Contractors involved
Construction company ALEC is the main contractor
for the project, while ALEC Energy was contracted to
design, engineer, procure, build, operate and maintain
the PV project. JinkoSolar will supply the PV
modules, while Huawei will supply the inverter
systems.
CallisonRTKL developed the master plan for the
project. Other contractors that supported the design
and architecture include Alef and JP Infinity.
Flowconme received a contract to provide chilled
water and plumbing valves. Effisus was responsible
for the installation of its Ecofaçade Membranes and
Bond FT solutions.
Kone was contracted to supply 66 elevators, 88
escalators, and two inclined autowalks.
Mimar Models developed the architectural model for
the project. Arma-Elektropanç was awarded a
contract to perform mechanical, electrical and
plumbing works. Subcontractors for the mall
development include Polypipe Middle East and