Version 1.

MATERIAL SUBMITTAL

Project : Sobha The Crest REF. No. : MAR-CRT-CIVIL-043


Client : PNC Investments Rev. No. : 00
Consultant : PNC Architects Date : 29-07-2022
Contractor : Sobha Constructions LLC Category : Civil ✔ Arch ID MEP
Subcontractor : Minotti Dry Mix Factory LLC Others :

Material Description ( one item only on this form )


Material Reference : MAR-CRT-CIVIL-043 Revision No. : 00
Description : Plaster - Bond Key (Mino 120) and Cement Plaster (Mino 210)

Area of Application : Internal and External Plaster above AAC Block


Drawing Ref : N/A B.O.Q Ref. No. : N/A
Specification Ref : N/A Standards : Project Specifications

Manufacturer/Supplier
Company Name : Minotti Dry Mix Factory LLC
Address : Dubai,UAE
Local Agent : Minotti Dry Mix Factory LLC

Submitted By : palanivel G Position : Sr. Project Manager Signature : Date : 29-07-2022

Consultant's Comments
ARCHITECT
- Material has been approved for Sobha Hartland Project - Greens, CVR, WAV
- Subject to MOCK UP approval along with satisfactory Pull out test to be done with result to be submitted.
- Strictly follow manufacturer's method of application, mixing, curing and storage
- MIR to submitted for any material delivered to the site along with test reports
- METHOD STATEMENT (w/ITP and RA) to be submitted for approval
- Shall follow approved drawings and details.
- Comply with project specification and authority requirement.

APPROVAL IS SUBJECTED TO FULL COMPLIANCE WITH COMMENTS.

A- Approved ✔ B- Approved As Noted C- Not Approved (Resubmit) D- Rejected

Name : Bernard Abdon Position : Sr. Site Architect Signature : Date : 20/07/2022

Employer's Comments

A- Approved B- Approved As Noted C- Not Approved (Resubmit) D- Rejected

Name : Position : Signature : Date :

1- Contractor to mark all relevant technical description in the literature.


2- Approval shall not relieve Contractor of his liabilities under the Contract or consititute authorization of any change to contract documents
3- Contractor should certify that the above submited items have been reviewed in details and are correct and in strict conformity with the contract drawings and
specifications otherwise stated, also that the material sources indicated above have been reviewed in detail and will be supplied in conformity with the above and
delivered same timely.

FS/CO/06/01