Professional Documents
Culture Documents
INSPEÇÃO MÊCANICA
MECHANICAL INSPECTION
APROVADO / APPROVED REPROVADO / REJECTED NA
LIMPEZA E CONSERVAÇÃO
APPROVED
CLEANLINESS AND CONSERVATION
TERMINAÇÕES EXTERNAS APPROVED
EXTERNAL TERMINATIONS
TERMINAÇÕES INTERNAS APPROVED
INTERNAL TERMINATIONS
CONEXÕES APPROVED
CONNECTIONS
SUPORTES
APPROVED
SUPPORTS
CONTINUIDADE APPROVED
CONTINUITY
ATERRAMENTO NA
EARTHING
RESISTÊNCIA DE ISOLAMENTO
CIRCUITO DE: PARA: C1 x C2 C1 x G +T C2 x G + T C1 x B C2 x B GxT CONTINUIDADE
CIRCUIT FROM: TO: (MΩ) (MΩ) (MΩ) (MΩ) (MΩ) (MΩ) CONTINUITY
TENSÃO APLICADA (KV) / APPLIED VOLTAGE (KV) TEMPO DE APLICAÇÃO(Min) / APPLIED TIME (Min)
0.5KV 1MIN
TEMPERATURA °C / TEMPERATURE °C UR (%)
8°C 50%
OBSERVAÇÕES / OBSERVATIONS
INSTRUMENTOS
Nº CERTIFICADOPADRÕES UTILIZADOS
Nº DE SÉRIE/ STANDARD INSTRUMENTS
ORGÃO OFICIAL USED VALIDADE
TAG CERTIFICATION Nº SERIAL Nº DEPARTMENT EXPIRATION
FLUKE 15B 2016-电-4087846 20271675 TIMT 21/09/2017
FLUCKE 1587 815005952-001 97540015 NIMM 12/12/2017
DT8835 JJ1611210902 12044497 DSIC 20/11/2017