REPORT NO : MRCSB/DESB/DMSB/DPI/2022-027

DANAMIN (M) SDN BHD


PROCEDURE NO : DMSB/OP/Conv/DPI
INSPECTION DATE : 30.05.2022
LIQUID PENETRANT TEST REPORT
PAGE NO : 1 OF 1

Client : DOMINANT ENERGY SBN BHD Report Date : 30.05.2022


Project : RESET WP20B Location : MRCSB (UNIT 16)
Description : PIPING Specification/Code : ASME V ED 2019 Article 6
Drawing No : D-15-1360-007-021 Acceptance Criteria : ASME B31.3 PARA 344.4.2

Material : CARBON STEEL Surface Temperature : AMBIENT


Welding Process : GTAW Surface Condition : AS CLEAN
Welding Preparation : AS GRINDED Weld Type : BUTT WELD

Equipment/Test Technique

Penetrant Type : CHECMOR 240 (CHEMETTAL) Pre-Cleaning Application : WIPE/SPRAY


Cleaner (PT Remover) : S76 (CHEMETTAL) Penetrant Application : WIPE/SPRAY
Developer : LD7 (CHEMETTAL) Developer Application : SPRAY
Dwell Time : 10 MIN

RESULT
Result
No Joint Reference Interpretation Remark
Accept Reject
6"-P16021-A1A1
BEVEL

1 TP-01/16-003 NSD ACC NO RELEVANT INDICATION WAS FOUND


DURING INSPECTION TIME

2 TP-02/16-003 NSD ACC NO RELEVANT INDICATION WAS FOUND


DURING INSPECTION TIME

3 TP-03/16-003 NSD ACC NO RELEVANT INDICATION WAS FOUND


DURING INSPECTION TIME

Note :
- All measurement in mm
- Detail of the result see the attachment of photo or drawing

PREPARED BY REVIEWED BY APPROVED BY


SIGNATURE : SIGNATURE : SIGNATURE :
NAME : WAN IDHAM WAN OMAR
DATE : 30.05.2022 DATE : DATE :
QUALIFICATION : ASNT LVL II
NDT INSPECTOR NDT COORDINATOR/ QC INSPECTOR PMC REPRESENTATIVE