Category

Sub
category

Item
Continuation Certificat
Piped Gas- proposed but status
Intomation of Dissent
Holds
Dry Wall
Master Plan
Finishes schedule
Marketing
External facilities
LEED
BIM
Waterproofing
MEP penetrations
Fire Ratings
Programme
Photographic
Sales office
Org Chart
Org charts
Design Schedules
Budget Schedules
Office services
Equipment register
Thermo couplers
Lifts
Floor plate
Acronyms
Faade
VRV
Canopy NIB detail
Port Cochere
Faade
Fire stairs
Fire stairs
Basement HVAC
Lead Design Manager
Lead Design Manager
Payments
Payments
Manning
Staff meeting
PM meeting
Drip groove

MEP Addenda
Diesel Generators
Budget Review
IPD schedule
VRV Service ledge
Aconex
Deliverables
Deliverables
Structural Adequacey completion cert
Basement waterproofing
Carpark
Carpark
IT

Allocation
Co.
HILL
CC
L&T, BR AM
BR
WT
IOD
BR
DB, GM
Any area specifically on Hold, reason, purpose and proposed solution AHC
WT, AK
Design performance details. Proposed solutions by supply. Proposed AHC, Arup WT
HI interaction. Status. Impact on ICC MP
AHC
GM
AHC to prepare comprehensive finishes schedule, wall, floor, ceiling, fiWT, AHC WT
Brochures, YouTube, FB
BR
WT
Pool and clubhouse are undecided. Impacting on N-T planning and coBR, AHC WT
Determination of rating, consultant, continuous certification, recommBR, AHC WT
Advantage of BIM. Inclusion in the trade specification. As part of th BR
WT
WMS and ITP to be improved
WMS, ITP
L&T
RM
Working drawings and detailing for all aspects of oenetrations, conduiAHC, MEPCWT, AN
Complete review of fire rating as a FR
AHC
WT
L&T propose a 8 day cycle for the flr-flr in the cycle. Require simple L&T
Afroz
Formal proposal for photographic record, LGA, legal, marketing impera
BR
GM
Extensive rework of sales display may be required to reflect the pro BR
NA
Hill redo its org chart
AM
BR and all consultants to resubmit their org charts with accompanyin ALL
GM, YW
Prepare a list of proposed schedules, i.e. door schedule, hardware (inte
AHC
WT
Prepare a list of all budget schedules, PS and PC items
G+T
DB
Continuity of power
L&T
AK
HILL office equipment and assets. General and individual plus sign off of regist KN
Recommended for approval. Discussed with L&T and agreed as a sche
L&T, AHC, Ak, DB
Recommended to defer tenders to accommodate the TK tender. L&T tG+T
DB, AK
Necessity of beams across 'void' to 'extrenal' wall of stairs?
AHC, BOH WT
Require full reference schedule for project. CFD, CC, IOD, RFA, RFP, NOC, RFI, PMGM, KN
Faade is second most critical project procurement. Finalisation of th AHC, Arup WT
Issue of procurement for timing, cost wise, technology, performance, AHC,
ef
MEPCWT
Awful detail. Bulky, unecessary concrete structure under. FR and sm AHC, J+W, WT
Canopy interactivity with structure and structural coordination requir AHC, J+W, WT
Detail to respond to 40% view panel review
AHC, Arup WT
Compliance with NBC. Exit at GF. Width, handrail, balustrade, finish. AHC
WT
Ventilation. Compliance, Pressurisation, smoke release
AHC
WT
Air movement, supply air, exhaust, ducts and penetrations
AHC, MEPC,WT
Potential change from existing. WT has template documents. Rama to source req
WT, RM
Brief, schedule, new agreements, BIM?
BR
WT
AHC dispute and invoices not in accordance with contract T&C
G+T
WT, DB
General status of all recommendations, Lead and sub-consultants, HILG+T
DB
Review current proposed, examine org chart, requirements to complete manning.
GM, AK, DG
Raise issues. Allocate responsibilties, open forum. MAX 30 minutes
HILL
Release minutes. Prepare agenda for period away
GM
Limited but essential
AHC
WT
Description

Acronym

Date

Date due

Determine potential impact. Determin if re-tender or include in init AHC, MEPCWT, DB


BR have advised to withdraw tender from scope and allow technologyG+T
DB, AM
Propose revised dates and agenda to BR with preview with BR financeG+T, BR GM
Current IPD schedule not being maintained. Requires review and revis
L&T, BR AM, GM
Client to meet Municipal authority re approval of the VRV ledge. ProviBR, AHC WT
All team members to utilise properly to ensure seamless communicatHill
DB, WT, YW
Schedule HILL deliverables to BR
GM, WT
Schedule of deliverables by various consultants. Can be by return on tender.
WT
Agree who and what is involved in continuous certification to ensure AHC
GM
Review proposed design and solution for raised water table
AHC, J+W, WT
Finishes urgent for floor and columns
AHC, BR WT
Fire collar installation of penetrations, or sleeves?
WT
Server storage of general files and mail server. Back up management.
YW

Time
estimate

M, AK, DG

B, WT, YW