0% found this document useful (0 votes)
1K views15 pages

AAPL List of Projects GCC

The document lists 30 projects with details on scope of work, contractors, consultants, and client. It includes major infrastructure and construction projects in KSA and UAE, such as new satellite plants and water transmission systems in KSA, projects for the Red Sea development in KSA, and various building projects in Abu Dhabi and Dubai involving seismic and hydraulic studies for chilled water, fire protection, and other building systems. Most projects listed are ongoing.

Uploaded by

salith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views15 pages

AAPL List of Projects GCC

The document lists 30 projects with details on scope of work, contractors, consultants, and client. It includes major infrastructure and construction projects in KSA and UAE, such as new satellite plants and water transmission systems in KSA, projects for the Red Sea development in KSA, and various building projects in Abu Dhabi and Dubai involving seismic and hydraulic studies for chilled water, fire protection, and other building systems. Most projects listed are ongoing.

Uploaded by

salith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

S.

N Project Name Scope of work Contractor Consultant Client Project status


1 New Satellite Plant Phase 2 (New Design & Engineering services to Inecsa - Inarsa Khatib & Alami SWCC Ongoing
Satellite Plant Water New Satellite Plants Phase 2
Transmission System), KSA (Design & Engineering of Civil,
Mechanical, Electrical &
Instrumentation)
2 HE02- Red Sea Project, KSA Stress analysis and support Al Futtaim Engineering WS Atkins TRSDC (The Red Sea Ongoing
design for the chilled water and Development Company)
water supply pipes, Hydraulic
study for the chilled water
network
3 HC03- Red Sea Project, KSA Stress analysis and support Al Futtaim Engineering Dar Al Handasa TRSDC (The Red Sea Ongoing
design for the chilled water and Development Company)
water supply pipes, Hydraulic
study for the chilled water
network
4 HC02- Red Sea Project, KSA Stress analysis and support Al Futtaim Engineering Dar Al Handasa TRSDC (The Red Sea Ongoing
design for the chilled water and Development Company)
water supply pipes, Hydraulic
study for the chilled water
network
5 The Peninsula at Business Bay Seismic study and support design Firex Dubai Consultants Select Group Ongoing
Plot A & E for the fire fighting pipes
6 The Peninsula at Business Bay Seismic study and support design Aikah Dubai Consultants Select Group Ongoing
Plot D for the fire fighting pipes
7 Center of Curiosity, Abu Dhabi Seismic study and support design ALEMCO WME MIRAL Ongoing
for the FLS services
8 National History Museum, Abu Seismic study and support design ALEMCO WME MIRAL Ongoing
Dhabi for the FLS services
9 Qiddiya Water Theme Park, KSA Hydraulic study for the chilled Voltas Limited Dewan Architects & Qiddiya Ongoing
water network Engineers
10 District Cooling Chilled water Stress analysis and thrust block   Mario Associates Wade Adams Ongoing
network, Business Park District design for the underground
Section 3 Cluster 1 to 4, Dubai chilled water pipes
South
11 BAPS Hindu Mandir, Abu Dhabi Seismic study and support design Bahrain & Emirates Capital BAPS Ongoing
for the FLS system Electrical Mechanical
List of Projects [Link] AAPL Project List
Contracting LLC
12 The Peninsula at Business Bay Stress analysis and support Bilt ME Dubai Consultants Select Group Ongoing
Plot F design of chilled water pipes
13 The Peninsula at Business Bay Stress analysis and support Bilt ME Dubai Consultants Select Group Ongoing
Plot D design of chilled water pipes,
seismic study for the LPG pipes
14 Palace Beach Residence on plot Stress analysis and support Bilt ME Rice Perry Ellis EMAAR Ongoing
no. 392 design of chilled water pipes and
seismic study for the cable trays
15 Dubai Creek Beach Stress analysis and support United Masters SSH DUBAI CREEK HARBOUR LLC Ongoing
design of chilled water pipes
16 Madinat Jumeirah Living Phase 3 Stress analysis and support Saifco NEXT Engineering Madinat Jumeirah Living Ongoing
design of chilled water pipes Consultants
17 Canal Front Residences SAFA- B Stress analysis and support Prime star Ae7 Meydan Group LLC Ongoing
(CF_05 & CF-06) design of chilled water pipes
18 Dubai Mall ETS Room Seismic stress analysis and Leaders Fort WSP EMAAR Ongoing
support design of chilled water
pipes
19 Jewel of Creek (JOC) Stress analysis and support Al Arabia Electro- GCE Consultants Dubai International Real Estate Ongoing
Development Plan Phase 2 design of chilled water pipes mechanical LLC
20 Al Badia Phase 4 Residential Stress analysis and support Al Futtaim Engineering NORR Architects & Dubai Festival City LLC Ongoing
Development design of fire fighting pipes Engineers
21 Jood Palace Hotel, Dubai Seismic stress analysis and Al Arabia Electro- WSP Juma Al Majid Holding Group Ongoing
support design of chilled water mechanical LLC
pipes
22 National History Museum, Abu Stress analysis and support ALEMCO WME MIRAL Ongoing
Dhabi design of chilled water pipes
23 Center of Curiosity, Abu Dhabi Stress analysis and support ALEMCO WME MIRAL Ongoing
design of chilled water pipes
24 CMW-C20019 Hydraulic analysis for the external House Engineering Command of Military Command of Military Works Ongoing
chilled water network Contracting LLC Works
25 Sabah Rotana Stress analysis and support China Railway 18th Al Asri Engineering Reeva Realty FZ LLC Ongoing
design of chilled water pipes Bureau Group Consultant
26 Canal Front Residences SAFA- B Stress analysis and support Al Shirawi Electro- Ae7 Meydan Group LLC Ongoing
design of chilled water pipes and Mechanical LLC
seismic study for the FLS system
List of Projects [Link] AAPL Project List
27 B+G+1+4P+23 TYP+R Hotel Stress analysis and support ITQAN Nasser Maktoum Nasser Maktoum Mohammed Ongoing
Building on Plot No. 3473902 at design of chilled water pipes Mohammed Amer Amer Alsheraifi
Al Merkadah, Dubai Alsheraifi
28 Canal Front Residences SAFA- A Stress analysis and support Al Shirawi Electro- Ae7 Meydan Group LLC Ongoing
design of chilled water pipes and Mechanical LLC
seismic study for the FLS system
29 HATTA PSHPP Project Hydraulic study of chilled water Voltas Limited EDF Government Of Dubai Ongoing
network & ESP calculations for
MEP equipments
30 Khazna Data Center- DXB2 Stress analysis and support Specialist Services Black & White Engg; BG&E Khazna Completed
design of chilled water pipes Engineers
31 Jaber Obaid Al Mansouri Building Floating floor design for the FAHU Al Sweidi & SHAMS AL Ain Consulting Mr. Jaber Obaid Al Mansouri Completed
at Al Raha Beach Contracting LLC Engineers LLC
32 Red Sea Pod Villas Acoustic study for the MEP Al Futtaim Engineering WS Atkins TRSDC (The Red Sea Completed
equipments Development Company)
33 SABIC Main Building Hydraulic study for the chilled Shapoorji Pallonji   SABIC Completed
water network Mideast L.L.C.
34 Residential Building Beach Front Stress analysis and support Elemec North 25 Central Dubai Projects LLC Completed
Tower (1B+G+36F+TC) design of fire fighting & water
supply pipes
35 Sort & Clearance Facility in the Seismic study and support design AZEMCO Planquadrat Dubai South Completed
Logistic District of Dubai South for the MEP system (Chilled
water system, Water supply
system, Fire fighting network,
Electricl cables and equipments
etc
36 Universal American School Stress analysis & thrust block Al Futtaim Engineering IAN Binhams & Associates Dubai Festival City LLC Completed
Cafeteria design for the underground
chilled water pipes
37 Al Shubaily Mall MCP, KSA Structural design for the HVAC Daikin ME & Africa FZE   Al Shubaily Mall Completed
modular system
38 Al Shubaily Mall MCP, KSA Hydraulic study, stress analysis Daikin ME & Africa FZE   Al Shubaily Mall Completed
and support design for the chilled
water & condenser water
network
39 Majnoon Sour Gas Treatment Vibration analysis for the Gas China Petrolium Engg & Basra Oil Company Basra Oil Company Completed
Facility Pipeline Constr Corporation
40 SIA Building Seismic study and support design Al Hamad Group of Parsons / ADPI Sharjah Airport Authority Completed
List of Projects [Link] AAPL Project List
for the fire fighting pipes Companies
41 EMAAR Downtown Development Stress analysis and support Jord Industries Allied Consultants EMMAR Completed
Fouquet's downtown ETS Room design of chilled water pipes
42 Amazon MCP Hydraulic study for the chilled Daikin ME & Africa FZE   Amazon Completed
water & condenser water
network
43 Hyatt Centric Hotel Stress analysis for the CHW pipes Construction & Building Afamia Engineering WASL LLC Completed
and acoustic study of MEP Engg LLC Consultants
equipments
44 NOON Logistic Hub Riyadh Acoustic study for MEP Saudi Amana HCO NOON Completed
equipments Contracting Co. LLC
45 JVT Hotel Stress analysis and support Pro Dynamic Dynamic Engineering Urban Wellness Real Estate Completed
design of chilled water pipes Consultants (DEC) Development
46 Vida Hotel & Residences Dubai Structural analysis of cooling ASU Ramboll EMAAR Completed
Marina Yacht Club tower structure
47 Sarah Al Emarat Tower Stress analysis and support Smithline Trillium Engineering Shk: Abdulla Mohd Al Qasimi Completed
design for condenser water pipes
48 Collective Tower Seismic study and restraint design GINCO Rice Perry Ellis Dubai Hills Estate LLC Completed
for the water supply and drainage
pipes
49 Al Badia Phase 4 Residential Stress analysis and support Al Futtaim Engineering NORR Architects & Dubai Festival City LLC Completed
Development design of chilled water pipes Engineers
50 Inter Continental Residence Stress analysis and support BK Gulf Kling Consult GmbH Al Ali Property Investment Completed
Suites design of chilled water pipes,
water supply pipes
51 Arcadia School Stress analysis and support Al Madaen GAJ Middle East Blue Rose Property Investment Completed
design of chilled water pipes Electromechanical Architectural Consultants LTD
Works LLC
52 Process Piping for Oman Sugar Stress analysis and support Smithline Oman Sugar Factory Oman Sugar Factory Completed
Refinery design for potable water pipes
53 Five Luxe Stress analysis and support ETTS Ae7 WASL Asset Management Group Completed
design of chilled water pipes
54 BOROUGE FEA for the strainers C.A.T. Group, Abu ADNOC ADNOC Completed
Dhabi
55 Burj Crown - Downtown Dubai Seismic study and support design Bilt Middle East Dubai Consultants EMAAR Completed
for the FLS system
56 4B+UB+G+39+1M+R+UR Seismic study, stress analysis and Al Hamad Group of APG WISAL Development DMCC Completed
Residential Building restraint design for the chilled Companies
List of Projects [Link] AAPL Project List
water pipes
57 DEWA HQ Stress analysis and support Voltas Limited ATKINS DEWA Completed
design of water supply pipes
58 AHAD Tower Stress analysis and support Evan Lim Penta VX Ahad Real Estate Investment Completed
design of water supply pipes Construction Co.
59 WASL Tower Seismic study and restraint design Bilt Middle East SEED Engineering WASL Asset Management Group Completed
for the fire fighting and LPG pipes Consultants
60 WASL Tower Seismic study and restraint design Bilt Middle East SEED Engineering WASL Asset Management Group Completed
for the chilled water pipes Consultants
61 Beach Isle Beach Resort at Dubai Seismic study and restraint design Bilt Middle East Mirage Leisure & EMAAR Completed
Harbour Development for the fire fighting pipes Development LLC
62 Sea Water Pre-treatment Pilot Design & Engineering of Saline Dominion LLC Nanostone Water INC SWCC Completed
System, Al Khobar KSA water pumping system
63 WASL Tower CFD analysis for the smoke Bilt Middle East SEED Engineering WASL Asset Management Group Completed
extraxt duct and ball room area Consultants
64 WASL Tower Seismic study for the HVAC Bilt Middle East SEED Engineering WASL Asset Management Group Completed
Equipments Consultants
65 WASL Tower Seismic study, stress analys and Bilt Middle East SEED Engineering WASL Asset Management Group Completed
support design for the chilled Consultants
water pipes
66 Bahrain New Exhibition & Surge analysis for the chilled Kartec Services SPC Tilke Engineering & Bahrain Tourism & Exhibitions Completed
Convention Centre water network Architects Authority
67 Bahrain New Exhibition & Stress analysis & support design Kartec Services SPC Tilke Engineering & Bahrain Tourism & Exhibitions Completed
Convention Centre for the chilled water pipes Architects Authority
68 Construction of NEST Student Acoustic study of MEP GECO MIMAR Al Jada Completed
Accommodation, Al Jada, Sharjah Equipments
69 CIEL Tower, Dubai Marina Seismic study & restraint design Al Arabia Electro NORR Architects & The First Group Completed
of fire fighting pipes Mechanical L.L.C Engineers
70 Etihad Rail Stage 2&3 Seismic study, stress analysis and Al-Futtaim Engineering Jacobs Etihad Rail Completed
support design of chilled water
pipes
71 Etihad Rail Stage 2&3 Seismic study, stress analysis and Al-Futtaim Engineering Jacobs Etihad Rail Completed
support design of fire fighting
pipes
72 Creek Edge Acoustic stdy for MEP Saifco U+A EMAAR Completed
Equipments Electromechanical LLC
73 Creek Edge Stress analysis for the chilled Saifco U+A EMAAR Completed
water pipes and support design Electromechanical LLC
List of Projects [Link] AAPL Project List
74 DEWA HQ Stress analysis and support Voltas Limited ATKINS DEWA Completed
design of chilled and condenser
water pipes
75 DMCC District Phase 1 Stress analysis for the chilled Six-Voltas JV WSP Dubai Multi Commodities Centre Completed
water pipes and support design
76 DMCC District Phase 1 Seismic study and support design Naffco WSP Dubai Multi Commodities Centre Completed
for the fire fighting pipes
77 DMCC District Phase 1 Seismic study and support design Voltas-Six JV WSP Dubai Multi Comodities Centre Completed
for electrical bus bars
78 DEWA HQ Acoustic and Vibration Study of Voltas Limited ATKINS DEWA Completed
MEP Equipments
79 Souq Al Jubail Al Dhaid Stress analysis and support GECO Khatib & Alami Government Of Sharjah Completed
design for the chilled water pipes
80 15 North Side Proposed Stress analysiss and support Al Madaen NEB Select Group Completed
2B+G+M+2P+HC+21F+LR+UR design for the chilled water pipes Electromechanical
Works LLC
81 Construction of Chilled Water Valve chamber design for the Hills & Fort Khatib & Alami EMPOWER Completed
Piping Network Phase 6, DLRC under ground chilled water pipes
82 Beach Isle Beach Resort at Dubai Seismic stdy and restraint design Bilt Middle East Mirage Leisure & EMAAR Completed
Harbour Development for the electrical services Development LLC
83 DEWA HQ Stress analysis and support Firex ATKINS DEWA Completed
design for the fire fighting pipes
84 Marsa Al Arab Stress analysis & support design ASGC Ramboll DUBAI HOLDING Completed
for Under ground chilled water
pipes
85 Urban Oasis Tower at Business Acoustic study for the HVAC Saifco LACASA Architectural Dar Al Arkan Completed
Bay Equipments Electromechanical LLC Consultants
86 Grand Bleu Stress analysis and support Conversion Mirage Leisure & EMAAR Completed
design for the chilled, Fire fighting Electromechanical LLC Development LLC
and water supply system
87 B4 Residential Towers, Opera Stress analysis and support Naffco WSP EMAAR Completed
District Downtown design for the Generator exhaust
pipes
88 Replacement of underground Stress analysis and support Smithline DEWA DEWA Completed
HDPE line to GRP at L station, design of the GRP fire fighting
DEWA pipes
89 Replacement of underground Hydraulic study for the GRP fire Smithline DEWA DEWA Completed
HDPE line to GRP at L station, fighting pipes
List of Projects [Link] AAPL Project List
DEWA
90 B4 Residential Towers, Opera Stress analysis and support China State Engineering WSP EMAAR Completed
District Downtown design for the water supply pipes. & Contracting Co
91 Private Residences Dubai Stress analysis and support Bilt Middle East IAN Binhams & Associates Private Residences Dubai LLC Completed
design of the chilled water pipes
92 Burj Crown - Downtown Dubai Seismic study, stress analysis and Bilt Middle East Dubai Consultants EMAAR Completed
support design for the chilled
water pipes
93 The DCH Palace - Residences Stress analysis and support Al Shafar United GAJ Middle East The Lagoons Phase 1 LLC, Dubai Completed
(Island Plot 14) design of chilled water pipes Architectural Consultants
94 DEWA HQ Acoustic and Vibration Study of Voltas Limited ATKINS DEWA Completed
Plumbing Equipments
95 University of Birmingham Stress analysis and support BK Gulf IAN Binhams & Associates TECOM Group Completed
design of Chilled water and water
supply pipes. Seismic study and
restraint design of all MEP
services including Fire fighting
pipes
96 Marassi Mall, Bahrain Thermal expansion study and Shapoorji Pallonji PACE / PARSONS Diyar, Bahrain Completed
support design of generator Mideast L.L.C.
exhaust pipes
97 Madinat Jumeirah Living Phase 2 Thermal expansion study of Saifco NEXT Engineering Madinat Jumeirah Living Completed
chilled water & water supply Electromechanical LLC Consultants
pipes
98 Grand Marina Intercontinental Stress analysis and support Verger Delporte UAE Consulting Engineers LLC National Corporation for Tourism Completed
Hotel design for the chilled water, LTD & Hotel
water supply and fire fighting
pipes
99 TANK T 722, DHARAN BULK Design & Engineering calculations Salamah Consulting SAUDI ARAMCO SAUDI ARAMCO Completed
PLANT, KSA of storage tank nozzles Engineers
100 Beach Isle Beach Resort at Dubai Seismic study, stress analysis and Bilt Middle East Mirage Leisure & EMAAR Completed
Harbour Development support design for the chilled Development LLC
water pipes
101 Underground dry utilities Lifting study of electrical manhole Hills & Fort ACE Dubai Municipality Completed
102 Underground dry utilities Lifting study of electrical manhole Kinden Corporation ACE Dubai Municipality Completed
103 SeaWorld, Abu Dhabi Structural design for medical VAMED AECOM Middle East Miral Completed
equipments Limited
List of Projects [Link] AAPL Project List
104 Heliport Teminal, EXPO 2020 Acoustic study for the HVAC Golden Oasis FM Ingegnaria EXPO 2020 Dubai Completed
indoor units
105 Dubai Hills Mall Car Park Seismic study and support design ALEC Engineering & Arcadia EMAAR Completed
of fire fighting pipes Contracting L.L.C
106 Deira Waterfront Development Thermal expansion study and Trinity Engineering Ae7 Deira Waterfront Development Completed
Plot 12 support design of generator Services LLC LLC
exhaust pipes
107 Chilled water piping network Structural design of external Hills & Fort CDM Smith EMPOWER Completed
connection to KIFAF chilled water valve chambers
Development at DIFC
108 DMCC District Phase 1 Structural calculations of MEP Voltas Limited WSP Dubai Multi Commodities Centre Completed
support
109 Dubai International Airport Stress analysis and support Al Naboodah MEP LLC DAR Dubai Aviation Engineering Completed
Expansion Phase 3 design for the SS316 drainage Projects
pipes
110 Time Out Market Main, Dubai Stress analysis and support IWIN / Dutco WSP EMAAR Completed
Mall design for the chilled water pipes
111 Bio gas plant in Al Warsan 3D Modelling and Detailed Teemco / Ali & Sons Veolia Energy Gulf WLL Dubai Municipality Completed
Sewage Treatment Plant engineering
112 H2B One Central Hotel Thermal expansion study and Al-Futtaim Engineering WSP Dubai World Trade Centre Completed
support design of generator
exhaust pipes
113 Deira Waterfront Development Stress analysis and support Trinity Engineering Ae7 Deira Waterfront Development Completed
Plot 12 design for the chilled water pipes Services LLC LLC
114 Emirates Hospital Stress analysis and support Saifco Al Hashemi P,A, E / Green Al Sheikha Rawda Bint Ahmed Completed
design for the water supply pipes Electromechanical LLC Concept Engineer Bin Juma Al Maktoum
Consultant
115 Marsa Al Arab Seismic study and support design ASGC Ramboll DUBAI HOLDING Completed
for the fire fighting pipes
116 Dubai Creek Beach Dubai Creek Stress analysis and support United Masters SSH EMAAR Completed
Harbour Development design of chilled water pipes
117 Qaryat Al Hidd Development Stress analysis and support Shapoorji Pallonji Khatib & Alami Al Sadiyat Development Completed
design of chilled water pipes Mideast L.L.C. Investment Co.
118 Burj Royale Plot 97 Dubai Stress analysis and support Menasco Mech. WME EMAAR Completed
Downtown design of chilled water pipes Contracting
119 Vida Dubai Mall Stress analysis and support Shapoorji Pallonji WSP EMAAR Completed
design for chilled water pipes Mideast L.L.C.
120 Marsa Al Arab Stress analysis and support Al Shafer United WS Atkins & Partners DUBAI HOLDING Completed
List of Projects [Link] AAPL Project List
design for chilled water pipes Overseas
121 B+G+11Typ+R Pipe stress analysis and support Aa Qabdah Global WS Atkins & Partners Dubai South Completed
The Pulse Mixed Use Project design for the chilled water pipes Building Contracting Overseas
Residential City Dubai South , LLC
Parcel 04
122 Kifaf Development Phase 2 Stress analysis and support Shinryo Corporation WS Atkins & Partners KIFAF Real Estate Development Completed
design for the chilled water pipes Overseas
123 The Pulse Mixed Use Project at Stress analysis and support Electrofos WS Atkins & Partners DUBAI South Completed
Residential City, Dubai South design for the chilled water pipes Overseas
124 TECOM PT233/1 Offices and Lab Stress analysis and support Al Madaen Khatib & Alami TECOM Group Completed
Building at Dubai Science Park design for the water supply pipes Electromechanical
Works LLC
125 New Private Villa Acoustic study for HVAC system Al Ryum Contracting & Al Gurg Consultants Private Villa Development Completed
General Transport LLC
126 Khalifa City Mall Seismic study and support design Shapoorji Pallonji NEB Engineering Line Investment & Property LLC Completed
for Fire, Life and Safety systems Mideast L.L.C. Consultant
127 Al Maktoum International Airport Stress analysis and support Al Naboodah MEP LLC Dar Al Handasah DAEP Completed
design of chilled water pipes
128 C15- Opportunity Pavillion, EXPO Acoustic and Vibration Study of Al Shafar General e-construct EXPO Dubai 2020 llc Completed
Dubai MEP Equipments Contracting
129 C15- Opportunity Pavillion, EXPO Acoustic and Vibration Study of Al Shafar General e-construct EXPO Dubai 2020 llc Completed
Dubai MEP Equipments Contracting
130 B+G+11+R The Pulse Mixed Use Stress analysis and support Adeeb WS Atkins & Partners Dubai South Completed
Project at Residential City, Dubai design of chilled water pipes Overseas
South
131 B4 Residential Towers, Opera Surge analysis and China State Engineering WSP EMAAR Completed
District Downtown recommendations for the chilled & Contracting Co
water system.
132 Mobility Pavilion, EXPO 2020 Accessplatform design and ALEC Engineering & WSP EMAAR Completed
preperation of detailed drawings. Contracting L.L.C
Mobility Pavilion, EXPO 2020
133 Warner Bros Hotel Seismic study and restraint design Shapoorji Pallonji GAJ Middle East Miral Completed
for FLS System Mideast L.L.C. Architectural Consultants
134 G+5P+HC+SERVICE+32TYP+ROOF Stress analysis and support Al Manolya Contracting Sharjah Engineering   Completed
design of the chilled water Company Consultants
network-
135 Najmat Phase 3 Infrastructure Stress analysis and support C.A.T. Group, Abu Rafik El- Khoury & Partners REEM Developers Completed
works design of the underground chilled Dhabi
List of Projects [Link] AAPL Project List
water network
136 P 42 Umm Ramool Development Pipe Stress analysis, support International Electro- P & T Architects and DUBAI COMMERCITY Completed
design, Surge analysis & hydraulic mechanical Services Engineers LTD
study for the district cooling Co. LLC (IEMS)
chilled water network
137 Ecoplex District Cooling Plant Pipe Stress analysis and support Al Marwan Electro- Fittons / AMEC The Ecoplex Completed
design for the chilled water and Mechanical LLC
condenser water pipes
138 Khalifa City Mall Pipe Stress analysis and support Shapoorji Pallonji NEB Line Investment & Property LLC Completed
design for the condenser water Mideast L.L.C.
pipes- Khalifa City Mall
139 P 42 Umm Ramool Development Seismic analysis and support International Electro- P & T Architects and DUBAI COMMERCITY Completed
design for elecrical equipments, mechanical Services Engineers LTD
cable trays and fire protection Co. LLC (IEMS)
system
140 Fujairah International Airport Stress analysis and support VOLTAS LIMITED Development Research & Abu Dhabi Airports and Fujairah Completed
Expansion Programme design for above ground and Urban Planning International Airport
under ground chilled water pipes Consultants
141 VERA Residence Stress analysis and support MBM Engineering Consortium DAMAC Completed
design for chilled water pipes Consulting Engineers
142 Sunrise Bay at EMAAR Stress analysis and support REMCO Rice Perry Ellis EMAAR Completed
Beachfront design for chilled water pipes
143 Luxemboug Pavilion Stress analysis and support Lunar WME Le Government Completed
design for chilled water pipes
144 Tiara Towers Stress analysis and support Al Shirawi ADPI Tiara United Towers Completed
design for chilled water pipes-
Tiara Towers
145 GRP Pipes Flush Header Pipes , Stress analysis and support Smithline DEWA DEWA Completed
DEWA design for GRP Flush header
pipes- DEWA
146 Plot C5 Al Reem Seismic study and support design Voltas KEO Wafra Real Estate Company Completed
for chilled water pipes and water
supply pipes
147 Icon Bay Stress analysis and support United Masters WME EMAAR Completed
design for chilled water pipes
148 Advanced Military Maintanance Stress analysis and support Efeco WSP AMMROC Completed
Repair and Overhaul Center design for chilled water pipes
149 Strategic Tonnel Enhancement Seismic analysis and support Envicon MOTT MACDONALD ADSSC (Abu Dhabi Sewerage Completed
List of Projects [Link] AAPL Project List
Programme design for the fire rated ducts Services Company)
150 B4 Residential Towers, Opera Stress analysis and support CHINA STATE WME EMAAR Completed
District Downtown design for chilled water pipes CONSTRUCTION
ENGRG. CORP.
(MIDDLE EAST) (L.L.C)
151 Dubai World Trade Centre Stress analysis for chilled water VOLTAS LIMITED WSP/Hopkins Architect Dubai World Trade Centre Completed
District Phase 1A5 pipes Dubai
152 MERAAS Development Project Pipe Stress Analysis as per ASME HEYDON W S Atkins & Partners MERAAS Development Completed
31.4 for Buried lines and 31.9 for ELECTROMECHANICAL Overseas
above ground CHW and CW lines LLC
153 District cooling network for JVC Pipe Stress Analysis for Chilled ISLAND TOWER   EMPOWER Completed
and JVT Water Service Pipe Lines for ELECTRO MECHANICAL
Jumeirah Village Circle (JVC) WORKS LLC
Phase 1, Phase 2, Phase 3 and
Jumeriah Village Triangle (JVT)
Phase 1, Phase 2, Phase 3
154 Dubai Festival City Pipe Stress Analysis for Chilled AL-FUTTAIM Fittons Consulting Al Futtaim Group Real Estate Completed
Water Service Pipe Lines for ENGINEERING
District Cooling Connections to
Holiday Inn Hotel, Lexus Building
& ETS Room at Zone 14A at DFC
Dubai
155 Private Resort at Jumeirah Island- Pipe stress analysis and support BINLADIN ARC INTERNATIONAL H.H. Sheikh Hamdan Bin Rashid Completed
2 design for chilled water pipes CONTRACTING GROUP ENGINEERING Al Maktoum
CONSULTANTS
156 Jebel Ali Power Station M- Pipe stress analysis for GRP pipes SMITHLINE MOTT MACDONALD DEWA Completed
Extension REINFORCED
COMPOSITES FZC
157 City Centre Ajman Expansion Pipe Stress Analysis and support Trans Gulf WSP Majid Al Futtaim Properties LLC Completed
Project design for Roof Floor& Riser
Chilled Water Pipe Lines
158 Specialized Rehabilitation Pipe Stress Analysis for Chilled Trans Gulf HOARE LEA Abu Dhabi Capital Group Completed
Hospital-Abu Dhabi Water Pipe Lines for Specialized
Rehabilitation Hospital
159 VVIP Villa at Al-Mina Palace Pipe Stress Analysis for Chilled Efeco WS Atkins & Partners Crown Prince Hotel Completed
Project Phase 1 and 2 Water Piping Network Overseas
160 MAI Dubai Factory Expansion Pipe Stress Analysis for Chilled AMANA ARCHCORP MAI DUBAI Completed
Project Water Piping Network for MAI ARCHITECTURAL
List of Projects [Link] AAPL Project List
Dubai Factory Expansion Project ENGINEERING
161 CEN Expansion & Engineering Pipe Flexibility Analysis for Chilled SAUDI BINLADIN HIDI/archcorp American University of Sharjah Completed
Sciences Building Project Water Pipe Lines GROUP
162 Dubai Arena Pipe Flexibility Analysis for ASGC Populous Meras Completed
Chilled Water Pipe Lines
163 CEN Expansion & Engineering Seismic Analysis of SRP Pipe & SAUDI BINLADIN HIDI/archcorp American University of Sharjah Completed
Sciences Building Project Structural Evaluation GROUP
164 Amity International School – Chilled water pipe stress analysis Bahrain & Emirates Dewan Architects & Amity International School Completed
Phase 2 and thrust block design for UG Electrical Mechanical Engineers
network Contracting LLC
165 Seismic & RS analysis for Baba LBE Piping Support Design & FEA VTPL India AAPL India BARC India Completed
Atomic Research Centre Validation
166 Harmonic and seismic excitation Piping flexibility and dynamic VTPL India AAPL India IPR India Completed
for Institute of Plasma Research analysis
Govt of India
167 Qasr Al Hasn External Piping and Chilled water pipe stress analysis CAT Contracting & Tabreed National Central Tabreed National Central Cooling Completed
ETS room and support design Trading Co. Cooling Co Co
168 Dubai Creek Harbour Chilled water pipe stress analysis EFECO DAR EMAAR Completed
Development Plot 18A, Creekside and support design
18
169 SOHAR 3 IPP Pipe flexibility analysis for GRP Al Sidrah Oil & Gas LLC SEPCOIII Electric Power Shinas Generating Company Completed
Pipes Construction Corporation SAOC
170 Park Heights 1 & 2 Chilled water pipe stress analysis Shapoorji Pallonji Khatib & Alami EMAAR Properties PJSC Completed
and support design Mideast L.L.C.
171 Sustainability Pavilion, EXPO Chilled water pipe stress analysis Al Shafar General Grimshaw EMAAR Properties PJSC Completed
2020 and support design Contracting
172 PN1502-EXPO Village Pipe stress analysis and support Al Arabia Electro KEO Dubai World Trade Centre LLC Completed
Development - Main works for design for the chilled water and Mechanical L.L.C
Parcel 10&11 water supply pipes
173 Dubai Creek Harbour - Creek Pipe stress analysis and support EFECO SSHIC International EMAAR Completed
Horizon Plot 19A design for the chilled water pipes Engineering Consultant
174 One Central Phase 1A7, H2B Seismic study, stress analysis and Al Futtaim Engineering WSP Dubai World Trade Centre Completed
Hotel support design for the chilled
water and fire fighting pipes
175 Deira Waterfront Development Pipe stress analysis and support DCE AE7 Deira Waterfront Development Completed
Plot 11 & plot 13 design for the chilled water pipes LLC
176 Downtown Dubai Chilled water UG Chilled water pipe stress Island Tower Allied Consultants EMAAR Completed
List of Projects [Link] AAPL Project List
network Modification analysis and valve chamber Electromechanical LLC
design
177 COEX Campus, EXPO 2020 COEX CAMPUS(EAST & WEST) VOLTAS Aurecon EMAAR Properties PJSC Completed
178 Kifaf Development Phase 1 Pipe stress analysis and support Bin Lahej ARCHGROUP Al Kifafa Real Estate Completed
design for the chilled water pipes Electromechanical LLC Development LLC
179 Jumeirah Gate Chilled water pipe suppport BILT WSP   Completed
design
180 Big Box Retail Pipe stress analysis and support Al Futtaim Engineering BSBG Al Futtaim Retail Park LLC Completed
design for the chilled water pipes
181 Deira Waterfront Development Pipe stress analysis and support Beaver Gulf AE7 Deira Waterfront Development Completed
design for the chilled water pipes LLC
182 EXPO 2020-Mobility Pavilion Pipe stress analysis and support ALEC Engineering & WSP EMAAR Properties PJSC Completed
design for the chilled water, Contracting L.L.C
water supply and fire fighting
pipes
183 Proposed Building Pipe stress analysis and support Smithline Reinforced Sharjah Engineering Sheikh Mohammed Bin Abdullah Completed
(G+5P+HC+43Typ+1Service+Roof) design for the condenser water Composites FZ LLC Consultants Al Qasmy
AL MAMZAR, SHARJAH pipes
184 Rochester Institute of Technology Pipe stress analysis and support Sobha Engineering & ZAS Developers Dubai Silicon Oasis Authority Completed
(RIT) Campus design for the UG chilled water Contracting
netwok
185 Grand Hyatt- The Regent Pipe stress analysis and support VOLTAS Limited Dennis Lems Architects Emirates Pearl for Development Completed
Emirates Pearl Hotel validation for the PPR water Associates & Investment LLC
supply Pipes
186 Shopping Mall (2B+GR+1+Service Pipe stress analysis and support Smithline Composite archdome Mr. Badr Abdulla Ismailal Completed
Roof) design for the condenser water Mutawa
pipes
187 Enhancement Main Potable Pipe stress analysis and support Techno Smart Abu Dhabi Airport Abu Dhabi Airport Company Completed
Waterline at Abu Dhabi Airport validation for the water supply Contracting & General Company
network Maintenance
188 Design & Construction Pipe stress analysis and support Engineering Office EO MERAAS Completed
Khawaneej, Phase 3 design for the chilled water pipes Construction
Department
189 Meydan One Mall Pipe stress analysis and support MS Construction ae7 MEYDAN Completed
design for the chilled water pipes
190 Deira Waterfront Development Pipe stress analysis and support DCE ae7 Deira Waterfront Development Completed
design for the chilled water pipes LLC
List of Projects [Link] AAPL Project List
191 Creek Gate Pipe stress analysis and support Trinity Engineering NORR Architects & The Lagoons Phase 1 Completed
design for the chilled water pipes Services LLC Engineers
192 The Bridges, Phase 1 & 2 Abu Pipe stress analysis and support MAPCO L.L.C. AECOM Middle East ALDAR Properties PJSC Completed
Dhabi design for the chilled water pipes Limited
193 Ruwais Housing Complex Acoustic study and vibration Al Ryum Contracting & ADNOC ADNOC Completed
Expansion analysis of MEP equipments General Transport LLC
194 Downtown Views II Pipe stress analysis and support China State Engineering ARCHGROUP EMAAR Completed
design for the chilled water pipes & Contracting Co
195 Dubai Hills Estate Stress analysis and support Shapoorji Pallonji Design & Architecture Dubai Hills Estate LLC Completed
design for generator exhaust Mideast L.L.C. bureau | DAR
pipes
196 Vida Hotel & Residences Dubai Pipe stress analysis and support Al Shafar United WME EMAAR Completed
Marina Yacht Club design for the chilled water pipes
197 EXPO 2020-Mobility Pavilion Structural validation study for the ALEC Engineering & WSP EMAAR Completed
skylight RAHUs and Fans Contracting L.L.C
198 EXPO 2020-Mobility Pavilion Structural design for the MEP ALEC Engineering & WSP EMAAR Completed
equipments Contracting L.L.C
199 Al Falah Plaza Residential Pipe stress analysis and thrust Freiberg General Al Amara Al Shaqia Al Falah Plaza Completed
Complex block design for the UG chilled Contracting
water network
200 COEX Campus, EXPO 2020 Structural validation study for the VOLTAS Limited Aurecon Dubai World Trade Centre Completed
roof mounted axial fans
201 Address Harbour Point Dubai Pipe stress analysis and support International Electro- KEO International EMAAR Properties Completed
Creek Harbour Plot A.005 design for the chilled water pipes mechanical Services Consultants
Co. LLC
202 Nakhali Lodges Pipe stress analysis and support Khansaheb EO MERASS Completed
design for the chilled water pipes
203 Address Residences Dubai Opera- Pipe stress analysis and support EFECO Khatib & Alami EMAAR Properties Completed
A2A3 Towers design for the water supply pipes
204 Address Residences Dubai Opera- Surge analysis and EFECO Khatib & Alami EMAAR Properties Completed
A2A3 Towers recommendations for the water
supply system.
205 Warner Bros Hotel and Pipe stress analysis and thrust Taurus General Tabreed National Central Tabreed National Central Cooling Completed
Apartments block design for the UG chilled Contracting Cooling Co Co
water network
206 Marassi Mall, Bahrain Stress analysis and support Shapoorji Pallonji PACE / PARSONS Diyar, Bahrain Completed
design for the chilled water pipes Mideast L.L.C.
List of Projects [Link] AAPL Project List
207 G+5P+32TYP Floor Building Stress analysis and support Al Mawarid Electro- Sharjah Engineering   Completed
design for the chilled water pipes mechanical LLC Consultants
208 RO Pipe Line, DEWA Stress analysis and support Smithline Reinforced DEWA DEWA Completed
design for the RO water linei Composites FZ LLC