You are on page 1of 1

DOC NO: RFI JN12 SR1 M08 01

REQUEST FOR INSPECTION


Date: 15-07-2019
PROJECT NAME: Modification of Fire Hydrant PROJECT NO: 4600003004
CLIENT: ORPIC CONTRACTOR: Al Rouba Ent. & Trad. LLC

INSPECTION POINT: FIT UP & FINAL


REF. DOC. TITLE: ASME B31.3 ed. 2016 – Table 341.3.2 ITP N0: ART-JN12-ITP-R1 INSPECTION STEP: Visual
WELD

Serial No Equipment Number Item to be Inspected Date of Inspection Time of Inspection Location of Inspection Remarks

20HY-24 (M08) 1. FIT UP 15-07-2019 1. 10: 00 AM


1 AL ROUBA FAB SHOP
SJ-26 2. FINAL WELD 15-07-2019 2. 04: 00 PM
20HY-24 (M08) 1. FIT UP 15-07-2019 1. 10: 00 AM AL ROUBA FAB SHOP
2
SJ-28 2. FINAL WELD 15-07-2019 2. 04: 00 PM

Additional Comments:

Requested by: By Orpic:

Name: Mr Jithin Johny Inspected and Released: Reviewed by:

Designation: QC ENGINEER Name: Name:


Signature with Date: 15/07/2019 Designation: Designation:

Signature with Date: Signature with date:


Form: 2533-143-F-1.