DYE PENETRANT

TESTING
REPORT

CLIENT : PT. AGINCOURT RESOURCES REPORT NO. : 008/QC-EMK/AR/PT/VIII/2020


PROJECT : MARTABE RECYN PLANT PROJECT SHEET : 1 of 1
LOCATION : MARTABE RECYN PLANT PROJECT DATE OF INSP. : 05-AGUSTUS-2020

SURFACE PREPARATION
SUBJECT : Nozzle inlet TK-011 AS WELDED AS CAST
ITEM NO. : N1 inlet TK-011 AS ROLLED GRINDING
LINE/DWG NO. : see Weld Map AS FORGED MACHINING
MATERIAL : CARBON STEEL
TEMP. : AMBIENT STAGE OF EXAMINATION
CRITERIA : API 650 BEFORE / AFTER PWHT
: AFTER HYDROTEST

TECHNIQUE : COLOR CONTRAST FLUORESCENT


SOLVENT REMOVEL OTHER/

PRODUCT MANUFACTURER DWELL TIME


PENETRANT : SKL-SP1 MAGNAFLUX 10 MINUTES
DEVELOPER : SKD-S2 MAGNAFLUX 10 MINUTES
CLEANER : SKC-S MAGNAFLUX

PENETRANT APPLICATION
SPRAYING BLACK LIGHT INTENSITY : - μW / cm²
BRUSHING LIGHT INTENSITY : 1000 Lux
OTHER/ LIGHT METER S/N :

WELDER IND. SIZE ( mm ) RESULT WELDER IND. SIZE ( mm ) RESULT


PART OR WELD PART OR WELD
STAMP NO STAMP NO
LINIER ROUNDED ACC REJ LINIER ROUNDED ACC REJ

Nozzle N1
TK-011

N1-A IMN-102 - - - √
N1-B IMN-102 - - - √
N1-C IMN-102 - - - √
N1-D IMN-102 - - - √

NOTE : PT.EMK/IMN PT.AGINCOURT RESOURCES INTERTEK


Yuwantoni Srira Raharja Hasanudin
DATE: 8/6/2020 DATE: DATE: