Specification References:
Equipment / Materials Specified Equipment / Materials Offered
Manufacture: Manufacture:
Brand: Brand:
Country of Origin: Country of Origin:
Model No.: Model No.:
Attachments
Catalogue of Manufacture Technical Data Others (Specify)
Certificate/Approval Letter Compliance Statement Method Statement
Sample (to be submitted on sample board Working Programme
Equipment Schedule Test Certificate/Approval Letter
Issued For:
REVIEW - For Review & Comment
Submitter:
Issued by: Ronald Garcia
Signature:
Designation: PIC
Company: PBD Joint Venture Date Sent: April 14, 2020
Recipient:
Received by: Rochelle Anne Lajada
Signature:
Designation: Sur Document Controller
Company: Sureste Properties, Inc. Date Received: April 15, 2020
Table of Contents
1.0 PURPOSE ........................................................................................ 3
2.0 SCOPE OF WORK ............................................................................ 3
2.1 Tools and Equipment ..................................................................... 3
2.2 Materials ....................................................................................... 3
2.3 Work Methodology......................................................................... 4
3.0 ORGANIZATION, SAFETY, AND ORGANIZATION ............................... 5
4.0 WORK FORCE ................................................................................. 6
5.0 REFERENCES .................................................................................. 6
6.0 ENVIRONMENTAL, SAFETY AND HEALTH ......................................... 6
6.1 Job Safety Analysis ........................................................................ 6
6.2 Protective & Safety Equipment ...................................................... 6
6.3 Information to Personnel ............................................................... 7
6.4 Emergency Procedures.............................................................. 7
7.0 QUALITY ASSURANCE ..................................................................... 7
7.1 Quality Requirements Table ........................................................ 7
Effectivity Date:
METHOD STATEMENT 06 April 2020
Document Code:
Project Name:
SOLN-MS-ST-PBD-BA101-
SOLAIRE NORTH PROJECT
0036
Document Title:
Rev. No. Page No.
METHOD STATEMENT FOR TYPICAL STRUCTURAL AND
SUPERFICIAL CONCRETE REPAIR OF DEFECTS
0 3 of 7
1.0 PURPOSE
The following items are the minimum tools/equipment required for this
specific scope of work considering compliance to safety standards:
2.2 Materials
Include Lanko 751
b. QA/QC Inspector :
o Ensure that Inspection Test Plan is strictly followed.
o Monitor the implementation of approved QC plan.
o Control all Non-Conformance Report and undertake remedial action.
Ensure also the all workers
c. Safety Officer prior to start will be done by
o Ensure that all personnel haveDOLE mandatorysafety
undergone 8 hrs induction/toolbox.
orientation. (No exemption)
o Ensure that all field personnel comply with the clients ES& H plan
requirements.
o Reports and investigate all accidents and incident
4. 0 WORK FORCE
5.0 REFERENCES
o Contract Documents
o Health and Safety Plan
o Approved Drawings
o ACI RAP Bulletin 10 – Levelling and Reprofilling of Vertical and
Overhead Surfaces
2. HAZARD IDENTIFICATION : identify hazards that may be present by ticking items on the list below. 3. PRECAUTIONS : hardhat, safety glasses, safety boots compulsory
CONFINED SPACE HAZARDOUS AREA HIGH RISK HIGH RISK ADDITIONAL PRECAUTIONS PERMITS
Difficult Entry/Exit Excavation Falling Objects X Suspended loads Gloves (typs) : riggers Hot Work
Oxygen Deficiency Erection/dismantling of scaffold Poor Lighting Poor visibility Goggles /safety glass X Excavation
Oxygen Excess Working at Heights X Slippery Surfaces X Inhale able dusts/fibres X Full face shield X Confined Space
Engulfment Formworks stripping Multiple Electrical Feeds High noise levels High visibility vest X Hazardous Work Clearance
Toxic Gas Present Working above/in water Trip Hazards X Use of chemicals Harness C&A 6 X Access to Area
Temperature Extremes Hazardous/Toxic Substances X Electrical Hazards Elevated work platform X Fire extinguishers High Voltage Access
Biological Hazards Potential for Difficult Rescue Working near crane and Difficulty to communicate Barricades X Scaffolding x
Explosive Gas Present Remote Area crane runways amongst workers Ventilation X Other?
Carbon monoxide present Heavy Lifting Activity moving machinery Manual Handling X Lighting X
Traffic movement Sharp Materials X Erect scaffolding to access
HAZARDOUS SUBSTANCES in work area/to be used attach Rail movement Working near operation Respirator or dust mask X SPECIAL ISSUES:
MSDS Live rails processing lines Erect warning signs
Ladders used in the task X Radiation Personal locks or tag system
Working at heights x Tools & equipment X Group isolation
Flammable materials Working with Toxic/ Welding screen
present Hazardous Substances Fall arrest systems
Pneumatics Pressurized fluids Welding face shield
Step Sequence of basic job Potential safety & environmental Risk Recommended corrective/preventive action or Residual Action by
n° steps hazards Rating procedure risk
rating State the name of
Break down job into steps. Each step Identify the hazards (health, safety and/or all personnel’s
Logical environmental) associated with each step, Use table who will be
sequenc should accomplish a major task and Determine what actions are necessary to eliminate or minimize all After
e be logical. Examine each to find all possible risk factors. on the hazards that could lead to an accident, injury, illness or environmental implementin responsible for
previous incident. The risk must be reduced or controlled to a level that is the execution of
Environmental aspects. page to
g the
the control
acceptable before work commences. corrective
score risk. Indicate who is to perform the action where applicable against each action. measures
action.
1 Structural Defects / 1. Slip, trip and fall 2 1. Toolbox talks to be conducted to all involved workers 4 Supervisor
2. Eye irritant and staff personnel prior to commence of work Safety
Honeycomb on Slab, Beam 3. Exposed to dust 2. No fabricated tools to be use on site
4. Pinch point 3. Wear Personal Protective Equipment
Soffit, Columns, Retaining
5. cuts Hard Hat
Wall & Shearwall Spectacles
(1) Hazard allowed here Face Shield
Cut squarely the honeycomb Hand Gloves
area to avoid feather edging High Visibility Vest
of the surface. Chip off and Safety Shoes
remove all loose concrete. N95
4. Conduct housekeeping and materials management at
all times
5. No obstruction on the access and egress
Remove all contaminants 1. Eye irritant 2 1. Wear Spectacle and face shield 4 Supervisor
2. Exposed to sun 2. Awareness on heat stress and discussed during Safety
including dirt and dust.
3. Heat exhaustion toolbox meeting
3. Drinking water must be available always
Clean the surface area using 1. Noise exposure 3 1. Ensure the workers wearing of ear plug or earmuff 9 Supervisor
2. Eye irritant 2. Wear face shield Safety
paint brush or manual air
3. Exposed to dust 3. Wear N95
compressor to remove dust.
4. Fall from height 4. Wear full body harness and ensure the Lan yard
properly hook above shoulder
5. Full body harness must be properly inspection prior
to use
Apply additional mortar Lanko 1. Chemical exposure 3 1. Wear Personal Protective Equipment 9 Supervisor
2. Inhalation Rubber Gloves Safety
731 layer by layer using
3. Burn Spectacles
spatula or stainless steel
4. Fall from height N95
trowel to obtain the desired Full body harness
overall thickness. 2. Provide Safety Data Sheet
3. Discussed to all involved workers the importance of
Safety Data Sheet prior to commence of work