stated in GSB-PQHSE-I2-6
- monitoring and measurement schedule ? Yes Pemantauan dan Pengukuran and
recorded in GSB-Form-211 Jadwal Jenis
Pengukuran Lingkungan
It is stated in GSB-PQE-I1.7
Performance Measurement and GSB-
- monitoring of achievement ? Yes PQHSE-I1.4 Rapat Tinjauan Manajemen
and recorded in GSB-Form-131 Hasil
Evaluasi Sasaran Mutu, and
Management Review Report