LIQUID PENETRANT EXAMINATION REPORT

Date of REPORT No
3/28/2022 GPTI-NDE-PT-11423 Page : 01 0F 02
Examination: & Rev no :
Client :
HIT ACE Material : SA 516 Gr.60N

Location : ALGHAIL,RAS AL KHAIMAH ,UAE Test Temparature : AMBIENT (30⁰C)

Job Description : N/A Penetrant Type : VISIBLE DYE PENETRANT.


Project : Test Technique or
1236 WATER SOLUBLE.
Method :
Job No : Method Of Applying Penetrant : SPRAYING

Drawing No: Mentioned in Continuation sheet Penetrant Dwell Time : 1 Hour


GPTI-NDT-ASME-PT-001, Rev-11,API Method Of
Ref / Procedure No BY APPLYING WATER
650 SECTION 7(7.2.4.1C) Edition- Removing Excess
& Rev no :
2021 Method Of Applying Developer : SPRAYING.
Lighting Equip: DAY LIGHT.(>1076 LUX) Developing Time : 1 Hour
Light Intensity : 1150 LUX Surface Condition.: AS WELDED AND CLEANED.

Size / Thickness : AS PER DRAWING. Welding Process : SMAW/FCAW

Specification/Acceptance Criteria : API 650 SECTION 7(7.3.4),Edition-13th


Consumables Type Make Batch No Expiry Date
Cleaner - Solvent ZCECK-CL 210209 Jan-24
Penetrant - Solvent ZCECK-PTW 201115 Oct-23
Developer - Wet Powder ZCECK-DL 210813 Jul-24
Time Period Between Steps and Drying Aids:

OBSERVATION & EVALUATION :

# LIQUID PENETRANT LEAK TEST WAS CARRIED OUT ON ALL TANK SUMP WELDS AFTER THE ROOT PASSES.
# TOTAL QUANTITY - 8 SUMP.
# Evaluation done 1 hour after the application of developer on weld side and other side penetrant. .
# FOUND ACCEPTABLE AS PER SPECIFICATION.

ACCEPT REJECT
TEST RESULT
TECHNICIAN : AKHIL R KRISHNAN CLIENT REP: AI/TPI:
LEVEL : LEVEL II NAME : NAME :
SIGNATURE : SIGNATURE : SIGNATURE :

DATE : 23.03.2022 DATE : DATE :

Report-GPI/NDT/DP/001, REV-6 (Rev-date : 28/02/2022)


Disclaimer : This report is a property of GPTI & valid only if signed and stamped by GPTI Technician. Under no Circumstances will GPTI accept
any liability for loss or damage; consequential or otherwise caused by use or misuse of the test results. The test report shall not be reproduced in full
or in part for any promotional or publicity purpose without the written consent from GPTI
LIQUID PENETRANT EXAMINATION REPORT
(CONTINUATION SHEET)

DATE : 3/28/2022 REPORT NO & Rev no: GPTI-NDE-PT-11423 PAGE : 2 OF 02

NDT RESULT
SL.NO. TANK NO. JOINT NAME DRG.NO. JOINT NO. WELDER NO. QUANTITY
REFERANCE
ACCEPT REJECT

SUMP NECK PLATE TO SUMP VN2154-101-A-


1 31-TK-001-A
COLLER PLATE FILLET WELD SOJ1 W.NO:037/036 1 ✓
DGN-0361-01
SUMP BUTT JOINT COLLER TO VN2154-101-A-
2 31-TK-001-A
COLLER CJ1 to CJ4 W.NO:037/036 1 ✓
DGN-0361-01
1 TANK
BOTTOM SUMP PLATE TO VN2154-101-A-
3 31-TK-001-A
SUMP NECK PLATE SMJ1 W.NO:037/036 1 ✓
DGN-0361-01

VN2154-101-A-
4 31-TK-001-A SUMP NECK BUTT JOINT SNJ1 W.NO:037/036 1 ✓
DGN-0361-01

SUMP NECK PLATE TO SUMP VN2154-101-A-


5 31-TK-001-B
COLLER PLATE FILLET WELD SOJ1 W.NO:037/036 1 ✓
DGN-0361-01

SUMP BUTT JOINT COLLER TO VN2154-101-A-


6 31-TK-001-B
COLLER CJ1 to CJ4 W.NO:037/036 1 ✓
DGN-0361-01
1 TANK
BOTTOM SUMP PLATE TO VN2154-101-A-
7 31-TK-001-B
SUMP NECK PLATE SMJ1 W.NO:037/036 1 ✓
DGN-0361-01

VN2154-101-A-
8 31-TK-001-B SUMP NECK BUTT JOINT SNJ1 W.NO:037/036 1 ✓
DGN-0361-01

SUMP NECK PLATE TO SUMP VN2154-101-A-


9 31-TK-002
COLLER PLATE FILLET WELD SOJ1 W.NO:037/036 2 ✓
DGN-0409-01

SUMP BUTT JOINT COLLER TO VN2154-101-A-


10 31-TK-002
COLLER CJ1 to CJ4 W.NO:037/036 2 ✓
DGN-0409-01
2 TANK
BOTTOM SUMP PLATE TO VN2154-101-A-
11 31-TK-002
SUMP NECK PLATE SMJ1 W.NO:037/036 2 ✓
DGN-0409-01

VN2154-101-A-
12 31-TK-002 SUMP NECK BUTT JOINT SNJ1 W.NO:037/036 2 ✓
DGN-0409-01

TECHNICIAN : AKHIL R KRISHNAN CLIENT REP. : AI / TPI :

LEVEL : II NAME : NAME :

SIGNATURE : SIGNATURE : SIGNATURE :

DATE : 28-03-2022 DATE : DATE :

Report-GPI/NDT/DP/001, REV-6 (Rev-date : 28/02/2022)


Disclaimer : This report is a property of GPTI & valid only if signed and stamped by GPTI Technician. Under no Circumstances will GPTI accept
any liability for loss or damage; consequential or otherwise caused by use or misuse of the test results. The test report shall not be reproduced in full
or in part for any promotional or publicity purpose without the written consent from GPTI
LIQUID PENETRANT EXAMINATION REPORT
(CONTINUATION SHEET)

DATE : REPORT NO & Rev no: PAGE :

PICTURES

TECHNICIAN : CLIENT REP. : AI / TPI :

LEVEL : NAME : NAME :

SIGNATURE : NAME : SIGNATURE :

DATE : DATE : DATE :

Report-GPI/NDT/DP/001, REV-4 (Rev-date : 08/05/2019)


Disclaimer : This report is valid only if signed and stamped by Level III or Level II and read our Terms and Condition