P-0001-PH01-D01-01A001-ALEC-PQS-CIV-000005
Technical Submittal Rev.No.00
Date: 15.04.24
Reqd. By:
Subject of Submittal: Pre-Qualification Documents of Third Party (Material Testing) Laboratory M/s. Alhoty Stanger
Operation & Maintenance Manual Project Quality Plan HSE Plan Calculation Survey Others
Ref No 5218794/R11-
Note: The contractor (ALEC) shall ensure all project safety and quality requirement shall imposed to the 3rd
party.
Ref.No 5218794/R10-
2- Table of contents
ILMI SCIENCE DISCOVERY & INNOVATION CENTRE
1.1E10-240
1.1E10-270 / 450
Temperature and Slump test
1.1E10-280
1.1E10-280
Aggregates Testing
1.1E10-130 / 180 Clay lumps and friable particles (ASTM C142 (04))
Cement Testing
Water Testing
5- Company Profile
Pre-Qualification Data
Company Profile ®
AlHoty Stanger Ltd. Co.
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
INDEX
# Description Pages
6.0 Affiliated Companies with related interests in the Middle East 75-78
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Pages
Note: Company Financial Audit Statement is available upon request to Head Office
1
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
2
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
The Company operates a series of independent testing laboratories throughout the Kingdom.
Current laboratory locations are in Al Khobar, Jubail and Hofuf in the Eastern Province; Riyadh in
the Central Province; Jeddah and Yanbu in the Western Province of Saudi Arabia. In 1986, a
purpose-built laboratory was opened in Dubai mainly to carry out petroleum and petroleum
product testing, but was quickly expanded to cover a full range of materials testing services. From
these centers, the Company can mobilize testing and inspection facilities to most other locations
in Saudi Arabia and the Middle East. A further branch was opened in Abu Dhabi, mid 1993, to
perform a wide range of laboratory services.
Company activities include construction materials testing, water, chemical, Microbiology, soils,
metallurgical testing and analysis, non-destructive testing and inspection, failure investigation,
paint and coating examination, polymer and plastic, rubber and wood testing, asbestos
identification and geotechnical investigation. Fully equipped oil analysis laboratories offer
services in lubrication, fuel, hydraulic, insulating oil and other fluid analysis.
Fully qualified personnel are available to design and implement inspection /testing programs
tailored to client's individual investigative requirements. These include complete QC and
compliance testing schemes backed by an extensive data processing facility.
The Al Khobar and specialist laboratories, located in a purpose-built head-office and laboratory
complex in the Thuqbah district of Al Khobar, were awarded the first National Laboratory
Accreditation Certificate by the Saudi Arabian Standards Organization (S.A.S.O.) in July 1988;
accreditation by SASO has been on-going ever since then. Al Hoty-Stanger Ltd. Co. is also
operated to the ISO 9001:2015, registered by Intertek & ISO 17025:2017, Saudi Accreditation
Center (SAAC).
Al Hoty-Stanger Ltd. Co. is associated with three other companies: Al Hoty Company Ltd., Al Hoty
Calibration Services and Al Hoty Pest Control.
The company maintains a working relationship with Stanger Consultants Ltd. in the UK which itself
evolved from Harry Stanger Ltd. (founded in 1874).
3
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
VAT # 300457662700003
Admin@alhotystanger.com
E-mail
ahsmain@al-hoty.com
Riyad Bank
Al-Rayan Branch - Dammam-31411
Bankers ACC # 3500399999941
IBAN # SA1620000003500399999941
Bank Letter Page # 21
4
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
5
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Pages
Financial Data
(Available Upon Request)
6
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
7
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
8
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
9
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
10
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
11
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
12
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
13
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
14
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
15
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
16
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
17
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
18
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
19
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
20
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
21
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
22
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
23
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
24
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
25
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
26
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
27
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
28
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
29
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Pages
1. B.1 First Lab Accreditation (S.A.S.O) 31
30
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Note: This photo was taken on the day AHS was awarded SASO accreditation certificate No 1
31
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
32
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
33
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
34
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
35
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
36
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
37
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
38
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
39
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
40
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
41
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
42
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
43
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Page 44 of 80
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Page 45 of 80
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Page 46 of 80
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
2. Regional Laboratory
Pages
2.1 Al Khobar 48
2.2 Jubail 49
2.3 Riyadh 50
2.4 Hofuf 51
2.5 Jeddah 52
2.6 Yanbu 53
2.7 NEOM 54
Page 47 of 80
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Page 48 of 80
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Established in early 1979, the Jubail Regional Laboratory serves the Madinah Al Jubail Al-
Saniyah Project, itself under the jurisdiction of the Royal Commission for Jubail and Yanbu. The
facility is a 2000 square meter purpose-built laboratory, currently employing an experienced
team of approximately thirty (30) qualified engineers, technicians and supporting staff. The
facility is located in the Support Industry Park of Jubail Industrial City.
Al Hoty-Stanger completed three successive contracts for Materials Testing Services to the
Royal Commission. It also provides independent materials testing to other contractors
completing construction or service contracts on the Jubail project including quality
control/assurance services to established industries.
The Jubail laboratory has frequently been commissioned to carry out full-scale investigative
projects in the Eastern province. Major investigations completed include:
The staffs are assisted by a fully equipped computerized data processing unit.
Page 49 of 80
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
E-mail hosam.rasmy@alhotystanger.com
The Riyadh laboratory was established in late 1977 and has subsequently thrice moved to new
and enhanced premises to accommodate the continued expansion of the services offered.
The laboratory provides the facilities to test constructional materials to include soils,
aggregates, concrete, and concrete and asphalt products. Additionally, the Non-destructive
Testing (NDT) department offers services for the testing and inspection of welding and welder's
qualifications.
The Riyadh laboratory staffs constitutes experienced civil, structural and materials engineers,
geologists, chemists, and employ NDT and civil technicians to provide a comprehensive service
in inspection and testing both in the laboratory and on-site. The services offered include failure
investigation; crack/corrosion investigation of reinforced concrete, structural assessment and
additionally a chartered geologist provide advice on geotechnical projects and exploration for
raw construction material.
Support is also given by the Al Khobar based Specialist Departments in oil testing, detailed
chemical analysis, metallurgy, geotechnical and related services.
The geographical situation of the laboratory (see the location map) affords the mobilization of
staff and equipment within the Central Province of Saudi Arabia.
50
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Established in September 1992, the Hofuf laboratory offers a wide range of construction
materials testing encompassing soil, concrete and concrete products, asphalt and related
materials.
Al Khobar based specialist departments offer their support for NDT, Geotechnical, Metallurgy,
failure investigation, comprehensive chemical and other specialized work.
51
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
The Jeddah Laboratory, established in 1979, currently employs some 20 experienced engineers,
technicians and support staff that provide both laboratory and site testing facilities for soils, concrete
and asphalt. In addition, suitably qualified personnel are available to witness, monitor or sample in
specialized fields such as metallurgy (including inspection), chemistry, lubrication, oil analysis and
general quality control procedures.
Jeddah region has its own local Geotechnical Department with qualified Geologists to undertake and
supervise a full range of site investigation and geological services.
The Jeddah laboratory is fully equipped to perform cement testing to either ASTM or BS requirements
and has long experience of testing both indigenous Saudi and imported cements.
The Jeddah staff has expertise in the in-service assessment of buildings or other structures including
failure investigation and subsequent evaluation of the structural implications of distress or failure.
Full back up from the Al Hoty-Stanger specialist departments is available and when necessary, a rapid
dispatch service of samples from Jeddah to Al Khobar ensures timely provision of results to clients.
The proximity of the laboratory to Jeddah Islamic Port provides a convenient facility for sampling,
inspection and testing of cement, grain and other imported cargo.
52
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
In early 1994, Al Hoty-Stanger Ltd. opened a new branch in Yanbu to offer a wide range of
laboratory services.
The facility now provides an extensive range of services in the field of materials testing
including soils, concrete and constituents, concrete products. Yanbu laboratory is provided
support by our Jeddah Regional Laboratory as well as from Al Khobar (Head Office) for
metallurgical, NDT, Geotechnical, and failure investigation and other specialized work.
53
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
E-mail saeed.siddiqui@alhotystanger.com
E-mail dads.melo@alhotystanger.com
The NEOM laboratory established in 2022, to accommodate the continued expansion of the
services offered.
The NEOM laboratory is fully equipped to provides the facilities to test constructional materials
to include soils, aggregates, concrete, asphalt products. Additionally, the Chemical &
Microbiology Testing.
NEOM LOCATION
NEOM COMMUNITY-2 BATCHING PLANT AREA, LAB #6
28.1025090,35.3390430
54
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Pages
3.1 Chemistry 56
3.2 Microbiology 57
3.4 Mechanical/Metallurgical 59
3.6 Geotechnical 61
55
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
3.1 Chemistry
Address P.O. Box 3072, Al Khobar 31952, Saudi Arabia
Section Head(A) Mazher Afridi
Technical Manager Huryyah Al Amer
Contact Number 0593052524
The Chemistry Section of Al Hoty-Stanger Ltd. Was originally a support service to the Soil and
Geotechnical Division. Subsequent diversification and expansion of available facilities has
provided a thriving department offering a comprehensive range of high-quality laboratory
testing. The department is located in the head-office laboratory complex. (See location map in
Section 1).
The department is fully equipped with sophisticated equipment capable of performing a wide
range of tests to ASTM, AASHTO, SASO, BS and other appropriate standards.
Areas of particular expertise include:
a) Silicate Chemistry – Cement, lime, concrete, aggregates, plaster, cementations raw
materials.
b) Water Analysis – (1) Chemical and bacteriological [American Public Health Association and
World Health Organization Standards]; (2) Leach ate examination to ascertain pollution
and contamination levels in groundwater; (3) Sewage analysis and treatment; (4)
Chlorination techniques for disinfections of pipelines and water storage; (5) Analysis for
aggressiveness toward civil engineering materials; (6) Assessment of chemical/toxic
contamination.
c) Water Treatment – Consultancy services on industrial and potable water treatment.
d) Analytical Chemistry – Identification of unknown substances, determination of
composition.
e) Corrosion – Analysis of corrosion products, treatment and inhibition.
f) Chemical analysis of metals and metal ores.
g) Agricultural Testing – Soil and water for suitability for use in agriculture/ horticulture.
h) Insurance claims and other related testing.
i) Checking and troubleshooting in food and beverage industries including micro- biological
and biochemical testing.
j) Asbestos Testing, Polymer, Plastic and Rubber Testing etc.
56
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
The Microbiology Section of Al Hoty-Stanger Ltd. Was originally a support service to the Food, feed and
water quality. Subsequent diversification and expansion of available facilities has provided a thriving
department offering a comprehensive range of high quality laboratory testing. The department is
located in the head office laboratory complex. (See location map in section 1).
B. Checking and troubleshooting in food and beverage industries including microbiological and
biochemical testing. The department is fully equipped with sophisticated equipment capable of
performing a wide range of tests to AOAC, BAM, AWWA and other appropriate standards.
B) Food and animal feed analysis as per SASO, CCFRA, BAM, and AOAC.
C) Food implicated illness: monitoring food implicated illness or food intoxication for microbiology.
E) Testing the Efficacy of Disinfectant: Testing the efficacy for different chemicals against different
microorganisms.
F) Soil and Water – Soil and Water for suitably discharge to the sea.
57
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
E-mail nagarajan.mani@alhotystanger.com
usman.khan@alhotystanger.com
This department located in the head-office laboratory complex (see location map in Section 1),
offers a wide range of inspection and testing services. These include:
4) Sampling and chemical analysis of metals and alloys for identification to international
specifications.
58
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
E-mail nagarajan.mani@alhotystanger.com
usman.khan@alhotystanger.com
This department, located in the head-office laboratory complex (see location map in Section 1), offers
testing services in accordance with ASTM standards in the areas of optical microscopy, in-situ
metallography, quantitative metallography, mechanical testing, structure-property correlation and
failure analysis of metal products. These include:
1) Cutting, mounting, surface preparation (by grinding, polishing and etching) and
microscopic/microstructure examination of metals and alloys.
8) Structure-property correlation.
9) Failure analysis of metallic components.
10) Sampling and chemical analysis of metals and alloys for identification to international
specifications.
59
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
The Oil Analysis Laboratory is located in the head-office laboratory complex (See location map
in Page 81).
The laboratory offers a comprehensive range of tests on petroleum products to IF, ASTM and
other relevant specifications. Products tested include crude oil, lubricating oils, fuels, gear oils,
hydraulic fluids and insulating oils. Tests, generally tailored to individual requirements, may be
conducted on either new or used petroleum products.
Unused products such as diesel or turbine fuel are normally tested for conformance to physical
and chemical criteria specified in relation to a particular engine model. Relevant properties
include sulfur content, flash point, gravity and heating value.
Used petroleum products, sampled from an operating system, are tested as a diagnostic
technique, not only for the oil itself (contamination, oxidation) but also to identify wear and
tear on the mechanical system, which may often be intense in the Middle Eastern environment.
The testing of used lubricating oil as a preventive maintenance tool is used by the armed forces,
airlines, merchant fleet operators, oil companies and many other heavy equipment users
throughout the Gulf.
Properties assessed may be physical – fuel dilution, total solids, water contamination, viscosity
and total acid or base number. Spectrochemicals tests determine the extent of dissolved “wear
metals” in the oil.
The Oil Analysis Department is fully equipped with sophisticated analytical equipment including
a computerized Atomic Emission Spectrometer and Infrared Spectrophotometer, in addition to
dielectric, distillation, and calorimeter and viscosity equipment.
The recent installation of a Gas Chromatograph equipped with both thermal conductivity and
flame ionization detectors enables the laboratory to test gaseous fuels for composition, test
environmental samples and breathing air for contaminates and determines the dissolved gas
content in insulating oil.
60
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
E-mail faisal.khan@alhotystanger.com
The Geotechnical Department is based at the head-office laboratory complex (see location map
in Section 1).
The department provides a comprehensive site investigation and foundation evaluation service
throughout the Kingdom with full support from the company's regional laboratories. The
department is largely concerned with assessment and design of foundations for a wide variety
of structures including housing, community facilities, office and commercial developments,
power transmission lines, water towers, coastal and offshore engineering works and other
industrial developments and infrastructure. Resource surveys for suitable fill materials,
aggregates for concrete and raw materials for cement manufacture have also been undertaken.
Staffing comprise of a group of qualified engineers and geologists who are responsible for the
technical direction of field investigations, the formulation of in-situ and laboratory testing
programs and the preparation of geotechnical reports. Laboratory facilities include a
comprehensive range of soil and rock mechanics tests.
61
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
E-mail asjad.hussain@alhotystanger.com
spl.testing@alhotystanger.com
The section is located in the Al Khobar laboratory complex (see location map 1 in Section 2.1).
The laboratory offers a comprehensive range of tests on plastic and polymer products as per
SASO/ISO, and ASTM and other relevant specifications. It includes products like plastic pipe
including PVC, UPVC, HDPE, CPVC, PP-R, PP-H, GRP, FRP, Waterproofing membranes like
Bitumen membrane, PVC Membrane, EPDM etc.
We also have core expertise in insulation materials XPS Boards, EPS Boards, GPS Boards,
Polyurethane Foam, Polyisocyanurate Foam.
Our core field expertise would include HDPE and LLDPE Liner field test and Lab test. We also do
Geotextile and Geonet materials test on site.
With our experience that we have in this field makes us the best testing facility in the entire
Saudi Arabia.
Our Major Equipment includes but not limited to UTM, MFI, DSC, Infrared Camera, Guarded
Hot plate, Izod Impact tester .
62
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Physical and chemical testing of soils, aggregates, cement, lime, plaster, concrete,
concrete products and bituminous materials, core and non-destructive testing,
Provision of qualified and experienced staff for field inspection and sampling.
Physical and chemical testing of concrete, soils, aggregates, cement, rock, admixtures,
concrete products, waterproofing membranes, geotextiles, geogrids, water stop,
bituminous materials and wood refractory testing to British, European, American and
other national and international standards. Physical, mechanical and chemical testing
of metals, alloys and plastic composites.
Load testing of concrete structural elements, manhole covers and scaffolding components.
Provision of qualified and experienced personnel for field inspection, sampling
and testing. Equipping, staffing and management of site and mobile
construction testing laboratories.
63
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
General Service: -
Fleet Supervisor KSA Hussain Najjar
G.S Supervisor KSA Obaidullah Mohd Zahir
Regional/Asst./Branch Managers
Jeddah – Manager (Western Region) KSA Fadi Khalifa
Neom– Branch Manager KSA Saeed Siddique
Riyadh – Regional Manager KSA Riyaz Shaikh
Jubail – Regional Manager KSA Riazul Hassan
Yanbu – Regional Manager KSA Sanooj Basheer
64
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Legend:
UAE - United Arab Emirates
KSA – Kingdom of
65Saudi Arabia
AL HOTY-STANGER LTD. ﺷرﻛﺔ الحوطي ستانجر المحدودة
Pages
NOTE:
The enclosed listing of clients, completed projects and on-going projects covers the period
from 2000 to 2020. The lists of completed projects from its formation in 1976 to 1999 are
66
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
67
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
2014 On Going 150K Overseas Contracting Co. Rabigh PP-2
2014 On Going 400K MAPA Construction & Trade Co. Briman Project
2014 On Going 900K China Petroleum Jilin Engg. & Const. Co. Petro Rabigh 2
2014 2015 30K Harmchang Day Cont. Est. Yanbu Phase-3
2014 2015 450K GS Hinku / POSCO MARAFIQ
2014 2016 330K GS Construction Arabia Ltd. Petro Rabigh UO1
2014 On Going 2M China 11th Chemical Const. Co. Yanbu-Madina – SWCC Project
2015 Continuing - AZZAM TRADING & CONTRACTING CO. LTD. HUNAIN IPP-2 , 380KV SUB-STATION
2015 Continuing - DAR AL KHOYOUL CO. HOUSING COMPLEX COMPOUND
2015 Continuing - ISAM KABBANI SHUQAIQ POWER STREAM PLANT
2015 Continuing - SAUDI ARCHIRODON LTD. SHUQAIQ POWER STREAM PLANT
2015 Continuing - BENAA & ENMAA INC. TAIF WATER PIPE LINE
2015 Continuing - MUTAH CONTRACTING CO. PREMIER INN HOTEL
2015 Continuing - Samsung Engineering S.A. Aramco-Shaybah Package 5
2015 Continuing Bin Qurayya Aramco-Shaybah Package 5
2015 Continuing - METSCCO QURAYAT POWER PLANT
2015 Continuing - CLEAN ENERGY CO.LTD. AL QASHIM PIPE LINE
2015 Continuing - BACS RIYADH METRO PROJECT
2015 2015 130K Saad Al Nagem for Cont. Umlajj North 380kV BSP
2015 On Going 150K Ishadat Company Ltd. Technical College – Umlaj
2015 On Going 75K Dodsal & Company Camp Project – RC, Yanbu
2015 On Going 150K Al Saghyir Trading & Cont. Co. Al Eis – Badr Court Project
2015 On Going 50K Al Hubaishi Company Drainage & Storm Water - Umlaj
2015 2016 70K Sejong Saudi Arabia – LLC Rabigh 2, CP-3&4
2015 2016 360K Fiber Glass Oasis Co. FGOC – Yanbu
2015 2016 110K Daesun Electric & Communication Rabigh II/CP-3
2015 Continuing 130 Million Al-Sari Concrete & Soil / Asphalt – SCECO
2015 2015 - Petrojet – Saudi Arabia Soil Testing Services
2015 2015 - Petroleum, Chemicals & Mining Co. Ltd. Civil Testing Services
2016 Continuing - RUWAD CIVILCONSTRUCTION (R.C.C.) AL AISAEI HOTEL
2016 Continuing - VARIOUS CLIENT JIZAN ECONOMIC CITY
2016 Continuing - SEDER GROUP AL QASHIM PIPE LINE
2016 2016 - Yuksel Insaat RIYADH METRO PROJECT
2016 Continuing - Advance Constructions Technology Services RIYADH METRO PROJECT-North Riyadh
2016 Continuing - Advance Constructions Technology Services RIYADH METRO PROJECT-South Riyadh
2016 Continuing - Shapoorji Paloonji Marriot Hotel
2016 Continuing - GAMA AL MOUSHEGA Aramco-Khurais
2016 Continuing - GAMA AL MOUSHEGA Aramco-Khurais
2016 On Going 150K Global Suhaimi Co. SWCC – Yanbu
2016 On Going 100K Isam Kabbani & Partners Co. YANSAB
2016 On Going 250K AMMICO International Cont. Co. Duba Power Plant
2016 On Going 50K Al Faal United for Construction Co. Royal Commission
2016 On Going 150K Al Asas United Company Royal Commission
2016 On Going 50K Yousef Deleabeh Al-Mehmadi Est. Power & Fiber Cable G2 - Yanbu
2016 On Going 75K Sinopec International Petroleum Yanbu-Madina – SWCC Project
2016 On Going 150K Daelim Saudi Arabia Co. Ltd. Rabigh II/CP-3
2016 On Going 1M Nasser S. Al Hajri Corporation Jazan Export Refinery
68
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
2016 On Going 500K Sinopec Engineering Group Jazan Export Refinery
2016 On Going 200K METSCCO Heavy Industry Jazan Export Refinery
2016 2014 60 Million Yuksel Concrete & Soil – SWCC & SCECO
2016 Continuing 350 Million China Railways Construction Corp. Concrete & Soil / Asphalt – Housing
2019 Continuing - China Railways Construction Corp. Testing of Ballasts/ Aggregates
2017 2018 - Al Mobty Co. Testing of Ballasts/Aggregates
2012 2016 3,417,760 ABV Rock Group KSU Bldg #3,4,5,6,9,11,12, & 13 + King Salman Centre
2013 2016 4,211,079 Samsung Engineering Co. Power Generation Division (PKG #1 to 5)
2010 2016 3,000,000 Mastoura for Trading & Contracting Cathodic Protection of well casing & Flow Line, Hawiyah, Uthmaniyah,&Haradh
2012 2017 15,000,000 M.S Al Suwaidi Industrial Services Co. Ltd. Tanajib Saudi Aramco
2014 2017 1,400,000 Petrojet Saudi Arabia Petro Rabhi Phase II/ Lubref-Samsung & MTBE Projects
2015 2017 3,500,000 A.HAK PIJPLEIDINGEN B.V Khurais Sewage Pipeline
2015 2018 3,000,000 MAPA Co. Al Raidah Housing Complex Project
2015 2018 2,000,000 Isam Kabbani Group Power Plant Project, Shuqaiq
2012 2018 1,500,000 Khalid Al Mulhem & Bros. Co. Luberef/ IBN Rushd Projects
2014 2018 1,224,552 SEPCO Increase Gas Handling Capacity (PKG-5)
2016 2018 800,000 Eastern Precast Concrete Kuwait University,ABV Rock South Border
2017 2019 2,000,000 Umm Al Qura for Development & Construction Co. Witnessing of Laboratory Activities
2016 2019 874,728 GAMA Area Facilities Expansion & Satellite GOSP
2017 2019 750,000 Denys Arabia Ltd. Khursaniya Gas Plant Project
2017 2019 750,000 Dywidag Precast Concrete Co. Fadhily Sulphur Recovery Units Project
2017 2019 650,000 Rawabi Specialized Contracting Construction of Motor Oil Manufacturing & Storage Facilities for Future Oper.
2018 2019 400,000 Yapi Merkezi Haramain Railway Station
2018 2019 100,000 Tunisian Saudi for Projects Co. Ltd. SGDN – MARAFIQ, Yanbu
2015 2019 165,000 Al-Saghyir Trading & Cont.Co. Court Project, Al EIS
2015 2020 2,500,000 Prainsa Precast Concrete Riyadh Metro
2017 2020 865,000 Petroleum Chemical & Mining Co. Farabi Normal Paraffin & Derivatives Complex
2016 2020 300,000 Azzam Trading & Contracting Co. Ltd. Jamjoom Pharma
2018 2020 500,000 Prime Technical Construction Company MASIC Industry
2014 2020 150,000 Marafiq Saur Operation & Maintenance Co. (MASA) Royal Commission Projects – Yanbu
2020 Continuing 6,000,000 Haif Company Third Party Civil Testing Services
2010 Continuing 5,000,000 Femco Yuksel Consertium KFU Infrastructure Phase – 2 Al Hasa
2013 Continuing 3,000,000 Saudi ABV General Contractors Co. Ltd. King Abdul Aziz University, Jeddah
2016 Continuing 2,700,000 Al Fanar – 118 Area Facilities Expansion & Satellite GOSP – CPF(117/118) Khurais
2015 Continuing 2,500,000 Al Mashariq Trading & Contracting Al Hasa Housing Project
2016 Continuing 2,000,000 China Railways Construction Co. Rievera Compound -1
2015 Continuing 1,000,000 Isam Kabbani Group Luberef, Jeddah
2007 Continuing 1,000,000 A.R. NAMLAH HEIRS CONT. Co. Ltd RC/MYAS/ Baladiyah Project
2007 Continuing 1,000,000 A.R. Namlah Heirs Cont. Co. Ltd. RC / MYAS / Baladiyah project – Yanbu
2016 Continuing 300,000 Isam Kabbani & Partners Yansab Cristal Project
2004 Continuing 250,000 Al Hubaishi Company RC / Baladiyah Projects – Yanbu
2014 Continuing 150,000 Kawader Al-Watan Group Royal Commission Projects – Yanbu
2014 Continuing 250,000 Sanai Commercial Est. Various Projects
2020 Continuing 112,392 MCC (Metallurgical China Construction Co. New Yamama Cement Plant
2020 Continuing 67,200 MAMPCO Mansourah Massarah Gold Project
69
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
70
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
71
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
2015 Continuing 1100000 GULF STEEL RT,WQT,WPQT / VARIOUS
2015 2016 400000 BILFAL WQT, WPQT/ ARAM CO
2016 2017 913,022.00 BRANCH OF SINOPEC INT. WPQT, WQT, NDT Inspections, Mechanical – Various Projects
2017 2017 40,200.00 SCHLUMBERGER MIDDLE EAST S.A. Mechanical & Metallurgy – Various Projects
2017 2017 80,000.00 CONSOLIDATED CONTRACTORS CO. NDT Inspection – Various Projects
2016 2018 250,000.00 ARABIAN FAL COMPANY WPQT, WQT, NDT Inspections, Mechanical – Various Projects
2016 2018 375,000.00 BIN QURAYA HOLDING CO. WPQT, WQT, NDT Inspections, Mechanical – Various Projects
2016 2018 480,100.00 GE ENERGY MANUF. TECH. (GEMTEC) NDT/RT, Mechanical – Various Projects
2016 2018 90,000.00 ZAMIL STEEL INDUSTRIES - P.E.B. NDT/RT, Mechanical – Various Projects
2017 2018 512,300.00 MA'ADEN ALUMINUM COMPANY Metallurgical / Failure Analysis – Various Projects
2017 2018 280,000.00 ZAMIL OFFSHORE SERVICES CO. NDT Inspection, WPQT, WQT – Various Projects
2018 2018 33,360 Nesma & Partners Co. North Project, Sharma-Tabuk
2018 2019 323,820 Tekfen Construction & Installation.Co Yanbu-North Jeddah Pipeline Project.
2014 2020 1,758,407 L & T hydrocarbon SA Ltd. Farabi Petrochemical
YERP-3/YASERF PROJECT-YANBU
2013 2020 1,472,841 Senden Internation Co. Ltd
PLANT SERVICE PROJECT
2013 2020 798,833 Gulf Resources Project Co. Nat Pet Project, Yanbu
2017 Continuing 1,000,000.00 Nasser S. Al Hajri Corporation WQT and WPQR Services in Jizan Refinery Project
2017 Continuing 98,000.00 Al Hadi Ready mix Physical and chemical analysis Test In Jizan Refinery project
2017 Continuing 358,000.00 Hidada Contracting Co.Ltd WQT and WPQR Services in Jizan Refinery Project
2018 Continuing 300,000.00 Petrofac NDT Services at Jizan Refinery Project
2018 Continuing 700,000.00 JGC Arabia Co. NDT Services at Jizan Refinery Project
2018 Continuing 150,000.00 Al Yamama Co.For Trading and Contracing WQT, WPQR & Chemical Analysis Testing Services in Jizan Ref. Project
2018 Continuing 95,000.00 Alishar Contracting Co. NDT Services at Abha
Physical and chemical analysis Test In
2018 Continuing 82,000.00 Qanbar Ready Mix
Jizan Refinery project
Physical and chemical analysis Test In
2018 Continuing 30,000.00 Ramz Al Arobah
Jizan Refinery project
2018 Continuing 69,000.00 Ruk Constructions NDT Services at Abha Area
2018 Continuing 45,000.00 Azdah Contracting Co.Ltd Physical & Chemical analysis Test at Darb
2018 Continuing 100,000.00 A.HAK GASCO - RT
2018 Continuing 50,000.00 AL SHAHIN METDL Various - NDT
2018 Continuing 15,0000.00 SHADE TECHNOLOGY Various NDT & WQT
2018 Continuing 72,000.00 SAUDI MECHANICAL INDS. Various WQT & NDT
2018 Continuing 100,000.00 SEDER GROUP SWCC-QASIM ,RIYDH
2019 Continuing 50,000.00 Crown steel NDT Services at Jazan economic city Project
2019 Continuing 38,000.00 Alfanar Co.ltd. NDT Services at Jazan
2017 Continuing 1,106,573 S.A Kentz Co. Ltd. Saudi Aramco Project Turaif
72
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Value/
Date Start DOC Client Brief Description of Work Performed/Project Title
SR
2000 2001 45,000 SAMGE, Riyadh Steam Water Chemistry
2000 Continuing 300,000 SEC-South (Abha) Oil/Transformer Oil Analysis
2000 Continuing 300,000 NCC Transformer Oil Analysis
2002 Continuing 500,000 S.A. Saipem Chem/Water analysis
2002 Continuing 1M SABIC (Hadeed) Oil/Foam/Water Analysis
2002 Continuing 600,000 SABIC Petrokemya Transformer Oil Analysis
2002 Continuing 1.5M SABIC Hadeed oil analysis from various equipment
2002 Continuing 40,000 Al Mimish Farm Chemical analysis (Bacteriological/Microbiological)
2002 Continuing 30,000 NALCO Chemical analysis (various testing)
2002 Continuing 100,000 GE BETZ Fuel additive
2003 Continuing 150,000 The Environmental Cons. Bureau Chemical analysis (Oiled sand)
2003 Continuing 2M Saudi Aramco Asbestos Survey- Kingdomwide
2004 Continuing 100,000 GE Energy Pempower Transformer and Lube Oil Analysis
2004 Continuing 10,000 RAE Training Env. Consultants Carious Soil and Water Analysis
2004 Continuing 75,000 Saudi Polyolefins Co. Stack Gas Analysis
2005 Continuing 15,000 Carlo Gavazzi Arabia Various Water Analysis
2005 Continuing 32,000 SAK Engineering Consultants Effluent & Influent Water
2005 Continuing 20,000 ETE Technical Water & Limestone Analysis
2004 Continuing 2M Saudi Aramco Asbestos Survey
2002 Continuing 100,000 SAIPEM Water and Wastewater Analysis
2004 Continuing 100,000 GE-U.S.A. Natural, Fuel and Gas Analysis
2000 Continuing 200,000 Ballast Nedam Water, Oil, Foam Analysis
2017 2017 19,200 Saudi Railway Co. Diesel Laboratory Analysis
2007 Continuing 30M+ Saudi Customs Authority Analysis of various products
2003 Continuing 5M+ Arabian Drilling Co. Water & Effluent Water Analysis
73
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
74
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Pages
75
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
E-mail : admin@al-hoty.com
Al Hoty Affiliated Companies are 100% Saudi Arabian Companies offering a wide variety of services to
clients, including:
• AL HOTY CO, LTD. has been operating for over (50) years now. In 1972 it pioneered the concept of
providing supplemental manpower, vehicles, equipment and general maintenance. Aramco was its first
beneficiary, which was replicated in other Aramco-related projects and became the standard of
supplemental manpower provision up to the present time.
• Al Hoty Calibration Services (ACS). Established in 1980, (ACS) offers the variety of services
related to calibration capabilities include, but not limited to, the following parameters:
• Acoustical / Chemical / Fluid Quantities / Dimensional / Electrical / Mechanical / Thermodynamics/
Time & Frequency.
• We are accredited laboratory by (A2LA) in accordance with ISO/IEC 17025:2017. and (SAAC)
accreditation as per SASO/ISO 17025:2017.
• The main laboratory is situated in Al Khobar with 5 Regional laboratory facilities throughout the
Kingdom.
• Al Hoty Pest Control was established in 1977, providing comprehensive package-deal programs in
the field of Pest Control and Pest Management, Disinfection Treatment, Termite Control, Fumigation
76
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
Service, Wood Preservation etc.; our aim is to ensure our quality services. At the same time, we ensure
that the treatment of such pests does not cause any risk to consumers or operators or to the
environment.
• Twelve Dal Co. Ltd. is the official Distributor for 12d Solutions’ products in Saudi Arabia, Bahrain,
and Qatar.
• 12d Model is a powerful surveying, terrain modeling & civil engineering software. It allows fast
production in a wide variety of projects including mapping, site layouts, road, rail and highway design,
residential, land developments, and environmental impact studies.
• CSCO CO. LTD is proud to be powered by 12d Model. offers the variety of services related to
powerful design capabilities like Underground Utility Survey, 3D Laser Scanning, topographical Survey,
and Subsurface Geological Investigation.
• Al Hoty Auto Care Center started in 1972 as an exclusive car repair and maintenance shop for Al
Hoty vehicles and to other clients. It has a modern and hi-tech equipment for
mechanical/electrical/body repair and service.
• PWHT Division, The PWHT division has several Meanings UK machines and experienced crews to
undertake large-scale projects. The division has completed a number of SABIC, SASREF and S. Aramco
projects during last decade.
• HAAPCO was established in 1994 for provision of high-quality materials testing equipment to
analytical laboratories manufacturing industries
• HAAPCO is a ISO Certified Company focusing on two major segments, Contracting & Trading services.
77
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
***
78
ILMI SCIENCE DISCOVERY & INNOVATION CENTRE
5
ILMI SCIENCE DISCOVERY & INNOVATION CENTRE
SKILLS
[ B. TECH. – MBA]
LEAN SIX SIGMA GREEN BELT | NEBOSH IGC |IOSH -MS
L E A D A U D IT O R I SO 9 0 0 1: 2 0 1 5 | 17 0 2 5 : 20 1 7 / 2 005 | I S O 4 50 0 1 : 2 01 8
I N T E R N A L A U D I TO R I S O 1 7 0 2 0 : 2 0 12 | I SO 1 4 0 0 1:2 0 1 5
Communication 100%
WORK EXPERIENCE
AL HOTY STANGER LTD.CO. (BRITISH-SAUDI VENTURE)
ISS is an Independents Laboratory to provide various CNDT, ANDT, Chemical & Mechanical Testing Services.
From 2022 March to 2023 March.
Position Held: QHSE Manager/ Management Representative
http://www.issksa.com
RESPONSIBILITIES:
➢ Planning, preparation, review, monitoring and update the QHSE Documents through the organization in different
operations auditing/planning as per QHSE Management System.
➢ Follow and promote the risk-based approach in each level of operations of organization via RAID logs.
➢ Analysis of performance of laboratory and its resources including equipment and manpower with the help of
respective KPIs
➢ Assessment/analysis of customer complaint.
➢ Involve in 3rd party inspections and reports preparation according to the client’s requirement.
➢ Monitoring the quality parameters and assisting to achieve quality standards in the respective jobs.
➢ Promoting agile approach in any ongoing project.
➢ Involved in guiding top management for business excellence and change management.
ECIL-RAPISCAN, DELHI
AND
From 2010 June to July 2012
Position Held: Consultant / Site Inspector
ECIL is Government of India Enterprise, engaged in the manufacture of Security Systems including XBIS, Computers,
Communication, Control Systems, Instruments, Components, Special Products, and Defense Products etc.
http://www.ecil.co.in/
Aseem Akhtar Khan | CV |Quality Manager 2
1. Project : Delhi Police Markets Surveillance & Commonwealth Games 2010 Surveillance, Delhi
Client : Delhi Police
Post : Consultant
This project regarding with security surveillance of main markets of Delhi, by Delhi Police. In first phase of this project 29
markets have been covered with IP cameras and public addressing systems, which is controlled by control room stated in
nearby Police Stations & inside the sports stadiums.
RESPONSIBILITIES:
➢ Monitoring the Installation of IP CCTV & Server-client MS for CCTV Video Surveillance (Fixed, PTZ, LPR) at site.
➢ Coordinating the various agencies during installation & commissioning of the system.
➢ Training the Police Personnel to control and Monitor the System.
➢ Faced the Inspection of Senior Police Officer (i.e., SCP, DCP, ACP and SHO) many times.
➢ Handed over the Sites to Delhi Police after the successfully inspection.
SAMEER ENGINEERS
MEMBERSHIP
➢ Active Membership of Saudi Council of Engineers (SCE) – Membership no.# 441260
➢ Active Certified OSH Professional Level – 2 – Cert Number#11211121050
➢ Active Membership of ASTM International – Membership no.# 2143143
PERSONAL DETAILS
Name & Age : Aseem Akhtar Khan / 35 years
Religion & Nationality : Islam / Indian
Marital Status : Married
Languages Known : English, Urdu, and Hindi
DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge.
ASEEM AKHTAR KHAN.
R E F E R E N C E S : To be provided on request.
Aseem Akhtar Khan | CV |Quality Manager 3
SHANJIDUL ALAM
CONTACT EXPERIENCE
EDUCATION
2020 - 2021
SECONDARY SCHOOL CERTIFICATE(SSC)
School : CHANDPUR TAMIZ UDDIN HIGH SCHOOL, BRAHMMANBARIA
Group : business studies
Result : 3.39 GPA
2018
JUNIOR SCHOOL CERTIFICATE(JSC)
School : CHANDPUR TAMIZ UDDIN HIGH SCHOOL, BRAHMMANBARIA
Result : 2.57 GPA
PERSONAL INFORMATION
PERMANENT ADDRESS
COMPANY PROFILE:
Al Hoty Stanger Ltd. was established in 1975 as independent laboratories and materials testing. We offer a wide range
of independent testing/inspection services including physical, mechanical and chemical testing of all kinds of materials
(e.g. Polymers, plastic, rubber, construction materials, metals, water, oil, fuel, food etc) and we have the laboratory
facilities throughout the kingdom.
JOB RESPONSIBILITIES
➢ As a first person in the department handled the complete setting of LAB along with the installation of
equipment and training sub ordinates on the same
MAJOR PROJECTS
1. King Abdul Aziz World Culture Centre, Dhahran. (6 years) – Third Party Inspector for EPDM Water
proofing membranes.
2. Jeddah Dam Project
3. HDPE Liner Installation -Madden Phosphate.
4. HDPE Liner Installation - Madden Aluminum.
Company : SKY PACK INDIA PVT LTD (JANUARY 2009 – AUGUST 2009)
COMPANY PROFILE:
Skypack introduces laminated tubes (Lamitubes) made from state-of-the-art Swiss Machinery
adopting compression molding for stronger fusion between shoulder and body. Product that
requires long shelf life and safe, hygienic & attractive looks can be packed in a Plastic
Laminated Tubes. Items that can be packed in Plastic Laminated Tubes are:
Ointments, Balms, Heena Paste, Face Creams, Foot Creams, Facial Creams, Diaper Rash
Creams, Toothpaste, Ketchups, Chilly Sauces etc.
JOB RESPONSIBILITIES
S.S.C
Institute : Govt Inter College Saharanpur
Board / University : UP board
Year of Passing : 2004
FIELD OF INTEREST
➢ Entrepreneur
➢ Research and development
➢ Product design and development
➢ Polymer Composites
ACHEIVEMENTS AND EXTRA CURRICULAR ACTIVITIES
PERSONAL INFORMATION
DECLARATION
I hereby declare that the above-mentioned information is correct and true to the best of my
knowledge.
Date: 10/04/2023
Place: AL Khobar, KSA
FARHAT NAZ
PERSONAL INFORMATION .
Registered Professional Engineer: PE.Tech/Civil/www.ntc.org.pk
Contact no: 055 304 5236
Email: farhatriaz4@gmail.com
Temporary Address: Al BadiaH Riyadh, KSA
Iqama Status: Valid Transferable
Practical work Experience: 11+ years
CAREER OBJECTIVE .
To achieve excellence in civil engineering being part of a dynamic and well-equipped Organization,
to seek a challenging position, utilize my knowledge, skills and expertise to contribute towards
Development of Organization and developing a long- term relationship organization.
EDUCATION HISTORY .
COURSE YEAR INSTITUTE
BACHELORS OF CIVIL TECHNOLOGY 2014 – 2018 INDUS UNIVERSITY
DAE CIVIL TECHNOLOGY 2008 - 2011 BTE PESHAWER
MATRICULATION 2008 BISE MALAKAND
EXPERIENCE 01 .
ORGANIZATION: AL HOTY STANGER LTD. CO
JOB TITLE: CIVIL ENGINEER
Material testing
Conduct comprehensive tests on construction materials, ensuring, and adherence to specified
standard and project requirements.
Quality Assurance
Oversee construction activities to ensure alignment with project specifications and quality
standards.
Quality Control
Implement rigorous quality control procedures for construction materials, guaranteeing
compliance with industry standards.
Lab Management
Efficiently manage and maintain testing laboratories, ensuring equipment calibration and
accurate documentation.
Research and development
Stay abreast of material advancements, incorporating innovative testing methodologies for
improved project outcomes.
Documentation
Record site observations, construction progress, and deviations, providing comprehensive
reports for project records.
Environmental Compliance.
EXPERIENCE 02 .
ORGANIZATION: PRINCIPAL CONSTRUCTORS PRIVATE LIMITED
JOB TITLE: CIVIL SITE ENGINEER
DURRATION: AUG -2021 TO SEP-2023
Duties/ Responsibilities:
Supervise and manage daily construction activities to ensure they align with project plans and
specifications.
Monitor progress and report on project status to higher management.
Ensure that construction work meets the required quality standards and adheres to relevant
regulations and codes.
Enforce and promote strict adherence to safety protocols and regulations to maintain a secure
working environment.
Supervise and coordinate the activities of the construction team, including subcontractors, to
ensure efficient collaboration.
Oversee the procurement, delivery, and usage of construction materials and equipment, ensuring
availability and compliance with specifications.
Address and resolve any issues or conflicts that may arise during the construction process,
ensuring minimal impact on project timelines.
Maintain accurate and up-to-date project documentation, including daily logs, progress reports,
and incident reports. Report to higher management as required.
Interface with clients, engineers, architects, and other stakeholders to provide project updates,
address concerns, and ensure alignment with project objectives.
EXPERIENCE 03 .
ORGANIZATION: AL-MASHRIK CONSTRUCTION INDUSTRY LEADER
JOB TITLE: CIVIL SITE ENGINEER
DURRATION: OCT -2019 TO APR-2021
Duties/ Responsibilities
Study of Construction drawings and specification.
Developed and contribute to the project plan, considering timelines, IFC Drawings, Milestone and
budget constraints.
Conduct regular site inspections to ensure work is progressing according to plan and specifications.
Implement and monitor quality control processes to ensure compliance with engineering standard
and project specifications.
Oversee the procurement and delivery of construction materials, ensuring they meet project
requirements.
Enforce and promote strict adherence to health and safety regulations on the construction site.
Maintain accurate and up to date project documentation, WIR, MIR, ITP, SOR NCRs including
drawings, reports, and correspondence.
EXPERIENCE 04 .
ORGANIZATION: ALODOOD CONTRACTING COMPANY
JOB TITLE: CIVIL SITE ENGINEER
DURRATION: JAN-2018 TO SEP -2019
Duties/ Responsibilities
Coordination, Meetings with consultant & Client for Construction Drawings, design parameter, and
Specification.
2
Conformed materials as per approved Material Approval Request (MAR) and achieved 0% NCR
rate of materials.
Monitored quality of work and safety at site in compliance with risk assessment
Developed planning of construction activities
Checking and Prepared material usage and raised material orders maintaining 0% shortage of
material at site.
Developed site planning schedules and manpower requirements.
Retaining Wall, Office Work, Inspection Check Request (ICR,WIR) Sub-Contractors Bills, Rate
Analysis, Sub- Contractor party arrangements,
Agreement’s, dealing with dealers, preparation of daily progress report and monthly (DPR & MPR)
Work Done Bills, (IPC) & Variation order (View).
EXPERIENCE 05 .
ORGANIZATION: HRL/ORCHID BUILDERS & DEVELOPERS
JOB TITLE: CIVIL INSPECTOR
DURRATION: AUG-2015 TO NOV -2017
Duties/ Responsibilities:
Inspection of shoring pile work, shoring pile anchoring Main piles, lean, water proofing, raft
foundation 2.4m & 5.6m Height) and all activities of civil construction works.
Providing accurate construction cost estimates.
Making revisions to project work plans.
Surveying properties and then writing a report to senior managers on their condition.
Conduct tests on construction materials, such as concrete and steel, to ensure they meet project
specifications.
Reading and understanding tower drawings, site status reports, site plans and execution process.
Carrying out periodic inspections of construction sites.
Manages contractors and monitoring the performance of their work.
Ensuring that the project complies with all contractual and regulatory requirements.
Prepared Bar-Bending Schedule/ Steel inspection works as per drawings.
Checking lay out of columns, shear walls and carves walls.
Ensure accurate and timely reporting of activities and material used.
Coordination with field staff for IRs/MIR/NCR/DPR, weekly & monthly working reports.
EXPERIENCE 06 .
ORGANIZATION: PARAGON CONSTRUCTORS PRIVATE LIMITED
JOB TITLE: CIVIL ENGINEER
DURRATION: MAY-2012 TO JULY -2015
Duties/ Responsibilities:
Works as per design and Specification while ensuring required quality.
Prepared Bar-Bending Schedule/ Steel inspection works as per drawing.
Checking lay out of columns, shear walls and carves walls.
Find out the quantity of concrete for pouring.
Ensure accurate and timely reporting of activities and material used.
3
Conformed materials as per approved Material Approval Request (MAR) and achieved 0% NCR
rate of materials
Monitored quality of work and safety at site in compliance with risk assessment
Supervised material estimation, and resource allocation with achievement of 0% material wastage.
Checking and Prepared material usage and raised material orders maintaining 0% shortage of
material at site.
Developed site planning schedules and manpower requirements.
LANGUAGES .
Language Speak
English Excellent
Urdu Excellent
Pashto Fluent
COMPUTER SKILLS .
MS office, word, excel
AutoCAD, 2D/ Architecture/Structural
PERSONAL SKILLS .
Ability to work as a team member and also a team leader
Demonstrated ability to work under tight schedules
In Depth technical Knowledge of construction processes and equipment.
Willing to undertake any training or development necessary.
Proven ability to build relationship with subcontractors, senior management and vendors
Strong negotiation skills
Excellent goodwill building capabilities
Sound decision making skills
Detail-oriented and able to manage multiple ongoing initiatives
Reference .
You’re demand
4
Curriculum Vitae (CV) of (Hosam M. Rasmy)
Work Experience
ALHOTY STANGER COMPANY, RIYADH, S AUDI ARABIA JUN 2019 – PRESENT
TECHNICAL M ANAGER .
Assisting in the management of the laboratory;
• Maintaining resources and productively and technical coordination with client.
• Scheduling and supervision of work order,
• Monitoring performance and safety of Technicians; resources; test material preservation & disposal and
verification of test results.
• involved in building assessment, structural analysis,
• Preparation of concrete design, and all testing reports inside our laboratory.
• Follow-up to the calibration of equipment.
• Monitoring and managing projects and communicating with clients
• Working as ITL in PNU project at batch plant(premco)
• Working as QC in KFU project for (civil work, arch. Work) and follow up snag list.
• Working as ITL in mile tower project at batch plant for mix design at unipiton and for general qc for all testing,
especially for pills and foundations
• Working as ITL in Raaeda project with MAPA main contractor
• Led engineer in KAAR project Monitoring all testing works in the project, ensuring their validity and approval,
and issuing reports on that
• Working as ITL in Gable Omar project with NISMA & BAYTUR & RCC
• Working as ITL in GABLE AL KAABA project with ABDULLATIF JAMIL
• Working as ITL in Harm Mace project with ben Laden
• Working as ITL in Harm Madneea project with ben Laden
• Working as ITL in Tayba undercity project with IKK
• Working as ITL in Jeddah airport project with ben Laden & IKK & Almabani .....
• Working in many tower in jeddah like (sail tower, Jawhra Tower, Alkayat,......)
• Working as ITL at Aramco projects at Jeddah, Yanbu, Dammam, Rabigh, .....)
• Working as ITL in many UNIVERSITIES projects with BenLaden , saudi oger , CCC, ALSIF, .....
• Working as ITL in substations projects with DELTA @ ALITH & ADAM, ......ect.
• Investigation of asphalt (KAA Air Base at Taif With BEA system)
• Monitoring the asphalt Quality( KFU at Riyadh , Municipality of Jeddah with Jack & Dramco, Aramco) check the
reports at appendix (A)
ATCO, D AMMAM , KINGDOM OF S AUDI ARABIA JUNE 2008 – J UNE 2009
STRUCTURE ENGINEER , SITE ENGINEER , QC
• Aramco( Rastanoura ) Site Manager
• Technical support for ((Alzamil tower (shop drawing , calculation note), P.M.U(snag list , reviewer))
AMEC, D AMMAM , KINGDOM OF S AUDI ARABIA SEP. 2005 – JUNE 2008
STRUCTURE E NGINEER, R.E.
• Design and supervision of residential villas
• Design and supervision of the housing complexes
• Design and supervision of mosques
• Design and supervise the project and exhibition and maintenance of the company Budget
• Residential Engineer of ÉTOILE Tower in Al Khobar site
• Implementation and supervise the project engineers in the district Raka
ARAB CONSULTANT , C AIRO , EGYPT SEP. 2004- SEP 2005
STRUCTURE E NGINEER
• Design a schools
• Design a residential complex
• Design for Water Treatment Plant
• Design Water Station
Page 1 of 16
Education, Certification and Seminars
ISO 17025 2022
• ON LINE
Water GEMS CE 2021
• ON LINE
MINI MPA 2017
• ON LINE
SAFETY COURSE 2017
• SAUDI ARABIA
RSO. 2011
• SAUDI ARABIA
PMP. 2010
• SAUDI ARABIA
ACI, 2009
• Masters of Business Administration
Saudi Counsel of Engineers 2006
• Institute of consulting research TQM
El Pla 2004
• Dr. Mohammed Algendy
Robot Millennium 2004
• Cambridge University Business Diploma
AutoCAD, 2003
• Cairo university
Sap 2002
• ASCB Certified Lean Six Sigma Green Belt
Robot Millennium 2004
• Cambridge University Business Diploma
Faculty of Engineering- Suez Canal University, Port Said, Egypt 2004
• Bachelor of Science in Civil Engineering, Major in thermal power
Personal Data
Data of birth : 17.11.1980
Place of birth : Dammam, Kingdom of Saudi Arabia
Nationality : Egyptian
Number of children: 3
Affiliations:
• Saudi Arabian Engineers’ council
• Egypt Engineers’ council
• PMI, member
• Alzouhor Club
• Egyptian and International Judo Federation
Page 2 of 16
Page 3 of 16
Page 4 of 16
Page 5 of 16
Page 6 of 16
Page 7 of 16
Page 8 of 16
Page 9 of 16
Page 10 of 16
Page 11 of 16
Page 12 of 16
Page 13 of 16
Page 14 of 16
Page 15 of 16
Page 16 of 16
‐OBJECTIVE
To be an astute learner and the best performer in your organization. So that I can
build an innovative career in your esteemed organization by using my skills and
other significant .To contribute my skills and experience to an organization that
provides a challenging and aggressive team oriented work environment and allows
me to grow both professionally and as an individual.
EXPERIENCE
> QC Technician February 2022 – Still Continue
ETE Ready‐mix Company, KSA
QC Technician
Duties
HSC
March 2018
NAROTTAMPUR UNION HIGH SCHOOL
SSC
PERSONAL INFORMATION
Date of Birth : 05.MAY.2000
Father’s Name : Abdul Mannan
Place of Birth : Noakhali
Nationality : Bangladesh
Religion : Islam
Marital Status : Unmarried
Passport No : AO1951243
Language : Bengali, Hindi
Arabic, English
DECLARATION
I hereby declare that the above given information is true, Correct and complete to
the best of my knowledge and belief.
Page 2
Page 3
Abdullatif Mohammed H. Al Najim Dammam Food Control lab Quality Manager
(Address) SFDA – Dammam Food Control lab - Dammam, King Abdul Aziz Seaport, Street,
ACADEMIC ACHIEVEMENTS
TRAINING
Details of course
Training course in Packing engineering Jica Tokyo -Japan Sep 1 – 17th Oct 1997
Applied handling and start Quality program ISO SFDA / GIZ 21 – 23 .3.2010
17025 /iso 17020 Course Riyadh
Antibiotic Analysis {LCMSMS ) In Meat and food , RIKILT institute July - 2011
Training course ISO/IEC 17025 Management Part DGQ / GIZ June 08 – 12/2013
1
Training course ISO/IEC 17025 Technical Part DGQ / GIZ April 13 – 17 2013
Lead assessor in sampling and calibrating labs GCC standardizations Organization Doha ,Qatar April 21-
25 2013
Laboratory Quality Manager and laboratory assessor Quality Austria Nov 18-29 2013
training
Lab quality Management System & Internal auditor BQC - Athens GREECE Jan 2015
As Per ISO/IEC 17025 :2005
KEY COMPETENCIES
CAREER HISTORY
2
RESUME
EDUCATION
WORK EXPERIENCE
Oversee the overall activities of the department, including review of testing reports,
personnel supervision, project management, acquisition, maintaining clients and
technical support.
Job Responsibilities
The quality control, monitoring, inspections, and test for all types of deep foundation &
concrete shaft, using PDA software, like (High strain dynamic test, Bidirectional static
load test (BDSLT), Cross hole sonic logging test, Low strain integrity of pile test,
Instrumentation of pile, Caliper logging test, Thermal Integrity Profiling (TIP),
continuity of deep foundation pile, load bearing capacity of pile, measuring settlement
by using data logger or simply dial gauges, measuring concrete
Job Responsibilities
JUNE 2015 –DEC 2019: SENIOR PILE TESTING AND INSTRUMENTATION
TECHNICAIN.
ARAB CENTER FOR ENGINEERING STUDIES-
. DUBAI-U.A.E.
The quality control, monitoring, inspections, and test for all types of deep foundation &
concrete shaft, using PDA software, like (High strain dynamic test, Bidirectional static
load test (BDSLT), Cross hole sonic logging test, Low strain integrity of pile test,
Instrumentation of pile, Caliper logging test, Tharmal Integrity Profiling (TIP), continuity
of deep foundation pile, load bearing capacity of pile, measuring settlement by using
data logger or simply dial gauges, measuring concrete.
Job Responsibilities
MAJORE PROJECTS:
Projects in Saudi Arabia: NEOM The line, REDSEA (subarea island, Hurairah Island,
Umhad Island. Amala Triple Bay
KEY STRENGTHS
PASSPORT DETAILS
PERSONAL
Contact EDUCATION
Address: International Technical Female College, Al Qatif
Saudi Arabia, Eastern Province Diploma in Occupational and safety ''2016-2019''
Phone:
+9665-5469-3811 TRINING EXPERIENCE
Email:
Marwaalmatter334@gmail.com -Volunteer - Sep 2019 - Jan 2020
Maternity and children hospital (MCH) -Dammam
Career Objective:-
Strength:
Able to use own initiative and work as part of a team.
Ability to learn quickly.
An effective communicator at all levels.
Good Communication skills.
Educational Qualification:
M.Sc,. Master of Science in Industrial Chemistry) with First grade from
Kuvempu University, Shankaraghatta, Shimoga ( 2004 July ). Karnataka
India.
BSc., in Chemistry, physics & Mathematics.
Personal Profile:
Instruments Handled:
UV: SHIMADZU 1601 / Perkin-Elmer Lambda 12
IR – SPECTRO PHOTOMETER – Perkin Elmer (FTIR)
&SHIMADZU (FTIR)
HPLC – (WATERS) Reverse Phase Dual Lambda with UV Detector.
Waters- Alliance
DISSOLUTION APPARATUS: ELECTROLAB TDT – 06P.
KF TITRATOR: LASCO
POLARIMETER: No. 23023.
Flame Photometer SYSTRONICS
ICP-OES 720/725 Varian and Atomic Absorption Spectroscopy, Varian.
Atomic Absorption Spectroscopy.
GC-MS Gas chromatography equipped with Mass Spectra detectors
Total Work Experience: 16 Years
Pharmaceutical Industries,
Worked as a QC Chemist at MEDOPHARM, Malur, Bangalore, from
January, 2004 to August 2006 .
Worked as a junior officer quality control at Microlabs ltd, Bangalore India
from August 2006 to july 2007.
Chemistry wet lab experience: At AL HOTY STANGER, Applied chemistry &
Environmental and petroleum Laboratories,
Worked as a chemist at Al-Hoty stanger laboratories. Saudi Arabia. Have
got sound knowledge in wet analysis of water and wastewater, food
products analysis construction material analysis and environmental air
quality monitoring. Oils lubricants, transmission oil, thermal insulating oil,
crude oil, heavy fuel oil,
At present working as laboratory section head for Material Analysis Dept.
at Al-Hoty Stanger ltd. Independent laboratories Alkhobar & Jeddah KSA.
Since August 2007 to till date.
WET LAB EXPERIENCE (At pharmaceutical laboratories) :
Finished Product Analysis & Intermediates Analysis eg., tablets capsules
and granules, and injections and syrup.(pharmaceutical laboratories)
Stability Samples, Validation & Control Samples Analysis eg., tablets
capsules and syrups (pharmaceutical laboratories)
Raw material Analysis (Actives drugs & Inactives)
ADDITIONAL RESPONSIBILITES:
Have got ISO 17025 internal auditor training & certification and
applying the knowledge acquired through the course
Calibration of KF – Titrator, pH meter and Conductometer.
UV Spectro photometer, Calibration.
Preparation and standardization of volumetric solutions.
Preparation of reagent solution and Indicators.
Maintainance of Working Standards.
Preparation and standardization of SOP’s
Dealing with clients to give to them better possible analytical services.
The above furnished details are true and correct to the best of my knowledge &
belief.
Thanking you,
Yours faithfully,
Place:
Date: MAZHAR ALI KHAN AFRIDI
rashidmj02@gmail.com 0540649930 Saudi 16/9/1998 https://www.linkedin.com/in/eng-rashid-aljaser-014696185
Harnessing my capabilities and quali cations and always striving to prove my competence in my duties and responsibilities, working to achieve excellence
at the individual and collective levels, gaining experience with continuous work, and developing my skills in the engineering and administrative aspect of
project management
Microsoft Of ce During this period, I trained in several executive projects, during which I got acquainted with the
most important tasks of the project manager, site engineer, materials engineer, and security and
AutoCAD safety engineer
Salesman
Jarir Company, Riyadh, Saudi Arabia
LANGUAGES Jul 2021 - Sep 2022
Arabic
COURSES
English
Team Work Calculation Of Construction And Architectural Quantities For a Complete Project
Collaboration, Delegation, Goal 20 Hours
Setting, Group Leadership
Civil Engineer Building Institute
AutoCAD course
Sep 2022
Design Zone
Intensive English
5to8 2019
Kaplan International Oxford, Oxford, UK
Higher intermediate level
Mohammed Objectives
Address:
Education
Saudi Arabia-Riyadh
Phone:
+966532583381 Bachelor: Civil Engineering
Languages
Arabic – (Native)
Experience
English – (intermediate)
Internship at Shibh Al Jazira (SAJCO): from Jun 2022 – Aug 2022
• Visiting locations belonging to the company, such as the
Skill Highlights equipment department.
• Taking lectures about the activities of the Company by the
• Intelligence Deputy Chairman of the Board.
in research • Supervising the company's sites with the responsible
supervisor (flood drainage, Traffic congestion)
• High sense of
responsibility Civil Engineer at Al Hoty Stanger: from Nov 2022 – Current Job
• Problem • Supervising on the sites, and labs to make sure all the tests
solver are matching the standers (STM, BS, SASO).
• Working as Quality Control/ Assurance and make sure all
• Make the equipment’s are all calibrated.
presentation • Visiting sites and do the test based on the client’s request
and make sure all the procedure are being done prefect.
• High
observation
• Get task
Certifications
done Quickly
10
AL HOTY-STANGER LTD. CO شركة الحوطي ستانجر المحدودة
11
AL HOTY-STANGER LTD. CO شركة الحوطي ستانجر المحدودة
12
AL HOTY-STANGER LTD. CO شركة الحوطي ستانجر المحدودة
13
AL HOTY-STANGER LTD. CO شركة الحوطي ستانجر المحدودة
14
AL HOTY-STANGER LTD. CO شركة الحوطي ستانجر المحدودة
15
ILMI SCIENCE DISCOVERY & INNOVATION CENTRE
ﺷﻬﺎﺩﺓ
ﺷﺮﻛﺔ ﺍﻟﺤﻮﻃﻲ ﺳﺘﺎﻧﺠﺮ ﺍﻟﻤﺤﺪﻭﺩﻩ ﻣﺨﺘﺒﺮﺍﺕ ﻭﻓﺤﺺ ﺍﻟﻤﻮﺍﺩ ﺍﻟﻤﺴﺘﻘﻠﻪ ﺇﺳﻢ ﺍﻟﻤﻨﺸﺄﺓ :
ﺹ.ﺏ ١١٢٢ :ﺍﻟﺨﺒﺮ ٣١٩٥٢
ﺍﻟﺴﻌﻮﺩﻳﺔ
٢١٠٠٣١٤٠٥ ﺭﻗﻢ ﺍﻹﺷﺘﺮﺍﻙ :
ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ٢٠٥١٠٠٢٩٩٩ :
ﻛﺘﺎﺑﺔ ﺭﻗﻤﺎ
ﺍﺛﻨﺎﻥ ﻭ ﺗﺴﻌﻮﻥ ﻣﺸﺘﺮﻛﺎ ٩٢ ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ
ﻣـﺎﺋﺔ ﻭ ﻭﺍﺣﺪ ﻭ ﺛﻤﺎﻧﻮﻥ ﻣﺸﺘﺮﻛﺎ ١٨١ ﻋﺪﺩ ﺍﻟﻤﺸﺘﺮﻛﻴﻦ ﻏﻴﺮ ﺍﻟﺴﻌﻮﺩﻳﻴﻦ
ﻣﺎﺋﺘﻴﻦ ﻭ ﺛﻼﺛﺔ ﻭ ﺳﺒﻌﻮﻥ ﻣﺸﺘﺮﻛﺎ ٢٧٣ ﺍﻟﻤﺠﻤﻮﻉ
ﺗﺸﻬﺪ ﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﺑﺄﻥ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﻗﺪ ﺃﻭﻓﺖ ﺑﺈﻟﺘﺰﺍﻣﺎﺗﻬﺎ ﺗﺠﺎﻩ ﺍﻟﻤﺆﺳﺴﺔ
ﻭﻓﻖ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻤﻘﺪﻣﺔ ﻣﻨﻬﺎ ﺣﺘﻰ ﺗﺎﺭﻳﺦ ﺇﺻﺪﺍﺭ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ،ﻭﺍﻟﺘﻲ ﺗﻢ ﻣﻨﺤﻬﺎ ﻟﺘﻘﺪﻳﻤﻬﺎ ﻷﻳﺔ ﺟﻬﺔ ﺗﻄﻠﺒﻬﺎ ،ﻭﻫﻲ
ﺻﺎﻟﺤﺔ ﻟﺠﻤﻴﻊ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ ﻧﺺ ﻋﻠﻴﻬﺎ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ ﻓﻲ ﺍﻟﻤﺎﺩﺓ ) (١٩/٦ﻣﻨﻪ.
ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﺳﺎﺭﻳﺔ ﺍﻟﻤﻔﻌﻮﻝ ﺣﺘﻰ ١٤٤٥/٠٩/٢٣ﻫـ.
ﻋﻦ ﻃﺮﻳﻖ ﺍﺳﺘﺨﺪﺍﻡ ﺃﻭ ﻳﻠﺰﻡ ﺍﻟﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﻭﺻﻼﺣﻴﺔ ﺍﻟﺸﻬﺎﺩﺓ ﻋﺒﺮ ﺯﻳﺎﺭﺓ ﺍﻟﺮﺍﺑﻂ
ﺍﻟﺮﻣﺰ ﺍﻟﻤﻌﺮﻑ ﺍﻟﺘﺎﻟﻲ : ﺃﺩﻧﺎﻩ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﻟﻠﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻹﺟﺘﻤﺎﻋﻴﺔ
www.gosi.gov.sa/vc
ﺗﻌﺪ ﻫﺬﻩ ﺍﻟﺸﻬﺎﺩﺓ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﺤﻜﻮﻣﻴﺔ ﺍﻟﺮﺳﻤﻴﺔ ،ﻭﻳﺤﻈﺮ ﻗﻄﻌﻴﺎ ﺗﻘﻠﻴﺪﻫﺎ ﺃﻭ ﺇﺩﺧﺎﻝ ﺃﻱ ﺗﻌﺪﻳﻼﺕ ﻋﻠﻴﻬﺎ ﺳﻮﺍﺀ ﺑﺎﻹﺿﺎﻓﺔ ﺃﻭ ﺍﻟﺤﺬﻑ
ﺃﻭ ﺍﻟﺘﻐﻴﻴﺮ ﻓﻲ ﺑﻴﺎﻧﺎﺗﻬﺎ ﺃﻭ ﻏﻴﺮ ﺫﻟﻚ ﻣﻦ ﺍﻧﻮﺍﻉ ﺍﻟﺘﻌﺪﻳﻞ ،ﻭﺗﻌﺪ ﺍﻟﺸﻬﺎﺩﺓ ﻻﻏﻴﺔ ﺇﺫﺍ ﺷﺎﺑﻬﺎ ﺷﻲﺀ ﻣﻦ ﺫﻟﻚ ،ﻛﻤﺎ ﺗﻌﺮﺽ ﺻﺎﺣﺒﻬﺎ ﻟﻠﻤﻼﺣﻘﺔ ﺍﻟﻨﻈﺎﻣﻴﺔ
ﺃﻣﺎﻡ ﺍﻟﺠﻬﺎﺕ ﺍﻟﻤﺨﺘﺼﺔ ﺑﺎﻹﺿﺎﻓﺔ ﺇﻟﻰ ﻣﺎﻳﻔﺮﺿﻪ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻣﻦ ﻋﻘﻮﺑﺎﺕ ،ﻭﻻﻳﺠﻮﺯ ﺗﺪﺍﻭﻝ ﺍﻟﺸﻬﺎﺩﺓ ﺇﻻ ﻓﻲ ﺍﻷﻏﺮﺍﺽ ﺍﻟﺘﻲ
ﺃﺻﺪﺭﺕ ﻷﺟﻠﻬﺎ ﻭﻓﻘﺎ ﻷﺣﻜﺎﻡ ﻧﻈﺎﻡ ﺍﻟﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ،ﻭﺍﻟﻤﺆﺳﺴﺔ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺘﺄﻣﻴﻨﺎﺕ ﺍﻻﺟﺘﻤﺎﻋﻴﺔ ﻏﻴﺮ ﻣﺴﺆﻭﻟﻪ ﻋﻦ ﺃﻱ ﺁﺛﺎﺭ ﺃﺧﺮﻯ ﻣﺘﺮﺗﺒﺔ
ﻗﺒﻞ ﺍﻟﻐﻴﺮ ﻋﻦ ﺍﻟﺸﻬﺎﺩﺓ ﻭﻏﻴﺮ ﻣﺴﺆﻭﻟﺔ ﻋﻦ ﺃﻱ ﻋﻤﻠﻴﺔ ﺗﺰﻭﻳﺮ ﺃﻭ ﺗﻌﺪﻳﻞ ﺗﺘﻢ ﻋﻠﻰ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻴﻬﺎ .
Publicﻋﺎﻡ
ILMI SCIENCE DISCOVERY & INNOVATION CENTRE
ﺷﻬﺎدة
Certificate
The Zakat,Tax and Customs ﺗﺸﻬﺪ ﻫﻴﺌﺔ اﻟﺰﻛﺎة واﻟﻀﺮﻳﺒﺔ
Entity Unified No./ID No. ٧٠٠٠١٥٨١٣٤ رﻗﻢ ﻫﻮﻳﺔ/ اﻟﺮﻗﻢ اﻟﻤﻮﺣﺪ ﻟﻠﻤﻨﺸﺄة
Commercial Registration/License/
٢٠٥١٠٠٢٩٩٩ ﻋﻘﺪ رﻗﻢ/ رﺧﺼﺔ/ ﺳﺠﻞ ﺗﺠﺎري
Contract No
Has submitted his tax return for the period ending on 31/10/2023 AD, and he ، ﻫـ١٤٤٥/٠٤/١٦ ﻗﺪم إﻗﺮاره ﻋﻦ اﻟﻔﺘﺮة اﻟﻤﻨﺘﻬﻴﺔ ﻓﻲ
was granted the certificate to complete all his transactions including the وﻗﺪ ﻣﻨﺢ ﻫﺬه اﻟﺸﻬﺎدة ﻹﻧﻬﺎء ﺟﻤﻴﻊ ﻣﻌﺎﻣﻼﺗﻪ ﺑﻤﺎ ﻓﻲ ذﻟﻚ ﺻﺮف
payment of the final amount due on the contract. .ﻣﺴﺘﺤﻘﺎﺗﻪ اﻟﻨﻬﺎﺋﻴﺔ ﻋﻦ اﻟﻌﻘﻮد
The Certificate is valid until 29/08/1446 AH corresponding to 28/02/2025 ﻫـ اﻟﻤﻮاﻓﻖ١٤٤٦/٠٨/٢٩ ﻳﺴﺮي ﻣﻔﻌﻮل ﻫﺬه اﻟﺸﻬﺎدة ﺣﺘﻰ ﺗﺎرﻳﺦ
AD م٢٠٢٥/٠٢/٢٨
This certificate is not valid until verified by the Authority's Website: www.zatca.gov.sa
1112114206
٣٠٠٤٥٧٦٦٢٧
١١١٢١١٤٢٠٦
١٤٤٥/٠٨/١٨ﻫـ
17
AL HOTY-STANGER LTD. CO شركة الحوطي ستانجر المحدودة
18
AL HOTY-STANGER LTD. CO شركة الحوطي ستانجر المحدودة
19
ILMI SCIENCE DISCOVERY & INNOVATION CENTRE
Table of Contents
Management has integrated Health, Safety and Environment (HSE) responsibilities to manage
environment and health & safety management systems. Managing personnel by providing risk free
safe working environment is our business strategy. By adhering to HSE Policy, Management assists
in protecting the environment and overall wellbeing of our employees, our stakeholders, our
customers, our contractor , our Sub contractors, and neighbors.
Management continues to take a proactive approach towards creating risk free safe working
environment for all employees and is accountable for promoting continued safety and environment
awareness, assigning responsibility for all aspects of the HSE policy, continuously reviewing to
identify the areas for improvement and ensuring the performance of safety management system
through evaluation of near misses and incidents.
Management is committed to address the environmental and health impact of AL HOTY products
and operations by reducing waste and discharges and by using energy efficiently. HSE Management
System aims for continual improvement of HSE performance through definition of roles and
responsibilities at all levels in the organization and by establishing effective communication system.
Through HSE Management System, AL HOTY STANGER LTD. CO. Management earn the confidence
of employees, customers, shareholders and regulatory authorities to enable sustained growth and
development of AHSL.
Physical, Mechanical and Chemical Testing of Construction Materials. Chemical Analysis of Metals,
Non-Metals, Water and Foodstuffs Microbiological Testing of Water, Foodstuffs and Beverages.
Horticultural Analysis of Soils, Water and Fertilizers. Physical, Chemical and Microbiological Testing
of Wastewaters, Environmental Testing and Monitoring.
This HSE meets the requirements of the International Standards ISO 14001:2015 and ISO
45001:2018 Standards. HSE manual is used internally to guide through the various requirements of
ISO 14001:2015 and ISO 45001:2018 Standards that must be met and maintained in order to
prevent the pollution to the environment and provide risk free environment to the employees to
perform their assigned tasks.
• Ensure that all personnel are committed to safety and perform their duties in
accordance with:
Prevention to any kind of pollution to the environment due to the aspects that
are generated due to meeting customer, legal and other requirements.
Commitment to a risk free environment by determining the hazardous activities
and evaluating the level of HSE risk by taking appropriate action to minimise
potential risks.
Following HSE management principles as defined by the organization.
Commitment to consultation and participation of workers, where they exist and
worker’s representatives.
• Consistently comply with ISO 45001:2018 & ISO 14001:2015 Occupational Health &
Safety & Environmental Management Systems to ensure HSE safety in our services and
to continually improve the effectiveness of the Occupational Health & Safety &
Environmental Management System.
• Annually reviewed for the continual improvement of the HSE Management System.
Overall, it is the goal of AL HOTY STANGER LTD. CO. to encourage all the employees for their
commitment towards Total Safety! HSE is Everyone’s Responsibility!
4.1 Responsibilities
Project Manager
The Project Manager's duties shall include:
To ensure or allocate sufficient resources for the management of the HSE plan.
To contribute as necessary to the plan.
To agree and approve the HSE plan.
The development of this plan and associated documentation ensuring that these are
updated or modified to suit changes in conditions.
Ensure that effective communications are in place that advises all parties of risks,
concerns, activities etc. as they are identified.
HSE Manager (Based in H.O, Al Khobar)
To be familiar with all local, national, and international laws that is applicable to
operations.
To prioritize and produce a strategy for implementing the various elements of the plan
and to ensure that it is being communicated effectively throughout the Project
Organization and Subcontracting Companies, updating it as required.
To report to the AL-HOTY STANGR TOP Management on implementation progress, points
of concern and any topical points of issue, on a regular basis.
To provide direction as necessary to attain HSE management standards and goals required
by the project HSE plan.
To establish a system of audits that measures the effectiveness of the HSE plan and
ensures that the requirements are being effectively communicated throughout the
workforce.
To ensure that sufficient training and induction of all personnel is being provided and
maintained.
To support the Project Manager in the practical implementation of the HSE Safety Plan
and supporting documents in the supervision of HSE Manager
Provide support to field supervision, provide technical guidance ensuring industry best
practices are adhered to on site as a minimum requirement
Perform periodic inspections, audits in accordance to the project HSE schedule
Attend HSE meetings, with client, supervisors and workers as necessary
Deliver Tool Box Talks to workforce- before beginning of any kind of work
Conduct ongoing HSE assessments of work areas and take corrective actions to eliminate
sub-standard practices, conditions or behaviours
Employee / All Personnel
The product of the persons works and that of any persons under his supervision shall itself
be acceptably safe
Anyone who becomes aware of an unsafe situation or action – even if they are not directly
involved – shall notify their line manager or the Site Supervisor at the earliest opportunity
and STOP THE JOB.
5.0 Commitments and Motivation
Al Hoty- Stanger Ltd.Co committed to this Health, Safety and Environment policy and Standard &
will provide motivation through:
Planning all work in safe manner prior to executing the tasks and conducting risk
assessments for non-routine and hazardous activities.
Providing a safe facility, equipment, personal protective equipment and safe working
procedures.
Providing suitable training, supervision, information and instruction to all personnel
engaged in specific testing activities.
Introducing systems to encourage active involvement of the management work force and
the local community in providing suggestions and proposals for improvements in HSE
performances.
Providing active support to the work force by way of specialist advice in safety and quality
areas.
6.0 Environmental Aspect & Impact Evaluation
• Project management has established procedure to determine the environmental aspects that
have impacts on the environment (Air, land, water, human being)
• Project HSE Manager in coordination with Project Site Safety Officer and Project Department
Heads determine the aspects that are generated due to followings but not limited to:
AL HOTY STANGER LABORATORIES Activities:
Surveying the market to identify the customer that involves travelling.
Chemical analysis:
Analysis of water
Analysis of waste water
Analysis of construction material
Analysis of Water treatment chemicals
Analysis of cosmetic products
Microbiology activities:
Collecting the samples
Analysis of food
Analysis of water
Analysis of waste water
Analysis of total coliforms
Analysis of E.Coli
Analysis of TBC
Analysis of cosmetic products
Physical and mechanical activities:
AHSL-HSEP-20 Issue.01 Rev. 00 Issue Date: 23 MAY 2022 Page 7 of 15
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ اﻟﺣوطﻲ ﺳﺗﺎﻧﺟر اﻟﻣﺣدودة
• General awareness – this training applies to all employees and covers EMS structure
and responsibility, the environmental policy, and general EMS procedures related to
communications and emergency response.
• Management level – this training is provided to personnel who have designated
responsibilities addressed in HSE management level procedures (i.e., planning,
training needs identification, contractor management, communications, corrective
actions, auditing and management review).
• Operational level – this training applies to employees performing work for which
specific environmental work instructions have been prepared.
• Regulatory based – this training applies to employees who have responsibilities
related to specific regulatory or permit requirements.
• Project HSE Department ensures induction training of all new employees. The
induction training record is sent to the respective Project Heads of the departments to
be kept in the employee’s personal file. Project HSE Manager ensures that induction
training is carried out within 30 days of employment; meanwhile the concerned
Project specialist or Project senior specialist closely supervises trainee’s activities.
• The effectiveness of the training and competencies are verified through the following:
Internal EMS audits
Third Party EMS audits
Corrective actions issued in the work area
Observations of work performance
• The job descriptions of the key technical and managerial personnel have been
described in the personal file of the employees along with other training and
qualification records.
• Project HSE Manager in Al Hoty Stanger Ltd. Co. Neom issues an Authorization matrix
all personnel who are directly involved in HSE activities. A copy of which is kept with
Project Heads of the Departments and the original is retained with the Project HSE
Manager.
8.0 Control of Record
Records are securely stored and held in confidence for a minimum period of 5 years. The
records may be archived for longer duration in case of legal regulatory or procedural
requirement.
9.0 Operational Control
Operational planning and control of the processes are established and implemented to enhance
occupational health and safety, by eliminating hazards or, if not practicable, by reducing the
OH&S risks to levels as low as reasonably practicable for all relevant operational areas and
activities. The organization plans, implements and controls its operational processes by
establishing operating criteria and control the processes in accordance with these operating
criteria. The operational controls selected should be maintained and evaluated periodically for
their continuing effectiveness.
• operational control of processes includes:
Use of procedures, work instructions, process maps and systems of work;
Monitoring key characteristics and stipulated operating criteria;
Ensuring the competence of workers;
Establishing preventive or predictive maintenance and inspection programs;
Developing specifications for the procurement of goods and services;
Applying controls related to contractors and other visitors to the workplace;
Ensuring compliance with legal and other requirements or manufacturers’ instructions
for equipment;
Applying engineering and administrative controls;
Adapting work to workers by defining or re-defining how the work is organized,
processes and working environments or by adopting an ergonomic approach when
designing new, or modifying workplaces, equipment, etc.
When planning and developing operational controls, priority is given to controls with higher
reliability in preventing work-related injury and ill health.
9.1 Emergency preparedness and response
• Project HSE Manager in coordination with Safety Officer has identified the potential emergency
situations and maintain as "List of Potential Emergency Situations:
Fire
Medical
•Project HSE Manager in coordination with Safety Officer have developed the "Emergency
Response Plans" to respond to the actual emergency situations so that adverse impact on the
environment and personnel is minimized.
• Project HSE Manager considers the needs of surrounding companies while developing
"Emergency Response Plans"
• Mock up drills are conducted by HSE team.
9.2 Internal Audit
Management has established a Procedure “Internal Audit Procedure” to confirm that HSE is
implemented across the AL HOTY and confirm to ISO 14001:2015and OHSAS 45001:2018
Standards.
• Project HSE Manager considers the criticality and importance of processes / area while
planning the internal audits and conducting audits with the aim to improve the
performance of key areas by ensuring that other areas / processes are not neglected.
• HSE Manager plans and prepare the Twelve Month Internal Audit Program. Internal
audits shall be carried out by in-house or external trained auditor (Training Source In-
House / External).
• Project HSE Manager defines the auditing frequency for each department:
• Project HSE Manager maintains the minutes of management review meeting and communicates
the actions agreed in the management review meeting to all concerned personnel.
• Management review meeting is conducted at least once in a year.
• Following personnel attend the meeting:
General Manager
HSE Management
Laboratory Manager
Section Heads as required
Project HSE Manager in coordination with Project site Safety Officer monitors the
implementation of actions agreed in the Management Review Meeting.
10 Improvement
Organization uses the HSE management system to improve its processes, products and services.
Such improvements aim to address the needs and expectations of customers as well as other
interested parties, to the extent possible. Improvement shall be driven by an analysis of data
related to.
covered by the procedures that are reviewed and updated on regular basis.
Training and competency programs are to be formalized and implemented to ensure that
personnel are prepared for the tasks required of them.
Emergency procedures covering communications and actions in case of medical accident
and environmental emergencies are to be maintained and tested.
All incidents and accidents, including near misses, are to be reported, analyzed and
remedial actions taken to avoid re-occurrence.
All operations and activities are to be assessed by inspection and audits.
Each area of operation will establish objectives and improvements plans based on incident
analysis, audit results and risk analysis in order to raise the level of HSE performance.
Ensure that all requirements and policies relating to the provision and use of P.P.E is
strictly adhered to and that they fully follow the basic Project PPE Assessment.
The following minimum requirements will be adhered to: -
Hard hats, Safety boots and coveralls
Safety harnesses and lifelines will be used for working at elevations in excess of
1.5 meters or where a fall of this distance is possible.
Personnel will be educated on the mandatory use and care of respiratory
protection for required activities.
Hearing protection will be worn when exposure to noise levels greater than 85
dB occurs.
Chemical suits, gloves, face protection, etc. shall be worn for any activity
requiring protection from corrosives, drilling fluids, and any other potentially
hazardous materials.
Eye protection shall be worn for any activity that presents risk from flying
particles, welding process, fumes etc.
Hazardous Materials
The Project Safety Office shall ensure that for all hazardous materials used by the AHSL,
Subcontractors, or others:
Prior approval for use is obtained from himself with regard to the application of
such material.
Information on the hazards of the materials is obtained from the manufacturer
or supplier and communicated to the users. Employees shall be trained in the
safe use of the materials, including personal protective equipment and
emergency procedures.
MSDS (Material Safety Data Sheet) of any material that can be hazardous to
human life will be used to train related workforce & all MSDSs will be recorded in
file as hardcopy.
Driving Safety
All categories of vehicle, including self-propelled mobile plants, must not be operated unless:
Vehicle is fit for purpose, inspected and confirmed to be in safe working order
Number of passengers does not exceed manufacturer’s design specification for the
vehicle
Loads are secure and do not exceed manufacturer’s design specifications or legal
limits for the vehicle
Seat belts are installed and worn by all passengers
Drivers must not be authorized to operate the vehicle unless:
They are trained, certified and medically fit to operate the vehicle.
They are not under the influence of alcohol or drugs, and are not suffering from
fatigue.
They do not use cell phones and radios while driving.
ÿ.FB7<:ÿ::FJ7<:4ÿG2H
GVÿ!$"(H
ÿ7<44P<
=0#>0?ÿ&M?ÿJ!"0#'
:ÿ""$(ÿ(0$5A@"!ÿMÿ$0AU"(ÿ"ÿY,#I5>$"0@ÿ0$5A@"!ÿ0>ÿÿJ0"'ÿ4"@K#ÿ9:-F.-ÿ>0#ÿF0@$#"%ÿ4"ÿ@(ÿ,ÿ:!"@K
G7LLHYÿ?0#>0?ÿ?"ÿ"ÿ>00?@Kÿ#!5"!ÿO
Z[\]ÿ_`ab]c\__adÿea]ÿaf_gca_\haddiÿjkbk`a_klm
Cc (2) NEOM Quality & Excellence Document Control - NEOM - Engineering & Technical Services Dept (+1
more...)
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
The attached documents have completed the "Prequalification Document of Alhoty-Independent Agency for Electrical Continuity Testing,
Cage Inspection and Reporting (M044)" workflow with the following results :
15-000000-4200000046-
The Line DCC N Document Control A - Work May Proceed
NSC-CIV-CRS-000164
15-000000-4200000046-
The Line DCC N Document Control A - Work May Proceed
NSC-CIV-PQD-000052
12/30/21, 10:47 AM Aconex
14 Outer Regions
Riyadh, KSA
Riyadh
Saudi Arabia
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
B-
14-621100- 1100001723/000 - CRS for Pre Qualification of Al-
Incorporate
1100001723-TPE- 01 22/12/2021 Hoty Stanger Ltd. Co. for Fuel Line Radiography
Comments -
MEC-CRS-000122 Works (Third Party)
Proceed
B-
14-621100- 1100001723/000 - Pre Qualification of Al-Hoty
Incorporate
1100001723-TPE- 01 22/12/2021 Stanger Ltd. Co. for Fuel Line Radiography Works
Comments -
MEC-PQD-000032 (Third Party)
Proceed
MESSAGE
The attached documents have completed the "14-1100001723/000-IN-Project Management - IFR-PQD_" workflow with the following results :
https://ksa1.aconex.com/Logon 1/2
8/16/23, 5:02 PM Aconex
Status N/A
(0 selected)
Revision
File Document No Revision Title Status
Date
MESSAGE
https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1363500981%26CORRESPONDENCE_… 1/2
8/16/23, 5:02 PM Aconex
https://ksa1.aconex.com/hub/index.html?mainTarget=%2FViewCorrespondence%3FCorrespondence_ID%3D1363500981%26CORRESPONDENCE_… 2/2
AL HOTY-STANGER LTD. CO ﺷرﻛﺔ الحوطي ستانجر المحدودة
42
AL HOTY‐STANGER LTD. CO ﺷﺮآﺔ اﻟﺤﻮﻃﻲ ﺳﺘﺎﻧﺠﺮ اﻟﻤﺤﺪودة
27
AL HOTY‐STANGER LTD. CO ﺷﺮآﺔ اﻟﺤﻮﻃﻲ ﺳﺘﺎﻧﺠﺮ اﻟﻤﺤﺪودة
28