Surveillance No. of
Conducted By: Visits to
Oscar Guerrero Date: 01
Non-conformance(s)
INSPECTION DISPOSITION: Accept Identified Placed on Hold
P.O. Status: Complete Incomplete
SURVEILLANCE INFORMATION
NEW NCR’S ISSUED THIS REPORTING
YES, NCR NUMBER NO
PERIOD:
TOTAL NCR’S ISSUED AGAINST THIS PO: TOTAL: ____ OPEN: CLOSED:
ACTION/REPLY REQUIRED TO THIS
YES (see below) NO
REPORT:
INSPECTION RELEASE CERTIFICATE
YES (see attached copy) NO
ISSUED:
Other
TYPE OF INSPECTION THIS REPORT: Pre-Fab Meeting In-Process Final/Pre-Ship
OVERALL INSPECTION RESULTS ACCEPTABLE UNACCEPTABLE
ANTICIPATED SHIPMENT
CONFIRMED DELIVERY DATE: 03/13/23
DATE: N/A
SUMMARY OF ACTIVITIES
Inspector has performed a visit in order to verify the current status of manufacturing for tags: P-
6397/98
2. PERSONNEL/ATTENDEES
Ozman Morales FLS Project Manager
Oscar Guerrero D&C Inspector on behalf of S&B.
3. AREAS OF CONCERN
Flowserve Seal division has been informed about a prenotification of delay due to RCCP
Supplier (QHP) Item: C0574476ZZ - Accumulator.
Flowserve Seal division is waiting ETA Date for Item: C0595061ZZ. In order to proceed with
an alternative plan, FLS will quote with Parker and let you know the best L.T.
4. SAFETY OBSERVATIONS
N/A
5. ENGINEERING SPECIFICATIONS AND DRAWINGS UTILIZED
FLS has provided a quick resume of documents status:
22 Documents approved.
2 late from customer.
12 late by FLS.
6. MATERIALS STATUS
Fls has reported the following material status:
PO Number Item Description Status Vendor
CASING COVER CASTING, MAT. A351, GR. CF3M, FPD: C3021, FLOW LINK SYSTEMS PRIVATE
0000286726 Received
PATTERN: M19367, DWG. DBM902174 LIMITED
Received KALAPI ENGINEERING ASSOCIATES
0000288916 COVER END, MAT A576 GR. 1020, FPD D3154, DWG. DBM905380
PVT. LTD
FLEXIBLE COUPLING REXNORD, THOMAS SERIES 71 , SPACER 5.5 Received
0000288674 REXNORD INDUSTRIES
IN
0000287207 MT & PRE MACHINING, SERVICE IMPELLER (M19169). Received RAM, S.A. DE C.V.
0000287207 RT MT & PRE MACHINIG SERVICE CASINGS (M19052). Received RAM, S.A. DE C.V.
Promised
PO Number Item Description Vendor Name
Date
0000287027 FLOWSERVE API 682 PLAN 53B FLOWSERVE TLAXCALA 14/02/2023
BASEPLATE, RAW MAT. CARBON STEEL, MAT. FPD D3002, DWG. LM014581 / FABRICACIONES Y MAQUINADOS PEREZ Y
0000291156 16/01/2023
20122HE0095-096 CARRASCO S.A. DE C.V.
0000287026 FLOWSERVE MECHANICAL SEAL, CARTRIDGE , FOR API PLAN 11/53B FLOWSERVE TLAXCALA 23/01/2023
0000287025 ELECTRIC MOTOR, SIEMENS, 25 HP, 284TS,3600 RPM, 460V, 60HZ, 3 PH SIEMENS INDUSTRY INC 26/01/2023
CASING COVER CASTING, MAT. A351, GR. CF3M, FPD: C3021, PATTERN:
0000286726 FLOW LINK SYSTEMS PRIVATE LIMITED Received.
M19367, DWG. DBM902174
BEARING HOUSING CASTING, MAT A216 GR WCB, PATTERN, M19646, FPD.
0000288066 FLOW LINK SYSTEMS PRIVATE LIMITED 09/12/2023
C3009, DWG. DDM905369
COUPLING GUARD, MAT. B209 ALLOY 3003(TEMPLE H14), FPD. I0041,DWG.
0000291698 GENARO RUBEN RIVERA LOPEZ 06/01/2023
LM034000, LINE. 22 (DDM905370)
7. FABRICATION STATUS
Cases are at machining process and will pass to welding process on week of 12/12.
The shafts completed the machining process and are ready for rotor assembly.
The diffusers completed the machining process.
The impellers are at final machining process and will pass to balancing process prior rotor
assembly.
The case covers completed machining process and are ready for hydrotest assembly.
Hydrostatic test scheduled for 01/11/23.
Performance test scheduled for 01/26/23.
Final inspection 02/24/23
1. Case tag P-6397 at machining process. 2. Case tag P-6398 at machining process.
3. Shaft tag P-6397 machining process 4. Shaft tag P-6398 machining process
completed. completed.
5. Diffuser tag P-6397 machining process 6. Diffuser tag P-6398 machining process
completed. completed.
7. Impeller tag P-6397 machining process 8. Impeller tag P-6398 machining process
completed. completed.
9. Cover tag P-6397 machining process 10. Cover tag P-6398 machining process
completed. completed.
11. Coupling tag P-6397 received. 12. Coupling tag P-6398 received.
15. COMPLETION:
End of Report