ADVANCED OILFIELD TECHNOLOGY COMPANY LLC

LIQUID PENETRANT EXAMINATION REPORT


AOTC/FORMAT 010/WP 011/ REV-2

CLIENT: GE MIDDLE EAST FZE JOB CARD NO. : 10014653


PROJECT: REFURBISHMENT OF SERVICE COOLING WATER
LPTR. NO: AOTC/14653/PT/02
PUMP
DRAWING NO: -- DATE: 15/12/2017
PROCEDURE: AOTC/WP-011 PENETRANT TIME: 10 MINUTES
ACCEPTANCE STANDARD: ASME B 31.3 DRYING TIME: 05 MINUTES
METHOD OF LPT: SOLVENT REMOVABLE DEVELOPING TIME: 10 MINUTES
Sl. Item Description / Spool No / Size,
Welder No Observation Result
No. Weld No Sch/WT

1 Impeller AOTC/AI2/W001 --- NSD Acceptable

2 Suction cone AOTC/AI2/W001 --- NSD Acceptable

3 Bellmouth AOTC/AI2/W001 --- NSD Acceptable

4 Top coloum AOTC/AI2/W001 --- NSD Acceptable

" Carried out Liquid Penetrant Test on all weld areas of Impeller, Suction cone, Bellmouth and Top coloum of
Service cooling water pump ( POMP PG0031R 04 ) and observed no defects "

Penetrant type: Visible Consumables:-


Material : DSS Cleaner: SPOTCHECK, SKC-S, Batch no: 150709,
Surface condition : As welded Validity : Nov 2018
Penetrant: SPOTCHECK, SKL-SP2, Batch no:
Welding process: GTAW
150113,
Source of light : Day Light Validity : Feb 2018
Developer: SPOTCHECK, SKD-S2, Batch no:
Light intensity : > 1000 lux
150504,
Surface temperature : Ambient Validity : May 2018
AOTC CLIENT/TPI

Signature: Signature:

Name: Rahul R Pillai


Name:
Qualification: ASNT Level - II in PT

Date: 15/12/2017 Date: